By dividing the work of open-pit coal mines into multiple sections and performing alternate steep and slow mining, the problem of limited equipment layout during combined steps is solved, and the production capacity and mining efficiency of open-pit coal mines are improved.

CN119266825APending Publication Date: 2025-01-07SHENHUA XINJIANG ENERGY CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411396239.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-08
Publication Date
2025-01-07

AI Technical Summary

Technical Problem

Equipment layout is easily restricted during combined steps mining in open-pit coal mines, which affects production capacity and mining efficiency.

Method used

By dividing the work into multiple sections and sorting and identifying the sections in a predetermined order, the combined step mining method is used to allow the steep mining section and the slow mining section to be mined alternately, thereby improving mining efficiency and reliability .

Benefits of technology

It effectively solved the problem of limited equipment layout, improved the production capacity and mining efficiency of open-pit coal mines, and achieved the technical effect of local steep mining.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119266825A_ABST
    Figure CN119266825A_ABST
Patent Text Reader

Abstract

The invention discloses an open pit coal mine mining treatment method and device. The method comprises the steps that mining demand information of a target coal mine is determined, and the mining demand information comprises mining operation demand information of the target coal mine and mining productivity demand information of the target coal mine; after determining a plurality of sections of a working side of the target coal mine according to the mining demand information, averagely dividing the working side into a plurality of sections by taking end sides on two sides of the working side as end points; sorting the plurality of sections according to a predetermined sequence, and adding identifiers to the sorted plurality of sections to obtain a plurality of identified sections; and controlling the mining equipment of the target coal mine to perform mining treatment on the working side from the first section of the plurality of identification sections as a starting end until the last section of the plurality of identification sections is completely mined. The technical problems that in the prior art, during combined step mining, equipment arrangement is prone to being limited, the production capacity of an opencast coal mine is affected, and the mining efficiency of the opencast coal mine is affected are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of coal mining, and in particular to an open-pit coal mining processing method and device. Background Art

[0002] The slope angle of the working side of an open-pit coal mine affects the amount of advance stripping. The traditional working side slow-wall mining has a small working side slope angle, which leads to an increase in the amount of advance stripping and an increase in the production stripping ratio. Combined steps are an important method to achieve steep working side mining, that is, the working side steps are divided into several groups. In each group, there is a working flat plate with the minimum working flat plate width, and the width of the remaining steps is reduced to the non-working flat plate width, reducing the horizontal projection length of the working side. The excavator is concentrated on the working flat plate. The excavator mines each step from top to bottom in the group. When the excavator mines the last step in the group, it returns to the first step to work and strip the next stripping belt. The number of combined steps is inversely proportional to the size of the working side slope angle. The more combined steps there are, the greater the working side slope angle is, the less advance stripping is, the lower the production stripping ratio is, the higher the production capacity of the open-pit mine is, the more equipment is required, and the equipment layout will be restricted during combined step mining, which will affect the production capacity of the open-pit coal mine.

[0003] To address the above-mentioned problems, no effective solution has been proposed yet. Summary of the invention

[0004] The embodiment of the present invention provides an open-pit coal mining processing method and device to at least solve the technical problem in the related art that the equipment layout is easily restricted during combined bench mining, which affects the production capacity of the open-pit coal mine and affects the mining efficiency of the open-pit coal mine.

[0005] According to one aspect of an embodiment of the present invention, there is provided an open-pit coal mine mining and processing method, comprising: determining mining demand information of a target coal mine, wherein the mining demand information comprises: mining operation requirement information of the target coal mine, mining capacity requirement information of the target coal mine; after determining a plurality of sections of a working gang of the target coal mine according to the mining demand information, taking the two side ends of the working gang as endpoints, dividing the working gang into the plurality of sections on an even basis; sorting the plurality of sections in a predetermined order, and adding identifications to the sorted plurality of sections to obtain a plurality of identification sections; and controlling the mining equipment of the target coal mine to perform mining processing on the working gang from the first section of the plurality of identification sections as the starting end, until the last section of the plurality of identification sections is mined.

[0006] Optionally, multiple sections of the working gang of the target coal mine are determined according to the mining demand information, including: determining the working line length corresponding to the working gang; determining the minimum working line length of the mining equipment; determining the number of sections of the working gang according to the working line length and the minimum working line length; dividing the working gang into the multiple sections according to the number of sections.

[0007] Optionally, after sorting the multiple sections in a predetermined order and adding labels to the sorted multiple sections to obtain multiple identified sections, the open-pit coal mining processing method also includes: determining that the first section among the multiple identified sections is a steep wall mining section, and determining that the last section among the multiple identified sections is a gentle wall mining section.

[0008] Optionally, in the case that there are three sections, the multiple sections include: the first section, the second section and the last section, and the mining equipment of the target coal mine is controlled to start from the first section of the multiple identified sections to mine the working wall until the last section of the multiple identified sections is mined, including: after the mining equipment advances forward a predetermined length in the first section, determining that the first section is converted into a gentle wall mining section, and the second section is converted into a steep wall mining section; during the process of the mining equipment mining the second section, if the mining equipment advances forward the predetermined length, determining that the second section is converted into a gentle wall mining section, and the last section is converted into a steep wall mining section; repeating the above steps to mine the first section, the second section and the last section until the last section is mined.

[0009] Optionally, the upper stripping steps of the multiple sections adopt a combined step mining method, and every two of the upper stripping steps are divided into a group, wherein one of every two upper stripping steps retains the minimum working flat plate width, and the other step retains the non-working flat plate width.

[0010] According to another aspect of an embodiment of the present invention, an open-pit coal mine mining and processing device is also provided, including: a first determination module, used to determine the mining demand information of the target coal mine, wherein the mining demand information includes: the mining operation requirement information of the target coal mine, and the mining capacity requirement information of the target coal mine; a division module, used to determine the multiple sections of the working gang of the target coal mine according to the mining demand information, and then divide the working gang into the multiple sections evenly with the two side ends of the working gang as endpoints; an identification module, used to sort the multiple sections in a predetermined order, and add identifications to the sorted multiple sections to obtain multiple identified sections; a mining module, used to control the mining equipment of the target coal mine to mine the working gang from the first section of the multiple identified sections as the starting end until the last section of the multiple identified sections is mined.

[0011] Optionally, the division module includes: a first determination unit, used to determine the working line length corresponding to the working gang; a second determination unit, used to determine the minimum working line length of the mining equipment; a third determination unit, used to determine the number of sections of the working gang according to the working line length and the minimum working line length; and a division unit, used to divide the working gang into the multiple sections according to the number of sections.

[0012] Optionally, the open-pit coal mine mining and processing device also includes: a second determination module, which is used to sort the multiple sections in a predetermined order, and add labels to the sorted multiple sections, and after obtaining multiple identified sections, determine that the first section among the multiple identified sections is a steep wall mining section, and determine that the last section among the multiple identified sections is a gentle wall mining section.

[0013] Optionally, the mining module comprises: a fourth determination unit, used to determine that the first section is converted into a gentle-wall mining section, and the second section is converted into a steep-wall mining section after the mining equipment advances forward a predetermined length in the first section; a fifth determination unit, used to determine that the second section is converted into a gentle-wall mining section, and the last section is converted into a steep-wall mining section when the mining equipment advances forward the predetermined length during the process of mining the second section; a mining unit, used to repeat the above steps to mine the first section, the second section and the last section until the last section is mined.

[0014] Optionally, the upper stripping steps of the multiple sections adopt a combined step mining method, and every two of the upper stripping steps are divided into a group, wherein one of every two upper stripping steps retains the minimum working flat plate width, and the other step retains the non-working flat plate width.

[0015] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is further provided, wherein the computer-readable storage medium includes a stored program, wherein the program executes any one of the above-mentioned open-pit coal mining processing methods.

[0016] According to another aspect of an embodiment of the present invention, a processor is further provided, wherein the processor is used to run a program, wherein the program executes any one of the above-mentioned open-pit coal mining processing methods when running.

[0017] According to another aspect of an embodiment of the present invention, a computer program product is provided, comprising computer instructions, wherein when the computer instructions are executed by a processor, any one of the above-mentioned open-pit coal mining processing methods is executed.

[0018] In an embodiment of the present invention, mining demand information of a target coal mine is determined, wherein the mining demand information includes: mining operation requirement information of the target coal mine, mining capacity requirement information of the target coal mine; after determining multiple sections of the working gang of the target coal mine according to the mining demand information, the working gang is evenly divided into multiple sections with the two side ends of the working gang as endpoints; the multiple sections are sorted in a predetermined order, and identifications are added to the sorted multiple sections to obtain multiple identification sections; the mining equipment of the target coal mine is controlled to mine the working gang from the first section of the multiple identification sections as the starting end until the last section of the multiple identification sections is mined. Through the technical scheme provided by the present invention, the working wall is divided into different sections with the end walls on both sides of the mining site as end points, and mining is carried out by adopting a combined step mining method, advancing forward step by step from top to bottom, so that the steep wall mining section and the slow mining section are mined alternately, thereby achieving the technical effect of local steep wall mining of the working wall of the open-pit coal mine, improving the efficiency and reliability of mining, and further solving the technical problem in the related technology that the equipment layout is easily restricted during combined step mining, which affects the production capacity of the open-pit coal mine and affects the mining efficiency of the open-pit coal mine. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0020] Figure 1 It is a hardware structure block diagram of a mobile terminal of an open-pit coal mining processing method according to an embodiment of the present invention;

[0021] Figure 2 is a flow chart of an open-pit coal mining processing method according to an embodiment of the present invention;

[0022] Figure 3 is a schematic diagram of the division of work sections according to an embodiment of the present invention;

[0023] Figure 4 is a schematic diagram of steep slope mining in Section 1 according to an embodiment of the present invention;

[0024] Figure 5 Schematic diagram of 2-section steep slope mining according to an embodiment of the present invention;

[0025] Figure 6 is a schematic diagram of three-section steep slope mining according to an embodiment of the present invention;

[0026] Figure 7 is a schematic diagram of optional steep slope mining in Section 1 according to an embodiment of the present invention;

[0027] Figure 8 is a schematic diagram of optional work area division according to an embodiment of the present invention;

[0028] Fig. 9 is a schematic diagram of the mobilization of mining equipment according to an embodiment of the present invention;

[0029] Fig.10 Schematic diagram of an open-pit coal mining and processing device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0030] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0031] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0032] As introduced in the background technology, in the related art, the equipment layout is easily restricted during combined bench mining, which affects the production capacity of open-pit coal mines and the mining efficiency of open-pit coal mines. In view of the above defects, an open-pit coal mining processing method and device, a computer-readable storage medium, a processor and a computer program product are provided in the embodiments of the present invention.

[0033] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0034] The method embodiments provided in the embodiments of the present invention can be executed in a mobile terminal, a computer terminal or a similar computing device. Taking running on a mobile terminal as an example, Figure 1 1 is a hardware structure block diagram of a mobile terminal of an open-pit coal mining processing method according to an embodiment of the present invention. Figure 1 As shown, the mobile terminal may include one or more ( Figure 1 Only one is shown in the figure) a processor 102 (the processor 102 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA) and a memory 104 for storing data, wherein the mobile terminal may also include a transmission device 106 and an input / output device 108 for communication functions. It can be understood by those skilled in the art that Figure 1 The structure shown is only for illustration and does not limit the structure of the mobile terminal. Figure 1 More or fewer components as shown, or with Figure 1 Different configurations are shown.

[0035] The memory 104 can be used to store computer programs, for example, software programs and modules of application software, such as the computer program corresponding to the open-pit coal mining processing method in the embodiment of the present invention. The processor 102 executes various functional applications and data processing by running the computer program stored in the memory 104, that is, the above method is implemented. The memory 104 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 104 may further include a memory remotely arranged relative to the processor 102, and these remote memories can be connected to the mobile terminal via a network. Examples of the above-mentioned network include but are not limited to the Internet, an intranet, a local area network, a mobile communication network, and a combination thereof. The transmission device 106 is used to receive or send data via a network. The above-mentioned specific example of the network may include a wireless network provided by a communication provider of the mobile terminal. In one example, the transmission device 106 includes a network adapter (Network Interface Controller, referred to as NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission device 106 may be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.

[0036] According to an embodiment of the present invention, a method embodiment of an open-pit coal mining processing method is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0037] Figure 2 Flow chart of the open-pit coal mining processing method according to an embodiment of the present invention. Figure 2 As shown, the method comprises the following steps:

[0038] Step S202, determining the mining demand information of the target coal mine, wherein the mining demand information includes: mining operation requirement information of the target coal mine, and mining capacity requirement information of the target coal mine.

[0039] In this embodiment, by understanding the mining demand information of the target coal mine, a more scientific and reasonable mining plan can be formulated to maximize the mining efficiency and production capacity of the coal mine. The mining operation requirement information can help determine suitable mining methods and equipment to ensure efficient and safe mining operations. The mining capacity requirement information can help plan production plans and resource allocation to meet the production capacity needs of the coal mine and improve production efficiency.

[0040] Optionally, the mining capacity requirement information of the above-mentioned target coal mine may include but is not limited to: daily output, equipment and facilities, staffing, address conditions and monthly mining volume; the mining operation requirement information of the above-mentioned target coal mine may include: coal mine mining operations need to comply with relevant safety regulations and standards to ensure the safety of operators, appropriate equipment and tools need to be used in mining operations to ensure operation efficiency and quality, mining operations need to be carried out in accordance with mine planning and design plans to ensure effective utilization and protection of resources, etc.

[0041] It should be noted that the mining operation requirement information of the above-mentioned target coal mine may include but is not limited to the above-mentioned contents, which will not be repeated here.

[0042] Step S204, after determining multiple sections of the working side of the target coal mine according to the mining demand information, the working side is evenly divided into multiple sections with the two side ends of the working side as endpoints.

[0043] In this embodiment, by evenly dividing the working gang into multiple sections, the mining progress and coal output of each section can be effectively controlled to avoid excessive accumulation of coal in the mine, which may cause safety hazards. By dividing the working gang into multiple sections, the mining process can be better organized and managed, the mining efficiency can be improved, and the full utilization of coal mine resources can be ensured.

[0044] Step S206 , sorting the multiple segments according to a predetermined order, and adding labels to the sorted multiple segments to obtain multiple labeled segments.

[0045] In this embodiment, multiple sections are sorted in a predetermined order and marked with labels, so that the ore mining process can be managed more effectively. By sorting the sections, it is possible to ensure that mining is carried out in the correct order, thereby improving mining efficiency and safety. Adding labels can accurately identify each section and avoid confusion and erroneous operations, thereby effectively organizing and monitoring the mining process.

[0046] Step S208, controlling the mining equipment of the target coal mine to mine the working section from the first section of the multiple identified sections as the starting end until the last section of the multiple identified sections is mined.

[0047] In this embodiment, by mining in the order of the marked sections, the mining process of the coal mine can be ensured to be orderly, confusion and wrong mining sequence can be avoided, the safety and stable mining of the mine can be ensured, and the mining progress and scope of the coal mine can be effectively controlled.

[0048] Through the above steps, the mining demand information of the target coal mine is determined, wherein the mining demand information includes: the mining operation requirement information of the target coal mine, the mining capacity requirement information of the target coal mine; after determining the multiple sections of the working wall of the target coal mine according to the mining demand information, the working wall is evenly divided into multiple sections with the two side end walls of the working wall as the endpoints; the multiple sections are sorted in a predetermined order, and identifications are added to the sorted multiple sections to obtain multiple identification sections; the mining equipment of the target coal mine is controlled to mine the working wall from the first section of the multiple identification sections as the starting end until the last section of the multiple identification sections is mined, so as to achieve the purpose of dividing the working wall into different sections with the two side end walls of the mining site as the endpoints, mining by adopting the combined step mining method, advancing step by step from top to bottom, so that the steep wall mining section and the slow mining section are mined alternately, thereby achieving the technical effect of local steep wall mining of the working wall of the open-pit coal mine, and improving the efficiency and reliability of mining.

[0049] The technical solution provided by the embodiment of the present invention solves the technical problem in the related art that the equipment layout is easily restricted during combined bench mining, which affects the production capacity of the open-pit coal mine and affects the mining efficiency of the open-pit coal mine.

[0050] According to the above embodiment of the present invention, multiple sections of the working gang of the target coal mine are determined based on the mining demand information, including: determining the working line length corresponding to the working gang; determining the minimum working line length of the mining equipment; determining the number of sections of the working gang based on the working line length and the minimum working line length; dividing the working gang into multiple sections according to the number of sections.

[0051] In this embodiment, the working line length corresponding to the working gang is determined to ensure the order of the working area in the mine, and the minimum working line length of the mining equipment is determined to ensure the normal operation and operating efficiency of the equipment. The number of sections of the working gang is determined according to the working line length and the minimum working line length, which can effectively plan and manage the mining operations in the mine. Dividing the working gang into multiple sections can arrange and dispatch operations in a targeted manner, thereby improving overall mining efficiency and safety.

[0052] Figure 3 Schematic diagram of work area division according to an embodiment of the present invention. Figure 3 As shown in the figure, the working area is divided into several sections according to the operation requirements and production capacity requirements. The length of the working line is L. The section length is determined according to the minimum working line length of the open-pit mining equipment selected. min , then the number of sections that the work group can be divided into is i (i = 1, 2, 3, ..., n), and the calculation method of the number of sections i is:

[0053] According to the above embodiment of the present invention, after sorting multiple sections in a predetermined order and adding labels to the sorted multiple sections to obtain multiple identified sections, the open-pit coal mine mining processing method also includes: determining that the first section among the multiple identified sections is a steep wall mining section, and determining that the last section among the multiple identified sections is a gentle wall mining section.

[0054] In this embodiment, determining that the first section among multiple identified sections is a steep wall mining section and the last section is a gentle wall mining section can ensure safe and efficient mining of the mine. The steep wall mining section is usually a slope or steep slope section in a coal mine, which is suitable for high-yield coal mining, while the gentle wall mining section is usually a flat section, which is suitable for transportation and processing of coal. By clearly distinguishing between the steep wall mining section and the gentle wall mining section, the coal mining process can be made more orderly and efficient.

[0055] Figure 4 Schematic diagram of steep slope mining in section 1 according to an embodiment of the present invention, Figure 4 As shown, with the two side end walls as endpoints, the working wall is divided into three parts equally, namely Section 1, Section 2 and Section 3. Section 1 on the left side of the working wall is set as the steep wall mining section, and the upper stripping step adopts the combined step mining method. The two stripping steps are divided into a group, one of which retains the minimum working flat plate width, and the other step retains the non-working flat plate width. The right side of the working wall is set as the gentle wall mining section, and each flat plate retains the minimum working flat plate width.

[0056] According to the above embodiment of the present invention, in the case that there are three multiple sections, the multiple sections include: a first section, a second section and a last section, and the mining equipment of the target coal mine is controlled to start from the first section of the multiple identified sections, and to perform mining processing on the working wall until the last section of the multiple identified sections is mined, including: after the mining equipment advances forward a predetermined length in the first section, determining that the first section is converted into a gentle wall mining section, and the second section is converted into a steep wall mining section; in the process of the mining equipment mining the second section, if the mining equipment advances forward a predetermined length, determining that the second section is converted into a gentle wall mining section, and the last section is converted into a steep wall mining section; repeating the above steps to mine the first section, the second section and the last section until the last section is mined.

[0057] In this embodiment, by converting different sections into gentle-slope mining sections and steep-slope mining sections respectively, the performance of the mining equipment can be fully utilized to improve mining efficiency and safety. Repeated mining of each section can maximize the mining rate of coal resources and ensure that coal resources are fully utilized. The geological conditions and coal seam characteristics of different sections can be effectively utilized to achieve efficient mining of coal resources.

[0058] Figure 5 Schematic diagram of 2-section steep slope mining according to an embodiment of the present invention, Figure 5 As shown, when the working wall and steep wall mining section advance forward 50m (i.e., the predetermined length), Section 1 (i.e., the first section) becomes the gentle wall mining section, each flat plate retains the minimum working flat plate width, and Section 2 (i.e., the second section) becomes the steep wall mining section, which is mined using the combined step method.

[0059] Figure 6 3 is a schematic diagram of steep slope mining in three sections according to an embodiment of the present invention, as shown in FIG. Figure 6 As shown, when the steep wall mining section in the middle of the working wall advances 50m, Section 2 becomes a gentle wall mining section, each flat plate retains the minimum working flat plate width, and Section 3 (i.e., the last section) becomes a steep wall mining section, which is mined using the combined step method.

[0060] Figure 7 Schematic diagram of optional steep slope mining in Section 1 according to an embodiment of the present invention, Figure 7 As shown, according to the layout of the surface system of the open-pit mine, the position of the steep wall mining section can be flexibly adjusted. For example, after completing a mining cycle of steep wall mining in section 3, it is restored to the gentle wall mining section, and section 1 is set as the steep wall mining section. After that, each section alternates with steep wall mining.

[0061] It should be noted that the above-mentioned mining takes three sections as an example. The mining sections may include but are not limited to three sections, which can be adjusted according to the actual project. Open-pit coal mines have large production capacity and a large number of sections. The purpose of the above-mentioned alternation is to ensure that the advancement of the working gang and the inner row is consistent and to release the inner row space.

[0062] Figure 8 Schematic diagram of optional work area division according to an embodiment of the present invention. Figure 8 As shown in the figure, the working area is divided into several sections according to the operation requirements and production capacity requirements. The length of the working line is L. The section length is determined according to the minimum working line length of the open-pit mining equipment selected. min , then the number of sections that the work group can be divided into is i (i=1,2,3,…,n).

[0063] This embodiment is described by taking three sections as an example. Fig. 9 Schematic diagram of the mining equipment mobilization according to an embodiment of the present invention, such as Fig. 9As shown, with the two side end walls as endpoints, the working wall is divided into three parts equally, namely Section 1, Section 2 and Section 3. Section 1 on the left side of the working wall is set as the steep wall mining section, and the upper stripping step adopts the combined step mining method. The two stripping steps are divided into a group, one of which retains the minimum working flat plate width, and the other step retains the non-working flat plate width. The right side of the working wall is set as the gentle wall mining section, and each flat plate retains the minimum working flat plate width.

[0064] It should be noted that since steep wall mining will affect the advancement rate, the steep wall mining section has certain requirements on the number of equipment. When the advancement rate of Section 1 and Sections 2 and 3 is quite different, Sections 2 and 3 need to transfer some equipment to the steep wall mining section to increase the advancement rate of the steep wall mining section, realize dynamic regulation of the production stripping ratio, and reduce the impact on production organization.

[0065] According to the above embodiment of the present invention, the upper stripping steps of multiple sections adopt a combined step mining method, and every two of the upper stripping steps are divided into a group, wherein one of every two upper stripping steps retains the minimum working flat plate width, and the other step retains the non-working flat plate width.

[0066] In this embodiment, by combining the step mining method, miners can be more stable and safe when performing mining operations. The design of retaining the minimum working flat plate width and non-working flat plate width can ensure that miners have enough space to work while reducing waste and losses in the coal mining process.

[0067] The technical solution provided by the above embodiment of the present invention solves the following problems: Under the existing working ridge slow ridge mining conditions, the amount of advanced stripping is large during the advancement of the working ridge, the production stripping ratio increases, and the economic benefits are reduced. If the overall steep ridge mining method of the working ridge is adopted, although the production stripping ratio can be reduced, it will affect the production capacity of the open-pit coal mine and increase the difficulty of production organization and management, especially in open-pit coal mines with large production capacity. It is more difficult to implement. At the same time, it has the following beneficial effects: the working ridge is divided into different sections, and the local steep ridge mining of the working ridge is realized by controlling the width of the flat plate in different sections and adjusting the mining procedure. Under the conditions of ensuring the production organization of the open-pit coal mine, especially under the influence of increased production capacity and increased number of equipment, the production stripping ratio is reduced and the economic benefits are improved.

[0068] As can be seen from the above, in the embodiment of the present invention, the end walls on both sides of the mining field are used as endpoints to divide the entire working wall into several mining sections. Among them, the width of the working flat plate in the slow wall mining section is greater than or equal to the minimum working flat plate width, and the steep wall mining section adopts a combined step mining method, and the working wall steps are divided into several groups. In each group of steps, only one flat plate has the minimum working flat plate width, and the widths of other flat plates are reserved according to the width of the non-working flat plate. When the working flat plate completes the operation of a mining belt, the step changes from a working step to a non-working step, and the flat plate width is adjusted to the non-working flat plate width. The next step changes from a non-working step to a working step, and all equipment moves to the next step, and the width is adjusted to the minimum working flat plate width. Mining is carried out step by step from top to bottom. When all steps in the group are advanced 50m forward, the slow mining section becomes the steep wall mining section, and the steep wall mining section becomes the slow mining section. The steep wall mining section and the slow mining section are mined alternately.

[0069] That is, the technical solution provided by the embodiment of the present invention comprehensively considers various factors, mines steep walls in some sections of the working wall, and combines it with other slow mining sections to reduce the amount of advanced stripping, while reducing the production stripping ratio and taking into account production organization and management, thereby improving the economic benefits of the mine. The slope angle of the working wall in some sections can be directly increased through the local steep wall mining procedure of the working wall, while reducing the amount of advanced stripping and reducing the production stripping ratio while considering the difficulty of production organization and management, thereby effectively improving the economic benefits of the mine.

[0070] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present application.

[0071] Through the description of the above implementation methods, those skilled in the art can clearly understand that the method according to the above embodiment can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, magnetic disk, optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, computer, server, or network device, etc.) to execute the methods of each embodiment of the present application.

[0072] According to an embodiment of the present invention, an open-pit coal mining and processing device for implementing the above-mentioned open-pit coal mining and processing method is also provided. Fig.10 Schematic diagram of an open-pit coal mining and processing device according to an embodiment of the present invention. Fig.10 As shown, the device includes: a first determination module 1001, a division module 1003, an identification module 1005 and a mining module 1007. The coal mining process is described below.

[0073] The first determination module 1001 is used to determine the mining demand information of the target coal mine, wherein the mining demand information includes: mining operation requirement information of the target coal mine and mining capacity requirement information of the target coal mine;

[0074] A division module 1003 is used to divide the working section into multiple sections evenly with the two side sections of the working section as endpoints after determining the multiple sections of the working section of the target coal mine according to the mining demand information;

[0075] The identification module 1005 is used to sort the multiple segments according to a predetermined order, and add identifications to the sorted multiple segments to obtain multiple identification segments;

[0076] The mining module 1007 is used to control the mining equipment of the target coal mine to start from the first section of the multiple identified sections and perform mining processing on the working section until the last section of the multiple identified sections is mined.

[0077] It should be noted here that the above-mentioned first determination module 1001, division module 1003, identification module 1005 and mining module 1007 correspond to steps S202 to S208 in the above-mentioned embodiment, and the four modules and the corresponding steps implement the same instances and application scenarios, but are not limited to the contents disclosed in the above-mentioned embodiment.

[0078] As can be seen from the above, in the scheme recorded in the above embodiment of the present invention, first, the first determination module can be used to determine the mining demand information of the target coal mine, wherein the mining demand information includes: the mining operation requirement information of the target coal mine, and the mining capacity requirement information of the target coal mine; then, the division module can be used to determine the multiple sections of the working gang of the target coal mine according to the mining demand information, and then the working gang is evenly divided into multiple sections with the two side ends of the working gang as endpoints; secondly, the identification module can be used to sort the multiple sections in a predetermined order, and add identifications to the sorted multiple sections to obtain Multiple identification sections; finally, the mining module can be used to control the mining equipment of the target coal mine to start from the first section of the multiple identification sections, and to mine the working wall until the last section of the multiple identification sections is mined. The working wall is divided into different sections with the end walls on both sides of the mining site as the end points, and the combined step mining method is used for mining. The mining is carried out step by step from top to bottom, so that the steep wall mining section and the slow mining section are mined alternately, thereby achieving the technical effect of local steep wall mining of the working wall of the open-pit coal mine and improving the efficiency and reliability of mining.

[0079] The technical solution provided by the embodiment of the present invention solves the technical problem in the related art that the equipment layout is easily restricted during combined bench mining, which affects the production capacity of the open-pit coal mine and affects the mining efficiency of the open-pit coal mine.

[0080] In an optional embodiment, the division module includes: a first determination unit, used to determine the working line length corresponding to the working gang; a second determination unit, used to determine the minimum working line length of the mining equipment; a third determination unit, used to determine the number of sections of the working gang according to the working line length and the minimum working line length; a division unit, used to divide the working gang into multiple sections according to the number of sections.

[0081] In an optional embodiment, the open-pit coal mine mining and processing device also includes: a second determination module, which is used to sort the multiple sections in a predetermined order, and add labels to the sorted multiple sections, and after obtaining the multiple identified sections, determine that the first section of the multiple identified sections is a steep wall mining section, and determine that the last section of the multiple identified sections is a gentle wall mining section.

[0082] In an optional embodiment, the mining module includes: a fourth determination unit, used to determine that the first section is converted into a gentle-wall mining section, and the second section is converted into a steep-wall mining section after the mining equipment advances a predetermined length in the first section; a fifth determination unit, used to determine that the second section is converted into a gentle-wall mining section, and the last section is converted into a steep-wall mining section when the mining equipment advances a predetermined length during the process of mining the second section; a mining unit, used to repeat the above steps to mine the first section, the second section and the last section until the last section is mined.

[0083] In an optional embodiment, the upper stripping steps of multiple sections are mined in a combined step manner, and every two of the upper stripping steps are divided into a group, wherein one of every two upper stripping steps retains the minimum working flat plate width, and the other step retains the non-working flat plate width.

[0084] According to another aspect of an embodiment of the present invention, a processor is further provided, and the processor is used to run a program, wherein when the program is run, any one of the above-mentioned open-pit coal mining processing methods is executed.

[0085] According to another aspect of an embodiment of the present invention, a computer program product is provided, comprising computer instructions, which, when executed by a processor, execute any one of the above-mentioned open-pit coal mining processing methods.

[0086] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is provided, the computer-readable storage medium comprising a stored program, wherein the program executes any one of the above-mentioned open-pit coal mining processing methods.

[0087] Optionally, in this embodiment, the computer-readable storage medium may be located in any one of the computer terminals in a computer terminal group in a computer network, or in any one of the communication devices in a communication device group.

[0088] Optionally, in this embodiment, the computer-readable storage medium is configured to store program code for executing the following steps: determining mining demand information of the target coal mine, wherein the mining demand information includes: mining operation requirement information of the target coal mine, mining capacity requirement information of the target coal mine; after determining multiple sections of the working gang of the target coal mine according to the mining demand information, taking the two side ends of the working gang as endpoints, dividing the working gang into multiple sections evenly; sorting the multiple sections in a predetermined order, and adding identifiers to the sorted multiple sections to obtain multiple identified sections; controlling the mining equipment of the target coal mine to mine the working gang from the first section of the multiple identified sections as the starting end until the last section of the multiple identified sections is mined.

[0089] Optionally, in this embodiment, the computer-readable storage medium is configured to store program codes for executing the following steps: determining the working line length corresponding to the working gang; determining the minimum working line length of the mining equipment; determining the number of sections of the working gang based on the working line length and the minimum working line length; dividing the working gang into multiple sections based on the number of sections.

[0090] Optionally, in this embodiment, the computer-readable storage medium is configured to store program code for performing the following steps: determining the first segment of multiple identified segments as a steep wall mining segment, and determining the last segment of multiple identified segments as a gentle wall mining segment.

[0091] Optionally, in this embodiment, the computer-readable storage medium is configured to store program code for executing the following steps: after the mining equipment advances a predetermined length in the first section, determining that the first section is converted into a gentle-wall mining section, and the second section is converted into a steep-wall mining section; during the process of the mining equipment mining the second section, if the mining equipment advances a predetermined length, determining that the second section is converted into a gentle-wall mining section, and the last section is converted into a steep-wall mining section; repeating the above steps to mine the first section, the second section, and the last section until the last section is mined.

[0092] Optionally, in this embodiment, the computer-readable storage medium is configured to store program code for performing the following steps: the upper stripping steps of multiple sections are mined using a combined step mining method, and every two of the upper stripping steps are divided into a group, wherein one of every two upper stripping steps retains the minimum working flat plate width, and the other step retains the non-working flat plate width.

[0093] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.

[0094] In the above embodiments of the present invention, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0095] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.

[0096] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.

[0097] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0098] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or optical disk and other media that can store program codes.

[0099] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A method for processing open-pit coal mining, characterized in that: include: Determine the mining demand information of the target coal mine, wherein the mining demand information includes: mining operation requirement information of the target coal mine and mining capacity requirement information of the target coal mine; After determining a plurality of sections of the working side of the target coal mine according to the mining demand information, taking the two side ends of the working side as endpoints, the working side is evenly divided into the plurality of sections; Sorting the multiple segments according to a predetermined order, and adding labels to the sorted multiple segments to obtain multiple labeled segments; The mining equipment of the target coal mine is controlled to start from the first section of the multiple identified sections and to perform mining processing on the working section until the last section of the multiple identified sections is mined.

2. The open-pit coal mining method according to claim 1, characterized in that: Determining multiple sections of the working section of the target coal mine according to the mining demand information includes: Determine the length of the working line corresponding to the working gang; Determining the minimum working line length of the mining equipment; Determine the number of sections of the working gang according to the working line length and the minimum working line length; The work group is divided into the plurality of sections according to the number of sections.

3. The open-pit coal mining method according to claim 1, characterized in that: After the plurality of segments are sorted in a predetermined order and identifications are added to the sorted plurality of segments to obtain a plurality of identification segments, the method further includes: The first section among the multiple identified sections is determined to be a steep-slope mining section, and the last section among the multiple identified sections is determined to be a gentle-slope mining section.

4. The open-pit coal mining method according to claim 3, characterized in that: In the case where the number of the multiple sections is three, the multiple sections include: the first section, the second section and the last section, controlling the mining equipment of the target coal mine to mine the working section from the first section of the multiple identified sections as the starting end until the last section of the multiple identified sections is mined, including: After the mining equipment advances forward a predetermined length in the first section, determining that the first section is converted into a gentle-wall mining section and the second section is converted into a steep-wall mining section; During the mining process of the second section by the mining equipment, if the mining equipment is advanced to the predetermined length, it is determined that the second section is converted into a gentle-wall mining section, and the last section is converted into a steep-wall mining section; Repeat the above steps to mine the first section, the second section and the last section until the last section is mined.

5. The open-pit coal mining method according to claim 3, characterized in that: The upper stripping steps of the multiple sections adopt a combined step mining method, and every two of the upper stripping steps are divided into a group, wherein one step of every two upper stripping steps retains the minimum working flat plate width, and the other step retains the non-working flat plate width.

6. An open-pit coal mining and processing device, characterized in that: include: A first determination module is used to determine mining demand information of a target coal mine, wherein the mining demand information includes: mining operation requirement information of the target coal mine and mining capacity requirement information of the target coal mine; A division module, for determining a plurality of sections of the working section of the target coal mine according to the mining demand information, and taking the two side ends of the working section as endpoints to evenly divide the working section into the plurality of sections; an identification module, used for sorting the multiple sections according to a predetermined order, and adding identifications to the sorted multiple sections to obtain multiple identification sections; A mining module is used to control the mining equipment of the target coal mine to mine the working section starting from the first section of the multiple identified sections until the last section of the multiple identified sections is mined.

7. The open-pit coal mining and processing device according to claim 6, characterized in that: The division module comprises: A first determining unit, used to determine the length of the working line corresponding to the working gang; A second determination unit, for determining a minimum working line length of the mining equipment; A third determining unit, configured to determine the number of sections of the working gang according to the working line length and the minimum working line length; A division unit is used to divide the work group into the multiple sections according to the number of sections.

8. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored program, wherein the program executes the open-pit coal mining processing method according to any one of claims 1 to 5.

9. A processor, characterized in that: The processor is used to run a program, wherein the open-pit coal mining processing method according to any one of claims 1 to 5 is executed when the program is run.

10. A computer program product comprising computer instructions, characterized in that: When the computer instructions are executed by the processor, the open-pit coal mining processing method according to any one of claims 1 to 5 is executed.