Pre-outfitting process for engine room of product oil and chemical tanker
Through ship outfit simulation technology, the installation problems during the pre-installation of refined oil and chemical ship cabins are discovered and solved in advance, the risks of problems exposed during installation are solved, the pre-installation rate and construction efficiency are improved, and the ship is shortened Construction cycle.
Patent Information
- Application Number
- CN202411867357.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-18
- Publication Date
- 2025-02-14
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the pre-installation of refined oil and chemical ship cabins, problems during the installation process may be exposed during the actual installation process, resulting in increased risks, extended construction cycles and reduced efficiency.
The ship outfit simulation technology is used to build a three-dimensional model of the cabin using three-dimensional modeling software, conduct information integration, collision detection, pre-installation planning and dynamic simulation, discover and solve installation problems in advance, and optimize the installation process.
By discovering and solving installation problems in advance, we can improve pre-installation rates, shorten ship construction cycles, reduce installation errors and rework, and improve overall construction progress and efficiency.
Smart Images

Figure CN119429010A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of ship engine room pre-outfitting, in particular to a finished oil and chemical ship engine room pre-outfitting process. Background Art
[0002] Finished oil and chemical tankers are mainly used to transport bulk oil, finished oil, petroleum products, petrochemicals, chemical synthetic products, animal and vegetable oils and other liquid cargoes. They usually have structural features such as double bottom, double side, and continuous main deck to ensure safety and stability during transportation. Before the pre-outfitting of the engine room of a finished oil or chemical tanker, the hull is regarded as a carrier, and all objects installed on the hull are called outfitting parts. The inner meaning of outfitting to achieve efficient shipbuilding should be "outfitting first", that is, to reduce the amount of outfitting work in the ship during docking and launching to a minimum, to move the outfitting process forward or optimize the daily process, to maximize the completion rate of each production link, and to achieve prefabrication and preinstallation.
[0003] At present, during the pre-outfitting process of the ship's engine room, some problems in the installation process may be exposed during the actual installation process, so that the verification of the solutions to these problems may need to be carried out during the actual installation process, which not only increases the risk, but may also affect the entire construction cycle, increase the difficulty and time cost of rectification, and affect the efficiency of pre-outfitting of the engine room of finished oil and chemical ships and the ship construction cycle.
[0004] Therefore, we propose a pre-outfitting process for the engine room of finished oil and chemical tankers. Summary of the invention
[0005] The purpose of the present invention is to provide a pre-outfitting process for the engine room of a finished oil or chemical ship in order to discover and solve problems in the installation process in advance, thereby improving the pre-outfitting rate and shortening the ship construction period.
[0006] The technical solution adopted by the present invention is as follows: A pre-outfitting process for the engine room of a finished oil and chemical tanker, including ship outfitting simulation, block pre-outfitting, block pre-outfitting, engine room equipment pre-installation, piping and cable laying, outfitting parts inspection and commissioning, and ship painting and anti-corrosion; The steps of the ship outfitting simulation are: S1: Use 3D modeling software to build a 3D model of the ship's engine room and reflect all the structures, equipment, pipelines, and cable elements in the engine room; S2: Perform information integration, integrate equipment parameters, installation locations, connection methods, and material specifications into the model, and attach all information required for design, production, and construction to the model through attributes or tags; S3: Perform collision detection. Use the collision detection function of the 3D model to check the spatial relationship between equipment, pipes, cables, etc. to avoid interference and conflict during installation. Adjust the model and optimize the layout to ensure that all elements can be installed smoothly. S4: Carry out pre-outfitting planning, plan the order and steps of pre-outfitting in the model, and determine the pre-outfitting content of each section and the whole section; S5: Use the dynamic simulation function of the model to simulate the entire process of pre-outfitting, including equipment hoisting, pipeline connection, and cable laying; through simulated construction, identify potential problems and risks, and take preventive and corrective measures in advance.
[0007] In a preferred embodiment of the invention, the segmented pre-outfitting includes installing piping, cables and equipment mounts on the segmented structure to ensure that all outfitting parts fit tightly with the segmented structure without any omissions or incorrect installations.
[0008] In a preferred embodiment of the invention, the overall section pre-outfitting includes the main engine, auxiliary engine, pump body, piping, cables, lamp rack and control box, and multiple segment structures are combined to form the overall section.
[0009] In a preferred embodiment of the invention, the pump body includes a lubricating oil pump, a fuel oil pump, a seawater pump, a fresh water pump, a cargo oil pump and a sewage pump.
[0010] In a preferred embodiment of the invention, the piping system includes large-diameter pipes for a seawater system, a bilge water system, a ballast system, and a fuel and lubricating oil system.
[0011] In a preferred embodiment of the invention, the engine room equipment pre-installation is used to pre-install the engine, shaft system, boiler and oil separator in the engine room, ensuring that the equipment is accurately positioned and does not interfere with the surrounding structures, laying the foundation for subsequent installation and commissioning.
[0012] In a preferred embodiment of the invention, the piping and cable laying includes laying pipes for the fuel system, cooling system, drainage system, and cables for transmitting from the generator to various equipment on the ship, ensuring that the piping and cables are laid in a reasonable direction, firmly fixed, and avoiding conflicts with other components.
[0013] In a preferred embodiment of the invention, the inspection and debugging of outfitting parts includes inspecting all pre-installed outfitting parts to ensure that they are installed correctly without damage or omission, and performing preliminary debugging on parts that need debugging to ensure that they function normally.
[0014] In a preferred embodiment of the invention, the ship painting and anti-corrosion treatment includes painting and anti-corrosion treatment of the pre-outfitting area to protect the outfitting parts from corrosion and damage.
[0015] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are: 1. In the present invention, the layout and installation position of the engine room equipment can be refined and accurately displayed by utilizing the ship outfitting simulation, thereby optimizing the installation process of the outfitting parts and reducing errors and rework during the installation process; by simulating and optimizing the installation of the outfitting parts through the model, problems in the installation process can be discovered and solved in advance, thereby improving the pre-outfitting rate and shortening the ship construction period.
[0016] 2. In the present invention, the use of ship outfitting simulation can more accurately determine the location and size of the openings required for the engine room equipment, improve the accuracy and completeness of the opening stage, and reduce subsequent modification and remedial work.
[0017] 3. In the present invention, the use of ship outfitting simulation can drive enterprises to achieve intelligent manufacturing transformation, provide more efficient and accurate pre-outfitting support for engine room pre-outfitting, improve the pre-outfitting rate, and shorten the ship construction period.
[0018] 4. In the present invention, the segmented pre-outfitting can move the outfitting work forward to the segmentation stage, in parallel with the hull structure construction, thereby greatly improving the pre-outfitting rate, ensuring that the outfitting parts are correctly installed in the segmentation stage, reducing rework due to reverse installation or size inconsistency, and at the same time further integrating and optimizing through the overall segment pre-outfitting to ensure the overall installation accuracy and efficiency, reduce delays caused by weather and other reasons, improve the overall construction progress of the ship, and shorten the cycle. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a flow chart of the pre-outfitting process of the present invention. DETAILED DESCRIPTION
[0020] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in combination with the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0021] The following will be combined Figure 1 A pre-outfitting process for the engine room of a finished oil or chemical ship according to an embodiment of the present invention is described in detail. Example
[0022] Reference Figure 1A pre-outfitting process for the engine room of a finished oil and chemical tanker includes ship outfitting simulation, block pre-outfitting, block pre-outfitting, engine room equipment pre-installation, piping and cable laying, outfitting parts inspection and commissioning, and ship painting and anti-corrosion; the steps of the ship outfitting simulation are: first, a three-dimensional model of the ship engine room is constructed using three-dimensional modeling software, and all structures, equipment, pipelines, and cable elements in the engine room are reflected; then information integration is performed, equipment parameters, installation locations, connection methods, and material specifications are integrated into the model, and all information required for design, production, and construction is attached to the model by attributes or tags; specifically, by using ship outfitting simulation, the layout and installation location of the engine room equipment can be refined and accurately displayed, thereby optimizing the installation process of outfitting parts and reducing errors and rework during the installation process; by simulating and optimizing the installation of outfitting parts through the model, problems in the installation process can be discovered and solved in advance, thereby improving the pre-outfitting rate and shortening the ship construction period.
[0023] Reference Figure 1 , then carry out collision detection, use the collision detection function of the 3D model to check the spatial relationship between equipment, pipelines, cables, etc., avoid interference and conflict during installation, and optimize the layout by adjusting the model to ensure that all elements can be installed smoothly; then carry out pre-outfitting planning, plan the order and steps of pre-outfitting in the model, and determine the pre-outfitting content of each section and the whole section; finally, use the dynamic simulation function of the model to simulate the entire process of pre-outfitting, including equipment lifting, pipeline connection, and cable laying; through simulated construction, discover potential problems and risks, and prevent and correct them in advance; specifically, the use of ship outfitting simulation can more accurately determine the location and size of the openings required for the engine room equipment, improve the accuracy and completeness of the opening stage, reduce subsequent modifications and remedial work, and drive enterprises to achieve intelligent manufacturing transformation, provide more efficient and accurate pre-outfitting support for engine room pre-outfitting, improve the pre-outfitting rate, and shorten the ship construction cycle.
[0024] Reference Figure 1The pre-outfitting of sections includes the installation of piping, cables and equipment brackets on the section structures, ensuring that all outfitting parts are closely matched with the section structures without omissions or incorrect installations. The pre-outfitting of the main section includes the main engine, auxiliary engine, pump body, piping, cables, lamp racks and control boxes, and multiple section structures are combined to form the main section. The pump body includes a lubricating oil pump, a fuel pump, a seawater pump, a fresh water pump, a cargo oil pump and a sewage pump. The piping includes a seawater system, a bilge water pump, and a Specifically, the pre-outfitting of sections can move the outfitting work forward to the section stage and carry out it in parallel with the hull structure construction, thereby greatly improving the pre-outfitting rate and ensuring that the outfitting parts are correctly installed in the section stage, reducing rework caused by reverse installation or size discrepancy, and at the same time further integrating and optimizing through the pre-outfitting of the whole section to ensure the overall installation accuracy and efficiency, reduce delays caused by weather and other reasons, improve the overall construction schedule of the ship, and shorten the cycle.
[0025] Reference Figure 1 The engine room equipment pre-installation is used to pre-install the engine, shaft system, boiler and oil separator in the engine room, ensuring that the equipment is accurately positioned and does not interfere with the surrounding structures, laying the foundation for subsequent installation and commissioning; the piping and cable laying includes the laying of pipes for the fuel system, cooling system, drainage system and cables transmitted from the generator to various equipment on the ship, ensuring that the piping and cables are reasonably oriented and securely fixed to avoid conflicts with other components.
[0026] Reference Figure 1 The inspection and debugging of outfitting parts includes the inspection of all pre-installed outfitting parts to ensure that they are installed correctly without damage or omissions, and the preliminary debugging of parts that need debugging to ensure their normal functions; specifically, through inspection and debugging, possible problems with outfitting parts can be discovered and repaired in time to ensure that their performance meets the design requirements and improve the reliability and stability of the equipment; the painting and anti-corrosion of the ship includes painting and anti-corrosion treatment of the pre-outfitting areas to protect the outfitting parts from corrosion and damage; specifically, the painting and anti-corrosion treatment can effectively resist the erosion of corrosive media such as seawater and salt spray, and extend the service life of the ship.
[0027] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0028] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A process for pre-outfitting the engine room of a finished oil or chemical ship, characterized in that: Including ship outfitting simulation, block pre-outfitting, block pre-outfitting, engine room equipment pre-installation, piping and cable laying, outfitting parts inspection and commissioning, and ship painting and anti-corrosion; The steps of the ship outfitting simulation are: S1: Use 3D modeling software to build a 3D model of the ship's engine room and reflect all the structures, equipment, pipelines, and cable elements in the engine room; S2: Perform information integration, integrate equipment parameters, installation locations, connection methods, and material specifications into the model, and attach all information required for design, production, and construction to the model through attributes or tags; S3: Perform collision detection. Use the collision detection function of the 3D model to check the spatial relationship between equipment, pipes, cables, etc. to avoid interference and conflict during installation. Adjust the model and optimize the layout to ensure that all elements can be installed smoothly. S4: Carry out pre-outfitting planning, plan the order and steps of pre-outfitting in the model, and determine the pre-outfitting content of each section and the whole section; S5: Use the dynamic simulation function of the model to simulate the entire process of pre-outfitting, including equipment hoisting, pipeline connection, and cable laying; through simulated construction, identify potential problems and risks, and take preventive and corrective measures in advance.
2. The process for pre-outfitting the engine room of a finished oil or chemical tanker according to claim 1, characterized in that: The section pre-outfitting includes the installation of piping, cables and equipment mounts on the section structure to ensure that all outfitting parts fit tightly with the section structure without omission or incorrect installation.
3. The process for pre-outfitting the engine room of a finished oil or chemical tanker according to claim 1, characterized in that: The pre-outfitting of the main section includes the main engine, auxiliary engine, pump body, piping, cables, light rack and control box, and multiple segment structures are combined to form the main section.
4. The process for pre-outfitting the engine room of a finished oil or chemical ship as claimed in claim 3, characterized in that: The pump body includes a lubricating oil pump, a fuel pump, a seawater pump, a fresh water pump, a cargo oil pump and a sewage pump.
5. The process for pre-outfitting the engine room of a finished oil or chemical ship as claimed in claim 3, characterized in that: The piping system includes large-diameter pipes for seawater system, bilge water system, ballast system and fuel and lubricating oil system.
6. The process for pre-outfitting the engine room of a finished oil or chemical tanker according to claim 1, characterized in that: The engine room equipment pre-installation is used to pre-install the engine, shaft system, boiler and oil separator in the engine room to ensure that the equipment is accurately positioned and does not interfere with the surrounding structures, laying the foundation for subsequent installation and commissioning.
7. The process for pre-outfitting the engine room of a finished oil or chemical tanker according to claim 1, characterized in that: The piping and cable laying includes laying of pipes for the fuel system, cooling system, drainage system and cables transmitted from the generator to various equipment on the ship, ensuring that the piping and cables are laid in a reasonable direction, firmly fixed and avoid conflict with other components.
8. The process for pre-outfitting the engine room of a finished oil or chemical tanker according to claim 1, characterized in that: The inspection and debugging of outfitting parts includes the inspection of all pre-installed outfitting parts to ensure that they are installed correctly without damage or omission, and the preliminary debugging of parts that need debugging to ensure that they function normally.
9. The process for pre-outfitting the engine room of a finished oil or chemical tanker according to claim 1, characterized in that: The ship painting and anti-corrosion includes painting and anti-corrosion treatment of the pre-outfitting area to protect the outfitting parts from corrosion and damage.