Production scheduling method and device, electronic equipment and storage medium
By assigning all production equipment to the same production site and scheduling production equipment and transportation equipment according to the process sequence of the target production order, the problems of limited flexibility and inefficiency caused by the binding of production equipment and site are solved, and the problem of further development is achieved. Efficient production scheduling.
Patent Information
- Application Number
- CN202411561432.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-04
- Publication Date
- 2025-02-11
AI Technical Summary
In the prior art, after the production equipment is bound to the production site, only the production process of the site can be completed, resulting in limited flexibility of the production equipment and low production efficiency.
By assigning all production equipment to the same production site and scheduling production equipment and transportation equipment according to the process sequence of the target production orders, flexible scheduling of production equipment is achieved.
Improve production efficiency and enhance the flexibility of production equipment, so that the production system can respond more flexibly to the needs of different production orders.
Smart Images

Figure CN119414799A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of production scheduling, and in particular to a method, device, electronic device and storage medium for production scheduling. Background Art
[0002] The three primary colors of RGB refer to red, green, and blue. These three colors of light can be mixed in a certain proportion to produce various colors. When the three colors are mixed in equal amounts, white can be obtained. The RGB color model is an additive color model and is widely used in electronic systems such as televisions and computer monitors.
[0003] In the prior art, when producing panels (displays) based on the three primary colors of RGB, all production equipment is divided into multiple production sites. Then production is carried out in the order of each production site. After the production equipment is bound to a site, it can only complete the production process of the site. This method greatly limits the flexibility of the production equipment and leads to low production efficiency. Summary of the invention
[0004] In view of this, the purpose of the present application is to provide a production scheduling method, device, electronic device and storage medium to overcome the problems in the prior art.
[0005] In a first aspect, an embodiment of the present application provides a production scheduling method, which is applied to a production system, wherein the production system includes a transportation device and a plurality of production devices, wherein the production devices are evenly divided into a plurality of production sites according to a manufacturing process flow, and the transportation device physically transports materials to a current production site, and after the current process is completed at the current production site, the transportation device transports materials to the next production site; the method includes:
[0006] In response to the site unification operation, all the production equipment are attributed to the same production site;
[0007] When a target production order is received, the production equipment and the transportation equipment are scheduled to complete the production within the process time corresponding to the target production order according to the process sequence included in the target production order.
[0008] In some technical solutions of the present application, the process sequence includes first performing a first process type and then performing a second process type;
[0009] When receiving the target production order, scheduling the production equipment and the transportation equipment to complete the production within the process time corresponding to the target production order according to the process sequence included in the target production order includes:
[0010] When receiving the target production order, scheduling a first device among the production devices for production according to the first process type;
[0011] According to the second process type, a second device in the production equipment is scheduled to perform production; wherein the second device includes the first device that completes the production and other devices in the production equipment except the first device.
[0012] In some technical solutions of the present application, when the second device is the first device that completes production, the method further includes:
[0013] According to the production requirements of the second process type, the initial parameters of the first device are adjusted to obtain adjusted target parameters; the first device can perform the production of the second process type based on the target parameters.
[0014] In some technical solutions of the present application, the number of the above-mentioned target production orders is multiple;
[0015] When receiving the target production order, scheduling the production equipment and the transportation equipment to complete the production within the process time corresponding to the target production order according to the process sequence included in the target production order includes:
[0016] Determining the scheduling level of each of the target production orders according to the process time corresponding to each of the target production orders;
[0017] According to the scheduling level and the process sequence included in each of the target production orders, the production equipment and the transportation equipment are scheduled to complete the production within the process time corresponding to the target production order.
[0018] In some technical solutions of the present application, the above-mentioned multiple target production orders include a first production order and a second production order; the scheduling level of the first production order is a first level, and the scheduling level of the second production order is a second level; wherein the first level is higher than the second level;
[0019] The step of scheduling the production equipment and the transportation equipment to complete the production within the process time corresponding to the target production order according to the scheduling level and the process sequence included in each target production order includes:
[0020] According to the first process sequence of the first production order, the first equipment, the second equipment and the transportation equipment in the production equipment are scheduled to complete the production within the process time corresponding to the first production order;
[0021] If the first process sequence and the second process sequence of the second production order do not meet the preset sequence requirement, according to the second process sequence of the second production order, the third equipment, the fourth equipment and the transportation equipment in the production equipment are scheduled to complete the production within the process time corresponding to the second production order;
[0022] If the first process sequence and the second process sequence of the second production order meet the preset sequence requirements, the second equipment, the fifth equipment and the transportation equipment in the production equipment are scheduled to complete the production within the process time corresponding to the second production order according to the second process sequence of the second production order; wherein the fifth equipment includes the first equipment for completing the process, the second equipment for completing the process, and other equipment except the first equipment and the second equipment.
[0023] In some technical solutions of the present application, there are multiple transport devices, and the method dispatches the transport devices in the following manner:
[0024] According to the loading status of the transport equipment, a target equipment capable of exchanging materials for the current process is selected for scheduling.
[0025] In some technical solutions of the present application, the above-mentioned production equipment is of multiple manufacturer types;
[0026] When a target production order that meets the preset accuracy requirement is received, scheduling the production equipment and the transportation equipment to complete the production within the process time corresponding to the target production order according to the process sequence included in the target production order includes:
[0027] According to the process sequence included in the target production order, the production equipment and the transportation equipment of the same manufacturer type are scheduled to complete the production within the process time corresponding to the target production order.
[0028] In a second aspect, an embodiment of the present application provides a production scheduling device, which is applied to a production system, wherein the production system includes a transportation device and a plurality of production devices, wherein the production devices are evenly divided into a plurality of production sites according to a manufacturing process flow, and the transportation device physically transports materials to a current production site, and after the current process is completed at the current production site, the transportation device transports materials to the next production site; the device includes:
[0029] A response module, configured to respond to the site unified operation and attribute all the production equipment to the same production site;
[0030] The scheduling module is used to schedule the production equipment and the transportation equipment to complete the production within the process time corresponding to the target production order according to the process sequence contained in the target production order when the target production order is received.
[0031] In a third aspect, an embodiment of the present application provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above-mentioned production scheduling method when executing the computer program.
[0032] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the steps of the above-mentioned production scheduling method are executed.
[0033] The technical solution provided by the embodiments of the present application may have the following beneficial effects:
[0034] The present application is applied to a production system, which includes a transport device and a plurality of production devices. The production equipment is evenly divided into a plurality of production sites according to the manufacturing process flow. The transport device will physically transport the materials to the current production site. After the current process is completed at the current production site, the transport device will transport the materials to the next production site. The method includes: in response to the unified operation of the site, all the production equipment are assigned to the same production site. Upon receiving a target production order, according to the process sequence contained in the target production order, the production equipment and the transport device are scheduled to complete the production within the process time corresponding to the target production order. The present application assigns all production equipment to the same production site, and schedules all production equipment according to the needs of the target production order, thereby improving production efficiency.
[0035] In order to make the above-mentioned objects, features and advantages of the present application more obvious and easy to understand, preferred embodiments are specifically cited below and described in detail with reference to the attached drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0037] Figure 1 A schematic diagram of a production scheduling method provided in an embodiment of the present application is shown;
[0038] Figure 2 A schematic diagram of a production device provided in an embodiment of the present application is shown;
[0039] Figure 3A schematic diagram showing a specific implementation of a production scheduling method provided in an embodiment of the present application;
[0040] Figure 4 A schematic diagram of a production scheduling device provided in an embodiment of the present application is shown;
[0041] Figure 5 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0042] To make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. It should be understood that the drawings in the present application only serve the purpose of explanation and description and are not used to limit the scope of protection of the present application. In addition, it should be understood that the schematic drawings are not drawn in real proportion. The flowchart used in this application shows the operations implemented according to some embodiments of the present application. It should be understood that the operations of the flowchart can be implemented out of sequence, and the steps without logical context can be reversed in order or implemented simultaneously. In addition, those skilled in the art can add one or more other operations to the flowchart under the guidance of the content of the present application, or remove one or more operations from the flowchart.
[0043] In addition, the described embodiments are only a part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various configurations. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the application claimed for protection, but merely represents the selected embodiments of the present application. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present application.
[0044] It should be noted that the term "comprising" will be used in the embodiments of the present application to indicate the existence of the features declared thereafter, but does not exclude the addition of other features.
[0045] The three primary colors of RGB refer to red, green, and blue. These three colors of light can be mixed in a certain proportion to produce various colors. When the three colors are mixed in equal amounts, white can be obtained. The RGB color model is an additive color model and is widely used in electronic systems such as televisions and computer monitors.
[0046] In the prior art, when producing panels (displays) based on the three primary colors of RGB, all production equipment is divided into multiple production sites. Then production is carried out in the order of each production site. After the production equipment is bound to a site, it can only complete the production process of the site. This method greatly limits the flexibility of the production equipment and leads to low production efficiency.
[0047] Based on this, the embodiments of the present application provide a method, device, electronic device and storage medium for production scheduling, which are described below through embodiments.
[0048] Figure 1 A flow chart of a production scheduling method provided in an embodiment of the present application is shown, wherein the method includes steps S101-S102; specifically:
[0049] S101, in response to a site unified operation, assigning all the production equipment to the same production site;
[0050] S102. When a target production order is received, the production equipment and the transportation equipment are scheduled to complete the production within the process time corresponding to the target production order according to the process sequence included in the target production order.
[0051] This application assigns all production equipment to the same production site, and schedules all production equipment according to the needs of target production orders, thereby improving production efficiency.
[0052] Some embodiments of the present application are described in detail below. In the absence of conflict, the following embodiments and features in the embodiments can be combined with each other.
[0053] Before introducing the production scheduling method in the embodiment of the present application, the production system in the embodiment of the present application is first introduced. The production system here is a system for production based on the three primary colors of RGB. In this system, during specific production, it is necessary to proceed in the order of R, G and B contained in the order. The production system in the prior art includes a transportation device and a plurality of production devices. The production equipment is evenly divided into a plurality of production sites according to the manufacturing process flow. The transportation device will physically transport the material to the current production site. After the current process is completed at the current production site, the transportation device will transport the material to the next production site.
[0054] like Figure 2As shown in the figure, there are nine production equipment (A-I) in total, three (A, B, C) are allocated to production site 1, the other four (D, E, F) are allocated to production site 2, and the last four (G, H, I) are allocated to production site 3. Then the equipment at production site 1 can only complete one process. After the equipment (A, B, C) at production site 1 completes production, it can only be idle and cannot be used for production at other production sites.
[0055] The present application provides a method for production scheduling, and the technical concept of the present application is to place all production equipment under the same production site, so that all production equipment can be scheduled. Specifically, the user needs to perform site unification operations on all production equipment first. In the specific implementation, the site unification operation here includes the merging operation of existing sites, or the cancellation operation of existing sites. By performing site merging or site cancellation, the binding relationship between each production equipment and the existing site is canceled. That is, after this operation, the production of the production equipment is no longer limited to the generation process of a certain production site, and can be adaptively worked by scheduling to any required process (after the initial parameters on the equipment are adjusted). The specific scheduling process is carried out according to the received target production order. That is, when a process in the target production order requires it, the production equipment is scheduled in real time to complete the production within the process time corresponding to the target production order.
[0056] When producing the specific RGB primary colors, the production equipment here can be a solid crystal transfer equipment, and the transportation equipment here can be an automatic transport cart. The corresponding process time in the target production order is determined according to the specific material or product. For example, the process time here can be the time range (Q Time range) in which the solder paste can be used after printing: minimum Q Time and maximum Q Time. The product must reach the time within the Q Time range before it can be dispatched, and the Rework process will be executed when it exceeds the maximum Q Time, and subsequent processes will not be executed. Example: In the Micro LED industry, solder paste will be printed on the substrate before the RGB chip is bonded to facilitate bonding. Q Time needs to control the minimum and maximum temperature recovery time of the solder paste.
[0057] In an optional implementation, the production system receives a target production order issued by ERP. The target production order includes the RGB process sequence of the current product requirement process. The target production order received by the production system includes the following situations: the first situation is that the target production order includes only one order; the second situation is that the target production order includes multiple orders (the embodiment of the present application is described by taking two orders as an example, and in the specific implementation, the multiple orders can be three, four or even more).
[0058] When the target production order includes only one order, the process sequence described in the order includes first executing the first process type and then executing the second process type (here only two process types are described as an example, and in the specific implementation, a third process sequence, a fourth process sequence, etc. may be included).
[0059] According to the process sequence contained in the target production order, the production equipment and the transportation equipment are scheduled to complete the production within the process time corresponding to the target production order, including: when receiving the target production order, according to the first process type, the first equipment in the production equipment is scheduled to perform production; according to the second process type, the second equipment in the production equipment is scheduled to perform production; wherein the second equipment includes the first equipment that completes the production and other equipment in the production equipment except the first equipment. When the second equipment is the first equipment that completes the production, the method further includes: according to the production requirements of the second process type, the initial parameters of the first equipment are adjusted to obtain the adjusted target parameters; the first equipment can perform the production of the second process type based on the target parameters.
[0060] That is to say, in the embodiment of the present application, when production is carried out for a production order, the first equipment that meets the first process type is first scheduled from all production equipment, and then the second equipment that meets the second process type is scheduled. When scheduling the second equipment, there are the following situations: there is a first equipment that has completed the first process type and there is no first equipment that has completed the first process type. In the case where there is a first equipment that has completed the first process type, the scheduling of the second equipment can be performed on the first equipment that has completed the first process type and the equipment other than the first equipment. In the case where there is no first equipment that has completed the first process type, the scheduling of the second equipment can be performed on the equipment other than the first equipment.
[0061] Before each production equipment carries out each type of process type, it is necessary to set the initial parameters of each production equipment to the parameters corresponding to the process type. After the setting, the production equipment can carry out the production of the corresponding process type. For the first equipment that has completed the first process type, if it is scheduled to carry out the second process type production, it is also necessary to adjust its initial parameters to adapt to the target parameters of the second support type, so that the first equipment can carry out the second process type production after the adjustment.
[0062] When the target production order includes multiple orders (such as the first production order and the second production order), upon receiving the target production order, scheduling the production equipment and the transportation equipment to complete the production within the process time corresponding to the target production order according to the process sequence included in the target production order, including:
[0063] Determining the scheduling level of each of the target production orders according to the process time corresponding to each of the target production orders;
[0064] According to the scheduling level and the process sequence included in each of the target production orders, the production equipment and the transportation equipment are scheduled to complete the production within the process time corresponding to the target production order.
[0065] When the target production order of the embodiment of the present application includes multiple orders, it is necessary to first determine the scheduling level of the production order according to the process time of each production order. In order to ensure the production effect, the production order with a shorter process time has a higher corresponding scheduling level. The production order with a higher scheduling level is scheduled for production first.
[0066] For example, the process time of the first production order is three hours, and the process time of the second production order is five hours. The scheduling level of the first production order is the first level, and the scheduling level of the second production order is the second level; wherein the first level is higher than the second level. When scheduling, the production equipment is scheduled to complete the first production order first.
[0067] The step of scheduling the production equipment and the transportation equipment to complete the production within the process time corresponding to the target production order according to the scheduling level and the process sequence included in each target production order includes:
[0068] According to the first process sequence of the first production order, the first equipment, the second equipment and the transportation equipment in the production equipment are scheduled to complete the production within the process time corresponding to the first production order.
[0069] When scheduling the first equipment of the first production order, it is also necessary to detect the second process sequence of the second production order to determine whether the second process sequence and the first process sequence of the first production order meet the preset sequence requirements.
[0070] If the first process sequence and the second process sequence of the second production order do not meet the preset sequence requirement, according to the second process sequence of the second production order, the third equipment, the fourth equipment and the transportation equipment in the production equipment are scheduled to complete the production within the process time corresponding to the second production order;
[0071] If the first process sequence and the second process sequence of the second production order meet the preset sequence requirements, the second equipment, the fifth equipment and the transportation equipment in the production equipment are scheduled to complete the production within the process time corresponding to the second production order according to the second process sequence of the second production order; wherein the fifth equipment includes the first equipment for completing the process, the second equipment for completing the process, and other equipment except the first equipment and the second equipment.
[0072] The preset sequence requirement here is whether the second process sequence does not conflict with the first process sequence (same sequence). For example, the first process sequence is R, G, B, and the second process sequence is G, R, G. The sequences of the two are completely different. In this case, the first process sequence and the second process sequence meet the preset sequence requirement. If the first process sequence is R, G, B, and the second process sequence is B, G, R. R is the same in the sequences of the two. In this case, the first process sequence and the second process sequence do not meet the preset sequence requirement.
[0073] For the case where the first process sequence is R, G, B, and the second process sequence is G, R, G, at this time, while scheduling for the first process sequence, the second process sequence can also be scheduled, and there is no conflict between the two. That is, after scheduling the first equipment, the second equipment, and the transportation equipment for the first process sequence (including the first process type and the second process type, if the second process type is included, the corresponding equipment includes the third equipment, which are set accordingly), the second equipment, the fifth equipment, and the transportation equipment in the production equipment can also be scheduled for the second process sequence. Since there is no conflict between the second process sequence and the first process sequence, the fifth equipment here can be the first equipment that completes the process, the second equipment that completes the process, or other equipment except the first equipment and the second equipment.
[0074] In the case where the first process sequence is R, G, B, and the second process sequence is B, G, R, scheduling can be performed for B and R in the second process sequence while scheduling for the first process sequence. When scheduling G in the second process sequence, it is necessary to consider whether its scheduling has an impact on G in the first process sequence. If the number of production equipment can meet the needs of G in the first process sequence and G in the second process sequence at the same time, scheduling can also be performed for G in the second process sequence when scheduling G for the first process sequence. If there are some production equipment after the number of equipment in the production equipment can meet the needs of G in the first process sequence, but this part of the production equipment cannot meet all the needs in the second process sequence. At this time, this part of the production equipment will be scheduled first to produce G in the second process sequence, and after there is equipment that has completed the first process sequence, the equipment will be scheduled to produce G in the second process sequence.
[0075] In an optional implementation, in order to meet the production efficiency of all production equipment, the transportation equipment in the embodiment of the present application is also provided in multiple numbers, and each transportation equipment can transport materials in each production equipment.
[0076] In order to improve transportation efficiency, when scheduling the transport equipment, the embodiments of the present application also need to consider the loading status of each transport equipment. If the transport equipment is not loaded with materials, when scheduling the transport equipment, it can be scheduled nearby according to the distance between the transport equipment and each production equipment. If there are materials in the transport equipment, when scheduling the transport equipment, the loading time of the transport equipment and the production equipment for the materials is taken into consideration, and the embodiments of the present application give priority to scheduling the transport equipment to carry production equipment with the same material type.
[0077] Specifically, Figure 3 As shown, in order to save AGV scheduling resources, reduce the AGV dispatching distance, and improve product production efficiency; when scheduling the automatic transport cart, priority is given to the direct transmission + exchange film logic; after determining the next station equipment for the current product, query the AGV cart inventory information to check whether there is any product that can be made by the current equipment; priority is given to dispatching AGVs that can execute exchange films.
[0078] In an optional implementation, since there are multiple production equipment, these production equipment may be produced by multiple manufacturers, that is, these production equipment have different manufacturer types (one manufacturer corresponds to one manufacturer type). There are certain differences in the production accuracy corresponding to different manufacturer types. If the received target production order has a higher accuracy requirement (meets the preset accuracy requirement, and the accuracy requirement is greater than or equal to the preset accuracy threshold), when scheduling the production equipment, it is necessary to schedule the production equipment of the same manufacturer type.
[0079] For example, there are three production equipment (A, B, C), where A and B are of the same manufacturer type and C is of another manufacturer type. When a high-precision production order is received, only A and B can be scheduled for production, or only C can be scheduled for production (when considering production efficiency, scheduling A and B is given priority). If it is a non-high-precision order, A, B, and C can be scheduled for production at the same time.
[0080] In an optional embodiment, the method in the present application can be implemented in the following manner: the RGB product process Q Time range (product process standard time range) is maintained. ERP issues the RGB process process sequence of different order products (RGB, GBR, only RG, only RB, only R). Timer scans the equipment status and the Panel to be dispatched in real time, triggers the scheduling system, and generates a scheduling task. The system monitors the arrival of the product at the start position of the dispatch section, and obtains the first process technology in the RGB process sequence issued by the current product order. If all the first process equipment have not called for materials, and there are products of the same type in the AGV, the current Panel is dispatched to the AGV for temporary storage; when waiting for the equipment to be idle, the product in the AGV is called for priority. Otherwise, the work is dispatched to the first process equipment (the earliest idle equipment is dispatched first). The process of the first equipment is completed, and the second process equipment technology of the order product is obtained. Record the equipment supplier of the first process equipment of the product, and subsequent dispatches will be dispatched to the equipment of the same supplier first. Verify whether the product process Qtim1e exceeds the maintenance standard range. If the current product has been processed for more than the Q time standard time, the subsequent process will not be continued, and the Rework process will be triggered. Otherwise, the verification exchange logic will be executed to dispatch the product to the next RGB process equipment to continue the process. Execute the verification exchange logic: 1. Query the next device destination of the current product; 2. Query whether there is a process that can be processed in the AGV equipment of the current dispatch section; implement a one-time AGV dispatch, specify the current product location, and put in the processable product.
[0081] Figure 4 A structural schematic diagram of a production scheduling device provided in an embodiment of the present application is shown, which is applied to a production system, wherein the production system includes a transportation device and a plurality of production devices, wherein the production devices are evenly divided into a plurality of production sites according to a manufacturing process flow, and the transportation device physically transports materials to a current production site, and after the current process is completed at the current production site, the transportation device transports materials to the next production site; the device includes:
[0082] A response module, configured to respond to the site unified operation and attribute all the production equipment to the same production site;
[0083] The scheduling module is used to schedule the production equipment and the transportation equipment to complete the production within the process time corresponding to the target production order according to the process sequence contained in the target production order when the target production order is received.
[0084] The process sequence includes performing a first process type first and then performing a second process type;
[0085] When receiving the target production order, scheduling the production equipment and the transportation equipment to complete the production within the process time corresponding to the target production order according to the process sequence included in the target production order includes:
[0086] When receiving the target production order, scheduling a first device among the production devices for production according to the first process type;
[0087] According to the second process type, a second device in the production equipment is scheduled to perform production; wherein the second device includes the first device that completes the production and other devices in the production equipment except the first device.
[0088] When the second device is the first device for completing production, the apparatus further includes: an adjustment module for adjusting initial parameters of the first device according to production requirements of the second process type to obtain adjusted target parameters; the first device can perform production of the second process type based on the target parameters.
[0089] The number of the target production orders is multiple;
[0090] When receiving the target production order, scheduling the production equipment and the transportation equipment to complete the production within the process time corresponding to the target production order according to the process sequence included in the target production order includes:
[0091] Determining the scheduling level of each of the target production orders according to the process time corresponding to each of the target production orders;
[0092] According to the scheduling level and the process sequence included in each of the target production orders, the production equipment and the transportation equipment are scheduled to complete the production within the process time corresponding to the target production order.
[0093] The multiple target production orders include a first production order and a second production order; the scheduling level of the first production order is a first level, and the scheduling level of the second production order is a second level; wherein the first level is higher than the second level;
[0094] The step of scheduling the production equipment and the transportation equipment to complete the production within the process time corresponding to the target production order according to the scheduling level and the process sequence included in each target production order includes:
[0095] According to the first process sequence of the first production order, the first equipment, the second equipment and the transportation equipment in the production equipment are scheduled to complete the production within the process time corresponding to the first production order;
[0096] If the first process sequence and the second process sequence of the second production order do not meet the preset sequence requirement, according to the second process sequence of the second production order, the third equipment, the fourth equipment and the transportation equipment in the production equipment are scheduled to complete the production within the process time corresponding to the second production order;
[0097] If the first process sequence and the second process sequence of the second production order meet the preset sequence requirements, the second equipment, the fifth equipment and the transportation equipment in the production equipment are scheduled to complete the production within the process time corresponding to the second production order according to the second process sequence of the second production order; wherein the fifth equipment includes the first equipment for completing the process, the second equipment for completing the process, and other equipment except the first equipment and the second equipment.
[0098] There are multiple transport devices, and the transport devices are dispatched in the following manner:
[0099] According to the loading status of the transport equipment, a target equipment capable of exchanging materials for the current process is selected for scheduling.
[0100] The production equipment is of multiple manufacturers’ types;
[0101] When a target production order that meets the preset accuracy requirement is received, scheduling the production equipment and the transportation equipment to complete the production within the process time corresponding to the target production order according to the process sequence included in the target production order includes:
[0102] According to the process sequence included in the target production order, the production equipment and the transportation equipment of the same manufacturer type are scheduled to complete the production within the process time corresponding to the target production order.
[0103] like Figure 5 As shown, an embodiment of the present application provides an electronic device for executing the production scheduling method in the present application, the device includes a memory, a processor, a bus, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the production scheduling method when executing the computer program.
[0104] Specifically, the above-mentioned memory and processor may be general-purpose memory and processor, which are not specifically limited here. When the processor runs the computer program stored in the memory, the above-mentioned production scheduling method can be executed.
[0105] Corresponding to the production scheduling method in the present application, an embodiment of the present application also provides a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the steps of the above-mentioned production scheduling method are executed.
[0106] Specifically, the storage medium can be a general storage medium, such as a mobile disk, a hard disk, etc. When the computer program on the storage medium is executed, the above-mentioned production scheduling method can be executed.
[0107] In the embodiments provided in the present application, it should be understood that the disclosed systems and methods can be implemented in other ways. The system embodiments described above are merely schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some communication interfaces, indirect coupling or communication connection of systems or units, which can be electrical, mechanical or other forms.
[0108] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, and may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0109] In addition, each functional unit in the embodiments provided in the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.
[0110] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.
[0111] It should be noted that similar numbers and letters represent similar items in the following figures. Therefore, once an item is defined in one figure, it does not need to be further defined and explained in subsequent figures. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description and are not to be understood as indicating or implying relative importance.
[0112] Finally, it should be noted that the above-described embodiments are only specific implementation methods of the present application, which are used to illustrate the technical solutions of the present application, rather than to limit them. The protection scope of the present application is not limited thereto. Although the present application is described in detail with reference to the above-mentioned embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-mentioned embodiments within the technical scope disclosed in the present application, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present application. They should all be included in the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the protection scope of the claims.
Claims
1. A production scheduling method, characterized in that: Applied to a production system, the production system includes a transport device and a plurality of production devices, the production devices are evenly divided into a plurality of production sites according to a manufacturing process, the transport device physically transports materials to a current production site, and after the current process is completed at the current production site, the transport device transports materials to the next production site; the method includes: In response to the site unification operation, all the production equipment are attributed to the same production site; When a target production order is received, the production equipment and the transportation equipment are scheduled to complete the production within the process time corresponding to the target production order according to the process sequence included in the target production order.
2. The method according to claim 1, characterized in that: The process sequence includes performing a first process type first and then performing a second process type; When receiving the target production order, scheduling the production equipment and the transportation equipment to complete the production within the process time corresponding to the target production order according to the process sequence included in the target production order includes: When receiving the target production order, scheduling a first device among the production devices for production according to the first process type; According to the second process type, a second device in the production equipment is scheduled to perform production; wherein the second device includes the first device that completes the production and other devices in the production equipment except the first device.
3. The method according to claim 2, characterized in that When the second device is the first device that completes production, the method further includes: According to the production requirements of the second process type, the initial parameters of the first device are adjusted to obtain adjusted target parameters; the first device can perform the production of the second process type based on the target parameters.
4. The method according to claim 1, characterized in that: The number of the target production orders is multiple; When receiving the target production order, scheduling the production equipment and the transportation equipment to complete the production within the process time corresponding to the target production order according to the process sequence included in the target production order includes: Determining the scheduling level of each of the target production orders according to the process time corresponding to each of the target production orders; According to the scheduling level and the process sequence included in each of the target production orders, the production equipment and the transportation equipment are scheduled to complete the production within the process time corresponding to the target production order.
5. The method according to claim 4, characterized in that The multiple target production orders include a first production order and a second production order; the scheduling level of the first production order is a first level, and the scheduling level of the second production order is a second level; wherein the first level is higher than the second level; The step of scheduling the production equipment and the transportation equipment to complete the production within the process time corresponding to the target production order according to the scheduling level and the process sequence included in each target production order includes: According to the first process sequence of the first production order, the first equipment, the second equipment and the transportation equipment in the production equipment are scheduled to complete the production within the process time corresponding to the first production order; If the first process sequence and the second process sequence of the second production order do not meet the preset sequence requirement, according to the second process sequence of the second production order, the third equipment, the fourth equipment and the transportation equipment in the production equipment are scheduled to complete the production within the process time corresponding to the second production order; If the first process sequence and the second process sequence of the second production order meet the preset sequence requirements, the second equipment, the fifth equipment and the transportation equipment in the production equipment are scheduled to complete the production within the process time corresponding to the second production order according to the second process sequence of the second production order; wherein the fifth equipment includes the first equipment for completing the process, the second equipment for completing the process, and other equipment except the first equipment and the second equipment.
6. The method according to claim 5, characterized in that There are multiple transport devices, and the method dispatches the transport devices in the following manner: According to the loading status of the transport equipment, a target equipment capable of exchanging materials for the current process is selected for scheduling.
7. The method according to claim 1, characterized in that The production equipment is of multiple manufacturers. When a target production order that meets the preset accuracy requirement is received, scheduling the production equipment and the transportation equipment to complete the production within the process time corresponding to the target production order according to the process sequence included in the target production order includes: According to the process sequence included in the target production order, the production equipment and the transportation equipment of the same manufacturer type are scheduled to complete the production within the process time corresponding to the target production order.
8. A production scheduling device, characterized in that: Applied to a production system, the production system includes a transport device and a plurality of production devices, the production devices are evenly divided into a plurality of production sites according to the manufacturing process flow, the transport device physically transports the material to the current production site, and after the current process is completed at the current production site, the transport device transports the material to the next production site; the device includes: A response module, configured to respond to the site unified operation and attribute all the production equipment to the same production site; The scheduling module is used to schedule the production equipment and the transportation equipment to complete the production within the process time corresponding to the target production order according to the process sequence contained in the target production order when the target production order is received.
9. An electronic device, characterized in that: include: A processor, a memory and a bus, wherein the memory stores machine-readable instructions executable by the processor, and when the electronic device is running, the processor and the memory communicate via the bus, and when the machine-readable instructions are executed by the processor, the steps of the production scheduling method as described in any one of claims 1 to 7 are performed.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the production scheduling method as described in any one of claims 1 to 7 are executed.