Pipe clamp device and method for fixing multiple pipelines at movable arm of ballast cleaning machine
By designing a pipe clamp device with misalignment arrangement and angle setting, the problem of inconvenient pipeline fixation at the cleaning machine arm is solved, and the rational arrangement and disassembly of multiple pipelines is realized, the maintenance process is simplified and the weight of the boom is reduced.
Patent Information
- Application Number
- CN202411664755.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-20
- Publication Date
- 2025-01-10
- Estimated Expiration
- 2044-11-20
AI Technical Summary
The pipeline fixation at the cleaning machine motor arm is inconvenient, resulting in complex maintenance and chaotic layout. The existing pipe clamps cannot effectively fix multiple pipelines, especially in limited spaces, which are difficult to disassemble and replace.
A device including a first pipe clamp and a second pipe clamp is designed. Through the dislocation arrangement and angle arrangement between two adjacent first pipe clamps, multiple pipes are fixed using the outer space of the boom, and the second pipe clamp is located at the movable position. The outside of the center line in the length direction of the arm avoids pipeline accumulation and realizes separate arrangement and disassembly of pipelines of different diameters.
It realizes the rational arrangement of multiple pipelines in a limited space, which facilitates maintenance and replacement, reduces the weight of the boom, improves the resolution and installation efficiency of pipelines, avoids pipeline superposition, and simplifies the maintenance process.
Smart Images

Figure CN119288019A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of ballast cleaning machines, and in particular to a pipe clamp device and a method for fixing a plurality of pipes at a boom of a ballast cleaning machine. Background Art
[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.
[0003] The main structure of a traditional excavator can be improved into a ballast cleaning machine. The function of the ballast cleaning machine is to dig out and screen the dirty ballast within a range of 30 to 40 cm deep from the bottom of the rail sleeper, backfill the qualified ballast after screening onto the line, and add some new ballast to form a clean roadbed. In order to achieve this function, the ballast cleaning machine needs to be equipped with more rotary attachment motors, chain attachment motors and gear attachment motors than traditional excavators, which requires several more sets of pipelines on the boom. At present, the boom of traditional excavators has been arranged with quick-change, crushing and hydraulic shear steel pipes. These pipelines are arranged on the outer side of the boom through pipe clamps, and the arrangement space at the boom is limited. With the increase of pipelines, the problem that the increased pipelines cannot be reasonably arranged is that the existing processing method is to fix two adjacent pipelines to the boom through pipe clamps. The pipe clamp can only fix two pipelines at most, and each pipeline has not only an oil inlet pipe but also an oil return pipe. The number of pipelines is large, so layer after layer of pipelines are arranged in turn on the outside of the already arranged pipelines. This installation method has the problem of inconvenient disassembly and assembly, that is, if the inner pipeline has a problem and needs to be replaced, the outer pipeline needs to be removed before the inner pipeline can be removed, which makes the maintenance of the ballast cleaning machine more complicated.
[0004] In addition, some pipelines are thinner, some are thicker, and all pipelines are laid on the outside of the boom, resulting in a rather chaotic layout. Summary of the invention
[0005] In view of the deficiencies in the prior art, an object of the present invention is to provide a pipe clamp device for fixing multiple pipes at a boom of a ballast remover, which can fix multiple pipes at the boom and facilitate the disassembly of the pipes.
[0006] In order to achieve the above object, the present invention is implemented through the following technical solutions:
[0007] A pipe clamp device for fixing multiple pipes at a boom of a ballast cleaning machine comprises a first pipe clamp and a second pipe clamp. The first pipe clamp is provided with at least one layer from the outer side of the boom outward. When the first pipe clamp is provided with two or more layers, two adjacent first pipe clamps are fixedly connected. The first pipe clamp is fixed to the surface of the boom. The outer end of the first pipe clamp is connected to the second pipe clamp so that the second pipe clamp is located outside the center line of the length direction of the boom. The first pipe clamp and the second pipe clamp are arranged at an interval of 70°-120° to utilize the space outside the boom to install part of the pipes. The second pipe clamp fixes at least two pipes.
[0008] As described above, in a pipe clamp device for fixing multiple pipes at the boom of a ballast cleaning machine, when the first pipe clamps are provided in two or more layers, two adjacent first pipe clamps are staggered, and the first pipe clamp located in the upper layer is provided close to the second pipe clamp, so as to avoid the pipelines from being piled up in the middle position of the boom, facilitate the fixation of the pipelines from the outside through the second pipe clamps, and will not interfere with the pipelines on the inside.
[0009] As described above, a pipe clamp device for fixing multiple pipes at the boom of a ballast cleaning machine, when the first pipe clamps are provided with two or more layers, the length of the first pipe clamps located in the upper layer is smaller than the length of the first pipe clamps in the lower layer, the structure of the first pipe clamps located in the upper layer is the same as or different from the structure of the first pipe clamps in the lower layer, the first pipe clamps located in the upper layer can be used to fix pipes with smaller diameters, and the first pipe clamps located in the lower layer can be used to fix pipes with larger diameters, and when the first pipe clamp structures are the same, pipes of the same specification are fixed by the first pipe clamps.
[0010] A pipe clamp device for fixing multiple pipes at a ballast cleaning boom as described above, wherein the first pipe clamp located at the lower layer comprises a first pipe seat, the first pipe seat is connected to the second pipe clamp, the first pipe seat supports a partition, support rings are arranged on both sides of the partition for the pipes to pass through, the first cover plate is fixedly connected to the partition, the side of the first cover plate covers the support ring, the support ring is fixedly connected to the first pipe seat, and the length of the support ring is less than the width of the first pipe seat;
[0011] The support ring is an integral ring; or, part of the support ring is fixed to the first cover plate, and part of the support ring is fixed to the first pipe seat.
[0012] As described above, in the pipe clamp device for fixing multiple pipes at the boom of a ballast cleaning machine, the first pipe clamp located at the upper layer includes a support plate, which is detachably connected to the first pipe clamp at the lower layer, and the support plate supports the third cover plate and is fixedly connected to the third cover plate.
[0013] A pipe clamp device for fixing multiple pipes at a ballast cleaning boom as described above, a cushion block is arranged on the top of the first pipe clamp located at the lower layer, the cushion block supports the support plate, the fastener passes through the support plate, the cushion block and the first pipe clamp of the lower layer are detachably connected, and the third cover plate is provided with at least one first recess on one side facing the support plate to cooperate with the pipe;
[0014] The first pipe clamp located at the lower layer is connected to the second pipe clamp.
[0015] In the pipe clamp device for fixing multiple pipes at the boom of a ballast cleaning machine as described above, the width of the support plate on one side close to the second pipe clamp is smaller than the width on the other side, and the width of the third cover plate is less than or equal to the width of the narrower side of the support plate.
[0016] As described above, a pipe clamp device for fixing multiple pipes at the boom of a ballast cleaning machine, the second pipe clamp includes a second pipe seat, a second cover plate is arranged on the outer side of the second pipe seat away from the first pipe clamp, a plurality of second recesses are arranged on the inner side of the second cover plate to fix the corresponding pipes, and a fastener connects the second cover plate and the second pipe seat.
[0017] In the pipe clamp device for fixing multiple pipes at the boom of a ballast cleaning machine as described above, the first pipe clamp is vertically connected to the second pipe clamp.
[0018] In a second aspect, the present invention further provides a method for fixing multiple pipes at a ballast cleaning boom, wherein the pipe clamp device for fixing multiple pipes at a ballast cleaning boom comprises the following contents:
[0019] A first pipe clamp is fixed on the outer side of the boom, the first pipe clamp is connected to a second pipe clamp, the second pipe clamp is placed outside the center line of the boom in the length direction, and the first pipe clamp is sequentially provided with at least one layer, and a part of the pipeline is fixed by the first pipe clamp;
[0020] The second pipe clamp is located at the side of the first pipe clamp and utilizes the outer space of the movable arm to install part of the pipeline.
[0021] The beneficial effects of the present invention are as follows:
[0022] 1) In the present invention, a first pipe clamp and a second pipe clamp are provided, the first pipe clamp and the second pipe clamp are connected, the first pipe clamp is provided with one or more layers, the second pipe clamp is connected to the first pipe clamp and the two are spaced at a set angle, so that the second pipe clamp will not interfere with the installation of the first pipe clamp, and the outer space outside the outer side of the boom can be used to fix part of the pipeline, so that the pipelines will not be simply stacked layer by layer, and more pipelines can be arranged separately in a limited space. When the pipelines are maintained, it is also convenient to find the corresponding pipelines and remove or replace them.
[0023] 2) In the present invention, the second pipe clamp is arranged on the outside of the center line of the boom in the length direction relative to the first pipe clamp, so as to avoid the pipeline being accumulated in the middle of the boom, and to facilitate the fixing of the pipeline from the outside through the second pipe clamp, without interfering with the pipeline on the inside. In this way, when an oil inlet pipe and an oil return pipe are provided, the oil inlet pipe and the oil return pipe can be arranged relatively on both sides of the outer side of the boom, and the overall arrangement is more reasonable.
[0024] 3) In the present invention, the first pipe clamps are arranged in multiple layers, so that more than 5 pipes can be arranged in a relatively small space. By changing the structure of the first pipe clamps of two adjacent layers, pipes of different diameters can be installed. The first pipe clamps of two adjacent layers are arranged in a staggered manner, which is beneficial to ensure balance and is also convenient for distinguishing pipes in a relatively small space.
[0025] 4) The first pipe clamp and the second pipe clamp in the present invention are reasonably arranged in structure, and each cover plate is reasonably arranged. The overall weight is effectively reduced while ensuring the strength, which is beneficial to controlling the weight of the boom. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0027] Figure 1 It is a schematic diagram of a pipe clamp device for fixing multiple pipes at a ballast cleaning machine boom according to one or more embodiments of the present invention, in which there is only one layer of first pipe clamps.
[0028] Figure 2 It is a schematic diagram of a pipe clamp device for fixing multiple pipes at a ballast cleaning machine boom according to one or more embodiments of the present invention, in which there are two layers of first pipe clamps.
[0029] Figure 3 It is a schematic diagram of a pipe clamp device for fixing multiple pipes at a ballast cleaning machine boom according to one or more embodiments of the present invention when in use.
[0030] In the figure: the distances or sizes between parts are exaggerated to show the positions of various parts, and the schematic diagram is for reference only.
[0031] Wherein: 1. first tube clamp, 1-1. first tube seat, 1-2. support ring, 1-3. first cover plate, 1-4. separator, 1-5. spacer, 1-6. support plate, 1-7. third cover plate, 1-8. countersunk hole;
[0032] 2. second tube clamp, 2-1. second tube seat, 2-2. second cover plate;
[0033] 3. Pipes, 4. Fasteners. DETAILED DESCRIPTION
[0034] It should be noted that the following detailed descriptions are illustrative and intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used in the present invention have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0035] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present invention. As used herein, unless otherwise explicitly stated in the present invention, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "include" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof;
[0036] As introduced in the background technology, in the prior art, the space on the outer side of the boom is limited and many pipelines are laid in layers, making it difficult to disassemble the pipelines. In order to solve the above technical problems, the present invention proposes a pipe clamp device for fixing multiple pipelines at the boom of a ballast cleaner.
[0037] Embodiment 1
[0038] In a typical embodiment of the present invention, reference is made to Figure 1 and Figure 2 As shown, a pipe clamp device for fixing multiple pipes at the boom of a ballast cleaning machine includes a first pipe clamp 1 and a second pipe clamp 2. The first pipe clamp 1 is provided with at least one layer from the outer side of the boom outward. When the first pipe clamp 1 is provided with two or more layers, two adjacent first pipe clamps 1 are fixedly connected. The first pipe clamp 1 is fixed to the surface of the boom by welding. The first pipe clamp 1 is connected to the second pipe clamp 2. The first pipe clamp 1 and the second pipe clamp 2 are arranged at an interval of 70°-120° to utilize the outer space of the boom to install part of the pipes. The second pipe clamp 2 fixes at least two pipes.
[0039] In this embodiment, the first pipe clamp 1 is vertically connected to the second pipe clamp 2. Of course, the angle between the first pipe clamp and the second pipe clamp can also be 80° or 100°.
[0040] According to actual needs, the first pipe clamp 1 can be provided with a layer, the bottom of the first pipe clamp 1 is welded to the boom, the first pipe clamp 1 can fix two pipes, the outer end of the first pipe clamp 1 is connected to the second pipe clamp 2, and the second pipe clamp is used to fix three pipes.
[0041] refer to Figure 1 As shown, the first pipe clamp 1 includes a first pipe seat 1-1, the first pipe seat 1-1 is connected to the second pipe clamp 2, the first pipe seat 1-1 is away from the outer side of the movable arm to support the partition 1-4, the partition 1-4 can be a partition block, the partition can be welded to the first pipe seat, both sides of the partition 1-4 are provided with support rings 1-2 for the pipeline to pass through, the inner diameter of the support ring is larger than the outer diameter of the pipeline, the two support rings 1-2 are arranged parallel to each other, the first cover plate 1-3 is fixedly connected to the partition, the side of the first cover plate 1-3 covers the support ring, the two sides of the first cover plate 1-3 are bent toward the direction of the movable arm to cooperate with the support ring, and the support ring 1-2 can be welded to the first pipe seat 1-1;
[0042] In this embodiment, the length of the support ring 1 - 2 is smaller than the width of the first tube base 1 - 1 .
[0043] Of course, in other examples, the first tube base 1 - 1 may also be provided with two partitions 1 - 4 , and the two partitions 1 - 4 may separate the three support rings 1 - 2 .
[0044] It should be noted that when the first pipe clamp 1 is provided with two or more layers, the two adjacent first pipe clamps 1 are staggered, and the first cover plate 1-3 of the first pipe clamp of the lower layer (the first pipe clamp close to the boom) is arranged in the direction of the center line of the length direction of the boom, and the first pipe clamp located on the upper layer is arranged close to the second pipe clamp 2, and the second pipe clamp 2 is located on the outside of the center line of the length direction of the boom, so as to avoid the pipeline 3 from being accumulated in the middle position of the boom, facilitate the fixation of the pipeline 3 from the outside through the second pipe clamp 2, and will not interfere with the pipeline on the inside. The staggered first pipe clamps are also conducive to the identification of the pipeline 3.
[0045] refer to Figure 2 As shown, when the first pipe clamp 1 is provided with two or more layers, the length of the first pipe clamp located in the upper layer is smaller than the length of the first pipe clamp located in the lower layer, the structure of the first pipe clamp located in the upper layer is the same as or different from the structure of the first pipe clamp located in the lower layer, the first pipe clamp located in the upper layer can be used to fix the pipe with a smaller diameter, and the first pipe clamp located in the lower layer can be used to fix the pipe with a larger diameter. When the first pipe clamp structures are the same, the pipes of the same specification are fixed by the first pipe clamp.
[0046] The first pipe clamp 1 located at the lower layer includes a first pipe seat 1-1, which is connected to the second pipe clamp 2. The first pipe seat 1-1 supports the partition, and support rings are arranged on both sides of the partition 1-4 for the pipeline to pass through. The first cover plate 1-3 is detachably connected to the partition, and the side of the first cover plate 1-3 covers the support ring 1-2, and the support ring 1-2 is fixedly connected to the first pipe seat 1-1.
[0047] Specifically, the first pipe clamp located on the upper layer includes a support plate 1-6, the support plate 1-6 is fixedly connected to the first pipe clamp of the lower layer, the support plate supports the third cover plate 1-7 and is detachably connected to the third cover plate, a cushion block 1-5 is arranged on the top of the first cover plate 1-3, the cushion block 1-5 is arranged along the width direction of the top of the first cover plate, the cushion block is arranged at the center position of the top of the first cover plate, the cushion block 1-5 supports the support plate 1-6, a fastener 4 such as a bolt passes through the support plate, the cushion block is fixedly connected or detachably connected to the first pipe clamp of the lower layer, and the third cover plate 1-7 is provided with at least one first recess on one side facing the support plate to cooperate with the pipeline, specifically two, a spacer block is arranged between two adjacent first recesses, and the first recess is an arc-shaped recess;
[0048] It is easy to understand that when the first pipe clamp 1 is provided with multiple layers, the first pipe clamp located at the lower layer is connected to the second pipe clamp. In addition, when the support ring is a whole circular ring component, the pipeline 3 is provided through the first pipe clamp 1. During processing, the support plate has been connected to the first pipe clamp of the lower layer, and the end of the support plate is also connected to the second pipe clamp to ensure the overall stability. In this way, after the upper first pipe clamp supports the upper pipeline on site, the third cover plate 1-7 can be installed.
[0049] In other examples, because the end of the pipeline cannot pass through the support ring, the support ring 1-2 is not a complete support ring. A part of the support ring (half ring) is fixed to the first pipe seat 1-1, and the first pipe seat 1-1 is a flat plate. The other part of the support ring is fixed to the inner side of the first cover plate 1-3. The first cover plate is buckled on the first pipe seat 1-1 to achieve buckling. The two adjacent layers of first pipe clamps 1 are installed on site. The first cover plate 1-3 is provided with a countersunk hole 1-8, and the top of the countersunk hole 1-8 is a threaded hole. After the screw passes through the countersunk hole and is connected to the partition 1-4, the gasket 1-5 and the support plate 1-6 are installed, and fasteners such as bolts pass through the support plate and the gasket and are inserted into the countersunk hole of the first cover plate.
[0050] It is easy to understand that the width of the support plate 1-6 on one side close to the second pipe clamp is smaller than the width of the other side, and the width of the third cover plate 1-7 is less than or equal to the width of the narrower side of the support plate.
[0051] refer to Figure 1 and Figure 2 As shown, the second pipe clamp includes a second pipe seat 2-1, which is a flat plate. A second cover plate 2-2 is arranged on the outer side of the second pipe seat 2-1 away from the first pipe clamp, and a plurality of second recesses, such as two or three, are arranged on the inner side of the second cover plate 2-2 to fix the corresponding pipeline 3. A spacer block is arranged between two adjacent second recesses, and the second recess is an arc-shaped recess. Fasteners, such as bolts, connect the second cover plate 2-2 and the second pipe seat 2-1.
[0052] The pipe clamp device provided in this embodiment is provided with a first pipe clamp and a second pipe clamp, the first pipe clamp and the second pipe clamp are connected, the first pipe clamp is provided with one or more layers, the second pipe clamp is connected to the first pipe clamp and the two are spaced at a set angle, so that the second pipe clamp will not interfere with the installation of the first pipe clamp, and the outer space outside the outer side of the boom can be used to fix part of the pipeline, so that the pipelines will not be simply stacked layer by layer, and more pipelines can be arranged separately in a limited space. When maintaining the pipelines, it is also convenient to find the corresponding pipelines and remove or replace them.
[0053] Embodiment 2
[0054] This embodiment provides a method for fixing multiple pipes at the boom of a ballast cleaning machine. Figure 3As shown, including the following:
[0055] A first pipe clamp is fixed on the outer side of the boom, the first pipe clamp 1 is connected to the second pipe clamp 2, the second pipe clamp 2 is placed outside the center line of the boom in the length direction, and the first pipe clamp 1 is sequentially provided with at least one layer, and a part of the pipeline 3 is fixed by the first pipe clamp;
[0056] The second pipe clamp 2 is located on the side of the first pipe clamp and uses the outer space of the boom to install part of the pipeline;
[0057] According to the number of pipelines to be fixed, a single-layer first pipe clamp or a multi-layer first pipe clamp is selected. A single-layer first pipe clamp can fix 5-6 pipelines, and a multi-layer first pipe clamp can fix 7-8 pipelines.
[0058] In some examples, on opposite sides of the same position on the outer side of the boom, one side may be provided with a pipe clamp device having only a single layer of first pipe clamps, and the other side may be provided with a pipe clamp device having two layers of first pipe clamps.
[0059] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A pipe clamp device for fixing multiple pipes at a ballast cleaning boom, characterized in that: It includes a first pipe clamp and a second pipe clamp. At least one layer of the first pipe clamp is arranged outward from the outer side of the boom. When the first pipe clamp is arranged with two or more layers, two adjacent first pipe clamps are fixedly connected. The first pipe clamp is fixed to the surface of the boom. The outer end of the first pipe clamp is connected to the second pipe clamp so that the second pipe clamp is located outside the center line of the length direction of the boom. The first pipe clamp and the second pipe clamp are arranged at an interval of 70°-120° to utilize the space outside the boom to install part of the pipeline. The second pipe clamp fixes at least two pipelines.
2. A pipe clamp device for fixing multiple pipes at a ballast cleaning boom according to claim 1, characterized in that: The first pipe clamp is provided with a layer, the first pipe clamp comprises a first pipe seat, the first pipe seat is connected to the second pipe clamp, the first pipe seat supports the partition, support rings are provided on both sides of the partition for the pipeline to pass through, the first cover plate is fixedly connected to the partition, and the side of the first cover plate covers the support ring.
3. A pipe clamp device for fixing multiple pipes at a ballast cleaning machine boom according to claim 1, characterized in that: When the first pipe clamps are provided in two or more layers, two adjacent first pipe clamps are arranged in a staggered manner, and the first pipe clamp located in the upper layer is arranged close to the second pipe clamp; When the first tube clamps are provided in two or more layers, the length of the first tube clamps in the upper layer is smaller than that of the first tube clamps in the lower layer, and the structure of the first tube clamps in the upper layer is the same as or different from that of the first tube clamps in the lower layer.
4. A pipe clamp device for fixing multiple pipes at a ballast cleaning boom according to claim 3, characterized in that: The first pipe clamp located at the lower layer includes a first pipe seat, the first pipe seat is connected to the second pipe clamp, the first pipe seat supports the separator, support rings are arranged on both sides of the separator for the pipeline to pass through, the first cover plate is fixedly connected to the separator, the side of the first cover plate covers the support ring, and the length of the support ring is less than the width of the first pipe seat; The support ring is an integral ring; or, part of the support ring is fixed to the first cover plate, and part of the support ring is fixed to the first pipe seat.
5. The pipe clamp device for fixing multiple pipes at the boom of a ballast cleaning machine according to claim 3, characterized in that: The first pipe clamp located at the upper layer includes a support plate, which is detachably connected to the first pipe clamp at the lower layer, and the support plate supports the third cover plate and is fixedly connected to the third cover plate.
6. A pipe clamp device for fixing multiple pipes at a ballast cleaning boom according to claim 5, characterized in that: A cushion block is arranged on the top of the first pipe clamp located at the lower layer, the cushion block supports the support plate, the fastener passes through the support plate and the cushion block and is detachably connected to the first pipe clamp of the lower layer, and at least one first recess is arranged on one side of the third cover plate facing the support plate to cooperate with the pipeline; The first pipe clamp located at the lower layer is connected to the second pipe clamp.
7. A pipe clamp device for fixing multiple pipes at a ballast cleaning boom according to claim 5, characterized in that: The width of the support plate at one side close to the second pipe clamp is smaller than the width of the other side, and the width of the third cover plate is smaller than or equal to the width of the narrower side of the support plate.
8. The pipe clamp device for fixing multiple pipes at the boom of a ballast cleaning machine according to claim 1, characterized in that: The second pipe clamp includes a second pipe seat, a second cover plate is arranged on the outer side of the second pipe seat away from the first pipe clamp, a plurality of second recesses are arranged on the inner side of the second cover plate to fix the corresponding pipeline, and a fastener connects the second cover plate and the second pipe seat.
9. The pipe clamp device for fixing multiple pipes at the boom of a ballast cleaning machine according to claim 1, characterized in that: The first pipe clamp is vertically connected to the second pipe clamp.
10. A method for fixing multiple pipes at a ballast cleaning boom, characterized in that: A pipe clamp device for fixing multiple pipes at a ballast cleaning machine boom according to any one of claims 1 to 9 comprises the following contents: A first pipe clamp is fixed on the outer side of the boom, the first pipe clamp is connected to a second pipe clamp, the second pipe clamp is placed outside the center line of the boom in the length direction, and the first pipe clamp is sequentially provided with at least one layer, and a part of the pipeline is fixed by the first pipe clamp; The second pipe clamp is located at the side of the first pipe clamp and utilizes the outer space of the movable arm to install part of the pipeline.
Citation Information
Patent Citations
Pressure increasing type automatic locating steel pipe clamp
CN104878797A
Steering steel pipe fixing device
CN209325197U
Pipeline support
CN214331730U
Stacked pipe clamp
CN216618784U
Pipe clamp device and pipeline system
CN219827960U