Bus jack box control system and method
The centralized control and remote monitoring of the busbar plug-in box control system solves the problems of decentralized and limited functionality in remote control of busbar plug-in boxes in large factories and buildings, thereby improving safety and convenience.
Patent Information
- Application Number
- CN202411168162.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2025-01-10
AI Technical Summary
In the existing technology, the remote control of busbar plug-in boxes in large factories and dense buildings is relatively decentralized, inconvenient to operate and has limited functions.
The system adopts a busbar plug-in box control system, including a main controller, power consumption monitors, and busbar joint monitors. It monitors power consumption and temperature information and uploads it to the main controller through a gateway. The main controller then uploads it to the back-end server for analysis, providing safety prevention and fault alarm information, and realizing centralized control and remote operation.
It improves the safety and ease of operation of busbar junction boxes, and through the analysis of temperature and power consumption information, it enables accurate safety forecasts and fault warnings, reducing the risk of safety accidents.
Smart Images

Figure CN119298335A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power distribution control, and in particular to a busbar plug-in box control system and method. Background Art
[0002] In order to improve the reliability of power supply in buildings and avoid centralized power outages, each floor and power consumption area will be equipped with an independent busbar plug-in box as the main switch for the corresponding floor and power consumption area. When a power failure occurs in a single area, it will be automatically disconnected and isolated.
[0003] For the convenience of control, in the prior art, each busbar plug-in box is generally designed to be remotely controlled, so that the opening and closing control can be realized remotely, reducing the need for on-site operation by personnel. However, at present, the control of busbar plug-in boxes in large factories and building-intensive types is all configured with a one-to-one remote electric control button box. The remote electric control button boxes are arranged in various areas of the factory, with a relatively scattered location, and are not convenient to operate. In addition, the electric control button box only controls the opening and closing of the plug-in box switch, and has a single function. Summary of the invention
[0004] Based on this, the purpose of the present invention is to provide a busbar plug-in box control system and method to solve the problems in the prior art that the remote control of large-scale busbar plug-in boxes in factories, buildings, etc. is relatively scattered, remote operation is inconvenient, and the available functions are single.
[0005] In one aspect, the present invention provides a busbar plug-in box control system for centralized control of building busbar plug-in boxes, the busbar plug-in box control system comprises a master controller, and a power consumption monitor and a busbar joint monitor arranged in each branch busbar plug-in box of the building busbar plug-in box, wherein:
[0006] The power consumption monitor is used to monitor the power consumption information of the corresponding branch busbar plug-in box, and send the monitored power consumption information to the main controller through the gateway, and the power consumption information includes current, voltage, harmonics, power and power consumption;
[0007] The busbar joint monitor is used to monitor the temperature information of the corresponding branch busbar plug-in box, and send the temperature information to the main controller through the gateway, and the temperature information includes the busbar duct temperature and the connector temperature;
[0008] The master controller is used to control the opening and closing of each branch busbar plug-in box, and to upload the received power consumption information and temperature information to the background server, so as to obtain safety prevention information and fault alarm information through the background server's analysis of the power consumption information and the temperature information.
[0009] Optionally, the background server is also used to: obtain the operating power of the target branch bus plug-in box based on the power consumption information, and obtain the predicted temperature information of the target branch bus plug-in box in combination with the temperature information of the target branch bus plug-in box, and provide the safety prevention information based on the predicted temperature information.
[0010] Optionally, the background server is also used to: obtain heating power according to the operating power of the target branch busbar plug-in box and the preset busbar configuration, obtain heat dissipation power according to the bus trough temperature and connector temperature of the target branch busbar plug-in box, so as to obtain the predicted temperature information based on the heating power and the heat dissipation power.
[0011] Optionally, the background server is also used to: record the historical information of the operating power, bus duct temperature, connector temperature and overheating faults of each branch busbar plug-in box, and obtain the overheating fault correlation coefficients of the operating power, bus duct temperature and connector temperature based on the historical information, so as to predict the overheating risk based on each of the overheating fault correlation coefficients and the real-time operating power, bus duct temperature and connector temperature of each branch busbar plug-in box, so as to issue an overheating risk alarm when there is an overheating risk based on the overheating risk prediction results.
[0012] Optionally, the background server is further used to: issue the overheating risk alarm before the predicted overheating moment according to the overheating risk prediction result and a preset response time.
[0013] Optionally, the backend server is also used to upload the historical information to a cloud service platform, wherein the cloud service platform is used to expand the amount of overheating fault sample data based on the historical information of multiple busbar plug-in box control systems, so as to obtain a remote overheating fault correlation coefficient based on the historical information of multiple busbar plug-in box control systems, and publish the remote overheating fault correlation coefficient to each of the backend servers.
[0014] The present invention also provides a busbar plug-in box control method, comprising:
[0015] Monitor the power consumption information of each branch busbar plug-in box, and send the monitored power consumption information to the main controller through the gateway, the power consumption information includes current, voltage, harmonics, power and power consumption;
[0016] Monitor the temperature information of each branch busbar plug-in box, and send the temperature information to the main controller through the gateway, the temperature information includes the busbar duct temperature and the connector temperature;
[0017] The main controller controls the opening and closing of each branch busbar plug-in box, and uploads the received power consumption information and temperature information to the background server, so that the background server analyzes the power consumption information and the temperature information to obtain safety prevention information and fault alarm information.
[0018] Optionally, it also includes: recording the historical information of the operating power, bus duct temperature, connector temperature and overheating faults of each branch busbar plug-in box, and obtaining the overheating fault correlation coefficients of the operating power, bus duct temperature and connector temperature according to the historical information, so as to predict the overheating risk according to each of the overheating fault correlation coefficients and the real-time operating power, bus duct temperature and connector temperature of each branch busbar plug-in box, so as to issue an overheating risk alarm when there is an overheating risk according to the overheating risk prediction results.
[0019] Optionally, the step of issuing an overheating risk alarm when there is an overheating risk according to the overheating risk prediction result includes: issuing the overheating risk alarm before the predicted overheating moment according to the overheating risk prediction result and a preset response time.
[0020] Optionally, it also includes: uploading the historical information to a cloud service platform, wherein the cloud service platform is used to expand the amount of overheating fault sample data based on the historical information of multiple busbar plug-in box control systems, so as to obtain a remote overheating fault correlation coefficient based on the historical information of multiple busbar plug-in box control systems, and publish the remote overheating fault correlation coefficient to each of the backend servers.
[0021] The busbar plug-in box control system provided by the present invention is used for the centralized control of the building busbar plug-in box. The busbar plug-in box control system includes a main controller, and a power consumption monitor and a busbar joint monitor arranged in each branch busbar plug-in box of the building busbar plug-in box, wherein the power consumption monitor and the busbar joint monitor are respectively used to monitor the power consumption information and temperature information of the corresponding branch busbar plug-in box, and send the power consumption information and temperature information to the main controller through the gateway, and the temperature information includes the bus duct temperature and the connector temperature; the main controller is used to control the opening and closing of each branch busbar plug-in box, and upload the received power consumption information and temperature information to the background server, so as to obtain safety prevention information and fault alarm information through the background server's analysis of the power consumption information and temperature information. The busbar plug-in box control system provided by the present invention performs safety forecasts based on power consumption information, bus duct temperature and connector temperature, and expands the temperature collection point to the bus duct, which can improve the temperature-based safety forecast capability and improve safety. The main controller can centrally and remotely control the opening and closing of each branch busbar plug-in box, which can effectively improve the convenience of management and control. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1It is a schematic diagram of the module architecture of the busbar plug-in box control system in an embodiment of the present invention;
[0023] Figure 2 It is a main flow chart of the busbar junction box control method in an embodiment of the present invention.
[0024] The following specific implementation manner will further illustrate the present invention in conjunction with the above-mentioned drawings. DETAILED DESCRIPTION
[0025] In order to facilitate the understanding of the present invention, the present invention will be described more fully below with reference to the relevant drawings. Several embodiments of the present invention are given in the drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present invention more thorough and comprehensive.
[0026] It should be noted that when an element is referred to as being "fixed to" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only.
[0027] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.
[0028] In order to solve the problem that the remote control of large-scale busbar plug-in boxes in factories, buildings, etc. in the prior art is relatively scattered, the remote operation is inconvenient, and the available functions are single. The present invention provides a busbar plug-in box control system for the centralized control of building busbar plug-in boxes, a master controller is set to centrally and remotely control each branch busbar plug-in box, and a power consumption monitor and a busbar joint monitor are set in each branch busbar plug-in box to respectively monitor the power consumption information and temperature information of the corresponding branch busbar plug-in box, and send the power consumption information and temperature information to the master controller through the gateway. The master controller also uploads the received power consumption information and temperature information to the background server, so as to obtain safety prevention information and fault alarm information through the background server's analysis of the power consumption information and temperature information, wherein the temperature information includes the busbar duct temperature and the connector temperature, so that accurate safety forecasts can be made based on the power consumption information, the busbar duct temperature and the connector temperature, and the temperature collection point is expanded to the busbar duct, which can improve the temperature-based safety forecast capability and improve safety, and the master controller can centrally and remotely control the opening and closing of each branch busbar plug-in box, which can effectively improve the convenience of control.
[0029] Specifically, Figure 1 As shown, it is a schematic diagram of the module architecture of the busbar plug-in box control system in this embodiment, which includes a master controller 10, and a power consumption monitor 21 and a busbar joint monitor 22 arranged in each branch busbar plug-in box 01 of the building busbar plug-in box. The master controller 10 is used for remote control of the opening and closing of each branch busbar plug-in box 01.
[0030] The power consumption monitor 21 is used to monitor the power consumption information of the corresponding branch busbar plug-in box, and send the monitored power consumption information to the main controller 10 through the gateway. The power consumption information includes current, voltage, harmonics, power and power consumption.
[0031] Among them, current and voltage are key indicators for measuring basic electrical parameters in power systems. They are used to directly reflect the operating status of power systems, ensure the normal operation of power equipment, and monitor anomalies such as overload and short circuit, so as to take corresponding measures to avoid equipment damage and reduce the risk of safety accidents.
[0032] Harmonics are used to monitor the stability of power systems and the safe operation of equipment. By monitoring and analyzing harmonics, harmonic problems caused by nonlinear loads can be discovered in a timely manner, and measures can be taken to reduce the impact of harmonics on equipment and protect equipment from damage.
[0033] By monitoring active power and reactive power, the energy consumption of the equipment can be evaluated, and the operation mode of the equipment can be optimized to improve energy utilization efficiency.
[0034] Electricity consumption is directly used to measure the energy consumption level of enterprises. By recording and analyzing electricity consumption data, enterprises can better grasp their energy consumption trends, formulate reasonable energy use plans, and achieve the goals of energy conservation and emission reduction.
[0035] The busbar joint monitor 22 is used to monitor the temperature information of the corresponding branch busbar plug-in box, and send the temperature information to the main controller 10 through the gateway. The temperature information includes the busbar duct temperature and the connector temperature, wherein the temperatures of the connector and the busbar duct have different correlations with the actual busbar temperature, and are also affected differently by the ambient temperature, that is, at different ambient temperatures, based on the same busbar temperature, the actual appearances of the busbar duct temperature and the connector temperature will be different, and the heat dissipation capacity of the connector and the busbar duct also has certain differences. Predicting the actual busbar temperature based on the temperature information of the two sampling points can effectively improve the prediction accuracy and reliability.
[0036] The main controller 10 also uploads the received power consumption information and temperature information to the background server 11, so as to obtain safety prevention information and fault alarm information through the analysis of the power consumption information and temperature information by the background server 11, wherein the collected temperature information includes the bus duct temperature and the connector temperature, and the temperature prediction results based on the temperature information obtained from different sampling media and sampling points can be mutually verified, thereby improving the accuracy and reliability of the actual bus temperature prediction.
[0037] To achieve safety precautions, in one embodiment, the backend server is further used to: obtain the operating power of the target branch bus plug-in box according to the power consumption information, obtain the predicted temperature information of the target branch bus plug-in box in combination with the temperature information of the target branch bus plug-in box, and provide safety precaution information according to the predicted temperature information. Safety precautions for each branch bus plug-in box can be performed separately.
[0038] In a specific example, temperature prediction includes: obtaining heating power according to the operating power of the target branch busbar plug-in box and the preset busbar configuration, obtaining heat dissipation power according to the busbar duct temperature and connector temperature of the target branch busbar plug-in box, and obtaining predicted temperature information according to heating power and heat dissipation power. Among them, the heat dissipation power is mainly obtained according to the real-time changes of the busbar duct temperature and the connector temperature, and the busbar configuration includes the surface area, length, cross-sectional area and resistivity of the material of the busbar, which needs to be confirmed according to the actual situation.
[0039] In order to improve the intelligence level of safety prevention, in one embodiment, the background server is also used to: record the historical information of the operating power, bus duct temperature, connector temperature and overheating faults of each branch busbar plug-in box, and obtain the overheating fault correlation coefficients of the operating power, bus duct temperature and connector temperature based on the historical information, so as to predict the overheating risk based on each overheating fault correlation coefficient and the real-time operating power, bus duct temperature and connector temperature of each branch busbar plug-in box, so as to issue an overheating risk alarm when there is an overheating risk based on the overheating risk prediction results.
[0040] Among them, the sum of the products of the real-time operating power, bus duct temperature and connector temperature of the branch busbar plug-in box and the corresponding overheating fault correlation coefficient is the overheating index. The overheating risk prediction result mainly includes the relationship between the overheating index and time, and the moment when the overheating index reaches the risk threshold is taken as the risk moment. Furthermore, the background server is also used to: issue an overheating risk alarm before the predicted overheating moment according to the overheating risk prediction result and the preset response time. That is, the moment obtained by subtracting the response time from the risk moment is the overheating risk alarm moment, so as to provide sufficient response time for the operator to control the main controller to close the corresponding branch busbar plug-in box to avoid the actual occurrence of overheating safety accidents.
[0041] Alarms are issued to remind manual processing, and manual re-inspection can be used to ensure the accuracy of emergency avoidance operations for overheating risks, to avoid direct power outages due to misjudgment, which would affect normal production.
[0042] The response time can be set based on the actual conditions of the factory or building, and can also be set based on the actual fault handling response capabilities of known safety incidents.
[0043] In a specific example, the backend server is also used to upload historical information to a cloud service platform, wherein the cloud service platform is used to expand the amount of sample data of overheating faults based on the historical information of multiple busbar plug-in box control systems, so as to obtain a remote overheating fault correlation coefficient based on the historical information of multiple busbar plug-in box control systems, and publish the remote overheating fault correlation coefficient to each backend server. Since the actual execution effect of the safety assurance work is objective, the fault data available based on a single busbar plug-in box control system is limited, and the big data service capabilities of the cloud service platform are fully utilized to effectively integrate data on various safety issues actually occurring in different regions, increase the number of samples of historical information on the operating power, bus duct temperature, connector temperature, and overheating faults of the busbar plug-in box, and thereby improve the accuracy of the obtained remote overheating fault correlation coefficient. The remote overheating fault correlation coefficient is distributed to the local backend servers of each busbar plug-in box control system, and the overheating fault correlation coefficient of the local backend server is updated, which can improve the accuracy of fault prediction.
[0044] The present invention also provides a busbar plug-in box control method, such as Figure 2 As shown, it specifically includes:
[0045] Step S01: monitor the power usage information of each branch busbar plug-in box, and send the monitored power usage information to the main controller through the gateway, wherein the power usage information includes current, voltage, harmonics, power and power consumption.
[0046] Step S02: Monitor the temperature information of each branch busbar plug-in box, and send the temperature information to the main controller through the gateway, wherein the temperature information includes the busbar duct temperature and the connector temperature.
[0047] Step S03: Control the opening and closing of each branch busbar plug-in box through the main controller, and upload the received power consumption information and temperature information to the background server, so as to obtain safety prevention information and fault alarm information through the background server's analysis of the power consumption information and the temperature information.
[0048] As a specific example, it also includes: recording the historical information of the operating power, bus duct temperature, connector temperature and overheating faults of each branch busbar plug-in box, and obtaining the overheating fault correlation coefficients of the operating power, bus duct temperature and connector temperature respectively according to the historical information, so as to predict the overheating risk according to each of the overheating fault correlation coefficients combined with the real-time operating power, bus duct temperature and connector temperature of each branch busbar plug-in box, so as to issue an overheating risk alarm when there is an overheating risk according to the overheating risk prediction results.
[0049] To improve the accuracy of risk management and control, the step of issuing an overheating risk alarm when there is an overheating risk according to the overheating risk prediction result includes: issuing the overheating risk alarm before the predicted overheating moment according to the overheating risk prediction result and the preset response time. Before overheating, the staff or workers in the power consumption area can be reminded to make accurate power outages, such as saving electronic files, etc., thereby reducing the impact of the suddenness of the system's automatic power outage on production when an overheating fault occurs.
[0050] In order to improve the prediction accuracy, it also includes: uploading the historical information to a cloud service platform, wherein the cloud service platform is used to expand the overheating fault sample data volume according to the historical information of multiple busbar plug-in box control systems, so as to obtain a remote overheating fault correlation coefficient according to the historical information of multiple busbar plug-in box control systems, and publish the remote overheating fault correlation coefficient to each of the backend servers.
[0051] The busbar plug-in box control system and method provided by the present invention are used for the centralized control of the building busbar plug-in box. The busbar plug-in box control system includes a main controller, and a power consumption monitor and a busbar joint monitor arranged in each branch busbar plug-in box of the building busbar plug-in box. The power consumption monitor and the busbar joint monitor send the monitored power consumption information and temperature information of the corresponding branch busbar plug-in box to the background server of the main controller through a gateway, so as to obtain safety prevention information and fault alarm information through the analysis of the power consumption information and temperature information by the background server. Safety forecasts can be made based on the power consumption information, bus duct temperature and connector temperature. The temperature collection points can be expanded to the bus duct, which can improve the temperature-based safety forecast capability and improve safety. The main controller can also remotely control the opening and closing of each branch busbar plug-in box, effectively improving the convenience of management and control.
[0052] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0053] The above-mentioned embodiments only express several specific implementation methods of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.
Claims
1. A busbar plug-in box control system, used for centralized control of building busbar plug-in boxes, characterized in that: The busbar plug-in box control system includes a master controller, and a power consumption monitor and a busbar joint monitor arranged in each branch busbar plug-in box of the building busbar plug-in box, wherein: The power consumption monitor is used to monitor the power consumption information of the corresponding branch busbar plug-in box, and send the monitored power consumption information to the main controller through the gateway, and the power consumption information includes current, voltage, harmonics, power and power consumption; The busbar joint monitor is used to monitor the temperature information of the corresponding branch busbar plug-in box, and send the temperature information to the main controller through the gateway, and the temperature information includes the busbar duct temperature and the connector temperature; The master controller is used to control the opening and closing of each branch busbar plug-in box, and to upload the received power consumption information and temperature information to the background server, so as to obtain safety prevention information and fault alarm information through the background server's analysis of the power consumption information and the temperature information.
2. The busbar plug-in box control system according to claim 1, characterized in that: The background server is also used to obtain the operating power of the target branch bus plug-in box according to the power consumption information, obtain the predicted temperature information of the target branch bus plug-in box in combination with the temperature information of the target branch bus plug-in box, and provide the safety prevention information according to the predicted temperature information.
3. The busbar plug-in box control system according to claim 2, characterized in that: The background server is also used to obtain heating power according to the operating power of the target branch busbar plug-in box and the preset busbar configuration, and to obtain heat dissipation power according to the busbar trough temperature and connector temperature of the target branch busbar plug-in box, so as to obtain the predicted temperature information according to the heating power and the heat dissipation power.
4. The busbar plug-in box control system according to claim 1, characterized in that: The background server is also used to: record the historical information of the operating power, bus duct temperature, connector temperature and overheating faults of each branch busbar plug-in box, and obtain the overheating fault correlation coefficients of the operating power, bus duct temperature and connector temperature according to the historical information, so as to predict the overheating risk according to each overheating fault correlation coefficient and the real-time operating power, bus duct temperature and connector temperature of each branch busbar plug-in box, so as to issue an overheating risk alarm when there is an overheating risk according to the overheating risk prediction result.
5. The busbar plug-in box control system according to claim 4, characterized in that: The backend server is further used to issue the overheating risk alarm before the predicted overheating moment according to the overheating risk prediction result and the preset response time.
6. The busbar plug-in box control system according to claim 4 or 5, characterized in that: The backend server is also used to upload the historical information to a cloud service platform, wherein the cloud service platform is used to expand the amount of overheating fault sample data based on the historical information of multiple busbar plug-in box control systems, so as to obtain a remote overheating fault correlation coefficient based on the historical information of multiple busbar plug-in box control systems, and publish the remote overheating fault correlation coefficient to each of the backend servers.
7. A busbar plug-in box control method, characterized in that: include: Monitor the power consumption information of each branch busbar plug-in box, and send the monitored power consumption information to the main controller through the gateway, the power consumption information includes current, voltage, harmonics, power and power consumption; Monitor the temperature information of each branch busbar plug-in box, and send the temperature information to the main controller through the gateway, the temperature information includes the busbar duct temperature and the connector temperature; The main controller controls the opening and closing of each branch busbar plug-in box, and uploads the received power consumption information and temperature information to the background server, so that the background server analyzes the power consumption information and the temperature information to obtain safety prevention information and fault alarm information.
8. The busbar plug-in box control method according to claim 7, characterized in that: Also includes: The operating power, bus duct temperature, connector temperature and historical information of overheating faults of each branch busbar plug-in box are recorded, and the overheating fault correlation coefficients of the operating power, bus duct temperature and connector temperature are obtained according to the historical information, so as to make an overheating risk prediction based on the overheating fault correlation coefficients in combination with the real-time operating power, bus duct temperature and connector temperature of each branch busbar plug-in box, so as to issue an overheating risk alarm when there is an overheating risk according to the overheating risk prediction result.
9. The busbar plug-in box control method according to claim 8, characterized in that: The step of issuing an overheating risk alarm when there is an overheating risk according to the overheating risk prediction result includes: issuing the overheating risk alarm before the predicted overheating moment according to the overheating risk prediction result and a preset response time.
10. The busbar plug-in box control method according to claim 8 or 9, characterized in that: Also includes: The historical information is uploaded to a cloud service platform, wherein the cloud service platform is used to expand the amount of overheating fault sample data based on the historical information of multiple busbar plug-in box control systems, so as to obtain a remote overheating fault correlation coefficient based on the historical information of multiple busbar plug-in box control systems, and publish the remote overheating fault correlation coefficient to each of the backend servers.