Intelligent control method and test platform for gap discharge characteristics based on laser ranging technology assisted hanging basket method

Through laser ranging technology and automated control system, the error problem of fixing and adjusting the hanging basket and wire in high-voltage tests is solved, and high-precision position monitoring and automatic adjustment are achieved, which improves the accuracy and safety of the test and reduces operation The burden of personnel.

CN119291403APending Publication Date: 2025-01-10CHINA THREE GORGES UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411352851.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-26
Publication Date
2025-01-10

AI Technical Summary

Technical Problem

During high-pressure testing, traditional methods are difficult to effectively fix and adjust the hanging basket and wire, resulting in errors in the test results. The operators have great safety hazards due to fatigue or visual restrictions, and fail to fully consider physical factors such as exhaustion. The operation is abnormal.

Method used

Using an intelligent control method based on laser ranging technology, three-dimensional position information is extracted through high-definition camera and image processing, combined with laser ranging sensors and servo motors, a closed-loop control system is built to realize automatic adjustment of the position of the hanging basket and wires and wind offset correction. Ensure the accuracy and safety of the test.

Benefits of technology

Significantly improve the accuracy and safety of the test results, reduce the burden on the operator, avoid position adjustment errors caused by height and wind, ensure that the hanging basket can be accurately positioned at any height, and improve the smooth operation Sex and reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119291403A_ABST
    Figure CN119291403A_ABST
Patent Text Reader

Abstract

The invention discloses an intelligent control method for gap discharge characteristics based on a laser ranging technology assisted hanging basket method and a test platform. The intelligent control method comprises the following steps: step 1, inputting basic distance parameters of a high-voltage test control system; 2, extracting three-dimensional position information; step 3, constructing a distance signal identification model; 4, performing feedback intelligent stay wire system processing on the operation stability parameters of the high-voltage test hanging basket; 5, analyzing the test windage yaw stability of the high-voltage test hanging basket; 6, evaluating the operation safety of the high-voltage test; 7, monitoring and adjusting the position in real time; step 8, external environment risk early warning; according to the invention, the efficiency and safety of the high-voltage test are effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of distance measurement for high voltage tests of power transmission lines, and in particular to an intelligent control method and a test platform for gap discharge characteristics based on a hanging basket method assisted by laser ranging technology. Background Art

[0002] At present, when conducting high-voltage tests simulating the helicopter hanging basket method, the manned hanging basket and the simulated wires on both sides of the simulated line are connected to the gantry crane through a hanging rope. During the high-voltage test, in order to resist the shaking caused by wind and avoid the influence of these shaking on the phase distance and the combined gap distance, which will lead to errors in the test results, the simulated wires and the hanging basket on both sides must be effectively fixed. Considering that it is very important to ensure the accuracy of the high-voltage test, manpower is required to pull at the four corners during the test to adjust and fix the simulated wires and the manned hanging basket on both sides of the test. This process is not only cumbersome, but also time-consuming and labor-intensive. If the operator pulls and fixes the simulated wires on both sides by pulling the traction rope, if the operation is improper due to physiological or psychological factors, it may affect the accuracy of the test. Therefore, it is necessary to design an automatic wire pulling device that can fix and move the simulated wires and the hanging basket on both sides during the test, and promptly detect and correct the position deviation caused by wind.

[0003] Previous safety measures, including strengthening the safety awareness of test personnel, improving fixed equipment and adding on-site monitoring personnel, are facing new challenges brought about by the expansion of the test scale and the increase in the height of experimental equipment: 1. Test personnel may reduce their safety awareness or make operational errors due to fatigue during long-term operation. 2. Due to the height and field of view of the tower, as well as external environmental factors, it is difficult to fully grasp the test status through naked eye monitoring, especially the execution of the position adjustment steps. 3. Traditional equipment fixing methods are backward. Usually, after the test equipment is blown and offset by the wind, the naked eye cannot measure the distance between the equipment, which increases the possibility of errors. 4. Existing methods fail to fully consider the operational abnormalities that may be caused by physical factors such as exhaustion of test personnel. Summary of the invention

[0004] The purpose of the present invention is to overcome the above-mentioned shortcomings and provide an intelligent control method and test platform for gap discharge characteristics based on laser ranging technology assisted hanging basket method to solve the problems raised in the background technology.

[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: an intelligent control method of gap discharge characteristics based on laser ranging technology assisted hanging basket method, which comprises the following steps: Step 1: Input basic distance parameters of the high-voltage test control system: pre-enter the voltage level, test method and the distance between the high-voltage test equipotential hanging basket and the conductors on both sides in the central control console; Step 2: Extracting 3D position information: After the high-voltage test basket and the wires on both sides are brought to the test site by the gantry crane, the test platform on the ground uses a high-definition camera to capture the real-time relative positions of the simulated wires on both sides and the basket during the high-voltage test, and uses image processing to extract key spatial features and perform 3D position information extraction; Step 3: distance signal recognition model construction: according to the three-dimensional position of the test basket relative to the standard working plane extracted in step 2, the relative position between the high-voltage test equipotential basket and the conductor is extracted, and the operation stability parameters at each sampling moment during the high-voltage test are obtained, wherein the operation stability parameters include the horizontal offset degree and the Z-axis offset degree of the working plane of the test basket; Step 4: Intelligent wire pulling system processing for feedback on the operating stability parameters of the high-voltage test hanging basket: Integrate laser ranging sensors, microcontrollers and servo motors to build a closed-loop control system. According to the parameters obtained by the above distance signal recognition model, the traction rope is pulled and relaxed to achieve automatic adjustment of the simulated wires and the hanging basket positions on both sides; Step 5: Windage stability analysis of high-voltage test basket test: obtain the actual three-dimensional position parameters of the high-voltage test basket test, and combine the ambient wind speed corresponding to the operating height to obtain the windage correction factor of the high-voltage test basket; Step 6: Safety assessment of high-voltage test operation: According to the various coefficients of the operation stability and anti-interference ability coefficient of the high-voltage test hanging basket, the test accuracy index of the high-voltage test is evaluated and processed; Step 7: Real-time position monitoring and adjustment: Fusion processing of sensor data to improve the stability and accuracy of position monitoring, and rapid adjustment decisions based on real-time monitoring data; Step 8. External environmental risk warning: According to the external environmental parameters during the high-voltage test, the meteorological risk factor of the test is analyzed, and adjustments and warnings are made to ensure the safety and accuracy of the test.

[0006] Furthermore, the specific process of step 2 is as follows: The horizontal plane where the centers of the two sets of simulated conductors are located is used as the standard working plane of the high-voltage test, and the intersection of the working plane on the equipotential side and the center of the test simulated conductor is used as the origin. With this as the position reference point, the three-dimensional laser scanner located on the ground first enters the standard working plane of the high-voltage test, and then performs a three-dimensional coordinate scan of the high-voltage test hanging basket, which is recorded as , which are placed in the reference three-dimensional coordinate system of the standard working plane to obtain the three-dimensional coordinates of the fluctuation of the test basket during the high-pressure experiment. Indicates The three-dimensional position measured at the second, =1,2,3…, Indicates The number of the test site, =1, 2, 3….

[0007] Furthermore, the specific process of step three is as follows: The first The three-dimensional coordinates of the monitoring points at each time in the test site , Substitute the axis coordinates into the formula: ; Obtain the horizontal deviation of the working plane of the test basket during the high-pressure test , It represents the correction factor for the horizontal deviation of the experimental platform. Indicates the total duration of three-dimensional position monitoring after the system is started, where and Indicates the standard of the working plane of the high voltage test preset stored in the database , Axis coordinate value; The three-dimensional coordinates of the monitoring points at each time in the test site Substitute the axis coordinates into the formula: ; Get the Z-axis deviation of the test basket in the high-pressure test , Indicates the correction factor for the Z-axis offset of the experimental platform, Indicates the total duration of three-dimensional position monitoring after the system is started, where Indicates the standard vertical working plane of the high voltage test preset stored in the database Axis coordinate values.

[0008] Furthermore, in step 4, the specific process of pulling and relaxing the traction rope according to the parameters obtained by the distance signal recognition model is as follows: ; ; ; Get the force arm part of the motor in the high voltage test should make The offset corresponding to the axis direction and The offset corresponding to the axis direction , and Indicates the correction factor for the offset of the force arm part of the motor in the high voltage test, It indicates the traction angle that should be maintained between the traction rope at the end of the arm part and the traction part and the standard working plane. and It indicates the standard deflection parameters that the arm part of the machine should make and stored in the database.

[0009] Furthermore, the specific process of step 5 is as follows: The wind speed measured on the standard working plane during the high-pressure test The windward area of ​​the high-pressure test basket Substitute into the formula: ; To resist the wind deflection caused by wind force in high voltage test, the motor needs to resist the wind deflection caused by the traction rope. ,in is the air density at standard atmospheric pressure, For the resistance coefficient corresponding to the high-voltage test basket, the arm part of the motor should be made The offset corresponding to the axis direction and The offset corresponding to the axis direction, The reference wind speed to ensure that the high-voltage test basket does not undergo minimum displacement under minimum traction.

[0010] Furthermore, the specific process of step eight is as follows: the wind resistance required by the working platform is , High-pressure test hanging basket windward area Substitute into the formula: ; Get the meteorological risk factor of the test ,in To test the quality of the hanging basket under high pressure, is the maximum wind resistance that the experimental platform can produce, It is the total time length after the meteorological monitoring system starts to detect during the whole test process. The weight factor representing the effect of wind force on the polarization acceleration of the test basket, It represents the weight factor of the influence of relatively safe test wind speed during the test.

[0011] In addition, the present invention also discloses a test platform for gap discharge characteristics based on the laser ranging technology assisted hanging basket method, so as to realize the above-mentioned intelligent control method for gap discharge characteristics based on the laser ranging technology assisted hanging basket method, including: Central control console: responsible for processing the pre-input voltage level and test method of the high-voltage test and the pre-input of the distance between the high-voltage test equipotential hanging basket and the conductors on both sides, and receiving the three-dimensional position and meteorological information of the test hanging basket and the simulation conductor collected by the monitoring module; Monitoring module: including three-dimensional position monitoring module and meteorological information monitoring module. The three-dimensional position monitoring module is connected to the monitoring table welded to the central control console, and the position signal is transmitted internally through wires; the meteorological information monitoring module is located on the top of the test hanging basket and is carried into the working plane with the tester to monitor the wind speed and other meteorological information in real time; Telescopic arm module: It consists of a telescopic push rod motor, a transverse arm and a longitudinal arm placed in the motor cabinet at the bottom of the central console; the transverse arm is located on both sides of the central console and is connected to the telescopic push rod motor from the bottom. The transverse extension and retraction process of the transverse arm is adjusted by the extension and retraction of the telescopic push rod motor; the center of the longitudinal arm is connected to the end of the transverse arm, and the longitudinal arm is a telescopic rod structure, and the longitudinal length can be manually adjusted; after receiving the relevant three-dimensional position information processed by the central console, the telescopic arm module performs transverse and longitudinal extension and retraction of the arm of the entire test platform to adapt to different test conditions; Traction arm module: It includes four traction arm frames, traction motors and traction ropes. The four traction arm frames are arranged around the entire test platform. The traction motor is located inside the traction arm frame and is connected to the traction rope wound on the coil wheel of the traction arm frame. The traction motor automatically adjusts the tension of the traction rope according to the instructions of the central control console to achieve precise position adjustment of the test basket.

[0012] Beneficial effects of the present invention: (1) Avoid position adjustment errors caused by excessive height: In traditional manual adjustment operations, faced with the challenges of high-altitude operations, visual limitations and instability of human judgment often lead to errors in position adjustment. This system uses high-precision laser ranging sensors, combined with advanced automated control algorithms, to accurately capture the relative position of the hanging basket and the surrounding environment, thereby effectively eliminating the visual errors caused by height. This precise adjustment capability ensures that the hanging basket can be accurately positioned at any height, significantly improving the safety and efficiency of the operation, while also reducing the mental and physical burden on the operator, making the entire operation process smoother and more reliable.

[0013] (2) Reduce the risk of displacement caused by fatigue: Long-term manual wire pulling operation will increase the fatigue of operators and increase the risk of displacement caused by operating errors. This system reduces the physical burden of operators through automated wire pulling operations, avoids unnecessary displacement caused by fatigue, and ensures the stability of the operation process and the accuracy of the basket position.

[0014] (3) Effectively resist displacement caused by wind: Wind is a key external factor affecting the stability of the hanging basket. This system is designed with a set of fast-response automatic wire pulling mechanism that can monitor the position changes of the hanging basket in real time and make rapid adjustments to resist the influence of wind, ensuring that the hanging basket always remains in the predetermined safe position during the test.

[0015] (4) Ensure the accuracy of high-voltage tests: The central control console ensures the accuracy of key measurement parameters in high-voltage tests by precisely controlling the distance between the hanging basket and the simulated wires on both sides. The system's automated monitoring and adjustment functions eliminate the interference of human factors on test accuracy and improve the reliability and repeatability of test results. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a structural schematic diagram of a test platform for gap discharge characteristics based on the laser ranging technology assisted hanging basket method; Figure 2 It is an enlarged structural diagram of the area where the center console is located; In the figure, 1. gantry; 2. insulator string; 3. steel wire rope; 4. simulated hanging basket; 5. simulated dummy; 6. simulated conductor; 7. traction rope; 8. traction arm; 9. lateral force arm; 10. longitudinal force arm; 11. high-definition camera; 12. support column; 13. center control console; 14. motor cabinet. DETAILED DESCRIPTION

[0017] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0018] Embodiment 1: An intelligent control method for gap discharge characteristics based on laser ranging technology assisted hanging basket method, comprising the following steps: Step 1: Input basic distance parameters of the high-voltage test control system: pre-enter the voltage level, test method and the distance between the high-voltage test equipotential hanging basket and the conductors on both sides in the central control console; Step 2: Extracting 3D position information: After the high-voltage test basket and the wires on both sides are brought to the test site by the gantry crane, the test platform on the ground uses a high-definition camera to capture the real-time relative positions of the simulated wires on both sides and the basket during the high-voltage test, and uses image processing to extract key spatial features and perform 3D position information extraction; Step 3: distance signal recognition model construction: according to the three-dimensional position of the test basket relative to the standard working plane extracted in step 2, the relative position between the high-voltage test equipotential basket and the conductor is extracted, and the operation stability parameters at each sampling moment during the high-voltage test are obtained, wherein the operation stability parameters include the horizontal offset degree and the Z-axis offset degree of the working plane of the test basket; Step 4: Intelligent wire pulling system processing for feedback on the operating stability parameters of the high-voltage test hanging basket: Integrate laser ranging sensors, microcontrollers and servo motors to build a closed-loop control system. According to the parameters obtained by the above distance signal recognition model, the traction rope is pulled and relaxed to achieve automatic adjustment of the simulated wires and the hanging basket positions on both sides; Step 5: Windage stability analysis of high-voltage test basket test: obtain the actual three-dimensional position parameters of the high-voltage test basket test, and combine the ambient wind speed corresponding to the operating height to obtain the windage correction factor of the high-voltage test basket; Step 6: Safety assessment of high-voltage test operation: According to the various coefficients of the operation stability and anti-interference ability coefficient of the high-voltage test hanging basket, the test accuracy index of the high-voltage test is evaluated and processed; Step 7: Real-time position monitoring and adjustment: Use data processing technology such as Kalman filtering to fuse sensor data, improve the stability and accuracy of position monitoring, and quickly make adjustment decisions based on real-time monitoring data; Step 8. External environmental risk warning: According to the external environmental parameters during the high-voltage test, the meteorological risk factor of the test is analyzed, and adjustments and warnings are made to ensure the safety and accuracy of the test.

[0019] Furthermore, the specific process of step 2 is as follows: The horizontal plane where the centers of the two sets of simulated conductors are located is used as the standard working plane of the high-voltage test, and the intersection of the working plane on the equipotential side and the center of the test simulated conductor is used as the origin. With this as the position reference point, the three-dimensional laser scanner located on the ground first enters the standard working plane of the high-voltage test, and then performs a three-dimensional coordinate scan of the high-voltage test hanging basket, which is recorded as , which are placed in the reference three-dimensional coordinate system of the standard working plane to obtain the three-dimensional coordinates of the fluctuation of the test basket during the high-pressure experiment. Indicates The three-dimensional position measured at the second, =1,2,3…, Indicates The number of the test site, =1, 2, 3….

[0020] Furthermore, the specific process of step three is as follows: The first The three-dimensional coordinates of the monitoring points at each time in the test site , Substitute the axis coordinates into the formula: ; Obtain the horizontal deviation of the working plane of the test basket during the high-pressure test , It represents the correction factor for the horizontal deviation of the experimental platform. Indicates the total duration of three-dimensional position monitoring after the system is started, where and Indicates the standard of the working plane of the high voltage test preset stored in the database , Axis coordinate value; The three-dimensional coordinates of the monitoring points at each time in the test site Substitute the axis coordinates into the formula: ; Get the Z-axis deviation of the test basket in the high-pressure test , Indicates the correction factor for the Z-axis offset of the experimental platform, Indicates the total duration of three-dimensional position monitoring after the system is started, where Indicates the standard vertical working plane of the high voltage test preset stored in the database Axis coordinate values.

[0021] Furthermore, in step 4, the specific process of pulling and relaxing the traction rope according to the parameters obtained by the distance signal recognition model is as follows: ; ; ; Get the force arm part of the motor in the high voltage test should make The offset corresponding to the axis direction and The offset corresponding to the axis direction , and Indicates the correction factor for the offset of the force arm part of the motor in the high voltage test, It indicates the traction angle that should be maintained between the traction rope at the end of the arm part and the traction part and the standard working plane. and It indicates the standard deflection parameters that the arm part of the machine should make and stored in the database.

[0022] Furthermore, the specific process of step 5 is as follows: The wind speed measured on the standard working plane during the high-pressure test The windward area of ​​the high-pressure test basket Substitute into the formula: ; To resist the wind deflection caused by wind force in high voltage test, the motor needs to resist the wind deflection caused by the traction rope. ,in is the air density at standard atmospheric pressure, For the resistance coefficient corresponding to the high-voltage test basket, the arm part of the motor should be made The offset corresponding to the axis direction and The offset corresponding to the axis direction, The reference wind speed to ensure that the high-voltage test basket does not undergo minimum displacement under minimum traction.

[0023] Furthermore, the specific process of step eight is as follows: the wind resistance required by the working platform is , High-pressure test hanging basket windward area Substitute into the formula: ; Get the meteorological risk factor of the test ,in To test the quality of the hanging basket under high pressure, is the maximum wind resistance that the experimental platform can produce, It is the total time length after the meteorological monitoring system starts to detect during the whole test process. The weight factor representing the effect of wind force on the polarization acceleration of the test basket, It represents the weight factor of the influence of relatively safe test wind speed during the test.

[0024] Embodiment 2: A test platform for gap discharge characteristics based on laser ranging technology assisted hanging basket method, to realize the above-mentioned intelligent control method for gap discharge characteristics based on laser ranging technology assisted hanging basket method, comprising: Central control console: responsible for processing the pre-input voltage level and test method of the high-voltage test and the pre-input of the distance between the high-voltage test equipotential hanging basket and the conductors on both sides, and receiving the three-dimensional position and meteorological information of the test hanging basket and the simulation conductor collected by the monitoring module; Monitoring module: including three-dimensional position monitoring module and meteorological information monitoring module. The three-dimensional position monitoring module is connected to the monitoring table welded to the central control console, and the position signal is transmitted internally through wires; the meteorological information monitoring module is located on the top of the test hanging basket and is carried into the working plane with the tester to monitor the wind speed and other meteorological information in real time; Telescopic arm module: It consists of a telescopic push rod motor, a transverse arm and a longitudinal arm placed in the motor cabinet at the bottom of the central console; the transverse arm is located on both sides of the central console and is connected to the telescopic push rod motor from the bottom. The transverse extension and retraction process of the transverse arm is adjusted by the extension and retraction of the telescopic push rod motor; the center of the longitudinal arm is connected to the end of the transverse arm, and the longitudinal arm is a telescopic rod structure, and the longitudinal length can be manually adjusted; after receiving the relevant three-dimensional position information processed by the central console, the telescopic arm module performs transverse and longitudinal extension and retraction of the arm of the entire test platform to adapt to different test conditions; Traction arm module: It includes four traction arm frames, traction motors and traction ropes. The four traction arm frames are arranged around the entire test platform. The traction motor is located inside the traction arm frame and is connected to the traction rope wound on the coil wheel of the traction arm frame. The traction motor automatically adjusts the tension of the traction rope according to the instructions of the central control console to achieve precise position adjustment of the test basket.

[0025] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. An intelligent control method for gap discharge characteristics based on laser ranging technology assisted hanging basket method, characterized in that: It includes the following steps: Step 1: Input basic distance parameters of the high-voltage test control system: pre-enter the voltage level, test method and the distance between the high-voltage test equipotential hanging basket and the conductors on both sides in the central control console; Step 2: Extracting 3D position information: After the high-voltage test basket and the wires on both sides are brought to the test site by the gantry crane, the test platform on the ground uses a high-definition camera to capture the real-time relative positions of the simulated wires on both sides and the basket during the high-voltage test, and uses image processing to extract key spatial features and perform 3D position information extraction; Step 3: distance signal recognition model construction: according to the three-dimensional position of the test basket relative to the standard working plane extracted in step 2, the relative position between the high-voltage test equipotential basket and the conductor is extracted, and the operation stability parameters at each sampling moment during the high-voltage test are obtained, wherein the operation stability parameters include the horizontal offset degree and the Z-axis offset degree of the working plane of the test basket; Step 4: Intelligent wire pulling system processing for feedback on the operating stability parameters of the high-voltage test hanging basket: Integrate laser ranging sensors, microcontrollers and servo motors to build a closed-loop control system. According to the parameters obtained by the above distance signal recognition model, the traction rope is pulled and relaxed to achieve automatic adjustment of the simulated wires and the hanging basket positions on both sides; Step 5: Windage stability analysis of high-voltage test basket test: obtain the actual three-dimensional position parameters of the high-voltage test basket test, and combine the ambient wind speed corresponding to the operating height to obtain the windage correction factor of the high-voltage test basket; Step 6: Safety assessment of high-voltage test operation: According to the various coefficients of the operation stability and anti-interference ability coefficient of the high-voltage test hanging basket, the test accuracy index of the high-voltage test is evaluated and processed; Step 7: Real-time position monitoring and adjustment: Process the sensor data to improve the stability and accuracy of position monitoring, and make adjustment decisions quickly based on the real-time monitoring data; Step 8. External environmental risk warning: According to the external environmental parameters during the high-voltage test, the meteorological risk factor of the test is analyzed, and adjustments and warnings are made to ensure the safety and accuracy of the test.

2. According to claim 1, the intelligent control method of gap discharge characteristics based on the laser ranging technology assisted hanging basket method is characterized by: The specific process of step 2 is as follows: The horizontal plane where the centers of the two sets of simulated conductors are located is used as the standard working plane of the high-voltage test, and the intersection of the working plane on the equipotential side and the center of the test simulated conductor is used as the origin. With this as the position reference point, the three-dimensional laser scanner located on the ground first enters the standard working plane of the high-voltage test, and then performs a three-dimensional coordinate scan of the high-voltage test hanging basket, which is recorded as , which are placed in the reference three-dimensional coordinate system of the standard working plane to obtain the three-dimensional coordinates of the fluctuation of the test basket during the high-pressure experiment. Indicates The three-dimensional position measured at the second, =1,2,3…, Indicates The number of the test site, =1, 2, 3….

3. According to claim 2, the intelligent control method of gap discharge characteristics based on the laser ranging technology assisted hanging basket method is characterized by: The specific process of step three is as follows: The first The three-dimensional coordinates of the monitoring points at each time in the test site , Substitute the axis coordinates into the formula: ; Obtain the horizontal deviation of the working plane of the test basket during the high-pressure test , It represents the correction factor for the horizontal deviation of the experimental platform. Indicates the total duration of three-dimensional position monitoring after the system is started, where and Indicates the standard of the working plane of the high voltage test preset stored in the database , Axis coordinate value; The three-dimensional coordinates of the monitoring points at each time in the test site Substitute the axis coordinates into the formula: ; Get the Z-axis deviation of the test basket in the high-pressure test , Indicates the correction factor for the Z-axis offset of the experimental platform, Indicates the total duration of three-dimensional position monitoring after the system is started, where Indicates the standard vertical working plane of the high voltage test preset stored in the database Axis coordinate values.

4. The intelligent control method of gap discharge characteristics based on the laser ranging technology assisted hanging basket method according to claim 3 is characterized by: In step 4, the specific process of pulling and relaxing the traction rope according to the parameters obtained by the distance signal recognition model is as follows: ; ; ; Get the force arm part of the motor in the high voltage test should make The offset corresponding to the axis direction and The offset corresponding to the axis direction , and Indicates the correction factor for the offset of the force arm part of the motor in the high voltage test, It indicates the traction angle that should be maintained between the traction rope at the end of the arm part and the traction part and the standard working plane. and It indicates the standard deflection parameters that the force arm part of the machine should make, which are stored in the database.

5. The intelligent control method of gap discharge characteristics based on the laser ranging technology assisted hanging basket method according to claim 4 is characterized by: The specific process of step 5 is as follows: The wind speed measured on the standard working plane during the high-pressure test The windward area of ​​the high-pressure test basket Substitute into the formula: ; To resist the wind deflection caused by wind force in high voltage test, the motor needs to resist the wind deflection caused by the traction rope. ,in is the air density at standard atmospheric pressure, For the resistance coefficient corresponding to the high-voltage test basket, the arm part of the motor should be made The offset corresponding to the axis direction and The offset corresponding to the axis direction, The reference wind speed to ensure that the high-voltage test basket does not undergo minimum displacement under minimum traction.

6. The intelligent control method of gap discharge characteristics based on the laser ranging technology assisted hanging basket method according to claim 5 is characterized by: The specific process of step eight is as follows: , High-pressure test hanging basket windward area Plug into the formula: ; Get the meteorological risk factor of the test ,in To test the quality of the hanging basket under high pressure, is the maximum wind resistance that the experimental platform can produce, It is the total time length after the meteorological monitoring system starts to detect during the whole test process. The weight factor representing the effect of wind force on the polarization acceleration of the test basket, It represents the weight factor of the influence of relatively safe test wind speed during the test.

7. A test platform for gap discharge characteristics based on laser ranging technology assisted hanging basket method, to implement the intelligent control method for gap discharge characteristics based on laser ranging technology assisted hanging basket method as claimed in any one of claims 1 to 6, characterized in that: include: Central control console: responsible for processing the pre-input voltage level and test method of the high-voltage test and the pre-input of the distance between the high-voltage test equipotential hanging basket and the conductors on both sides, and receiving the three-dimensional position and meteorological information of the test hanging basket and the simulation conductor collected by the monitoring module; Monitoring module: including three-dimensional position monitoring module and meteorological information monitoring module. The three-dimensional position monitoring module is connected to the monitoring table welded to the central control console, and the position signal is transmitted internally through wires; the meteorological information monitoring module is located on the top of the test hanging basket and is carried into the working plane with the tester to monitor the wind speed and other meteorological information in real time; Telescopic arm module: It consists of a telescopic push rod motor, a transverse arm and a longitudinal arm placed in the motor cabinet at the bottom of the central console; the transverse arm is located on both sides of the central console and is connected to the telescopic push rod motor from the bottom. The transverse extension and retraction process of the transverse arm is adjusted by the extension and retraction of the telescopic push rod motor; the center of the longitudinal arm is connected to the end of the transverse arm, and the longitudinal arm is a telescopic rod structure, and the longitudinal length can be manually adjusted; after receiving the relevant three-dimensional position information processed by the central console, the telescopic arm module performs transverse and longitudinal extension and retraction of the arm of the entire test platform to adapt to different test conditions; Traction arm module: It includes four traction arm frames, traction motors and traction ropes. The four traction arm frames are arranged around the entire test platform. The traction motor is located inside the traction arm frame and is connected to the traction rope wound on the coil wheel of the traction arm frame. The traction motor automatically adjusts the tension of the traction rope according to the instructions of the central control console to achieve precise position adjustment of the test basket.