Dynamic construction carbon emission visualization method and system based on numerical simulation

Through a combination of numerical simulation and input-output method, a 5D BIM model is constructed to display the dynamic distribution of construction carbon emissions, solving the problem of unvisible carbon emissions in the existing technology, realizing a detailed and intuitive display of construction carbon emissions, and providing Decision-making basis.

CN119312565AActive Publication Date: 2025-01-14HARBIN INST OF TECH +1

Patent Information

Application Number
CN202411423884.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-12
Publication Date
2025-01-14
Estimated Expiration
2044-10-12

AI Technical Summary

Technical Problem

The existing technology cannot effectively display the visual display of construction carbon emissions, and cannot reflect the inherent connection between dynamic carbon emissions and the construction process, resulting in the unintuitive carbon emission distribution relationship and change relationship.

Method used

Using a dynamic construction carbon emission visualization method based on numerical simulation, a 3D BIM model is constructed by collecting the resource consumption of each component during the construction process, and a 3D BIM model is distributed in combination with the input-output method to generate a 5D BIM model to display the minimum construction unit The dynamic distribution cloud map of daily and cumulative carbon emissions can realize the visualization of the distribution relationship and change relationship of carbon emissions in time and space.

Benefits of technology

It realizes a detailed, intuitive and concise visual display of construction carbon emissions, displays the distribution and change relationships of carbon emissions in time and space, restores the construction process to the greatest extent, and provides a decision-making basis for green and low-carbon construction management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119312565A_ABST
    Figure CN119312565A_ABST
Patent Text Reader

Abstract

The invention provides a dynamic construction carbon emission visualization method and system based on numerical simulation, and belongs to the field of carbon emission calculation. The method aims at solving the problems that an existing method cannot conduct visual display of construction carbon emission and cannot reflect the internal relation between dynamic carbon emission and the construction process. Firstly, a process analysis method and an input-output analysis method are used for accurately metering dynamic construction carbon emission, then carbon emission positioning is carried out according to a carbon footprint theory, then space-time correlation between construction carbon emission and a building model is achieved through a numerical simulation method, and finally the dynamic visualization target of construction carbon emission is achieved. According to the method, the construction process is regarded as the product production process, dynamic construction carbon emission metering is achieved by counting all resource investment of a project and final building composition, the relation between spatial and temporal distribution and internal composition of carbon emission can be simply, meticulously and visually displayed, and the construction carbon emission generation process is reduced to the maximum extent.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of carbon emission calculation, and in particular to a dynamic construction carbon emission visualization method and system based on numerical simulation. Background Art

[0002] For construction, carbon emissions account for a large proportion, have a large peak, are concentrated, and have a great impact on the environment, making it a key focus of energy conservation and emission reduction. At present, the measurement results of construction carbon emissions are generally displayed in the form of charts, which not only cannot intuitively show the location distribution comparison relationship and intensity comparison relationship of carbon emissions in various construction areas, but also cannot show the distribution relationship of carbon emissions in construction procedures and construction time.

[0003] The existing measurement results of construction carbon emissions can also be displayed by building a carbon emission model based on the construction stage. For example, the existing patent is a carbon emission assessment method and system based on 4D-BIM technology (application number: CN202410270978.3). First, determine the basic information of the building, divide the carbon emission stages of the building construction process, define the carbon emission calculation method of each stage and establish a digital model; then use BIM software to build a three-dimensional model of the building, then decompose the project, formulate a construction schedule, and calculate the carbon emissions of each stage with simulation results; integrate 4D-BIM technology to simulate the building visualization, and finally accurately calculate and evaluate carbon emissions. Although the above patent can observe the carbon emission relationship in the construction time, it is necessary to analyze the construction process, which leads to a complex model construction method, that is, the dynamic simulation model of the entire construction process is difficult to model, and the simulation process needs to ignore the influence of many construction uncertainties. The simulation results are far from the actual construction resource consumption data, and the distribution of construction carbon emissions cannot be intuitively displayed. Moreover, the visualization of carbon emissions in the above-mentioned patent only adds the time sequence conditions based on the construction process, and is unable to display the implicit carbon emissions. The implicit carbon emissions display includes the daily carbon emissions and cumulative carbon emissions of each component and the daily carbon emissions and cumulative carbon emissions of the building body. The visualization effect is poor, and it is difficult to intuitively and in detail display the changes in carbon emissions during the construction process. Summary of the invention

[0004] The technical problems to be solved by the present invention are:

[0005] In order to solve the problem that existing methods cannot visualize construction carbon emissions and cannot reflect the intrinsic connection between dynamic carbon emissions and the construction process.

[0006] The present invention adopts the following technical solutions to solve the above technical problems:

[0007] The present invention provides a dynamic construction carbon emission visualization method based on numerical simulation, comprising the following steps:

[0008] S100. Collect the resource consumption of each component during the construction process, determine the consumption data of labor, materials and mechanical energy during the construction process according to the project construction drawing design and construction organization design, and calculate the carbon emission data of each process according to the classification of sub-projects and corresponding carbon emission factors;

[0009] S200, the carbon emission data of each process obtained in step S100 is reallocated based on the input-output method, all labor, material and mechanical energy consumption in the construction process are regarded as project input, and the final completed construction building is regarded as project output. Based on the proportion of various materials in the cost of main project materials, all construction carbon emissions in the entire project are reallocated, and all carbon emissions are proportionally allocated to all main project materials; finally, according to the allocation results, the carbon emission data of each unit quantity of main project materials after allocation is calculated;

[0010] S300, constructing a 3D BIM model, using the 3D BIM building model established in the project design phase as a display carrier, dividing the building model into component boundaries according to the actual construction situation, and performing parametric transformation of the components so that each component has parametric properties;

[0011] S400, dividing the component into minimum construction units, dividing each component according to the minimum construction unit, while maintaining that the minimum construction unit has all the parametric properties of the component;

[0012] S500, associating process time, building a 4D BIM model, associating each minimum construction unit of each component with the corresponding construction process and construction time according to the actual construction situation, and generating a 4D BIM model;

[0013] S600, associating carbon emission characteristics and constructing a 5D BIM model. After the 4D BIM model is generated in step S500, the material consumption of each minimum construction unit of each component in each process is correlated with the corresponding position of the BIM model, and the carbon emission value of each unit quantity of the main engineering material is input. The parametric attributes added to the component in step S300 are used to automatically calculate the carbon emission measurement data with construction output as the carrier and changing with time series, and finally the 5D BIM model is formed;

[0014] S700, visually presenting the 5D BIM model obtained in step S600, including a dynamic distribution cloud map of daily carbon emissions of the minimum construction unit, a dynamic distribution cloud map of cumulative carbon emissions of the minimum construction unit, a dynamic distribution cloud map of daily carbon emissions of building components, and a dynamic distribution cloud map of cumulative carbon emissions of building components.

[0015] Furthermore, in step S200, the sub-projects include main projects and non-main projects. When allocating, the carbon emissions generated by all personnel, all machinery and all non-main project materials in the construction project are located on all main project material entities in proportion.

[0016] Furthermore, in step S300, the parameters of each component include component volume / area / weight, component material type and consumption quantity.

[0017] Furthermore, in step S400, the minimum construction unit of each component includes 1m 3 Concrete, 1㎡ masonry, 1m steel pipe, a precast beam or a steel component.

[0018] Further, in step S500, the associated data includes the construction start time, end time and duration.

[0019] Furthermore, in step S700, the following steps are included:

[0020] S710. When making a dynamic distribution cloud map of daily carbon emissions of the minimum construction unit, take the day as the minimum unit of temporal change, take the minimum construction unit as the statistical object, sort the carbon emission values ​​of all the minimum construction units in the 5D BIM model obtained in step S600, customize a gradient color card, divide the value ranges contained in the daily maximum and minimum carbon emissions of all the minimum construction units in the whole construction process in equal proportion, and make each color map to the corresponding value range; according to the mapping relationship between the value and color of the gradient color card, make each minimum construction unit present the corresponding color according to the carbon emissions of the day, so as to obtain the daily carbon emission distribution cloud map of the minimum construction unit;

[0021] S720. When making a dynamic distribution cloud map of the accumulated carbon emissions of the minimum construction unit, take the day as the minimum unit of time series change, take the minimum construction unit as the statistical object, sort the accumulated carbon emission values ​​of all the minimum construction units in the model, customize a gradient color card, divide the value ranges contained in the accumulated maximum and minimum carbon emissions in equal proportion, and make each color map to the corresponding value range; according to the mapping relationship between the value and color of the gradient color card, make each minimum construction unit present the corresponding color according to the accumulated carbon emissions up to that day, so as to obtain the accumulated carbon emission distribution cloud map of the minimum construction unit;

[0022] S730. When making a dynamic distribution cloud map of daily carbon emissions of building components, take day as the smallest unit of temporal change, take components as statistical objects, add up the carbon emissions of the smallest construction units that constitute each component in the daily model, and form the daily carbon emissions of each component; sort the carbon emission values ​​of all components in the model every day and customize a gradient color card, divide the value ranges contained in the daily maximum and minimum carbon emissions of all construction units in the whole construction process in equal proportion, and make each color map to the corresponding value range; according to the mapping relationship between the value and color of the gradient color card, make each component present the corresponding color according to the daily carbon emissions, so as to obtain the daily carbon emission distribution cloud map of the component;

[0023] S740. When making a dynamic distribution cloud map of the cumulative carbon emissions of building components, take days as the smallest unit of time series change and components as statistical objects, add up the cumulative carbon emissions of the smallest construction units that make up each component in the model to form the cumulative carbon emissions of each component; sort the cumulative carbon emission values ​​of all components in the model and customize a gradient color card, divide the numerical range contained in the cumulative maximum and minimum carbon emissions in equal proportion, and map each color to the corresponding numerical range; according to the mapping relationship between the gradient color card value and the color, make each component present the corresponding color according to the cumulative carbon emissions up to that day, so as to obtain the cumulative carbon emission distribution cloud map of the component.

[0024] Furthermore, the cloud map obtained in step S700 is played continuously in chronological order, thereby presenting the cumulative carbon emission changes of each part during the entire construction process.

[0025] A dynamic construction carbon emission visualization system based on numerical simulation is provided. The system has a program module corresponding to the above steps and executes the steps in the above dynamic construction carbon emission visualization method based on numerical simulation when running.

[0026] A computer-readable storage medium stores a computer program, wherein the computer program is configured to implement the steps of a dynamic construction carbon emission visualization method based on numerical simulation when called by a processor.

[0027] Compared with the prior art, the present invention has the following beneficial effects:

[0028] The present invention discloses a dynamic construction carbon emission visualization method and system based on numerical simulation, calculates carbon emissions based on process analysis method and input-output analysis method, visualizes carbon emissions based on numerical simulation, and divides the main structure into minimum construction units (m / ㎡ / m 3 / root / piece), a dynamic project carbon emission intensity cloud map is generated according to the project implementation progress and construction sequence, thereby realizing the visualization of the distribution relationship, change relationship and comparison relationship of carbon emissions in time and space, and finally achieving the goal of visual presentation of construction carbon emissions; the present invention concentrates all carbon emissions in the construction project on the main structure for display, and presents different colors according to the size of the carbon emissions of each component in the building model, thereby forming a carbon emission intensity cloud map; the present invention ignores process analysis, and only considers the consumption in the construction process as the project input and the final construction building as the project output. The method of model construction is relatively simple, and on this basis, the visualization model is more detailed, that is, the two dimensions of construction progress and construction carbon emissions are integrated on the basis of the 3D BIM model, forming a more real, detailed and intuitive construction 5D The BIM model displays the dynamic distribution of daily carbon emissions from the smallest construction unit, the dynamic distribution of cumulative carbon emissions from the smallest construction unit, the dynamic distribution of daily carbon emissions from building components, and the dynamic distribution of cumulative carbon emissions from building components. It is detailed, intuitive, simple, and effective. It can display the distribution relationship, change relationship, and comparative relationship of carbon emissions in time and space, and restore the construction process to the greatest extent; it can display the dynamic distribution of carbon emissions throughout the entire project construction process from three dimensions: the overall building, building components, and the smallest construction unit of the components, and from two scales: daily carbon emissions and cumulative carbon emissions; it can restore the relationship between the construction sequence and carbon emissions to the greatest extent and in the most detail, and provide a decision-making basis for green and low-carbon construction management at different stages. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 The present invention is a flowchart of a method for visualizing dynamic construction carbon emissions based on numerical simulation in an embodiment of the present invention. DETAILED DESCRIPTION

[0030] In the description of the present invention, it should be noted that the terms "first", "second", and "third" mentioned in the embodiments of the present invention are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first", "second", and "third" may explicitly or implicitly include one or more of the features.

[0031] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, specific embodiments of the present invention are described in detail below with reference to the accompanying drawings.

[0032] Specific implementation plan 1: Combine Figure 1 As shown, the present invention provides a dynamic construction carbon emission visualization method based on numerical simulation, comprising the following steps:

[0033] S100. Collect the resource consumption of each component during the construction process. According to the project construction drawing design and construction organization design, first determine the consumption data of labor, materials and mechanical energy in the construction, then classify these consumption data according to the sub-projects, and then obtain the carbon emission value of each process according to the carbon emission factors of various resources;

[0034] S200, the carbon emission data of each component obtained in step S100 is reallocated based on the input-output method, all labor, material and mechanical energy consumption in the construction process are regarded as project input, and the final completed construction building is regarded as project output. Based on the proportion of various materials in the cost of main project materials, all construction carbon emissions in the entire project are reallocated, and all carbon emissions are proportionally allocated to all main project materials; finally, according to the allocation results, the carbon emission value per unit quantity of each main project material after allocation is calculated;

[0035] This method ignores the complex and lengthy process analysis of resource consumption, matches all project inputs with outputs, and then attributes all project construction carbon emissions to the final building entity;

[0036] Since there are many sub-projects in the construction process, some of which include concrete engineering, masonry engineering, steel structure engineering, secondary structure engineering, ancillary facilities engineering, and decoration and renovation engineering, all of which belong to the main project; the other part includes earthwork engineering, support engineering, scaffolding engineering, formwork engineering, temporary construction engineering, and enclosure engineering, which belong to non-main engineering; each of these sub-projects has corresponding human, material, and machine resource consumption; therefore, it is necessary to locate the carbon emissions generated by all personnel, all machinery, and all non-main engineering materials in the construction project on all main engineering material entities according to the cost proportion of each main engineering material in all main engineering materials;

[0037] Since the more resources invested in producing a unit weight / volume of the material and the more complicated the process, the higher the carbon emission value of the material, the higher the monetary value of the material; therefore, according to the idea and principle of the input-output method, the material consumption of each main project is converted into monetary form, and the proportion of each material cost in the main project is calculated, so as to keep the proportion of the material consumption cost in the total material cost of the main project unchanged;

[0038] S300, constructing a 3D BIM model. In order to intuitively display the distribution relationship between project output and carbon emissions, the 3D BIM building model established in the project design phase is used as a display carrier. The building model is divided into component boundaries according to the actual construction situation (i.e., the boundaries of each component are determined and the entire building model is split into several components), and the components are parametrically modified (parameterization means adding parameters to the components so that the size, volume, weight, type of constituent materials and content of the components can be called using parameters. Such data of all the same components in the model can be quickly and uniformly modified by modifying the parameter values. Parameters can also be used to write calculation formulas to achieve rapid calculation of the carbon emission values ​​of the model components), so that each component has parametric properties, including component volume / area / weight, type of constituent materials and consumption quantity parameters;

[0039] S400, Divide the components into the smallest construction unit. Since the duration of many construction processes varies from a few days to a few weeks, in order to more vividly and meticulously display the dynamic process of building construction, each component is divided into the smallest construction unit (m, m2, m 3 , , root) to divide, such as 1m 3 Concrete, 1㎡ masonry, 1 precast beam, and a steel component, while maintaining all the parametric properties of the component in the smallest construction unit;

[0040] S500, associating process time, building a 4D BIM model, and associating each minimum construction unit of each component with the corresponding construction process and construction time according to the actual construction situation (by specifying time for each unit on the software, which is essentially model parameterization), including construction start time, end time, and duration, so that it presents the overlap relationship and duration of each process consistent with the construction organization design, thereby generating a 4D BIM model that is closest to the actual construction;

[0041] S600, associating carbon emission characteristics and constructing a 5D BIM model. After the 4D BIM model is generated in step S500, the material consumption of each process of the smallest construction unit of each component is correlated with the corresponding position of the BIM model (this correlation is to specify and add material consumption data for the corresponding unit in the model, which is essentially model parameterization). At the same time, the carbon emission value of each unit quantity of the main engineering material is input, and the parameterized attributes added to the component in step S300 are used for automatic calculation to obtain the carbon emission measurement data with construction output (building entity) as the carrier and changing with time series; finally, the two dimensions of progress and carbon emission are integrated on the basis of the 3D BIM model to form a 5D BIM model;

[0042] S700, visualizing the 5D BIM model obtained in step S600, including a dynamic distribution cloud map of carbon emissions per day for the smallest construction unit, a dynamic distribution cloud map of cumulative carbon emissions per smallest construction unit, a dynamic distribution cloud map of carbon emissions per day for building components, and a dynamic distribution cloud map of cumulative carbon emissions for building components, specifically including:

[0043] S710, dynamic distribution cloud map of daily carbon emissions of the smallest construction unit; taking day as the smallest unit of temporal change and the smallest construction unit as the statistical object, firstly sort the carbon emission values ​​of all the smallest construction units in the model every day, and then customize a gradient color card, divide the value range contained in the daily maximum and minimum carbon emissions of all the smallest construction units in the whole construction process in equal proportion, so that each color maps a certain value range (determined according to the selected color card, for example, if there are ten colors in the color card, this value range is divided into ten parts, each of which corresponds to a value range with the same span); then, according to the mapping relationship between the value and color of this gradient color card, each smallest construction unit presents the corresponding color according to the carbon emissions of the day, so as to produce the most intuitive and visual distribution cloud map of daily carbon emissions of the smallest construction unit; finally, these cloud maps are played continuously in chronological order to present the daily carbon emission changes of each point in the whole construction process;

[0044] S720, dynamic distribution cloud map of the accumulated carbon emissions of the smallest construction unit; this method takes the day as the smallest unit of temporal change and the smallest construction unit as the statistical object, firstly sorts the accumulated carbon emission values ​​of all the smallest construction units in the model, then customizes a gradient color card, divides the value intervals contained in the accumulated maximum and minimum carbon emissions in equal proportion, and makes each color map to a certain value range; then, according to the mapping relationship between the value and color of this gradient color card, makes each smallest construction unit present the corresponding color according to the accumulated carbon emissions up to that day, thereby producing the most intuitive and visual distribution cloud map of the accumulated carbon emissions of the smallest construction unit; finally, these cloud maps are played continuously in chronological order to present the changes in the accumulated carbon emissions of each point in the entire construction process;

[0045] S730, dynamic distribution cloud map of daily carbon emissions of building components; this method uses day as the smallest unit of temporal change and components as statistical objects. First, the carbon emissions of the smallest construction units that constitute each component in the daily model are added up to form the daily carbon emissions of each component; then the carbon emission values ​​of all components in the model are sorted and a gradient color card is customized to divide the value ranges contained in the daily maximum and minimum carbon emissions of all construction units during the entire construction process in equal proportions, so that each color maps a certain value range; then, according to the mapping relationship between the value and color of this gradient color card, each component presents the corresponding color according to the daily carbon emissions, thereby producing the most intuitive and visual component daily carbon emission distribution cloud map; these cloud maps are played continuously in chronological order to present the daily carbon emission changes of each part during the entire construction process;

[0046] S740. Dynamic distribution cloud map of cumulative carbon emissions of building components. This method uses day as the smallest unit of temporal change and components as statistical objects. First, the cumulative carbon emissions of the smallest construction units that make up each component in the model are added together to form the cumulative carbon emissions of each component. Then, the cumulative carbon emission values ​​of all components in the model are sorted and a gradient color card is customized to divide the numerical range contained in the cumulative maximum and minimum carbon emissions in equal proportion, so that each color maps a certain numerical range. Then, based on the mapping relationship between the value and color of this gradient color card, each component presents a corresponding color according to the cumulative carbon emissions up to that day, thereby producing the most intuitive and visual distribution cloud map of cumulative carbon emissions of components. These cloud maps are played continuously in chronological order to present the changes in cumulative carbon emissions of various parts during the entire construction process.

[0047] Specific implementation scheme 2: The present invention provides a dynamic construction carbon emission visualization system based on numerical simulation. The system has a program module corresponding to the above steps, and executes the steps in the above dynamic construction carbon emission visualization method based on numerical simulation during operation.

[0048] The other combinations and connection relationships of this embodiment are the same as those of the first embodiment.

[0049] Specific implementation scheme three: The present invention provides a computer-readable storage medium, which stores a computer program, and the computer program is configured to implement the steps of a dynamic construction carbon emission visualization method based on numerical simulation when called by a processor.

[0050] The other combinations and connection relationships of this embodiment are the same as those of the first embodiment.

[0051] Although the present invention is disclosed as above, the protection scope of the present invention is not limited thereto. Those skilled in the art may make various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications will fall within the protection scope of the present invention.

Claims

1. A dynamic construction carbon emission visualization method based on numerical simulation, characterized in that: The following steps are involved: S100. Collect the resource consumption of each component during the construction process, determine the consumption data of labor, materials and mechanical energy during the construction process according to the project construction drawing design and construction organization design, and calculate the carbon emission data of each process according to the classification of sub-projects and corresponding carbon emission factors; S200, the carbon emission data of each process obtained in step S100 is reallocated based on the input-output method, all labor, material and mechanical energy consumption in the construction process are regarded as project input, and the final completed construction building is regarded as project output. Based on the proportion of various materials in the cost of main project materials, all construction carbon emissions in the entire project are reallocated, and all carbon emissions are proportionally allocated to all main project materials; finally, according to the allocation results, the carbon emission data of each unit quantity of main project materials after allocation is calculated; S300, constructing a 3D BIM model, using the 3D BIM building model established in the project design phase as a display carrier, dividing the building model into component boundaries according to the actual construction situation, and performing parametric transformation of the components so that each component has parametric properties; S400, dividing the component into minimum construction units, dividing each component according to the minimum construction unit, while maintaining that the minimum construction unit has all the parametric properties of the component; S500, associating process time, building a 4D BIM model, associating each minimum construction unit of each component with the corresponding construction process and construction time according to the actual construction situation, and generating a 4D BIM model; S600, associating carbon emission characteristics and constructing a 5D BIM model. After the 4D BIM model is generated in step S500, the material consumption of each minimum construction unit of each component in each process is correlated with the corresponding position of the BIM model, and the carbon emission value of each unit quantity of the main engineering material is input. The parametric attributes added to the component in step S300 are used to automatically calculate the carbon emission measurement data based on the construction output and changing with time series, and finally a 5D BIM model is formed. S700, visually presenting the 5D BIM model obtained in step S600, including a dynamic distribution cloud map of daily carbon emissions of the minimum construction unit, a dynamic distribution cloud map of cumulative carbon emissions of the minimum construction unit, a dynamic distribution cloud map of daily carbon emissions of building components, and a dynamic distribution cloud map of cumulative carbon emissions of building components.

2. According to claim 1, a dynamic construction carbon emission visualization method based on numerical simulation is characterized by: In step S200, the sub-projects include the main project and non-main project. When allocating, the carbon emissions generated by all personnel, all machinery and all non-main project materials in the construction project are located on all main project material entities in proportion.

3. According to claim 2, a dynamic construction carbon emission visualization method based on numerical simulation is characterized by: In step S300, the parameters of each component include component volume / area / weight, constituent material type and consumption quantity.

4. According to claim 3, a dynamic construction carbon emission visualization method based on numerical simulation is characterized in that: In step S400, the minimum construction unit of each component includes 1m 3 Concrete, 1㎡ masonry, 1m steel pipe, a precast beam or a steel component.

5. According to claim 4, a dynamic construction carbon emission visualization method based on numerical simulation is characterized in that: In step S500, the associated data includes the construction start time, end time and duration.

6. A dynamic construction carbon emission visualization method based on numerical simulation according to claim 5, characterized in that: In step S700, the following steps are included: S710. When making a dynamic distribution cloud map of daily carbon emissions of the minimum construction unit, take the day as the minimum unit of temporal change, take the minimum construction unit as the statistical object, sort the carbon emission values ​​of all the minimum construction units in the 5D BIM model obtained in step S600, customize a gradient color card, divide the value ranges contained in the daily maximum and minimum carbon emissions of all the minimum construction units in the whole construction process in equal proportion, and make each color map to the corresponding value range; according to the mapping relationship between the value and color of the gradient color card, make each minimum construction unit present the corresponding color according to the carbon emissions of the day, so as to obtain the daily carbon emission distribution cloud map of the minimum construction unit; S720. When making a dynamic distribution cloud map of the accumulated carbon emissions of the minimum construction unit, take the day as the minimum unit of time series change, take the minimum construction unit as the statistical object, sort the accumulated carbon emission values ​​of all the minimum construction units in the model, customize a gradient color card, divide the value ranges contained in the accumulated maximum and minimum carbon emissions in equal proportion, and make each color map to the corresponding value range; according to the mapping relationship between the value and color of the gradient color card, make each minimum construction unit present the corresponding color according to the accumulated carbon emissions up to that day, so as to obtain the accumulated carbon emission distribution cloud map of the minimum construction unit; S730. When making a dynamic distribution cloud map of daily carbon emissions of building components, take day as the smallest unit of temporal change, take components as statistical objects, add up the carbon emissions of the smallest construction units that constitute each component in the daily model, and form the daily carbon emissions of each component; sort the carbon emission values ​​of all components in the model every day and customize a gradient color card, divide the value ranges contained in the daily maximum and minimum carbon emissions of all construction units in the whole construction process in equal proportion, and make each color map to the corresponding value range; according to the mapping relationship between the value and color of the gradient color card, make each component present the corresponding color according to the daily carbon emissions, so as to obtain the daily carbon emission distribution cloud map of the component; S740. When making a dynamic distribution cloud map of the cumulative carbon emissions of building components, take days as the smallest unit of time series change and components as statistical objects, add up the cumulative carbon emissions of the smallest construction units that make up each component in the model to form the cumulative carbon emissions of each component; sort the cumulative carbon emission values ​​of all components in the model and customize a gradient color card, divide the numerical range contained in the cumulative maximum and minimum carbon emissions in equal proportion, and map each color to the corresponding numerical range; according to the mapping relationship between the gradient color card value and the color, make each component present the corresponding color according to the cumulative carbon emissions up to that day, so as to obtain the cumulative carbon emission distribution cloud map of the component.

7. The method for visualizing dynamic construction carbon emissions based on numerical simulation according to claim 6, characterized in that: The cloud map obtained in step S700 is played continuously in chronological order to present the cumulative carbon emission changes of each part during the entire construction process.

8. A dynamic construction carbon emission visualization system based on numerical simulation, characterized by: The system has a program module corresponding to the steps of any one of claims 1 to 7, and executes the steps of the above-mentioned dynamic construction carbon emission visualization method based on numerical simulation when running.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and the computer program is configured to implement the steps of the dynamic construction carbon emission visualization method based on numerical simulation described in any one of claims 1 to 7 when called by a processor.

Citation Information

Patent Citations

  • Carbon emission control method and system based on BIM technology and intelligent construction site and storage medium

    CN116703673A

  • Fabricated building carbon emission control method based on BIM and Internet of Things

    CN117314135A

  • Method, system and equipment for automatically calculating BIM component carbon emission according to project business forms

    CN117332490A

  • Building construction process carbon emission calculation method based on 4D-BIM visualization

    CN118261321A

Cited By

  • Building construction engineering carbon emission visualization method and system

    CN120953397A

  • A method and system for visualizing carbon emissions of a construction project

    CN120953397B

  • Visual building construction process carbon emission calculation method

    CN121234462A

  • A method of visualizing carbon emissions calculations for building construction processes

    CN121234462B

  • Green building construction optimization method and system based on carbon emission monitoring

    CN121615920A