Wind power coupling heat supply system for gas turbine under non-operation working condition
Through the non-operating heating system of the gas engine coupled with wind power, the wind turbine heats molten salt and produces hydrogen, the problems of gas unit's difficulty in heating and waste of wind power resources under special operating conditions are solved, and effective heating is achieved and low emission effects.
Patent Information
- Application Number
- CN202411309662.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-19
- Publication Date
- 2025-01-17
AI Technical Summary
In special operating conditions such as long-term shutdown of gas units, FCB working conditions, load-shut conditions, or when gas units need to shut down during the heating season but need to ensure heating, the existing technology cannot effectively ensure the heating effect, and The trough electricity and waste electricity of wind power generation have not been effectively utilized, resulting in waste of resources and high carbon dioxide emissions.
A heating system for gas turbine coupled with wind power is designed in non-operating conditions. The wind turbine outputs electrical energy to heat the molten salt in the heating tank, heats the feed water through the molten salt-water heat exchanger, and is in the electrolytic cell. Hydrogen is produced, stored in hydrogen storage tanks, and enters the gas turbine to burn with natural gas at the appropriate time, achieving heating and reducing carbon dioxide emissions.
The heating effect is achieved under special operating conditions, reducing the power loss of wind power generation, and reducing the carbon dioxide emission concentration of the gas engine, effectively utilizing the low-rise and garbage electricity of wind power generation, and improving the energy efficiency and environmental performance of the system .
Smart Images

Figure CN119321582A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of carbon reduction transformation of gas turbine heating, and relates to a heating system for a gas turbine coupled with wind power in a non-operating condition. Background Art
[0002] Currently, in the heating process, steam is extracted from the steam turbine and then heated by heat exchange. However, the heating cannot be guaranteed under special operating conditions such as long-term shutdown of the gas unit, FCB conditions, load shedding conditions, etc., or when the gas unit needs to be shut down due to on-site demand during the heating season but cannot be shut down to ensure heating, the heating effect cannot be guaranteed. Summary of the invention
[0003] The purpose of the present invention is to overcome the disadvantages of the prior art and provide a heating system for a gas turbine coupled with wind power in a non-operating state, which can ensure heating.
[0004] To achieve the above object, the present invention discloses a heating system for a gas turbine coupled with wind power in non-operating condition, comprising a wind turbine generator, a hot tank, a molten salt-water heat exchanger, a cold tank, a primary side return water pipe of a heating network and a primary side inlet water pipe of a heating network;
[0005] The output end of the wind turbine is connected to the power interface of the hot tank, the outlet of the hot tank is connected to the molten salt side inlet of the molten salt-water heat exchanger, the molten salt side outlet of the molten salt-water heat exchanger is connected to the inlet of the cold tank, the outlet of the cold tank is connected to the inlet of the hot tank, the outlet of the primary side return pipe of the heating network is connected to the water side inlet of the molten salt-water heat exchanger, and the water side outlet of the molten salt-water heat exchanger is connected to the primary side water inlet pipe of the heating network.
[0006] The further improvement of the heating system of the gas turbine coupled with wind power in non-operating condition of the present invention is:
[0007] Furthermore, the outlet of the hot tank is connected to the molten salt side inlet of the molten salt-water heat exchanger through the hot tank outlet door.
[0008] Furthermore, the outlet of the cold tank is connected to the inlet of the hot tank via a cold tank outlet door.
[0009] Furthermore, it also includes an electrolyzer, wherein the output end of the wind turbine is connected to the power interface of the electrolyzer, and the hydrogen outlet of the electrolyzer is connected to the air inlet of the gas turbine.
[0010] Furthermore, it also includes a hydrogen storage tank, the hydrogen outlet of the electrolyzer is connected to the inlet of the hydrogen storage tank, and the outlet of the hydrogen storage tank is connected to the air inlet of the gas turbine.
[0011] Furthermore, it also includes a waste heat boiler, a chimney, a steam turbine, a condenser and a condensate pump. The flue gas outlet of the gas turbine is connected to the inlet of the waste heat boiler, and the flue gas outlet of the waste heat boiler is connected to the inlet of the chimney; the outlet of the steam turbine is connected to the inlet of the waste heat boiler via the condenser and the condensate pump in turn, and the steam outlet of the waste heat boiler is connected to the inlet of the steam turbine.
[0012] The present invention discloses a heating system for a gas turbine coupled with wind power in non-operating condition, comprising a waste heat boiler, a steam turbine, an electrolyzer, a wind turbine, a hot tank, a molten salt-water heat exchanger, a cold tank, a primary side return water pipeline of a heating network and a primary side inlet water pipeline of a heating network;
[0013] The output end of the wind turbine is connected to the power interface of the hot tank and the power interface of the electrolyzer, the outlet of the hot tank is connected to the molten salt side inlet of the molten salt-water heat exchanger, the molten salt side outlet of the molten salt-water heat exchanger is connected to the inlet of the cold tank, the outlet of the cold tank is connected to the inlet of the hot tank, the outlet of the primary side return water pipe of the heating network is connected to the water side inlet of the molten salt-water heat exchanger, and the water side outlet of the molten salt-water heat exchanger is connected to the primary side water inlet pipe of the heating network;
[0014] The hydrogen outlet of the electrolyzer is connected to the air inlet of the gas turbine;
[0015] The flue gas outlet of the gas turbine is connected to the inlet of the waste heat boiler, and the steam outlet of the waste heat boiler is connected to the inlet of the steam turbine.
[0016] The further improvement of the heating system of the gas turbine coupled with wind power in non-operating condition of the present invention is:
[0017] Furthermore, it also includes a hydrogen storage tank, the hydrogen outlet of the electrolyzer is connected to the inlet of the hydrogen storage tank, and the outlet of the hydrogen storage tank is connected to the air inlet of the gas turbine.
[0018] Furthermore, the outlet of the hot tank is connected to the molten salt side inlet of the molten salt-water heat exchanger through the hot tank outlet door.
[0019] Furthermore, the outlet of the cold tank is connected to the inlet of the hot tank via a cold tank outlet door.
[0020] The present invention has the following beneficial effects:
[0021] During specific operation, the heating system for the non-operating condition of the gas turbine coupled with wind power described in the present invention utilizes the electric energy output by the wind turbine to heat the molten salt in the heat tank. When the heating cannot be guaranteed under special conditions such as long-term shutdown of the gas unit, FCB condition, load shedding condition, or when the gas unit needs to be shut down due to on-site demand during the heating season but cannot be shut down to ensure heating, the molten salt output by the heat tank enters the molten salt-water heat exchanger, and the feed water is heated by the molten salt-water heat exchanger. The heating effect is good, and at the same time, the electricity generated by the wind turbine can be consumed.
[0022] Furthermore, due to the characteristics of wind power generation, there is "valley electricity" and "junk electricity", and this part of electricity is often not effectively utilized and is wasted. This part of electricity can be used in electrolyzers to produce hydrogen. The hydrogen is stored in hydrogen storage tanks and enters the gas turbine together with natural gas at the appropriate time to be mixed with hydrogen and burned to perform work, which not only reduces the energy loss of wind power generation, but also reduces the carbon dioxide concentration of the exhaust gas of the gas turbine.
[0023] Furthermore, when the gas unit cannot guarantee heating under special operating conditions such as long-term shutdown, FCB conditions, load shedding conditions, or when the gas unit needs to be shut down due to on-site demand during the heating season but cannot be shut down to ensure heating, and when wind power generation has "valley electricity" and "garbage electricity" due to its own characteristics, this part of electricity is often not effectively utilized and is wasted, then this part of electricity is used to produce hydrogen in the electrolyzer, and the hydrogen is stored in the hydrogen storage tank. At the same time, the hot tank outputs molten salt into the molten salt-water heat exchanger, and the feed water is heated by the molten salt-water heat exchanger, and the heating effect is better. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:
[0025] Figure 1 It is a structural diagram of the present invention.
[0026] Among them, 1 is a gas turbine, 2 is a hydrogen storage tank, 3 is an electrolyzer, 4 is a wind turbine, 5 is a hot tank, 6 is a cold tank outlet door, 7 is a cold tank, 8 is a molten salt-water heat exchanger, 9 is a hot tank outlet door, 10 is a waste heat boiler, 11 is a condensate pump, 12 is a condenser, 13 is a steam turbine, 14 is a chimney, 15 is a return water pipe on the primary side of the heating network, and 16 is a water inlet pipe on the primary side of the heating network. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0028] In the description of the present invention, it should be understood that the terms “include” and “comprises” indicate the presence of described features, wholes, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or collections thereof.
[0029] It should also be understood that the terms used in the present specification are only for the purpose of describing specific embodiments and are not intended to limit the present invention. As used in the present specification and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.
[0030] It should be further understood that the term "and / or" used in the present specification and the appended claims refers to any combination of one or more of the associated listed items and all possible combinations, and includes these combinations. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in the present invention generally indicates that the associated objects are in an "or" relationship.
[0031] It should be understood that, although the terms first, second, third, etc. may be used to describe preset ranges, etc. in the embodiments of the present invention, these preset ranges should not be limited to these terms. These terms are only used to distinguish preset ranges from each other. For example, without departing from the scope of the embodiments of the present invention, the first preset range may also be referred to as the second preset range, and similarly, the second preset range may also be referred to as the first preset range.
[0032] The word "if" as used herein may be interpreted as "at the time of" or "when" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrases "if it is determined" or "if (stated condition or event) is detected" may be interpreted as "when it is determined" or "in response to determining" or "when detecting (stated condition or event)" or "in response to detecting (stated condition or event)", depending on the context.
[0033] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. The components of the embodiments of the present invention described and shown in the drawings here can usually be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0034] Various structural schematic diagrams of the embodiments disclosed in the present invention are shown in the accompanying drawings. These figures are not drawn to scale, and some details are magnified and some details may be omitted for the purpose of clear expression. The shapes of various regions and layers shown in the figures and the relative sizes and positional relationships therebetween are only exemplary, and may deviate in practice due to manufacturing tolerances or technical limitations, and those skilled in the art may additionally design regions / layers with different shapes, sizes, and relative positions according to actual needs.
[0035] Embodiment 1
[0036] The heating system for the non-operating condition of the gas turbine coupled with wind power described in the present invention includes a wind turbine 4, a hot tank 5, a molten salt-water heat exchanger 8, a cold tank 7, a primary-side return water pipe 15 of the heating network and a primary-side inlet water pipe 16 of the heating network; the output end of the wind turbine 4 is connected to the power interface of the hot tank 5, the outlet of the hot tank 5 is connected to the molten salt side inlet of the molten salt-water heat exchanger 8, the molten salt side outlet of the molten salt-water heat exchanger 8 is connected to the inlet of the cold tank 7, the outlet of the cold tank 7 is connected to the inlet of the hot tank 5, the outlet of the primary-side return water pipe 15 of the heating network is connected to the water side inlet of the molten salt-water heat exchanger 8, and the water side outlet of the molten salt-water heat exchanger 8 is connected to the primary-side inlet water pipe 16 of the heating network.
[0037] As an embodiment of the present invention, the outlet of the hot tank 5 is connected to the molten salt side inlet of the molten salt-water heat exchanger 8 through the hot tank outlet door 9.
[0038] As an embodiment of the present invention, the outlet of the cold tank 7 is connected to the inlet of the hot tank 5 via the cold tank outlet door 6 .
[0039] The working process of this embodiment is:
[0040] When the gas unit cannot guarantee heating under special conditions such as long-term shutdown, FCB working condition, load shedding working condition, or the gas unit needs to be shut down due to on-site demand during the heating season but cannot be shut down to ensure heating, the electric energy generated by the wind turbine 4 is sent to the hot tank 5 to heat the molten salt, and the molten salt output by the hot tank 5 enters the molten salt side of the molten salt-water heat exchanger 8 to release heat, and then enters the cold tank 7, and the molten salt output by the cold tank 7 enters the hot tank 5 to continue heating. At the same time, the primary return water of the heating network output by the primary return water pipe 15 enters the water side of the molten salt-water heat exchanger 8 for heat exchange and temperature increase, and then enters the primary inlet water pipe 16 of the heating network.
[0041] It should be noted that heating cannot be guaranteed under special operating conditions such as long-term shutdown of the gas unit, FCB operating conditions, load shedding conditions, or when the gas unit needs to be shut down due to on-site demand during the heating season but cannot be shut down to ensure heating, the gas unit is shut down or the gas unit load is extremely low and heating cannot be guaranteed. The wind power is passed into the electric heater of the heat tank 5 in advance to heat the molten salt. The heated molten salt replaces the extraction steam of the steam turbine 13 to heat the primary side return water of the heating network, and produces hot water for heating.
[0042] Embodiment 2
[0043] On the basis of Example 1, an electrolytic cell 3 is added. Specifically, the heating system of the gas turbine coupled with wind power in the non-operating condition in this embodiment includes an electrolytic cell 3, a wind turbine 4, a hot tank 5, a molten salt-water heat exchanger 8, a cold tank 7, a primary-side return water pipe 15 of the heating network and a primary-side inlet water pipe 16 of the heating network; the output end of the wind turbine 4 is connected to the power interface of the hot tank 5 and the power interface of the electrolytic cell 3, the outlet of the hot tank 5 is connected to the molten salt side inlet of the molten salt-water heat exchanger 8, the molten salt side outlet of the molten salt-water heat exchanger 8 is connected to the inlet of the cold tank 7, the outlet of the cold tank 7 is connected to the inlet of the hot tank 5, the outlet of the primary-side return water pipe 15 of the heating network is connected to the water side inlet of the molten salt-water heat exchanger 8, the water side outlet of the molten salt-water heat exchanger 8 is connected to the primary-side inlet water pipe 16 of the heating network, and the hydrogen outlet of the electrolytic cell 3 is connected to the air inlet of the gas turbine 1.
[0044] As an embodiment of the present invention, the outlet of the hot tank 5 is connected to the molten salt side inlet of the molten salt-water heat exchanger 8 through the hot tank outlet door 9.
[0045] As an embodiment of the present invention, the outlet of the cold tank 7 is connected to the inlet of the hot tank 5 via the cold tank outlet door 6 .
[0046] As an embodiment of the present invention, it also includes a hydrogen storage tank 2, the hydrogen outlet of the electrolyzer 3 is connected to the inlet of the hydrogen storage tank 2, and the outlet of the hydrogen storage tank 2 is connected to the air inlet of the gas turbine 1.
[0047] The working process of this embodiment is:
[0048] When wind power generation has "off-peak electricity" and "junk electricity" due to its own characteristics, and this part of electricity is often not effectively used and is wasted, the electricity generated by the wind turbine 4 is sent to the hot tank 5 to heat the molten salt, and at the same time sent to the electrolytic cell 3; the molten salt output from the hot tank 5 enters the molten salt side of the molten salt-water heat exchanger 8 to release heat, and then enters the cold tank 7, and the molten salt output from the cold tank 7 enters the hot tank 5 to continue heating. At the same time, the primary return water of the heating network output by the primary return water pipe 15 enters the water side of the molten salt-water heat exchanger 8 for heat exchange and temperature increase, and then enters the primary inlet water pipe 16 of the heating network.
[0049] The hydrogen produced by the electrolysis of water in the electrolyzer 3 is stored in the hydrogen storage tank 2 and then enters the gas turbine 1 for combustion.
[0050] It should be noted that, due to the characteristics of wind power generation, there are "valley electricity" and "junk electricity", and this part of electricity is often not effectively utilized and is wasted. This part of electricity can be used to produce hydrogen in the electrolyzer 3, and the hydrogen is stored in the hydrogen storage tank 2. When appropriate, it enters the gas turbine 1 together with natural gas to be mixed with hydrogen and burned to perform work, which not only reduces the power loss of wind power generation, but also reduces the carbon dioxide concentration of the exhaust gas of the gas turbine.
[0051] Embodiment 3
[0052] refer to Figure 1 The heating system for the non-operating condition of the gas turbine coupled with wind power of the present invention comprises a gas turbine 1, a hydrogen storage tank 2, an electrolyzer 3, a wind turbine 4, a hot tank 5, a cold tank outlet door 6, a cold tank 7, a molten salt-water heat exchanger 8, a hot tank outlet door 9, a waste heat boiler 10, a condensate pump 11, a condenser 12, a steam turbine 13, a chimney 14, a primary side return water pipe 15 of the heating network and a primary side inlet water pipe 16 of the heating network;
[0053] The flue gas outlet of the gas turbine 1 is connected to the inlet of the waste heat boiler 10, and the flue gas outlet of the waste heat boiler 10 is connected to the inlet of the chimney 14; the outlet of the steam turbine 13 is connected to the inlet of the waste heat boiler 10 via the condenser 12 and the condensate pump 11 in sequence, and the steam outlet of the waste heat boiler 10 is connected to the inlet of the steam turbine 13, the output end of the wind turbine 4 is connected to the power interface of the heat tank 5 and the power interface of the electrolyzer 3, the hydrogen outlet of the electrolyzer 3 is connected to the inlet of the hydrogen storage tank 2, and the outlet of the hydrogen storage tank 2 and the outlet of the natural gas input pipeline are connected to the air inlet of the gas turbine 1;
[0054] The outlet of the hot tank 5 is connected to the molten salt side inlet of the molten salt-water heat exchanger 8 via the hot tank outlet door 9, the molten salt side outlet of the molten salt-water heat exchanger 8 is connected to the inlet of the cold tank 7, the outlet of the cold tank 7 is connected to the inlet of the hot tank 5 via the cold tank outlet door 6, the outlet of the primary side return water pipe 15 of the heating network is connected to the water side inlet of the molten salt-water heat exchanger 8, and the water side outlet of the molten salt-water heat exchanger 8 is connected to the primary side inlet water pipe 16 of the heating network.
[0055] The working principle of the present invention is:
[0056] When the gas unit cannot guarantee heating under special operating conditions such as long-term shutdown, FCB operating conditions, load shedding operating conditions, or when the gas unit needs to be shut down due to on-site demand during the heating season but cannot be shut down to ensure heating, and when wind power generation has "valley electricity" and "junk electricity" due to its own characteristics, this part of electricity is often not effectively utilized and is wasted, then air enters the compressor for compression, and the compressed air and natural gas burn in the combustion chamber to produce high-temperature flue gas, which enters the gas turbine 1 and expands to do work, and the exhaust gas of the gas turbine 1 enters the waste heat boiler 10 to heat the boiler feed water to form main steam with different pressure parameters, and the main steam enters the steam turbine 13 to expand and do work, and the exhaust steam of the steam turbine 13 enters the condenser 12 to form condensate, which is then pressurized by the condensate pump 11 to the waste heat boiler 10 to form a steam-water cycle, and the heat of the condenser 12 is taken away by the circulating water.
[0057] It should be noted that the present invention transforms the system, combines the electricity produced by the wind power plant near the gas unit, and builds an additional molten salt energy storage system, which can overcome the following problems: the gas unit cannot guarantee heating under special conditions such as long-term shutdown, FCB conditions, load shedding conditions, or the gas unit needs to be shut down during the heating season due to on-site demand but cannot be shut down to ensure heating. The specific operation mode of the present invention is: under the above special conditions, the gas turbine is shut down or the gas turbine load is extremely low and heating cannot be guaranteed, the wind power is passed into the electric heater of the heat tank 5 in advance to heat the molten salt, and the heated molten salt replaces the extraction steam of the steam turbine 13 to heat the primary side return water of the heat network to produce hot water for heating. In addition, due to the characteristics of wind power generation, there is "valley electricity" and "junk electricity", and this part of electricity is often not effectively utilized and is wasted. This part of electricity can be used in the electrolyzer 3 to produce hydrogen, and the hydrogen is stored in the hydrogen storage tank 2. When appropriate, it enters the gas turbine 1 together with natural gas to be mixed with hydrogen and burned to perform work, which not only reduces the power loss of wind power generation, but also reduces the carbon dioxide concentration of the exhaust gas of the gas turbine.
[0058] Those skilled in the art will readily appreciate other embodiments of the present invention after considering the specification and disclosure of the invention. This application is intended to cover any variations, uses or adaptations of the present invention that follow the general principles of the present invention and include common knowledge or customary techniques in the art that are not disclosed by the present invention. The specification and examples are to be considered exemplary only, and the true scope and spirit of the present invention are indicated by the following claims.
[0059] It should be understood that the present invention is not limited to the exact construction that has been described above and shown in the drawings and that various modifications and changes may be made without departing from the scope thereof. The scope of the present invention is limited only by the appended claims.
[0060] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any way. Any simple modification, change and equivalent structural change made to the above embodiment based on the technical essence of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. A heating system for a gas turbine coupled with wind power in non-operating condition, characterized in that: It comprises a wind turbine (4), a heat tank (5), a molten salt-water heat exchanger (8), a cold tank (7), a primary-side return water pipeline of a heat network (15) and a primary-side inlet water pipeline of a heat network (16); The output end of the wind turbine (4) is connected to the power interface of the hot tank (5), the outlet of the hot tank (5) is connected to the molten salt side inlet of the molten salt-water heat exchanger (8), the molten salt side outlet of the molten salt-water heat exchanger (8) is connected to the inlet of the cold tank (7), the outlet of the cold tank (7) is connected to the inlet of the hot tank (5), the outlet of the primary side return water pipe (15) of the heating network is connected to the water side inlet of the molten salt-water heat exchanger (8), and the water side outlet of the molten salt-water heat exchanger (8) is connected to the primary side water inlet pipe (16) of the heating network.
2. The heating system for non-operating conditions of a gas turbine coupled with wind power according to claim 1, characterized in that: The outlet of the hot tank (5) is connected to the molten salt side inlet of the molten salt-water heat exchanger (8) through the hot tank outlet door (9).
3. The heating system for non-operating gas turbines coupled with wind power according to claim 1, characterized in that: The outlet of the cold tank (7) is connected to the inlet of the hot tank (5) through the cold tank outlet door (6).
4. The heating system for non-operating gas turbines coupled with wind power according to claim 1, characterized in that: It also includes an electrolytic cell (3), wherein the output end of the wind turbine (4) is connected to the power interface of the electrolytic cell (3), and the hydrogen outlet of the electrolytic cell (3) is connected to the air inlet of the gas turbine (1).
5. The heating system for non-operating gas turbines coupled with wind power according to claim 4 is characterized in that: It also includes a hydrogen storage tank (2), the hydrogen outlet of the electrolyzer (3) is connected to the inlet of the hydrogen storage tank (2), and the outlet of the hydrogen storage tank (2) is connected to the air inlet of the gas turbine (1).
6. The heating system for non-operating gas turbines coupled with wind power according to claim 1, characterized in that: It also includes a waste heat boiler (10), a chimney (14), a steam turbine (13), a condenser (12) and a condensate pump (11); the flue gas outlet of the gas turbine (1) is connected to the inlet of the waste heat boiler (10), and the flue gas outlet of the waste heat boiler (10) is connected to the inlet of the chimney (14); the outlet of the steam turbine (13) is connected to the inlet of the waste heat boiler (10) via the condenser (12) and the condensate pump (11) in sequence, and the steam outlet of the waste heat boiler (10) is connected to the inlet of the steam turbine (13).
7. A heating system for a gas turbine in non-operating condition coupled with wind power, characterized in that: It comprises a waste heat boiler (10), a steam turbine (13), an electrolytic cell (3), a wind turbine (4), a hot tank (5), a molten salt-water heat exchanger (8), a cold tank (7), a primary side return water pipeline of a heating network (15) and a primary side inlet water pipeline of a heating network (16); The output end of the wind turbine (4) is connected to the power interface of the hot tank (5) and the power interface of the electrolytic cell (3); the outlet of the hot tank (5) is connected to the molten salt side inlet of the molten salt-water heat exchanger (8); the molten salt side outlet of the molten salt-water heat exchanger (8) is connected to the inlet of the cold tank (7); the outlet of the cold tank (7) is connected to the inlet of the hot tank (5); the outlet of the primary side return water pipe (15) of the heating network is connected to the water side inlet of the molten salt-water heat exchanger (8); and the water side outlet of the molten salt-water heat exchanger (8) is connected to the primary side water inlet pipe (16) of the heating network; The hydrogen outlet of the electrolyzer (3) is connected to the air inlet of the gas turbine (1); The flue gas outlet of the gas turbine (1) is connected to the inlet of the waste heat boiler (10), and the steam outlet of the waste heat boiler (10) is connected to the inlet of the steam turbine (13).
8. The heating system for non-operating gas turbines coupled with wind power according to claim 7, characterized in that: It also includes a hydrogen storage tank (2), the hydrogen outlet of the electrolyzer (3) is connected to the inlet of the hydrogen storage tank (2), and the outlet of the hydrogen storage tank (2) is connected to the air inlet of the gas turbine (1).
9. The heating system for non-operating gas turbines coupled with wind power according to claim 7, characterized in that: The outlet of the hot tank (5) is connected to the molten salt side inlet of the molten salt-water heat exchanger (8) through the hot tank outlet door (9).
10. The heating system for non-operating gas turbines coupled with wind power according to claim 7, characterized in that: The outlet of the cold tank (7) is connected to the inlet of the hot tank (5) through the cold tank outlet door (6).