Dynamic compaction construction informatization management system
By strengthening the construction information management system, combined with the hammer stability maintenance component and sensor technology, the problems of human factors interfering with and extensive management in the existing technology are solved, and efficient information management and safety improvement at the construction site are achieved, ensuring construction Reliability and accuracy of quality.
Patent Information
- Application Number
- CN202411392281.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-08
- Publication Date
- 2025-01-14
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the existing strong construction technology, it is greatly disturbed by human factors and extensive management, so it is impossible to achieve systematic and informatized management, making it difficult to accurately control the construction quality, the structure of the ramming is simple, and there are hidden dangers in the use method, which affects the reliability and safety of the construction. .
Adopt a strong tamp construction information management system, including tamping hammers, microcomputers and handheld terminals, and collect construction measurement information and feedback information through water body measurement modules, terrain measurement modules, inclination sensors and tension sensors, and communicate with handheld terminals using microcomputers, combined with The hammer maintenance component and the decoupler control module ensure the hammer balance and safe whereabouts, and improve construction reliability and information management efficiency.
Through real-time monitoring and feedback information, we can improve the management efficiency and safety of the construction site, ensure the reliability and accuracy of construction quality, reduce human interference, and enhance information management capabilities.
Smart Images

Figure CN119308284A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of dynamic compaction construction, and in particular to an information management system for dynamic compaction construction. Background Art
[0002] Dynamic compaction can quickly consolidate the foundation and greatly improve the bearing capacity. It has become one of the most commonly used and economical deep foundation treatment methods. The quality inspection and acceptance of foundation treatment by dynamic compaction method includes the inspection of main control items and general items. Among them, the main control items refer to the post-test indicators, including foundation strength (or compaction degree), compression modulus, foundation bearing capacity, and effective reinforcement depth; general items mainly refer to the parameters of the dynamic compaction construction process, including the distance of the tamping hammer, the weight of the hammer, the number and sequence of tamping times, the distance between tamping points, the range of tamping, and the interval between the two times.
[0003] Conventional projects that rely on supervision and construction personnel to manually control the compaction construction are subject to great interference from human factors and extensive management. During the compaction construction process, relevant detection cannot be effectively and timely transmitted, so that the construction quality cannot be accurately controlled. The existing information management platform for compaction construction quality is separated from the construction site and cannot be well combined with the construction site for systematic and information management. At the same time, the existing rammer has a simple structure and there are hidden dangers in its use, which affects the reliability of construction. Summary of the invention
[0004] The purpose of the present invention is to solve the shortcomings of the prior art and to propose an information management system for dynamic compaction construction.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions: A dynamic compaction construction information management system, comprising a rammer, a microcomputer and a handheld terminal, wherein the handheld terminal is used to receive construction measurement information and dynamic compaction machine construction feedback information to improve the construction site management efficiency, wherein the construction measurement information comprises surface settlement, pore water pressure, groundwater level, deep horizontal displacement, tamping amount and uplift amount, wherein the construction measurement information comes from a water body measurement module and a topographic measurement module, wherein the water body measurement module comprises a 2-wave velocity echo sounder, a groundwater level meter and a pore water pressure meter, wherein the topographic measurement module comprises a theodolite, a level, a total station and an inclinometer, wherein the dynamic compaction machine construction feedback information is used to monitor the working state of the dynamic compaction machine and ensure the reliability and safety of the construction, wherein the dynamic compaction machine construction feedback information comes from an inclination sensor and a tension sensor; The microcomputer is communicatively connected with the handheld terminal, and the microcomputer is connected with a rammer stabilization component and a decoupling device control module. The rammer stabilization component is used to maintain the balance of the rammer to avoid large-angle tilting during the falling process, which affects the accuracy of the tamping. The rammer stabilization component is arranged on the rammer, and the rammer stabilization component includes a control solenoid valve and an oil pump. The decoupling device control module is used to control the rammer to fall reliably during tamping, and to avoid the rammer from being unhooked when lifting and suspending the rammer, thereby improving construction safety.
[0006] Preferably, a liquid storage tank is provided in the middle of the rammer, a counterweight box is provided on the upper surface of the rammer, an oil pipe is provided between the liquid storage tank and the counterweight box, and the control solenoid valve and the oil pump are both provided on the oil pipe; The counterweight boxes are provided in multiple groups and are evenly arranged on the upper side of the rammer. The liquid storage tank and the counterweight boxes are filled with oil. The bottom of the counterweight boxes is conical or hemispherical.
[0007] Preferably, a counterweight groove is provided on the upper portion of the rammer, and the counterweight grooves are provided in multiple groups and are evenly arranged on the side walls of the rammer, and mounting holes are provided in the counterweight grooves.
[0008] Preferably, a hanging ring is provided on the top of the rammer, and the unhooking device control module comprises a main body, a telescopic rod and a hook, and the hook is arranged correspondingly to the hanging ring; The hook is rotatably connected to the main body, the two ends of the telescopic rod are respectively rotatably connected to the hook and the main body, and a suspension rod is arranged on the top of the main body.
[0009] Preferably, the water body measurement module is used to detect the state of the groundwater body and the changing characteristics of the groundwater level during the dynamic compaction process, which serves as the data basis for the foundation dewatering work before the dynamic compaction construction; The 2-wave echo sounder is used to detect the water depth of the foundation and provide high-precision water depth measurement data. The groundwater level meter is used to detect the moisture content of the foundation and feedback the progress of vacuum dewatering construction. The pore water pressure meter is used to observe the dissipation of excess pore water pressure, which is convenient for determining the compaction construction period.
[0010] Preferably, the topographic measurement module is used to detect the initial conditions of the construction site in order to preliminarily determine and adjust the dynamic compaction construction parameters, and to provide data feedback during the construction process, including vertical displacement monitoring, horizontal displacement monitoring and deep soil displacement monitoring of the foundation, so as to dynamically adjust the construction parameters according to the construction results.
[0011] Preferably, the handheld terminal is connected to a GPS satellite positioning system, and the GPS satellite positioning system is used to assist in the synchronous deployment of the elevation control network and the plane control network.
[0012] Preferably, the inclination sensor is arranged on the rammer, and the inclination sensor is used to measure the horizontal angle change of the rammer as a basis for adjusting the rammer stabilization assembly.
[0013] Preferably, the tension sensor is arranged on the suspension rod to detect the tension carried by the suspension rod and determine the suspension state of the rammer.
[0014] Compared with the prior art, the present invention has the following beneficial effects: 1. The present invention is provided with a rammer stabilization component. According to the data fed back by the inclination sensor on the rammer, the microcomputer controls the solenoid valve and the oil pump to control the oil flow, adjust the center of gravity of the rammer, ensure the rammer falls stably, and improve the reliability and controllability of the tamping work; 2. The present invention collects construction measurement information and dynamic compaction machine construction feedback information through a handheld terminal, thereby improving the efficiency of construction information management, and quickly feeds back to a microcomputer for sorting and analysis, quickly determining a construction plan, and facilitating operators to adjust construction parameters in a timely manner. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a structural schematic diagram of a dynamic compaction construction information management system proposed by the present invention; Figure 2 A construction flow chart of a dynamic compaction construction information management system proposed by the present invention; Figure 3 A schematic diagram of the three-dimensional structure of a rammer and a decoupling device of a dynamic tamping construction information management system proposed by the present invention; Figure 4 This is a schematic diagram of the main sectional structure of a decoupling device of a dynamic compaction construction information management system proposed by the present invention.
[0016] In the figure: 1. Water body measurement module; 2. Topography measurement module; 3. Rammer stabilization assembly; 31. Liquid storage tank; 32. Oil pump; 33. Counterweight box; 34. Oil pipe; 4. Unhooker control module; 41. Main body; 42. Hanging rod; 43. Telescopic rod; 44. Hook; 5. Counterweight slot; 6. Rammer; 61. Hanging ring. DETAILED DESCRIPTION
[0017] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. The following description of at least one exemplary embodiment is actually only illustrative and is by no means intended to limit the present invention and its application or use. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0018] Reference Figure 1-4, an information management system for dynamic tamping construction, including a tamping hammer 6, a microcomputer and a handheld terminal. A counterweight groove 5 is provided on the upper part of the tamping hammer 6. There are multiple groups of counterweight grooves 5, which are evenly arranged on the side wall of the tamping hammer 6. The center of gravity of the tamping hammer 6 is adjusted downward, the upper part is light and the lower part is heavy, so as to improve the falling stability of the tamping hammer 6 and avoid the tamping pit being uneven due to a large tilt when the tamping hammer 6 falls. There are mounting holes in the counterweight groove 5 for easy installation of the counterweight block and center of gravity adjustment. The handheld terminal is used to receive construction measurement information and feedback information of the dynamic tamping machine construction, so as to improve the efficiency of construction site management; The handheld terminal is connected to the GPS satellite positioning system, which is used to assist in the synchronous layout of the elevation control network and the plane control network; To prevent errors, as important measurement points such as control centerline piles and leveling points during construction, at least two groups must be set up for mutual inspection and verification, and measurement and inspection and verification records must be made. The arranged control piles should be stable and reliable and retained until the end of the project; For the convenience of protection, the construction leveling points are as consistent as possible with the plane control points. Basic leveling points and temporary leveling points are used for two-level layout. The basic leveling points are the main control points for controlling the entire construction area. Second-class leveling is used for joint measurement with the provided leveling points. Temporary leveling points are densely laid out according to the needs of layout. Construction measurement information includes surface settlement, pore water pressure, groundwater level, deep horizontal displacement, tamping amount and uplift amount. After each tamping, a steel tape measure is used in conjunction with other instruments to measure the tamping amount and uplift amount of each tamping point, and the information is entered into a handheld terminal for information management. The construction measurement information comes from the water body measurement module 1 and the terrain measurement module 2. The water body measurement module 1 is used to monitor the state of the groundwater body and the changing characteristics of the groundwater level during the compaction process, which serves as the data basis for the foundation dewatering work before the compaction construction. The water body measurement module 1 includes a 2-wave echo sounder, a groundwater level meter and a pore water pressure meter. The 2-wave echo sounder is used to detect the water depth of the foundation and provide high-precision water depth measurement data. The groundwater level meter is used to detect the water content of the foundation and feedback the progress of vacuum dewatering construction. The pore water pressure meter is used to observe the dissipation of excess pore water pressure to facilitate the determination of the strong compaction construction period. Before the strong compaction construction, it is necessary to ensure that the groundwater level is 2.5m below the tamping surface and that the excess pore water pressure in the soil body is dissipated by more than 80%; The topographic measurement module 2 includes a theodolite, a level, a total station and an inclinometer. The topographic measurement module 2 is used to detect the initial conditions of the construction site in order to preliminarily determine and adjust the dynamic compaction construction parameters. Data feedback is performed during the construction process, including vertical displacement monitoring, horizontal displacement monitoring and deep soil displacement monitoring of the foundation, so as to dynamically adjust the construction parameters according to the construction effect. Among them: The vertical displacement monitoring projects include the surface settlement of the high vacuum densification area, the vertical settlement of the wharf structure, the vertical settlement of the high-pressure swing spray pile and cement mixing pile, and the settlement of the top of the harbor and foundation pit slope. The horizontal displacement monitoring projects include the deep horizontal displacement of the high vacuum densification area, the horizontal displacement of the wharf structure, the surface and deep horizontal displacement of the high-pressure swing spray pile and cement mixing pile, and the displacement of the top of the harbor and foundation pit slope. Construction measurement is carried out according to the construction site, construction control network and design drawings to carry out positioning and elevation measurement; according to the design drawings and the control point coordinates provided by the owner, the positioning and layout data of the construction control line are calculated; when measuring and laying out, the orientation of the construction control line is controlled, the plane position is controlled with a total station, and the template support is controlled with a theodolite and level to ensure the straightness of the axis. The construction fixed-point layout is carried out with a total station; During the construction process, the baseline and leveling points must be checked regularly or irregularly and properly protected. If any deviation or damage is found, the cause must be investigated and restoration must be carried out in a timely manner.
[0019] The dynamic compaction machine construction feedback information is used to monitor the working status of the dynamic compaction machine and ensure the reliability and safety of the construction. The dynamic compaction machine construction feedback information comes from the inclination sensor and tension sensor, as well as the inspection of the tamping pit and foundation by on-site inspection personnel; The microcomputer is connected to the handheld terminal for communication. The microcomputer is connected to the rammer stabilization component 3 and the unhooking device control module 4. The inclination sensor is arranged on the rammer 6. The inclination sensor is used to measure the horizontal angle change of the rammer 6 as the basis for adjusting the rammer stabilization component 3. The rammer stabilizing assembly 3 is used to maintain the balance of the rammer 6 to avoid a large angle of tilt during the falling process, which affects the accuracy of the strong tamping. The rammer stabilizing assembly 3 is arranged on the rammer 6. The rammer stabilizing assembly 3 includes a control solenoid valve and an oil pump 32. A liquid storage tank 31 is provided in the middle of the rammer 6. A counterweight box 33 is provided on the upper surface of the rammer 6. An oil pipe 34 is provided between the liquid storage tank 31 and the counterweight box 33. The control solenoid valve and the oil pump 32 are both arranged on the oil pipe 34. There are multiple groups of counterweight boxes 33, which are evenly arranged on the upper side of the rammer 6. The liquid storage tank 31 and the counterweight box 33 are filled with oil. The bottom of the counterweight box 33 is conical or hemispherical, which is convenient for gathering oil and avoiding the flow of oil to affect the stability of the center of gravity. When the rammer 6 falls and tilts, the inclination sensor collects relevant data, which is collected by the microcomputer and an adjustment instruction is issued to control the solenoid valve and the oil pump 32 to start working, pumping oil, adjusting the amount of oil in each counterweight box 33, changing the counterweight, and adjusting the center of gravity; The unhooking device control module 4 is used to control the rammer 6 to fall reliably during strong tamping, and to prevent the rammer 6 from being unhooked when lifting and suspending the rammer 6, thereby improving construction safety. A hanging ring 61 is provided on the top of the rammer 6, and the unhooking device control module 4 includes a main body 41, a telescopic rod 43 and a hook 44, and the hook 44 is arranged corresponding to the hanging ring 61; the hook 44 is rotatably connected to the main body 41, and the two ends of the telescopic rod 43 are respectively rotatably connected to the hook 44 and the main body 41, and a hanging rod 42 is provided on the top of the main body 41.
[0020] The tilt sensor can be replaced by a gyroscope to collect horizontal, vertical, pitch, heading and angular velocity information; The tension sensor is arranged on the suspension rod 42 to detect the tension carried by the suspension rod 42 and determine the suspension state of the rammer 6.
[0021] Specific construction steps: (1) Configure equipment, prepare for construction, conduct geological survey of the site, determine the construction plan, and then level and backfill the site; (2) During the process of measuring and arranging control points, comprehensive consideration should be given to factors such as the control points should be convenient for construction, good visibility on site, stable and reliable foundations at the points, not prone to displacement, settlement, or damage, and easy to protect. During construction, temporary control points can be added according to the needs of the project construction, and their accuracy should meet the corresponding grade requirements; (3) Dig drainage ditches, arrange well point locations, prepare for vacuum well point dewatering, install equipment corresponding to the vacuum well point dewatering system, insert pipes to arrange dewatering pipes, configure pump rooms, and connect pipelines; When vacuum drainage is carried out, continuous pumping should be ensured when the vacuum system is in operation. During the drainage process, a 2-wave echo sounder, groundwater level meter and pore water pressure meter should be used to detect the groundwater body, and timely feedback on the construction effect should be given to improve the construction efficiency; (4) Four times of spot tamping and two times of full tamping. After the spot tamping is completed, all downpipes are removed and full tamping is performed. Full tamping is lap tamping with an lap width of 1 / 4 of the hammer diameter. The full tamping energy is set at 800 kJ and the number of hits per pass is 2. The interval time between each strong compaction should be strictly controlled by test compaction and information technology, and adjusted according to the on-site test results; the settlement amount of each blow is calculated by measuring the change in the height of the top surface of the hammer; a dedicated person uses a level to measure and record each blow, and then calculates the single-blow settlement amount and makes detailed records; the next point can be constructed only when the stop-blow standard is met; Steps of compaction construction: ① Mark the location of the first compaction point and measure the original ground elevation; ② Put the crane in place and align the center of the tamping hammer with the tamping point; ③Measure the elevation of the hammer top before tamping; After the hammer weight and lifting height are determined according to the test section, a fixed ruler is set on the crane to determine the elevation; the subsequent construction is carried out according to the construction method of the first strike; when the hammer withdrawal standard is reached, the tamping of the point is stopped, and the tamping of the point is completed; the surveyor calculates the average of the last two strikes of the tamping point and fills it in the record sheet; the tamping machine lifts the hammer and moves to the next tamping point and the construction is carried out in sequence according to the construction method of the first point; The tamping process needs to observe, record and analyze the number of tamping times at each tamping point, the tamping amount per tamping, the average tamping amount of the final two tampings, the cumulative tamping amount (tamping pit depth), and the tamping pit diameter; ④ Lift the rammer to the predetermined height, lower the hook after the rammer falls off and falls freely, and measure the elevation of the top of the rammer; if it is found that the rammer is tilted due to the tilt of the pit bottom, use a bulldozer in time to fill the pit bottom with silt or silty clay from the excavated earthwork of the harbor basin; ⑤ Repeat step ④ to complete the tamping of one tamping point according to the tamping times and control standards required by the design; The point tamping adopts the step-by-step tamping method. The tamping energy is set to 1000kJ, 1400kJ, 1800kJ, and 2200kJ according to the test area. The number of hits per pass is set to 6. The spacing between tamping points is 4.0m and they are arranged in a square. ⑥Change the tamping point and repeat steps ③ to ⑤ to complete the tamping of all tamping points in the first round; Firstly carry out spot tamping test construction according to the construction parameters, and the specific number of hits and energy need to be adjusted in combination with the on-site test tamping results; Stop hammer standard: The average tamping amount of the last two hits of a single point should not exceed 5cm, the ground around the tamping pit should not bulge too much, and the hammer should not be difficult to control due to the tamping pit being too deep; ⑦Complete the four-time spot tamping construction according to the above steps; In order to avoid the soil from being damaged by being beaten into "spring soil", there should not be too much bulge between ramming pits. The equipment is used to measure the bulge of the pit edge at 0.5m, 1.0m and 1.5m outside the pit in two orthogonal directions of each test ramming pit. With the help of a microcomputer, a curve of the relationship between the number of blows N and the amount of ramming S is drawn to calculate the bulge and side squeeze, determine the best ramming energy, and adjust the lifting height of the rammer. ⑧ After the last round of tamping, remove the vacuum tube in the site, flatten the site with a bulldozer, and then use low-energy full tamping to compact the surface soil of the site, and measure the site elevation after tamping; (5) Site leveling, equipment dismantling, and project acceptance; After each process is completed, the technical personnel and quality inspectors in charge of the process will organize the construction area manager to conduct inspections according to the relevant strike count specifications, and conduct construction quality inspections based on the process parameters in the microcomputer to effectively prevent bad behavior and ensure construction quality.
[0022] In addition, dynamic compaction construction cannot be carried out on rainy days. The site must be effectively drained after rain and the groundwater must be tested. After drainage, dynamic compaction can be carried out. During the construction process, the precipitation pipes that affect the movement of the tamping machine will be removed, and as few precipitation pipes as possible should be removed.
[0023] During the compaction process, check whether the rammer is in the center to ensure that the compaction point is accurate. If there is eccentricity, add counterweights to balance it and prevent the ramming pit from tilting excessively. During this process, when the tilt angle of the rammer 6 is too large, it affects the reliability of the tamping construction. The rammer stabilizing component 3 starts to work and begins to intervene in the control. The inclination sensor detects the tilt angle of the rammer 6. The microcomputer controls the solenoid valve and the oil pump 32 to start working according to the corresponding data, adjusts the oil distribution, improves the counterweight, and ensures that the rammer 6 tamps the soil stably.
[0024] The microcomputer can also be connected to a display and an alarm. The display is used to prompt the operator to operate according to instructions, improve the standardization and informatization of construction, and make timely adjustments based on feedback from construction measurements. The alarm is used to remind construction personnel or other personnel on site that tamping construction is in progress, and remind personnel to take shelter in time to improve safety.
[0025] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
[0026] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.
[0027] Unless otherwise specifically stated, the relative arrangement of the parts and steps described in these embodiments, numerical expressions and numerical values do not limit the scope of the present invention. At the same time, it should be understood that, for ease of description, the sizes of the various parts shown in the accompanying drawings are not drawn according to the actual proportional relationship. The technology, method and equipment known to ordinary technicians in the relevant field may not be discussed in detail, but in appropriate cases, the technology, method and equipment should be regarded as a part of the authorization specification. In all examples shown and discussed here, any specific value should be interpreted as being merely exemplary, rather than as a limitation. Therefore, other examples of exemplary embodiments may have different values. It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once a certain item is defined in an accompanying drawing, it does not need to be further discussed in subsequent drawings.
Claims
1. A dynamic tamping construction information management system, comprising a tamping hammer (6), a microcomputer and a handheld terminal, characterized in that: The handheld terminal is used to receive construction measurement information and dynamic compaction machine construction feedback information to improve the construction site management efficiency. The construction measurement information includes surface settlement, pore water pressure, groundwater level, deep horizontal displacement, compaction amount and uplift amount. The construction measurement information comes from a water body measurement module (1) and a topographic measurement module (2). The water body measurement module (1) includes a 2-wave echo sounder, a groundwater level meter and a pore water pressure meter. The topographic measurement module (2) includes a theodolite, a level, a total station and an inclinometer. The dynamic compaction machine construction feedback information is used to monitor the working state of the dynamic compaction machine and ensure the reliability and safety of the construction. The dynamic compaction machine construction feedback information comes from an inclination sensor and a tension sensor. The microcomputer is communicatively connected to the handheld terminal. The microcomputer is connected to a rammer stabilizing component (3) and a decoupling device control module (4). The rammer stabilizing component (3) is used to maintain the balance of the rammer (6) to avoid large-angle tilting during the falling process, thereby affecting the accuracy of strong compaction. The rammer stabilizing component (3) is arranged on the rammer (6). The rammer stabilizing component (3) includes a control solenoid valve and an oil pump (32). The decoupling device control module (4) is used to control the rammer (6) to fall reliably during strong compaction, and to avoid the rammer (6) from being decoupled when lifting and suspending the rammer (6), thereby improving construction safety.
2. The information management system for dynamic compaction construction according to claim 1 is characterized in that: A liquid storage tank (31) is provided in the middle of the rammer (6), a counterweight box (33) is provided on the upper surface of the rammer (6), an oil pipe (34) is provided between the liquid storage tank (31) and the counterweight box (33), and the control solenoid valve and the oil pump (32) are both provided on the oil pipe (34); The counterweight boxes (33) are provided in multiple groups and are evenly arranged on the upper side of the rammer (6). The liquid storage tank (31) and the counterweight boxes (33) are filled with oil. The bottom of the counterweight boxes (33) is conical or hemispherical.
3. The information management system for dynamic compaction construction according to claim 2 is characterized in that: A counterweight groove (5) is provided on the upper portion of the rammer (6), a plurality of counterweight grooves (5) are provided and are evenly arranged on the side wall of the rammer (6), and a mounting hole is provided in the counterweight groove (5).
4. The information management system for dynamic compaction construction according to claim 3 is characterized in that: The top of the rammer (6) is provided with a hanging ring (61); the dehooking device control module (4) comprises a main body (41), a telescopic rod (43) and a hook (44); the hook (44) and the hanging ring (61) are arranged correspondingly; The hook (44) is rotatably connected to the main body (41), and the two ends of the telescopic rod (43) are rotatably connected to the hook (44) and the main body (41) respectively. A suspension rod (42) is provided at the top of the main body (41).
5. The information management system for dynamic compaction construction according to claim 1 is characterized in that: The water body measurement module (1) is used to detect the state of the groundwater body and the changing characteristics of the groundwater level during the compaction process, which serves as a data basis for foundation dewatering work before the compaction construction. The 2-wave echo sounder is used to detect the water depth of the foundation and provide high-precision water depth measurement data. The groundwater level meter is used to detect the moisture content of the foundation and feedback the progress of vacuum dewatering construction. The pore water pressure meter is used to observe the dissipation of excess pore water pressure, which is convenient for determining the compaction construction period.
6. The information management system for dynamic compaction construction according to claim 5 is characterized in that: The topographic measurement module (2) is used to detect the initial conditions of the construction site so as to preliminarily determine and adjust the dynamic compaction construction parameters, and to provide data feedback during the construction process, including vertical displacement monitoring, horizontal displacement monitoring and deep soil displacement monitoring of the foundation, so as to facilitate dynamic adjustment of the construction parameters according to the construction effect.
7. The information management system for dynamic compaction construction according to claim 1 is characterized in that: The handheld terminal is connected to a GPS satellite positioning system, and the GPS satellite positioning system is used to assist in the synchronous deployment of the elevation control network and the plane control network.
8. The information management system for dynamic compaction construction according to claim 1 is characterized in that: The inclination sensor is arranged on the rammer (6), and is used to measure the horizontal angle change of the rammer (6) as a basis for adjusting the rammer stabilizing component (3).
9. The information management system for dynamic compaction construction according to claim 4, characterized in that: The tension sensor is arranged on the suspension rod (42) and is used to detect the tension carried by the suspension rod (42) and determine the suspension state of the rammer (6).