Ultra-long arc-shaped lamp box based on oval suspended ceiling and installation method thereof

By using prefabricated curved shell and inner base design in the oval suspended ceiling, combined with three-dimensional scanning and BIM technology, the problems of insufficient material processing errors and fire protection levels in traditional construction are solved, and efficient and safe ultra-long arc shape is achieved Light box installation reduces construction costs and construction period.

CN119314402APending Publication Date: 2025-01-14CHINA CONSTR FIFTH BUREAU DECORATION CURTAIN WALL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411475978.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-22
Publication Date
2025-01-14

AI Technical Summary

Technical Problem

The construction of traditional ultra-long curved light boxes based on oval ceilings has problems such as large material processing errors, insufficient load, insufficient fire protection grade, complex construction technology and high cost. Especially in the decorative ceiling of tall spaces, it is difficult to achieve safe and economical construction. .

Method used

Designed with an ultra-long curved light box based on an oval suspended ceiling, including a ceiling system of several parallel arranged angle steel, first boom, main keel, secondary keel and first base plate, as well as curved shell, inner base and lamp The membrane light box system is factory prefabricated through three-dimensional scanning, BIM reverse modeling and parameterized design. It uses shaped connectors and elastic arms to achieve rapid installation, ensuring that the lamp film is overall flat and seamless, and using Class A fireproof materials.

Benefits of technology

It realizes the installation of ultra-long arc light box with low cost, simple construction technology and good safety, shortens the construction period, reduces material losses and manufacturing costs, simplifies the construction technology, and ensures the overall effect and fire safety of the decorative ceiling of the tall space. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119314402A_ABST
    Figure CN119314402A_ABST
Patent Text Reader

Abstract

The invention discloses a super-long arc-shaped lamp box based on an oval suspended ceiling and a mounting method thereof.The lamp box comprises a suspended ceiling system and a lamp box system which are mounted below a conversion layer, the suspended ceiling system comprises a first base layer plate, and the conversion layer comprises a plurality of steel angles arranged in parallel; the lamp box system comprises an upper hanging rod, a C-shaped connecting piece, a lower hanging rod, an arc-shaped shell, an inner base, an LED lamp and a lamp film, the first hanging rod and the upper hanging rod are connected with the angle steel, the upper end of the lower hanging rod is connected with the upper hanging rod through the C-shaped connecting piece, and the lower end of the lower hanging rod penetrates through the first base layer plate to be connected with the arc-shaped shell; the arc-shaped shells are tightly attached to the bottom face of the first base plate, the adjacent arc-shaped shells are sequentially connected at the bottom of the first base plate to form an arc-shaped lamp box, clamping grooves which are bent inwards are formed in the two sides of the bottoms of the arc-shaped shells, elastic arms which are clamped with the clamping grooves in a clearance fit mode are arranged on the two sides of the bottom of the inner base, and the LED lamp is installed on the inner base. The lamp film is clamped between the two clamping grooves in the bottom of the arc-shaped shell. According to the invention, the cost is reduced, and the efficiency and quality are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of large space assembled light box construction, and in particular to an ultra-long arc light box based on an elliptical ceiling and an installation method thereof. Background Art

[0002] At present, large venues with hyperbolic GRG shapes are emerging in various parts of China, with high space, large span and multi-function as their prominent features. Among them, the scientific research hub project of Chengdu Industrial Research Institute Branch of China Mobile Communications Group Co., Ltd. includes an elliptical lecture hall with a tall and large space decorative ceiling. The elliptical lecture hall not only requires the ceiling effect of a two-story corridor, but also has a three-circle protruding ceiling light box shape to echo the hyperbolic GRG shape of the wall. The light box is 0.2 meters wide, protruding from the ceiling up to 0.5 meters, with a length of more than 60 meters and a radius ranging from 30 meters to 80 meters.

[0003] like Figure 5 and Figure 6 As shown, the traditional super-long arc light box based on the elliptical ceiling includes a ceiling system and a light box system installed under the conversion layer, wherein the conversion layer includes an angle steel a, a first transverse keel b and a second transverse keel c arranged on the angle steel a, the ceiling system includes a first suspension rod d, a main keel e, a secondary keel f and a first base plate g connected in sequence from top to bottom, the light box system includes a second suspension rod h, a keel frame i, a second base plate j, an LED lamp k and a lamp film l, the first suspension rod d is suspended at the bottom of the first transverse keel b, the second suspension rod h is suspended at the bottom of the second transverse keel c, the keel frame i is connected to the bottom of the second suspension rod h and extends out of the first base plate g, the second base plate j is fixed on the outer peripheral surface of the keel frame i and extends downward to form a lamp trough m with an opening arranged downward, the LED lamp k is installed in the lamp trough m, and the lamp film l is encapsulated at the bottom of the lamp trough m; the traditional construction steps of the above structure are as follows:

[0004] 1. According to the position of the light box system, the first transverse keel b and the second transverse keel c are arranged on the angle steel a to form a conversion layer, and the second suspension rod h is fixed to the second transverse keel c by threaded fasteners;

[0005] 2. Fix the first suspension rod d to the first transverse keel b through threaded fasteners, fix the main keel e under the first suspension rod d through suspension fittings, fix the secondary keel f under the main keel e through adapters, and arrange the main keel e parallel to the angle steel a, and the secondary keel f parallel to the first transverse keel b; set the main keel e under the second suspension rod h to be disconnected, and reserve an arc-shaped opening n for the keel frame i of the light box system and the second base plate j;

[0006] 3. Fix the keel frame i under the second suspension rod h, cover the second base plate j on the outer peripheral surface of the keel frame i, and extend the second base plate j located at the two vertical surfaces of the keel frame i out of the lower end of the keel frame i to form a lamp trough m with the opening facing downward;

[0007] 4. Treat the surface of the second base plate j in the lamp trough m with a white reflective finish and introduce electrical wires;

[0008] 5. Cover the second base plate j below the secondary keel f with an aluminum plate finish o on the outer facade;

[0009] 6. Install the first base plate g under the secondary keel f through the hanging parts, and ensure that the bottom surface of the first base plate g is lower than the top surface of the aluminum plate facing o. Perform the closing treatment on the junction between the first base plate g and the aluminum plate facing o, and then perform the facing treatment on the surface of the first base plate g;

[0010] 7. Install the LED lamp k in the lamp trough m and connect it with the wires, and install the lamp film l at the bottom of the lamp trough m.

[0011] The use of the above traditional construction structures and methods will have the following disadvantages:

[0012] First, because the finished light boxes on the market are independent and have limited specifications, the above-mentioned special light box system will be directly assembled on site using a keel frame made of angle steel and a second base plate made of flame retardant board or fireproof board. Not only are there problems such as large on-site processing errors and unguaranteed curvature; and the load of the traditional on-site light box includes the sum of the second hanger h, keel frame i, second base plate j, and metal finishing layer of the light box, with a load of about 58KG per meter and a load of 290KG per square. The specification requires that lamps weighing more than 3KG should be hung on the load-bearing structure, so a conversion layer needs to be set up. According to the conventional single-layer angle steel conversion layer design, the maximum stable bearing capacity is about 42KG, which is completely unable to meet its load requirements. Therefore, the first horizontal keel b for connecting the ceiling system and the second horizontal keel c for connecting the light box system must be added to the angle steel a of the existing conversion layer to form a larger steel structure conversion layer to ensure force safety, resulting in higher manufacturing costs;

[0013] In addition, the only board on the market that has the bending performance to meet the arc shape of the light box and has a normal cost is the wooden flame retardant board, but its fire protection grade can only reach B1 grade. As the base material for ceiling materials and lamp installation, the regulations require it to reach Class A fire protection. The other non-wooden flame retardant boards that can reach Class A, such as glass magnesium boards and cement fiber boards, have poor bending performance and poor nail holding force, and cannot meet the needs of the base modeling. In addition, the lightweight high-strength calcium silicate board that can meet the above requirements has a high base cost. The lightweight high-strength calcium silicate board with a thickness of 3-5mm can meet the bending curvature, but because the material has large elastic deformation, it needs to be shaped with a keel, which greatly increases the overall material and production costs.

[0014] 2. The keel frame i and the second base plate j of the light box system penetrate the keel and base plate of the ceiling system, so that the first base plate g connected to the side of the light box system needs to be processed into an arc section according to the corresponding size before it can be hoisted, which increases the manufacturing cost; the keel frame i and the second base plate j of the light box system are installed and manufactured on-site. Affected by the manual operation errors of the workers, the arc section of the first base plate g must also be manufactured on-site to ensure the matching accuracy. Therefore, the light box system and the ceiling system need to be installed in an interlaced construction method. The construction process is complicated and cumbersome, resulting in a long construction period.

[0015] 3. To ensure the force requirements, the main keel e and the secondary keel f located between the three light box systems need to be disconnected when encountering a light box. The two-area ceiling keels between the light boxes can only adopt a multi-section structure to be connected into a broken arc that matches the shape of the light box. The construction process is cumbersome, resulting in a long construction period. Summary of the invention

[0016] The purpose of the present invention is to address the deficiencies of the prior art and provide an ultra-long arc light box based on an elliptical ceiling and an installation method thereof which has low cost, simple construction process and good safety.

[0017] The ultra-long arc-shaped light box based on an oval ceiling provided by the present invention includes a ceiling system and a light box system installed under the conversion layer. The ceiling system includes a first hanging rod, a main keel, a secondary keel, and a first base plate connected in sequence from top to bottom. The conversion layer includes a number of parallel angle steels, which are arranged non-coplanar with both the main keel and the secondary keel. The light box system includes an upper hanging rod, a C-shaped connecting piece, a lower hanging rod, a number of arc-shaped outer shells, a number of inner bases, a number of LED lights, and a number of light films. Both the first hanging rod and the upper hanging rod are connected to the angle steel. The upper end of the lower hanging rod is connected to the upper hanging rod through the C-shaped connecting piece, and the lower end passes through the first base plate and is connected to the arc-shaped outer shell. The arc-shaped outer shell is arranged closely against the bottom surface of the first base plate, and adjacent arc-shaped outer shells are sequentially connected at the bottom of the first base plate to form an arc-shaped light box. Elastic arms that are arranged to bend inward are provided on both sides of the bottom of the arc-shaped outer shell, and elastic arms that are in clearance fit and clamped with the slots are provided on both sides of the bottom of the inner base. The inner base is axially position-adjustably clamped inside the arc-shaped outer shell through the elastic arms. The LED lights are installed on the inner base, and the light film is clamped between the two slots at the bottom of the arc-shaped outer shell.

[0018] To facilitate the positioning and adjustment of the arc-shaped outer shell, the C-shaped connecting piece includes a upper horizontal arm, a vertical connecting arm, and a lower horizontal arm connected in sequence. A first strip-shaped hole arranged along the axial direction of the angle steel is opened on the upper horizontal arm, and a second strip-shaped hole arranged perpendicular to the axial direction of the angle steel is opened on the lower horizontal arm. The C-shaped connecting piece is connected to the bottom of the upper hanging rod through a threaded fastener installed in the first strip-shaped hole and is adjustable in the front-back position. The lower hanging rod is connected to the bottom of the C-shaped connecting piece through a threaded fastener installed in the second strip-shaped hole and is adjustable in the left-right position. The lower hanging rod is installed at the bottom of the upper hanging rod through the C-shaped connecting piece and is adjustable in both the front-back and left-right positions.

[0019] To facilitate quick installation and ensure that the light film is overall straightened, flat, and seamless, the light box system further includes a clamping member for clamping the light film. The upper end of the clamping member is detachably connected to the elastic arm, and the lower end is closely arranged against the slot. The light film is clamped between the two slots at the bottom of the arc-shaped outer shell through the clamping member.

[0020] To ensure the fire safety of the ceiling, the arc-shaped outer shell, the inner base, and the light film are all made of A-level fireproof materials.

[0021] The installation method of the present invention applicable to the above-mentioned ultra-long arc-shaped light box based on an oval ceiling includes the following steps:

[0022] S1. Construct the angle steel, synchronously embed the upper hanging rod and the C-shaped connecting piece, and reserve the lamp wires.

[0023] S2. Complete the installation of the first hanging rod, the main keel, the secondary keel, and the first base plate of the ceiling system according to the normal construction process. Both the main keel and the secondary keel are arranged non-coplanar with the angle steel.

[0024] S3. The arc-shaped housing, inner base, and lamp film in the factory prefabricated light box system;

[0025] S4. Pre-layout the arc-shaped housing on the ground;

[0026] S5. Pre-assemble the arc-shaped housing on the first base plate of the suspended ceiling system;

[0027] S6. Through the access hatch for maintenance personnel, drill installation holes on the first base plate and the arc-shaped housing directly below the upper suspension rod. Pass the lower suspension rod through the installation holes. Fasten the upper end of the lower suspension rod to the C-shaped connecting piece with threaded fasteners, and fasten the lower end of the lower suspension rod to the arc-shaped housing with threaded fasteners;

[0028] S7. Install the LED lights in the inner base, synchronously and segmentally snap-fit the inner base with the installed LED lights into the arc-shaped housing. After leveling, fasten them to ensure the overall straightness, and connect the lamp wires;

[0029] S8. Snap-fit the lamp film at the bottom of the arc-shaped housing.

[0030] The specific steps of factory prefabrication in step S3 are as follows:

[0031] S31. 3D scanning

[0032] Use a 3D scanner to perform a 360-degree scan of the main structure and pipelines, obtain the on-site actual structural pipeline point cloud model, and convert it into a mechanism and mechanical and electrical pipeline model;

[0033] S32. BIM reverse modeling

[0034] On-site technical and detailed design personnel first construct the suspended ceiling shape and deepen the nodes according to the obtained deformation data, then reverse-build to form a BIM model, and finally perform the final optimization and establishment of the light box system structure model;

[0035] S34. Drawing design

[0036] Use Rhinoceros software with the Grasshoper plug-in to perform the drawing design of the arc-shaped housing, inner base, and lamp film. Adjust the drawing size with GH parameters. Through the comprehensive ceiling layout, avoid the conflict between the positions of various mechanical and electrical air vents, lamps, sprinkler end points, and the light box installation on the first base plate of the overall layout, make the arc transition smooth at the joints of each section of the arc-shaped housing, and make the three arc-shaped light boxes parallel to each other and evenly arranged to obtain the design drawings;

[0037] S35. Extract the drawing dimensions and place an order for the factory production of the arc-shaped housing, inner base, and lamp film.

[0038] The specific steps of pre-assembly in step S4 are as follows:

[0039] S41. Robot wire laying and positioning layout

[0040] Extract the coordinates of the arc shell control corner points in the BIM model and project them onto the ground to form a unique layout of the layout points. Import the layout of the layout points into the layout robot. Use the layout robot to project the laser of the layout points onto the working surface on site. The model point layout marking personnel mark and number the layout points according to the design drawings and positions. All the layout points are uniquely numbered. After the layout is completed, random points are checked.

[0041] S42. Construction preparation

[0042] Carry out the handover of the working surface, technical preparation of drawings, transportation and stacking of materials, and the implementation of construction measures;

[0043] S43, curved shell pre-layout

[0044] The curved shell should be pre-arranged and marked on the ground according to the layout diagram and the marking numbers on the ground. Slight adjustments should be made to the arc for a smooth transition at the intersection of each section. Every two sections should be connected to ensure that the top connection base is flat and smooth.

[0045] The specific steps of pre-assembling the arc-shaped housing in step S5 are as follows:

[0046] S51, marking and positioning installation control points on the upper surface of the arc-shaped housing, and projecting the points vertically onto the first base plate of the ceiling system;

[0047] S52. Lift the arc-shaped shell by the vertical lifting scissor lift platform, adjust the position, and fix the arc-shaped shell to the first base plate by auxiliary connecting screws. Consider the conflict with the vertical smoke barrier wall and disconnect it and set the head.

[0048] The specific steps for positioning the mounting holes in step S6 are as follows:

[0049] S61. Through the access opening, reinforce the upper suspension rod from top to bottom according to the position of the angle steel;

[0050] S62. Drill a layout observation hole on the first base plate, and guide the laser of the plumb line from the ground to the upper part of the conversion layer through the layout observation hole. Use the plumb line to extend the position of the upper suspension rod from the upper part of the conversion layer through the ground to the arc-shaped shell, and accurately locate the installation hole.

[0051] In the step S8, it also includes a clamp for installing the lamp film. The clamp is fixed on the elastic arm of the inner base according to the spacing on the drawing, and the lamp film is clamped between the clamps to complete the installation of the entire light box system.

[0052] Compared with the prior art, the present invention has the following advantages:

[0053] 1. The arc-shaped light box is formed by sequentially connecting several arc-shaped outer shells. The arc-shaped outer shells can be batch customized in sections by the factory with prefabricated openings, achieving efficient, precise, stable, and batch implementation. This not only solves the problem of processing errors in on-site light box production, ensures the overall flatness and straightness of the ultra-long arc-shaped metal light box and the overall effect, but also reduces material losses and optimizes the construction process, thereby shortening the construction period and creating economic value. Moreover, it has a small self-weight, and a conversion layer usually formed by several unidirectional angle steels can meet its load requirements, reducing the manufacturing cost.

[0054] 2. The arc-shaped outer shells are sequentially connected to the angle steel through lower suspension rods, C-shaped connectors, and upper suspension rods, simplifying the more complex keel, base layer, and panel system of the overall box body component; the lower suspension rods penetrate through the first base plate, and only installation holes for the lower suspension rods to penetrate need to be drilled on the first base plate, eliminating the need to process an arc-shaped section on-site, reducing the manufacturing cost. Moreover, the arc-shaped outer shell and the inner base can be assembled after the entire ceiling system is installed, reducing the problem of process interpenetration between the ceiling system and the light box system, simplifying the construction process, and shortening the construction period.

[0055] 3. The arc-shaped outer shell is arranged closely against the bottom surface of the first base plate, and the secondary keel of the ceiling system does not need to be disconnected, making the construction process simple and reducing the construction period.

[0056] 4. With a matching light film and standardized dimensions of the inner base, the overall shape of the light film is ensured, and the straight effect of the light film is ensured.

[0057] 5. The elastic arms of the inner base are clamped with the card slots of the arc-shaped outer shell through clearance fit, which is not only convenient for the axial position sliding fine adjustment of the inner base within the arc-shaped outer shell, but also enables the inner base to be stably leveled within the arc-shaped outer shell by its own gravity.

[0058] 6. For assembled installation, workers can operate after simple training, which is convenient for large-area implementation on-site, shortens the construction period, ensures the overall effect of the nearly 80-meter-long arc-shaped light box, reduces material losses and optimizes the construction process, thereby shortening the construction period and creating economic value. At the same time, it can also be disassembled twice, facilitating inspection and maintenance. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] Figure 1 It is a schematic structural diagram of the top view of the ultra-long arc-shaped light box based on an elliptical ceiling in the present invention.

[0060] Figure 2 For Figure 1 The partial cross-sectional structural schematic diagram at A-A in

[0061] Figure 3 For Figure 2 The enlarged structural schematic diagram at B in

[0062] Figure 4 For Figure 2 Axonometric enlarged structural schematic diagram of the C-shaped connecting piece.

[0063] Figure 5 Schematic diagram of the horizontal installation structure of the prior art (the conversion layer is not shown).

[0064] Figure 6 For Figure 5 Partial sectional structural schematic diagram at C-C in the middle.

[0065] The marks shown in the figure and the corresponding component names are:

[0066] 1. Angle steel;

[0067] 2. First suspension rod;

[0068] 3. Main keel;

[0069] 4. Secondary keel;

[0070] 5. First base plate;

[0071] 6. Upper suspension rod;

[0072] 7. C-shaped connecting piece; 71. Upper horizontal arm; 72. Vertical connecting arm; 73. Lower horizontal arm; 74. First elongated hole; 75. Second elongated hole;

[0073] 8. Lower suspension rod;

[0074] 9. Arc-shaped housing; 91. Card slot;

[0075] 10. Inner base; 101. Elastic arm;

[0076] 11. LED lamp;

[0077] 12. Lamp film;

[0078] 13. Fastening piece;

[0079] 14. Mounting hole. Detailed implementation mode

[0080] From Figures 1 to 4It can be seen that the ultra-long arc-shaped light box based on the oval ceiling of the present invention includes a ceiling system and a light box system installed under the conversion layer. Among them, the conversion layer includes a plurality of angle steels 1 arranged in parallel on the main structure. The ceiling system includes a first hanging rod 2, a main keel 3, a secondary keel 4, and a first base plate 5 connected in sequence from top to bottom. The light box system includes an upper hanging rod 6, a C-shaped connecting piece 7, a lower hanging rod 8, a plurality of arc-shaped outer shells 9, a plurality of inner bases 10, a plurality of LED lights 11, a plurality of light films 12, and a plurality of clamping members 13. The C-shaped connecting piece 7 includes an upper horizontal arm 71, a vertical connecting arm 72, and a lower horizontal arm 73 connected in sequence. A first elongated hole 74 arranged along the axial direction of the angle steel 1 is opened on the upper horizontal arm 71, and a second elongated hole 75 arranged perpendicular to the axial direction of the angle steel 1 is opened on the lower horizontal arm 73. On both sides of the bottom of the arc-shaped outer shell 9, there are inwardly bent slots 91, and on both sides of the bottom of the inner base 10, there are elastic arms 101 that are in clearance fit and clamped with the slots 91.

[0081] The upper end of the first hanging rod 2 is connected to the angle steel 1 through a threaded fastener. The main keel 3 is fixed to the bottom of the first hanging rod 2 through a hanging member and is arranged non-coplanar with the angle steel 1. The secondary keel 4 is fixed below the main keel 3 through an adapter and is arranged non-coplanar with the angle steel 1. The first base plate 5 is installed below the secondary keel 4 through a hanging member.

[0082] The upper end of the upper hanging rod 6 is connected to the angle steel 1 through a threaded fastener; the lower end of the upper hanging rod 6 passes through the first elongated hole 74 and is fixedly connected to the upper horizontal arm 71 through a threaded fastener. The C-shaped connecting piece 7 is connected to the bottom of the upper hanging rod 6 through the first elongated hole 74 with adjustable front and rear positions; the upper end of the lower hanging rod 8 passes through the second elongated hole 75 and is fixedly connected to the lower horizontal arm 73 through a threaded fastener. The lower hanging rod 8 is connected to the bottom of the C-shaped connecting piece 7 through the second elongated hole 75 with adjustable left and right positions. The lower hanging rod 8 is installed at the bottom of the upper hanging rod 6 through the C-shaped connecting piece 7 with adjustable front and rear and left and right positions; the arc-shaped outer shell 9 is arranged closely against the bottom surface of the first base plate 5. Installation holes 14 are drilled through the first base plate 5 and the arc-shaped outer shell 9 directly below the lower hanging rod 8. The lower end of the lower hanging rod 8 passes through the installation holes 14. The arc-shaped outer shell 9 is connected to the lower end of the lower hanging rod 8 through a threaded fastener. Adjacent arc-shaped outer shells 9 are sequentially connected into an arc-shaped light box at the bottom of the first base plate 5. The inner base 101 is axially position-adjustably clamped in the arc-shaped outer shell 9 through the cooperation of the elastic arm 101 and the slot 91. The LED light 11 is installed on the inner base 10. The upper end of the clamping member 13 is detachably connected to the elastic arm 101 through a screw, and the lower end is closely attached to the outer surface of the slot 91. The light film 12 is clamped between the two slots 91 at the bottom of the arc-shaped outer shell 9 through the clamping member 13.

[0083] In the present invention, the arc-shaped outer shell 9, the inner base 10, and the light film 12 are all made of A-level fireproof materials.

[0084] The installation method of the ultra-long arc light box based on the oval ceiling of the present invention includes the following steps:

[0085] S1. Construct angle steel 1 on the main structure, synchronously embed the hanging rod 6 and the C-shaped connecting piece 7 on the angle steel 1, and reserve the lamp wire;

[0086] S2. Complete the installation of the first suspension rod 2, the main keel 3, the secondary keel 4 and the first base plate 5 of the ceiling system according to the normal construction process. The main keel 3 and the secondary keel 4 are not arranged coplanarly with the angle steel 1;

[0087] S3. Prefabricate the arc-shaped outer shell 9, the inner base 10 and the lamp film 12 in the lamp box system in the factory;

[0088] S4. Pre-layout the arc-shaped outer shell 9 on the ground according to the layout drawing;

[0089] S5.预装 the arc-shaped outer shell 9 on the first base plate 5 of the ceiling system according to the positioning dimensions;

[0090] S6. Through the access opening for maintenance by personnel, drill installation holes 14 in the first base plate 5 and the arc-shaped outer shell 9 directly below the hanging rod. Pass the lower hanging rod 8 through the installation holes 14. The upper end of the lower hanging rod 8 is fixedly connected with the C-shaped connecting piece 7 through threaded fasteners, and the lower end of the lower hanging rod 8 is fixedly connected with the arc-shaped outer shell 9 through threaded fasteners;

[0091] S7. Install the LED lamp 11 in the inner base 10, and synchronously install the inner base 10 with the LED lamp 11 in sections in the arc-shaped outer shell 9. After leveling, fasten it to ensure that the whole is straight, and connect the lamp wire;

[0092] S8.卡装 the lamp film 12 at the bottom of the arc-shaped outer shell 9.

[0093] The specific steps of prefabrication in the factory in step S3 of the present invention are as follows:

[0094] S31. 三维扫描

[0095] Use the 3D scanner Leica RTC360 LT to scan the main structure and pipelines 360 degrees to obtain the on-site actual structural pipeline point cloud model and convert it into a mechanism and mechanical and electrical pipeline model;

[0096] S32. BIM逆向建模

[0097] On-site technical and detailed design personnel first construct the ceiling shape and deepen the nodes according to the obtained deformation data; after point cloud splicing and thinning, scan the point cloud model for collision, adjust the collision problems, reverse the main structure model from the point cloud state to a solid model to facilitate the extraction of structural lines, then reverse-build to form a BIM model, and finally optimize and establish the lamp box system structure model;

[0098] S34, Drawing Design

[0099] Use Rhino software equipped with Grasshoper plug-in to design the drawings of the arc shell 9, inner base 10 and lamp film 12, use GH parameterization to adjust the drawing size, and avoid conflicts between the various electromechanical vents and lamps, the end points of the spray and the installation positions of the light boxes on the first base plate 5 of the overall layout through comprehensive ceiling layout, so that the curvature transition of each arc shell joint is smooth, and the three arc light boxes are parallel to each other and the layout is uniform, and the design drawings are obtained;

[0100] S35, extract the dimensions of the drawing, and place an order for the production of the curved housing 9, the inner base 10 and the lamp film 12 in a factory.

[0101] The specific steps of pre-assembly in step S4 of the present invention are as follows:

[0102] S41, robot layout positioning

[0103] Extract the coordinates of the control corners of the arc shell 9 in the BIM model and project them onto the ground to form a unique layout of the layout points. Import the layout of the layout points into the TOPCON layout robot. Use the layout robot to project the laser of the layout points onto the working surface on site. The model point layout marking personnel mark and number the layout points according to the design drawings and positions. All the layout points are uniquely numbered for easy identification. After the layout is completed, conduct spot check;

[0104] S42. Construction preparation

[0105] Hand over the work surface, prepare technical drawings, transport and stack materials, and put construction measures in place; the on-site work surface is required to be handed over with the ceiling and ground process. If there are problems with the ceiling base and flatness, or if there are obstructions on the ground, the work surface will be handed over after rectification. According to the project implementation method, ceiling shape and related model drawings, construction measures are prepared in stages. During the installation stage, all light box aluminum plates are uniformly numbered and classified, equipped with installation drawings, processed and manufactured in the factory, and related accessories are in place and stacked in different areas for use. The main construction measures are aerial scissor trucks, and the installation tools are rechargeable hand drills, handheld rechargeable wrenches, etc. The machinery is inspected and accepted when it enters the site, and complete documents and certificates are required. It can only be used on site after passing the inspection. All finished equipment and materials are inspected and maintained regularly;

[0106] S43, curved shell 9 pre-layout

[0107] The arc-shaped shell 9 is numbered according to the layout diagram and the markings on the ground, and is pre-layouted and marked as a whole on the ground. Taking into account that some arc-shaped shells 9 have certain welding deformations and processing errors, the arc is slightly adjusted for smooth transition at the intersection of each section, and every two sections are connected to ensure that the top connection base surface is flat and smooth.

[0108] The specific steps of pre-assembling the arc-shaped housing in step S5 of the present invention are as follows:

[0109] S51, marking and positioning installation control points on the upper surface of the arc-shaped housing 9, and projecting the points vertically onto the first base plate 5 of the ceiling system;

[0110] S52. Lift the arc-shaped shell 9 by means of the vertical lifting scissor lift platform, adjust the position, fix the arc-shaped shell to the first base plate 5 by means of auxiliary connecting screws, and disconnect and set the head in consideration of the conflict with the position of the smoke barrier vertical wall.

[0111] The specific steps of positioning the mounting hole in step S6 of the present invention are as follows:

[0112] S61, through the access opening, reinforce the upper suspension rod 6 from top to bottom according to the position of the angle steel 1;

[0113] S62. Drill a layout observation hole on the first base plate 5, and guide the laser of the plumb line from the ground to the upper part of the conversion layer through the layout observation hole. Use the plumb line to extend the position of the upper suspension rod from the upper part of the conversion layer through the ground to the arc-shaped shell, and accurately locate the installation hole.

[0114] In step S8 of the present invention, it also includes a clamp 3 for installing the lamp film. The clamp 13 is fixed on the elastic arm 101 of the inner base according to the spacing in the drawing. The lamp film 12 is clamped between the clamps 13 by special tools to complete the installation of the entire light box system.

[0115] The present invention uses 3D scanning, reverse modeling, BIM in-depth optimization design, parametric design ordering, 3D simulation construction, collision inspection, optimization of elevation modeling, layout and terminal positioning; deepens the research and development of the ultra-long arc light box node structure based on the elliptical ceiling to achieve efficient and accurate reverse assembly construction, and finally conducts digital measurement, promotes robot laying, and accurately locates the arc installation control coordinate points; fully mechanized facilities and equipment are put into use for assembly construction. Compared with traditional construction methods, the present invention has the following characteristics:

[0116] 2.1 High degree of digitization and fully assembled construction. The present invention uses the advanced 3D scanner Leica RTC360 LT, the intelligent layout robot Topcon TOPCON, the mobile scissor-type aerial platform, the mobile aerial platform and other intelligent construction equipment in the current construction industry, and implements digital construction and industrial construction throughout the whole process. It is widely applicable to the construction of assembled light boxes in large spaces, and solves the construction problems of super-long elliptical ceilings and super-long triple arc-shaped three-dimensional light boxes.

[0117] 2.2 Less interleaving of processes, high reliability of structural connections; low cost, high efficiency, and light load. This construction method makes extensive use of digital technology, which is conducive to reducing the comprehensive costs of construction period, manpower, materials, etc. Compared with the traditional construction model, the implementation links such as deepening drawings, ordering materials, measuring and laying out, customized processing of the base layer, and installation and debugging by workers have greatly reduced the investment in manpower, materials, and measures, reduced the waiting time for technical intervals, avoided a large number of interleaving of processes and on-site customized processing time, and significantly improved the construction efficiency. At the same time, with one-click import of the laying-out model and intelligent layout positioning, workers only need to place the semi-finished light box in place according to the precise layout points of the robot, temporarily fix the screws, and then tighten them in one step with bolts. The light box base and light film are fully assembled and installed. Workers can do the job after simple training, which lowers the technical entry threshold for workers and makes construction easier.

[0118] The present invention is applicable to the construction of assembled light boxes in large spaces with different structural types such as steel structures and concrete structures, and is particularly applicable to the assembled construction of extra-long elliptical ceilings and extra-long triple arc-shaped three-dimensional light boxes. It can be widely applied to most of the special-shaped tall spaces such as offices, schools, hospitals, and stadiums within the scope of standard design, including different arc radii, length and width dimensions, and space heights. Digital construction and industrial construction are implemented throughout the process to solve the difficulties in the assembled construction of extra-long triple arc-shaped three-dimensional light boxes, promote the rapid development and maturity of intelligent construction, and provide practical and feasible practical case support for the intelligent construction system.

[0119] Compared with the original construction plan, the present invention can significantly save the costs caused by the measures, with an overall comprehensive economic benefit of about 120,000 yuan and a shortened construction period of about 20 days.

[0120] Compared with the original construction plan, the present invention can significantly save the labor costs of manual layout, auxiliary layout materials and other measures, improve construction efficiency, save installation labor costs, and save related materials and measures. The materials used in the present invention are all of conventional specifications, and the materials are quickly obtained and easy to process. The corresponding mechanical equipment is general engineering construction machinery and equipment, and there is no need to purchase it separately. Through the in-depth use of digital technology, it is beneficial to save time, manpower, and material costs while shortening the construction period.

[0121] The invention has been successfully applied to the interior decoration construction of the scientific research hub project of the Chengdu Industrial Research Institute Branch of China Mobile Communications Group Co., Ltd. The project is a key project in Sichuan Province. It will build a high-level science and technology park and a "government, industry, academia, research and application" platform in the field of information and communication centered on Chengdu. After completion, it will become Sichuan's 5G technology and artificial intelligence research and development center, and promote the development of Sichuan's digital economy. Through the application of the invention, the oval lecture hall is decorated and the spatial effect is perfectly presented. With the hyperbolic GRG shape of the wall and the light strip effect, the overall layout is staggered and echoed with each other, the sense of hierarchy is clear, and the details are exquisite, which has won praise from relevant parties.

[0122] The present invention uses green, environmentally friendly and recyclable materials such as metal aluminum plates and steel, promotes centralized processing, prefabricated construction, centralized storage of waste and garbage, etc., reduces garbage and dust at the construction site, and uses green construction technology. After the project is completed, it will create three green building stars and Luban Award. The smooth implementation of the project has been highly recognized by the local government, industry associations and owner units, and has won a good social reputation and good social benefits.

[0123] Application Case 1

[0124] The present invention has been successfully applied in the interior decoration construction project of the scientific research hub project of Chengdu Industrial Research Institute Branch of China Mobile Communications Group Co., Ltd. The project is located in Longdengshan Community, Zhonghe Street, High-tech Zone, Chengdu City, Sichuan Province. The total construction area of ​​the project is 174,989.80 square meters, and the above-ground construction area is 117,900 square meters. It is mainly used for functional R&D offices and public service supporting facilities. The project decoration area is 94,853.95 square meters, which consists of industrial offices, living facilities, industrial coordination and energy radiation centers and other buildings and related ancillary facilities.

[0125] Through the application of the present invention in actual projects, the project quality and construction period requirements are ensured, good economic and comprehensive benefits are achieved, and theoretical and practical case support is provided for subsequent intelligent construction of similar special-shaped ceiling light boxes in special-shaped rooms.

[0126] Application Case 2

[0127] The National (Weihai) Innovation Center is located in Shuangdaowan Science and Technology City, Weihai, Shandong. It is a bay-based complex ecological science and technology city led by high-tech. The planned area is 111,800 m2 and the total construction area is 272,700 m2. The park is planned to have super high-rise business office areas, single-building creative office areas, and leisure service areas with functions such as hotels and commercial services. In the future, this park will form a diversified, complex, and ecological science and technology city with co-prosperity between industry and city. At the same time, this project should become a landmark building complex in the science and technology service city.

[0128] During the entire construction period, the implementation effect was good, the product quality and safety stability were good, and the overall visual effect was outstanding. Compared with traditional construction methods, the project progress met the requirements, and it received unanimous praise from the government and all parties involved in the construction, achieving good social and economic benefits.

Claims

1. An ultra-long arc light box based on an elliptical ceiling, comprising a ceiling system and a light box system installed under a conversion layer, wherein the ceiling system comprises a first suspension rod (2), a main keel (3), a secondary keel (4) and a first base plate (5) connected in sequence from top to bottom, characterized in that: The conversion layer includes a number of angle steels (1) arranged in parallel, which are arranged non-coplanar with both the main keel and the secondary keel. The light box system includes an upper suspension rod (6), a C-shaped connecting piece (7), a lower suspension rod (8), several arc-shaped outer shells (9), several inner bases (10), several LED lights (11) and several light films (12). Both the first suspension rod and the upper suspension rod are connected to the angle steel. The upper end of the lower suspension rod is connected to the upper suspension rod through the C-shaped connecting piece, and the lower end passes through the first base plate and is connected to the arc-shaped outer shell. The arc-shaped outer shell is arranged close to the bottom surface of the first base plate, and adjacent arc-shaped outer shells are sequentially connected into an arc-shaped light box at the bottom of the first base plate. Elastic arms (101) that are arranged to bend inward are provided on both sides of the bottom of the arc-shaped outer shell, and elastic arms (101) that are in clearance fit and clamped with the slots are provided on both sides of the bottom of the inner base. The inner base is axially position-adjustably clamped in the arc-shaped outer shell through the elastic arms. The LED lights are installed on the inner base, and the light film is clamped between the two slots at the bottom of the arc-shaped outer shell.

2. The super-long arc light box based on the elliptical ceiling according to claim 1 is characterized in that: The C-shaped connecting piece includes an upper horizontal arm (71), a vertical connecting arm (72) and a lower horizontal arm (73) that are sequentially connected. A first elongated hole (74) arranged along the axial direction of the angle steel is opened on the upper horizontal arm, and a second elongated hole (75) arranged perpendicular to the axial direction of the angle steel is opened on the lower horizontal arm. The C-shaped connecting piece is connected to the bottom of the upper suspension rod through a threaded fastener installed in the first elongated hole, and the lower suspension rod is connected to the bottom of the C-shaped connecting piece through a threaded fastener installed in the second elongated hole. The lower suspension rod is installed at the bottom of the upper suspension rod through the C-shaped connecting piece with adjustable front-back and left-right positions.

3. The super-long arc light box based on the elliptical ceiling according to claim 1 is characterized in that: The light box system further includes a clamping member (13) for clamping the light film. The upper end of the clamping member is detachably connected to the elastic arm, and the lower end is arranged closely against the slot. The light film is clamped between the two slots at the bottom of the arc-shaped outer shell through the clamping member.

4. The super-long arc light box based on the elliptical ceiling according to claim 1 is characterized in that: The arc-shaped outer shell (9), the inner base (10) and the light film (12) are all made of A-level fireproof materials.

5. A method for installing the super-long arc light box based on an elliptical ceiling as described in any one of claims 1 to 4, characterized in that: It includes the following steps: S1. Construct the angle steel (1), synchronously embed the upper suspension rod (6) and the C-shaped connecting piece (7), and reserve the lamp wires; S2. Complete the installation of the first suspension rod (2), the main keel (3), the secondary keel (4) and the first base plate (5) of the ceiling system according to the normal construction process. Both the main keel and the secondary keel are arranged non-coplanar with the angle steel; S3. Prefabricate the arc-shaped outer shell (9), the inner base (10) and the light film (12) in the light box system in the factory; S4. Perform pre-layout of the arc-shaped outer shell (9) on the ground; S5. Pre-assemble the arc-shaped outer shell (9) on the first base plate (5) of the ceiling system; S6. Drill installation holes (14) on the first base plate (5) and the arc-shaped outer shell (9) directly below the upper suspension rod through the access hatch for maintenance by personnel. Pass the lower suspension rod (8) through the installation holes. The upper end of the lower suspension rod (8) is tightly connected to the C-shaped connecting piece (7) through a threaded fastener, and the lower end of the lower suspension rod (8) is tightly connected to the arc-shaped outer shell (9) through a threaded fastener; S7, installing the LED lamp (11) in the inner base (10), synchronously and segmentally clamping the inner base (10) with the LED lamp (11) installed in the arc-shaped outer shell (9), tightening it after leveling to ensure that the whole is straight, and connecting the lamp wire; S8, clamping the lamp film (12) on the bottom of the arc-shaped housing (9).

6. The installation method of the super-long arc light box based on the elliptical ceiling according to claim 5 is characterized in that: The specific steps of factory prefabrication in step S3 are as follows: S31, 3D scanning Use a 3D scanner to scan the main structure and pipelines 360 degrees, obtain the point cloud model of the actual structure and pipelines on site, and convert it into a mechanism and electromechanical pipeline model; S32, BIM reverse modeling On-site technical and detailed design personnel first constructed the ceiling shape and detailed the nodes based on the acquired deformation data, then reversed the construction to form a BIM model, and finally optimized and established the structural model of the light box system. S34, Drawing Design Use Rhino software equipped with Grasshoper plug-in to design the drawings of the arc-shaped shell (9), inner base (10) and lamp film (12), use GH parameterization to adjust the drawing size, and avoid conflicts between the various mechanical and electrical air vents and lamps, the end points of the spray and the installation position of the light box on the first base plate (5) of the overall layout through comprehensive ceiling layout, so that the curvature transition of each arc-shaped shell joint is smooth, and the three arc-shaped light boxes are parallel to each other and the layout is uniform, so as to obtain the design drawings; S35, extract the dimensions of the drawing, and place an order for the production of the curved housing (9), the inner base (10) and the lamp film (12) in a factory.

7. The installation method of the super-long arc light box based on the elliptical ceiling according to claim 6 is characterized in that: The specific steps of pre-assembly in step S4 are as follows: S41, robot layout positioning Extract the coordinates of the control corner points of the arc shell (9) in the BIM model and project them onto the ground to form a unique layout of the layout points. Import the layout of the layout points into the layout robot. Use the layout robot to project the laser of the layout points onto the working surface on site. The model point layout marking personnel mark and number the layout points according to the design drawings and positions. All the layout points are uniquely numbered. After the layout is completed, random point verification is performed. S42. Construction preparation Carry out the handover of the work surface, technical preparation of drawings, material transportation and stacking, and the implementation of construction measures; S43, curved shell (9) pre-layout The arc-shaped shell (9) is pre-arranged and marked on the ground according to the layout diagram and the marking numbers on the ground. Each section intersection position is slightly adjusted for arc smooth transition. Every two sections are connected to ensure that the top connection base surface is flat and smooth.

8. The installation method of the super-long arc light box based on the elliptical ceiling according to claim 7 is characterized in that: The specific steps of pre-assembling the arc-shaped housing in step S5 are as follows: S51, marking and positioning installation control points on the upper surface of the arc-shaped housing (9), and projecting the points vertically onto the first base plate (5) of the ceiling system; S52. Lift the arc-shaped shell (9) by means of a vertical lifting scissor lift platform, adjust the position, fix the arc-shaped shell to the first base plate (5) by means of auxiliary connecting screws, and disconnect and set a head in consideration of the conflict with the position of the smoke barrier vertical wall.

9. The installation method of the super-long arc light box based on the elliptical ceiling according to claim 8 is characterized in that: The specific steps for positioning the mounting holes in step S6 are as follows: S61, through the access opening, reinforce the upper suspension rod (6) from top to bottom according to the position of the angle steel (1); S62. Drill a layout observation hole on the first base plate (5). Through the layout observation hole, the laser of the plumb line is directed from the ground to the upper part of the conversion layer. The plumb line is used to extend the position of the upper suspension rod from the upper part of the conversion layer through the ground to the arc-shaped shell, so as to accurately locate the installation hole.

10. The installation method of the super-long arc light box based on the elliptical ceiling according to claim 5, characterized in that: In the step S8, it also includes a clamp (13) for installing the lamp film. The clamp (13) is fixed on the elastic arm (101) of the inner base according to the spacing of the drawing, and the lamp film (12) is clamped between the clamps (13) to complete the installation of the entire light box system.