By adopting the two-layer casting structure and construction method in advance during the installation of strong and weak electric boxes, the problems of hollow walls and difficult molding caused by dense pipelines are solved, and the wall and pipeline fixation is achieved with good integrity, which is improved. Construction quality.

CN119266534APending Publication Date: 2025-01-07THE THIRD CONSTR ENG CO LTD OF CHINA CONSTR SECOND ENG BUREAU +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411409163.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-10
Publication Date
2025-01-07

AI Technical Summary

Technical Problem

During the installation of strong and weak electric boxes, the wall is prone to hollowing when the pipeline is dense, and it is difficult to form during plastering, making it difficult to ensure the construction quality.

Method used

Adopt the pre-installation of strong and weak electric boxes into two-layer casting construction structure. By setting up upper beams or slabs above the wall and lower beams or slabs below, an installation groove that penetrates the upper and lower, and installs strong and weak electric boxes and pipelines in the installation groove. And pour concrete at the trough to ensure overall molding and fixing construction method.

Benefits of technology

It achieves good integrity of wall forming quality and internal pipeline fixation, avoids hollowing, and is suitable for the construction and installation of residential electric boxes and electric box pipelines, ensuring construction quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119266534A_ABST
    Figure CN119266534A_ABST
Patent Text Reader

Abstract

The invention relates to a construction structure and a construction method for pouring a strong and weak electricity box in advance in two layers, and belongs to the technical field of building construction.The construction structure for pouring the strong and weak electricity box in advance in two layers comprises a wall body, an upper-layer beam or plate is arranged above the wall body, and a lower-layer beam or plate is arranged below the wall body; the thickness of the wall body is 200mm, the front side of the wall body is provided with a vertically-through mounting groove, the thickness of the mounting groove is 100mm, the thickness of the wall body on the rear side of the mounting groove is 100mm, and a mounting back wall is formed; a strong and weak electricity box and an internal pipeline are installed in the installation groove, the four corners of the strong and weak electricity box are fixed to the installation back wall through screws, and the internal pipeline is connected into the threading pipe in a penetrating mode. The problems that grooving is labor-consuming and time-consuming when multiple pipelines are arranged at the installation position of the strong and weak electricity box, a wall body is prone to hollowing under the condition that the pipelines are dense, forming is difficult during plastering, and the construction quality is not easy to guarantee are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and particularly relates to a two-layer casting construction structure and a construction method for pre-installing a strong and weak current box. Background Art

[0002] At present, the conventional installation method of strong and weak current boxes is to embed the strong and weak current boxes into the masonry wall or pre-buried in the precast concrete blocks and then built on the wall, and then groove and embed the corresponding upper and lower connecting pipelines, and finally use mortar to plaster and seal and fix. This construction method usually makes the wall easy to hollow when the pipelines are dense, and it is difficult to shape during plastering, and it is not easy to ensure the construction quality. Summary of the invention

[0003] The object of the present invention is to provide A two-layer pouring construction structure and construction method for the advance installation of strong and weak electricity boxes solves the problems of time-consuming and labor-intensive grooving when there are many pipelines at the installation location of the strong and weak electricity boxes, the easy hollowing of the wall when the pipelines are dense, and the difficulty in shaping during plastering, making it difficult to ensure the construction quality.

[0004] To achieve the above object, the present invention adopts the following technical solution: A two-layer pouring construction structure for pre-installing a strong and weak current box comprises a wall, an upper beam or plate is arranged above the wall, and a lower beam or plate is arranged below the wall; The thickness of the wall is 200mm. A vertical through-going installation groove is opened on the front side of the wall. The thickness of the installation groove is 100mm. The thickness of the wall behind the installation groove is 100mm, forming an installation back wall. The installation slot is equipped with a strong and weak current box and internal pipelines. The four corners of the strong and weak current box are fixed to the installation back wall by screws, and the internal pipelines are connected to the threading tube; Reserved pipes are reserved on the upper beams or plates and the lower beams or plates, and the upper and lower parts of the threading pipes are connected with the reserved pipes through pipe joints; The installation groove and the front side of the wall are closed by formwork, and concrete is poured in the installation groove.

[0005] A further preferred technical solution: the wall is a masonry wall or a concrete wall.

[0006] A further preferred technical solution: the template is a wooden template.

[0007] The construction method of the strong and weak current box installed in advance is divided into two layers of pouring construction structure, and the steps are: Step 1: Wall layout and positioning; Determine the masonry position of the wall, the thickness of the wall is 200mm, and ensure that the wall can wrap the strong and weak electric boxes and internal pipelines; Step 2: wall construction; Determine the pre-installation position of the strong and weak electricity boxes and internal pipelines. When the wall is built to the pre-installation position of the strong and weak electricity boxes and internal pipelines, within the reserved width of the strong and weak electricity boxes and internal pipelines, only the 100mm thick part on the rear side is built to form the installation back wall, and the 100mm thick part on the front side forms the installation groove; Step 3: Install the strong and weak current boxes and internal pipelines; Install the strong and weak current boxes and internal pipelines in the installation slot, and ensure that the strong and weak current boxes are embedded in the installation back wall; Step 4: Support the formwork on one side; Set up the formwork at the installation groove position on the front side of the masonry wall and seal the formwork; Step 5: pouring concrete; After the formwork is set up, fine stone concrete is used to cast densely in the installation groove space. When the pipelines are dense and the fine stone concrete is difficult to cast densely, cement slurry can be used for pouring. The strong and weak electricity boxes and internal pipelines are cast into one through concrete to form a structural column. After the pouring is completed, ensure that the concrete poured later in the installation groove is anchored and embedded with the 100mm thick masonry wall built first.

[0008] Compared with the prior art, the present invention has the following characteristics and beneficial effects: 1. The present invention integrally casts the internal pipelines and the strong and weak electricity boxes into the wall, thereby ensuring the integrity of the wall surface, the molding quality of the finished surface and the integrity of the internal pipeline fixation. The invention has good integrity, is easy to control the quality, is not prone to hollowing, and is suitable for the construction and installation of the electric box and the electric box pipeline in the residence.

[0009] 2. When the wall thickness is 200mm, the present invention adopts a two-layer construction method in which half of the wall thickness is built by masonry and the other half is cast in situ. At the location of the strong and weak current boxes, the 200mm thick wall is divided into a 100mm thick wall and built in advance by masonry. The other 100mm thick wall is sealed on one side and cast with cement slurry after the internal pipelines are installed and arranged; the overall molding quality after the internal pipelines and strong and weak current boxes are installed is ensured. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 It is an elevation view of the two-layer pouring construction structure of the strong and weak current box installed in advance according to the present invention; Figure 2 The present invention Figure 1 1-1 section diagram in; Figure numerals: 1—wall, 2—upper beam or plate, 3—lower beam or plate, 4—installation groove, 5—installation back wall, 6—power and weak current boxes, 7—wire conduit, 8—formwork, 9—concrete. DETAILED DESCRIPTION

[0011] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0012] See also Figure 1 and Figure 2 As shown, the present invention provides a construction structure and construction method for pre-installation of strong and weak current boxes. The pre-installation of strong and weak current boxes is divided into two layers of casting construction structure, including a wall 1, the wall 1 is a masonry wall or a concrete wall, an upper beam or plate 2 is arranged above the wall 1, and a lower beam or plate 3 is arranged below the wall 1; the thickness of the wall 1 is 200mm, and an installation groove 4 is opened on the front side of the wall 1, which is through from top to bottom, and the thickness of the installation groove 4 is 100mm, and the thickness of the wall behind the installation groove 4 is 100mm, forming an installation back wall 5; a strong and weak current box 6 and internal pipelines are installed in the installation groove 4, the four corners of the strong and weak current box 6 are fixed to the installation back wall 5 by screws, and the internal pipelines are connected in the threading pipe 7; reserved pipes are reserved on the upper beam or plate 2 and the lower beam or plate 3, and the upper and lower parts of the threading pipe are connected with the reserved pipes through pipe joints; the installation groove 4 and the front side of the wall 1 are closed by a template 8, the template 8 is a wooden template, and concrete 9 is poured in the installation groove 4.

[0013] The construction method of the strong and weak current box of the present invention is to install the construction structure of the two-layer casting in advance, and the steps are as follows: Step 1: Wall layout and positioning; Determine the masonry position of the wall, the thickness of the wall is 200mm, and ensure that the wall can wrap the strong and weak electric boxes and internal pipelines; Step 2: wall construction; Determine the pre-installation position of the strong and weak electricity boxes and internal pipelines. When the wall is built to the pre-installation position of the strong and weak electricity boxes and internal pipelines, within the reserved width of the strong and weak electricity boxes and internal pipelines, only the 100mm thick part on the rear side is built to form the installation back wall, and the 100mm thick part on the front side forms the installation groove; Step 3: Install the strong and weak current boxes and internal pipelines; Install the strong and weak current boxes and internal pipelines in the installation slot, and ensure that the strong and weak current boxes are embedded in the installation back wall; Step 4: Support the formwork on one side; Set up the formwork at the installation groove position on the front side of the masonry wall and seal the formwork; Step 5: pouring concrete; After the formwork is set up, fine stone concrete is used to cast densely in the installation groove space. When the pipelines are dense and the fine stone concrete is difficult to cast densely, cement slurry can be used for pouring. The strong and weak electricity boxes and internal pipelines are cast into one through concrete to form a structural column. After the pouring is completed, ensure that the concrete poured later in the installation groove is anchored and embedded with the 100mm thick masonry wall built first.

[0014] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

[0015] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A two-layer pouring construction structure for the installation of strong and weak current boxes in advance, characterized in that: It comprises a wall (1), an upper beam or plate (2) is provided above the wall (1), and a lower beam or plate (3) is provided below the wall (1); The wall (1) has a thickness of 200 mm, a vertically penetrating installation groove (4) is provided on the front side of the wall (1), the thickness of the installation groove (4) is 100 mm, and the thickness of the wall behind the installation groove (4) is 100 mm, forming an installation back wall (5); A strong and weak current box (6) and internal pipelines are installed in the installation groove (4); the four corners of the strong and weak current box (6) are fixed to the installation back wall (5) by screws, and the internal pipelines are connected to the threading tube (7); A reserved pipe is reserved on both the upper beam or plate (2) and the lower beam or plate (3), and the upper and lower ends of the threading pipe are connected to the reserved pipe via pipe joints; The installation groove (4) and the front side of the wall (1) are closed by a template (8), and concrete (9) is poured in the installation groove (4).

2. The two-layer pouring construction structure for the pre-installation of the strong and weak current boxes according to claim 1 is characterized in that: The wall (1) is a masonry wall or a concrete wall.

3. The two-layer pouring construction structure for the pre-installation of the strong and weak current boxes according to claim 1 is characterized in that: The template (8) is a wooden template.

4. The construction method of the two-layer pouring construction structure for the pre-installation of the strong and weak current boxes according to claim 1 is characterized in that: The steps are: Step 1: Wall layout and positioning; Determine the masonry position of the wall, the thickness of the wall is 200mm, and ensure that the wall can wrap the strong and weak electric boxes and internal pipelines; Step 2: wall construction; Determine the pre-installation position of the strong and weak electricity boxes and internal pipelines. When the wall is built to the pre-installation position of the strong and weak electricity boxes and internal pipelines, within the reserved width of the strong and weak electricity boxes and internal pipelines, only the 100mm thick part on the rear side is built to form the installation back wall, and the 100mm thick part on the front side forms the installation groove; Step 3: Install the strong and weak current boxes and internal pipelines; Install the strong and weak current boxes and internal pipelines in the installation slot, and ensure that the strong and weak current boxes are embedded in the installation back wall; Step 4: Support the formwork on one side; Set up the formwork at the installation groove position on the front side of the masonry wall and seal the formwork; Step 5: pouring concrete; After the formwork is set up, fine stone concrete is used to cast densely in the installation groove space. When the pipelines are dense and the fine stone concrete is difficult to cast densely, cement slurry can be used for pouring. The strong and weak electricity boxes and internal pipelines are cast into one through concrete to form a structural column. After the pouring is completed, ensure that the concrete poured later in the installation groove is anchored and embedded with the 100mm thick masonry wall built first.