Construction method for transforming existing non-penetrating secondary beam bearing brick wall

Through the renovation method of pouring reinforced concrete columns first in old buildings and gradually dismantling the load-bearing brick wall, the construction safety risks of non-permeable secondary beam load-bearing brick walls and the problems of major disturbance to the original structure are solved, and construction safety is improved and shorten the construction period.

CN119392967APending Publication Date: 2025-02-07YUNNAN NO 5 CONSTR ENG +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411750749.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-02
Publication Date
2025-02-07

AI Technical Summary

Technical Problem

In the renovation of old buildings, the existing construction methods have problems such as high construction safety risks, large disturbances to the original structure, slow construction progress and high cost when renovating non-permeable secondary beam load-bearing brick walls.

Method used

A transformation method is adopted, by first pouring reinforced concrete columns under existing secondary beams, and gradually dismantling the load-bearing brick wall after the columns reach the design strength, and finally carrying out comprehensive reinforcement to reduce disturbances to the original structure.

Benefits of technology

It effectively improves construction safety, reduces disturbances to the original building structure, shortens construction period, reduces construction costs, and ensures construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119392967A_ABST
    Figure CN119392967A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method for transforming an existing non-penetrating secondary beam bearing brick wall, which comprises the following steps: firstly, positioning and paying off pouring positions of a reinforced concrete column I and a reinforced concrete column II, and mounting column longitudinal steel bars and stirrups I; formworks of the first reinforced concrete column and the second reinforced concrete column are installed, and concrete is poured; positioning and paying off are conducted on the third reinforced concrete column, and the bearing brick wall within the range of the third reinforced concrete column is dismantled; longitudinal steel bars and second stirrups are manufactured and installed on the third reinforced concrete column, the second stirrups are connected with the first reinforced concrete column and the second reinforced concrete column in a steel bar planting mode, a formwork of the third reinforced concrete column is installed, concrete is poured, and after the strength meets the requirement, the whole bearing brick wall below the secondary beam and the original structural beam is dismantled, and a large space is formed. According to the method, the transformation construction safety of the existing non-penetrability secondary beam bearing brick wall is improved, the construction cost is saved, and the construction safety is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of old building reconstruction and structural reinforcement engineering construction, and specifically relates to a construction method for reconstructing an existing non-penetrating secondary beam load-bearing brick wall. Background Art

[0002] In the renovation and structural reinforcement of old buildings, there are various construction methods for renovating existing non-penetrating secondary beam load-bearing brick walls. There are two commonly used construction methods: one construction method is to directly dismantle the secondary beam and the entire load-bearing brick wall under the original structural beam, and then construct reinforced concrete columns under the secondary beam. This construction method has a high construction safety risk and may cause the original structural beam to break or the building to collapse; the other construction method is to support the existing non-penetrating secondary beam load-bearing brick wall that needs to be renovated and then reinforce it. The support needs to be supported from the foundation to the top floor and from bottom to top, and then the load-bearing brick wall is dismantled from the top floor to the foundation to unload the load, and then new reinforced concrete columns are constructed from the foundation to the top floor. The entire renovation construction process will cause disturbance to the original structure, with a high construction safety risk and slow construction progress. It requires a large amount of manpower, materials, and machinery, which greatly increases the construction cost. Summary of the invention

[0003] The purpose of the present invention is to provide a construction method for transforming an existing non-penetrating secondary beam load-bearing brick wall, which effectively solves the construction safety problem of transforming an existing non-penetrating secondary beam load-bearing brick wall, reduces the disturbance to the original building structure, and improves the safety of the transformation construction.

[0004] In order to achieve the above object, the present invention provides the following technical solution: a construction method for transforming an existing non-penetrating secondary beam load-bearing brick wall, comprising the following steps: a. First, locate and lay out the pouring positions of reinforced concrete column 1 and reinforced concrete column 2, install the column longitudinal reinforcement and stirrup 1, and use embedded reinforcement to connect the intersection of the column longitudinal reinforcement and the secondary beam; install the formwork of reinforced concrete column 1 and reinforced concrete column 2, and pour concrete; b. When reinforced concrete columns 1 and 2 reach the design strength and bear the upper load, the reinforced concrete column 3 is positioned and laid out, and the load-bearing brick wall within the range of the reinforced concrete column 3 is removed; c. Fabricate and install the longitudinal reinforcement and stirrup 2 of reinforced concrete column 3, connect stirrup 2 with reinforced concrete column 1 and reinforced concrete column 2 by planting reinforcement, and connect the longitudinal reinforcement of reinforced concrete column 3 with the original structural beam by planting reinforcement; install the template of reinforced concrete column 3 and pour concrete; d. After reinforced concrete column 3 reaches the design strength and bears the upper load, the secondary beam, primary beam 2 and the load-bearing brick wall under the original structural beam are demolished.

[0005] Preferably, the newly added reinforced concrete column consisting of reinforced concrete column one, reinforced concrete column two and reinforced concrete column three has a rectangular structure in cross section.

[0006] Preferably, reinforced concrete column 1 and reinforced concrete column 2 are cast on both sides of the load-bearing brick wall, at the lower part of secondary beam 1 and secondary beam 2, respectively, and reinforced concrete column 1 and reinforced concrete column 2 are staggered with each other.

[0007] Preferably, the cross section of the reinforced concrete column three is a Z-shaped structure.

[0008] The present invention solves the safety problem of constructing new columns after dismantling the load-bearing masonry wall in the construction method for renovating the existing non-penetrating secondary beam load-bearing brick wall, reduces the disturbance to the original structure, improves the construction safety of the renovation of the existing non-penetrating secondary beam load-bearing brick wall, shortens the construction period, saves construction costs, and ensures construction safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] Figure 1 It is a schematic diagram of the front elevation of the existing non-penetrating secondary beam load-bearing brick wall before transformation of the present invention; Figure 2 It is a schematic diagram of the front elevation of the existing non-penetrating secondary beam load-bearing brick wall reconstruction of the present invention; Figure 3 It is a schematic diagram of the reconstruction construction of the existing non-penetrating secondary beam load-bearing brick wall of the present invention; Figure 4 It is a schematic diagram of the construction plan of reinforced concrete column 1 and reinforced concrete column 2; Figure 5 This is a schematic diagram of the side elevation after the construction of reinforced concrete column 1 and reinforced concrete column 2 is completed; Figure 6 It is a plan view of the reinforced concrete column 1, the reinforced concrete column 2 and the reinforced concrete column 3 being cast as a whole; Figure 7 It is a schematic diagram of the order of pouring reinforced concrete column 1, reinforced concrete column 2 and reinforced concrete column 3 as a whole; Figure 8 It is a schematic diagram of the front elevation of the existing non-penetrating secondary beam load-bearing brick wall after transformation of the present invention; Fig. 9 It is a schematic diagram of the side elevation after the transformation of the existing non-penetrating secondary beam load-bearing brick wall of the present invention; Numbers in the figure: 1. New reinforced concrete column; 2. Reinforced concrete column one; 3. Reinforced concrete column two; 4. Load-bearing brick wall (demolished after the renovation is completed); 5. Secondary beam one; 6. Secondary beam two; 7. Reinforced concrete column three (secondary casting); 8. Original structural beam; 9. Column longitudinal reinforcement; 10. Stirrup one; 11. Embedded reinforcement connection lae, 12. Stirrup two. DETAILED DESCRIPTION

[0010] The embodiments of the present invention are now described with reference to the accompanying drawings. It will be understood by those skilled in the art that the following embodiments are only used to illustrate the present invention and should not be considered to limit the scope of the present invention. If no specific technology, connection relationship or condition is indicated in the embodiments, the technology, connection relationship, condition described in the literature in this field or the product specification is used. If the manufacturer of the materials, instruments or equipment used is not indicated, they are all conventional products that can be purchased.

[0011] In the description of the embodiments of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "setting" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention are understood according to specific circumstances.

[0012] Combination Figure 1-Figure 9 As shown, the present invention provides a construction method for transforming an existing non-penetrating secondary beam load-bearing brick wall, comprising the following steps: a. First, locate and lay out the pouring positions of reinforced concrete column 1 2 and reinforced concrete column 2 3, install column longitudinal reinforcement 9 and stirrup 10, and use embedded reinforcement to connect the intersection (upper part) of column longitudinal reinforcement 9 with secondary beam 1 5 and secondary beam 2 6; install the formwork of reinforced concrete column 1 2 and reinforced concrete column 2 3, and pour concrete; b. When the reinforced concrete column 1 2 and reinforced concrete column 2 3 reach the design strength and bear the upper load, the reinforced concrete column 3 7 is positioned and laid out, and the load-bearing brick wall 4 within the range of the reinforced concrete column 3 7 is removed; c. Fabricate and install the longitudinal reinforcement 9 and stirrup 2 12 of reinforced concrete column 3 7, connect stirrup 2 12 with reinforced concrete column 1 2 and reinforced concrete column 2 3 by planting reinforcement, connect the longitudinal reinforcement 9 of reinforced concrete column 3 7 with the junction of the original structural beam 8 by planting reinforcement; install the template of reinforced concrete column 3 7 and pour concrete; d After the reinforced concrete column 3 7 reaches the design strength and bears the upper load, the secondary beam 1 5, secondary beam 2 6 and the load-bearing brick wall 4 under the original structural beam 8 are removed.

[0013] Specifically, the newly added reinforced concrete column 1 of the present invention, which is composed of a reinforced concrete column 1 2, a reinforced concrete column 2 3 and a reinforced concrete column 3 7, has a rectangular cross-section; the reinforced concrete column 1 2 and the reinforced concrete column 2 3 are respectively cast on both sides of the original brick wall 4, at the lower part of the secondary beam 1 5 and the secondary beam 2 6, and the reinforced concrete column 1 2 and the reinforced concrete column 2 3 are staggered with each other; the cross-section of the reinforced concrete column 3 7 is a Z-shaped structure, and the shape of the stirrup 2 12 is also a Z-shaped structure.

[0014] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A construction method for transforming an existing non-penetrating secondary beam load-bearing brick wall, characterized in that: The steps include: a. First, locate and lay out the pouring positions of reinforced concrete column 1 (2) and reinforced concrete column 2 (3), install the column longitudinal reinforcement (9) and stirrup 1 (10), and use embedded reinforcement to connect the intersection of the column longitudinal reinforcement (9) and the secondary beam 1 (5) and secondary beam 2 (6); install the formwork of reinforced concrete column 1 (2) and reinforced concrete column 2 (3), and pour concrete; b. When the reinforced concrete column 1 (2) and the reinforced concrete column 2 (3) reach the design strength and bear the upper load, the reinforced concrete column 3 (7) is positioned and laid out, and the load-bearing brick wall (4) within the range of the reinforced concrete column 3 (7) is removed; c. Fabricate and install the longitudinal reinforcement (9) and stirrup 2 (12) of reinforced concrete column 3 (7), connect stirrup 2 (12) with reinforced concrete column 1 (2) and reinforced concrete column 2 (3) by embedding reinforcement, and connect the longitudinal reinforcement (9) of reinforced concrete column 3 (7) with the original structural beam (8) by embedding reinforcement; install the template of reinforced concrete column 3 (7) and pour concrete; d. After the reinforced concrete column 3 (7) reaches the designed strength and bears the upper load, the secondary beam 1 (5), secondary beam 2 (6) and the load-bearing brick wall (4) under the original structural beam (8) are removed.

2. A construction method for transforming an existing non-penetrating secondary beam load-bearing brick wall according to claim 1, characterized in that: The newly added reinforced concrete column (1) consisting of reinforced concrete column 1 (2), reinforced concrete column 2 (3) and reinforced concrete column 3 (7) has a rectangular cross-section.

3. A construction method for transforming an existing non-penetrating secondary beam load-bearing brick wall according to claim 2, characterized in that: The reinforced concrete column 1 (2) and the reinforced concrete column 2 (3) are respectively cast on both sides of the load-bearing brick wall (4), at the lower part of the secondary beam 1 (5) and the secondary beam 2 (2), and the reinforced concrete column 1 (2) and the reinforced concrete column 2 (3) are staggered with each other.

4. A construction method for transforming an existing non-penetrating secondary beam load-bearing brick wall according to claim 2 or 3, characterized in that: The cross section of reinforced concrete column three (7) is a Z-shaped structure.