Pressure type anchor rod power foundation mechanism and forming method thereof

By adopting pressure anchor technology in the foundation of power facilities, using cement slurry and soil to form a pile body, and inserting anchor rods and steel plates into the pile body, the shortcomings of traditional foundation reinforcement methods under special geological conditions are solved, and the Efficient and economical basic reinforcement effect.

CN119434313AActive Publication Date: 2025-02-14ECONOMIC TECH RES INST OF STATE GRID ANHUI ELECTRIC POWER
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202510002972.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-02
Publication Date
2025-02-14
Estimated Expiration
2045-01-02

AI Technical Summary

Technical Problem

Under special geological conditions such as soft soil, sandy soil, and expansive soil, traditional power facility foundation reinforcement methods are difficult to meet the requirements of pulling resistance and stability, and there are problems such as high construction difficulty, high cost and limited results.

Method used

The pressure-type anchor power foundation mechanism is used to inject cement slurry into the soil and mix it with the soil to form a pile body, and then insert anchor rods and steel plates into the pile body to form a stable anchoring system.

Benefits of technology

It has achieved a power foundation reinforcement effect with strong pull-out resistance, convenient construction and low cost, adapted to complex geological conditions, and improved the stability of power facilities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure FT_1
    Figure FT_1
  • Figure FT_2
    Figure FT_2
  • Figure FT_3
    Figure FT_3
Patent Text Reader

Abstract

The invention discloses a pressure type anchor rod electric power foundation mechanism and a forming method thereof, and relates to the technical field of electric power foundation structure construction.The pressure type anchor rod electric power foundation mechanism comprises a pile body vertically buried in the ground, and the upper end of the pile body extends out of the ground surface; the at least one anchor rod is vertically and fixedly connected into the pile body, and the upper end of the anchor rod is higher than the upper end of the pile body; the steel plate is fixedly connected to the pile body, a steel column is fixedly connected to the steel plate, a column sleeve is coaxially connected to the steel column in a sliding mode, and a height adjusting assembly is arranged between the column sleeve and the steel column; the first I-shaped steel is fixedly connected to the column sleeve, a connecting piece connected with the electric power facility is arranged on the first I-shaped steel, a plurality of limiting piles are connected to the I-shaped steel in a sliding mode, all the limiting piles are inserted into the ground, and a bearing body is fixedly connected to the end of the anchor rod. On the contrary, a stable anchoring system is formed through interaction of the anchor rod and the surrounding soil body, and the advantages of being high in pulling resistance, convenient to construct, low in cost and the like are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of electric power foundation structure construction, in particular to a pressure-type anchor rod electric power foundation structure and a forming method thereof. Background Art

[0002] With the rapid development of the power industry, the construction scale and number of power facilities are increasing. However, the stable operation of power facilities depends on solid foundation support. Under some special geological conditions, such as soft soil, sandy soil, expansive soil, etc., traditional foundation reinforcement methods are often difficult to meet the requirements, resulting in the risk of settlement, tilting or even collapse of the foundation of power facilities. In addition, extreme climatic conditions and natural disasters also put forward higher requirements on the stability of the foundation of power facilities. Therefore, it is particularly important to develop an efficient, economical and reliable foundation reinforcement method.

[0003] At present, there are many foundation reinforcement technologies on the market, such as expanding the foundation, adding counterweights, pile foundation reinforcement, etc. However, these methods have problems such as high construction difficulty, high cost, and limited effect. Especially for the foundation of power facilities, a reinforcement solution is needed that can provide sufficient pull-out resistance and adapt to complex geological conditions. Summary of the invention

[0004] The object of the present invention is to provide a pressure-type anchor bolt power foundation mechanism and a forming method thereof, so as to solve the deficiencies in the above-mentioned prior art.

[0005] In order to achieve the above-mentioned purpose, the present invention provides the following technical solutions: a pressure-type anchor rod power foundation mechanism, comprising: a pile body, which is vertically buried in the ground, and its upper end extends out of the ground; at least one anchor rod, which is vertically fixedly connected in the pile body, and its upper end is higher than the upper end of the pile body; a steel plate, which is fixedly connected to the pile body, and a steel column is fixedly connected thereto, and a column sleeve is coaxially slidably connected to the steel column, and a height adjustment assembly is arranged between the column sleeve and the steel column; a first I-beam, which is fixedly connected to the column sleeve, and a connector connected to the power facility is arranged thereon.

[0006] Furthermore, a plurality of limit piles are slidably connected to the first I-beam, and each limit pile is inserted into the ground.

[0007] Furthermore, it also includes two height adjustment components, which include a connecting plate, a driving member and a supporting plate fixedly installed on the ground, the supporting plate is rotatably connected to a double-threaded screw, the supporting plate is horizontally slidably connected to a first slider and a second slider, the first slider and the second slider are both threadedly connected to the double-threaded screw, the connecting plate is clamped in the recess of the first I-beam, the first slider and the second slider are both hinged with a hinged rod, the other ends of the two hinged rods are hinged to the connecting plate, and the driving member is used to drive the double-threaded screw to rotate.

[0008] Furthermore, the driving member includes a driving motor, and an output shaft of the driving motor is coaxially and fixedly connected to the double-threaded screw.

[0009] Furthermore, there are two anchor rods.

[0010] Furthermore, the connecting piece includes a plurality of screw holes, each of which is screwed with a threaded rod that is screwed to the power facility.

[0011] Furthermore, the end of the anchor rod is fixedly connected to a bearing body.

[0012] The present invention also provides a forming method, which is implemented based on a pressure-type anchor rod power foundation mechanism and includes the following steps: S1, opening a groove on the ground, selecting a certain position in the groove, driving the stirring shaft to rotate through a power device, and driving the stirring blades to cut and stir the in-situ soil at the same time, and then, during the stirring process, injecting a curing agent such as cement slurry or cement mortar into the soil, fully mixing with the soil, and forming a cement slurry mixture; S2, vertically inserting a second I-beam with an anti-adhesive coating on the surface into the cement slurry mixture, inserting an anchor rod with a special adhesive coating on the surface into the cement slurry mixture, and after the cement slurry mixture solidifies, the cement slurry mixture forms a pile body, and then taking out the second I-beam; S3, filling the gap in the pile body after the I-beam is taken out with cement slurry until the cement slurry solidifies; S4, fixing the steel plate to the pile body with bolts, and installing power facilities on the first I-beam on the steel plate.

[0013] Compared with the prior art, the present invention provides a pressure-type anchor rod power foundation mechanism and a forming method thereof, firstly, a curing agent such as cement slurry or cement mortar is injected into the soil, fully mixed with the soil to form a cement slurry mixture, then a second I-beam is inserted into the cement slurry mixture, and then an anchor rod is inserted into the cement slurry mixture next to the second I-beam, after the cement slurry mixture solidifies, the cement slurry mixture forms a pile body, the second I-beam is taken out of the pile body, cement slurry is injected into the gap in the pile body where the second I-beam is taken out, and after the cement slurry solidifies, a steel plate is fixedly connected to the pile body; This power infrastructure avoids construction methods such as expanding the foundation, adding counterweights, and reinforcing pile foundations. Instead, a stable anchoring system is formed through the interaction between the anchor rods and the surrounding soil. It has the advantages of strong pull-out resistance, convenient construction, and low cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.

[0015] Figure 1A schematic diagram showing a pile body buried in the ground provided in an embodiment of the present invention; Figure 2 A schematic diagram of the height adjustment component structure provided by an embodiment of the present invention; Figure 3 This is a schematic structural diagram of the positional relationship between steel plates and I-beams provided in an embodiment of the present invention.

[0016] Description of reference numerals: 1. Pile body; 11. Land; 12. Anchor rod; 121. Bearing body; 2. Steel plate; 21. Steel column; 211. Column sleeve; 3. First I-beam; 31. Connector; 32. Limit pile; 4. Height adjustment assembly; 41. Connecting plate; 42. Bearing plate; 421. Double-thread screw; 422. First slider; 423. Second slider; 5. Articulated rod. DETAILED DESCRIPTION

[0017] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below with reference to the accompanying drawings.

[0018] See also Figure 1-3 A pressure-type anchor rod 12 power foundation mechanism provided by an embodiment of the present invention includes a pile body 1, two anchor rods 12, a steel plate 2 and a first I-beam 3. The pile body 1 is vertically buried in the ground 11, and the upper end of the pile body 1 extends out of the ground; the two anchor rods 12 are vertically fixedly connected in the pile body 1, and the upper ends of the two anchor rods 12 are higher than the upper end of the pile body 1; the steel plate 2 is fixedly connected to the pile body 1, and a steel column 21 is fixedly connected to the steel plate 2, and a column sleeve 211 is coaxially slidably connected to the steel column 21, and a height adjustment component is arranged between the column sleeve 211 and the steel column 21; the first I-beam 3 is fixedly connected to the column sleeve 211, and a connecting piece 31 connected to the power facility is arranged on the first I-beam 3, and the connecting piece 31 includes a plurality of screw holes, and a threaded rod screwed to the power facility is screwed on each screw hole.

[0019] First, a curing agent such as cement slurry or cement mortar is injected into the soil and fully mixed with the soil to form a cement slurry mixture. The second I-beam is then inserted into the cement slurry mixture, and then two anchor rods 12 are inserted into the cement slurry mixture next to the second I-beam (the anchor rod 12 rod body is anti-corrosive treated by hot-dip galvanizing process). The two anchor rods 12 are symmetrical with respect to the second I-beam. After the cement slurry mixture solidifies, the cement slurry mixture forms a pile body 1, the second I-beam is taken out of the pile body 1, and cement slurry is injected into the gap in the pile body 1 where the second I-beam is taken out. After the cement slurry solidifies, the steel plate 2 is fixedly connected to the pile body 1 (by drilling holes on the pile body 1 and screwing). After the construction is completed, quality inspection and acceptance work must be carried out to ensure that the construction quality meets the design requirements. The inspection content includes key indicators such as the strength of the pile body 1, the pull-out resistance of the anchor rod 12, and the density of the grouting body. The subsequent installation and commissioning of the power facilities can be carried out only after the acceptance is qualified.

[0020] Compared with the prior art, the present invention provides a pressure-type anchor rod 12 power foundation structure and a forming method thereof. This power foundation structure avoids construction methods such as expanding the foundation, adding counterweights, and reinforcing pile foundations. Instead, a stable anchoring system is formed through the interaction between the anchor rod 12 and the surrounding soil, which has the advantages of strong pull-out resistance, convenient construction, and low cost.

[0021] Among them, the end of the anchor rod 12 is fixedly connected with a carrier 121, which can concentrate the tension exerted on the anchor rod 12 in a smaller area, making the stress more concentrated. This can increase the friction and mechanical bite force between the anchor rod 12 and the surrounding structure, thereby improving the transmission efficiency of the anchoring force.

[0022] There are a plurality of limit piles 32 slidably connected to the first I-beam 3 , and each limit pile 32 is inserted into the ground 11 to limit the position of the first I-beam 3 and adjust the arc inclination of the first I-beam 3 .

[0023] In another embodiment provided by the present invention, referring to Figure 2 , also includes two height adjustment components 4, the height adjustment component 4 includes a connecting plate 41, a driving member and a supporting plate 42 fixedly installed on the ground, the supporting plate 42 is rotatably connected with a double-threaded screw 421, the supporting plate 42 is horizontally slidably connected with a first slider 422 and a second slider 423, the first slider 422 and the second slider 423 are both threadedly connected to the double-threaded screw 421, the connecting plate 41 is clamped in the recess of the first I-beam 3, the first slider 422 and the second slider 423 are both hinged with an articulated rod 5, the other ends of the two articulated rods 5 are hinged to the connecting plate 41, the driving member is used to drive the double-threaded screw 421 to rotate, specifically, the driving member includes a driving motor, and the output shaft of the driving motor is coaxially and fixedly connected with the double-threaded screw 421.

[0024] When the geology changes and the land 11 here sinks, the height of the power facilities here is lower than that of other places (for example, when one of the four corners of the power tower is lower, it may tilt). At this time, it is necessary to fix the rotating shaft of the drive motor coaxially with the double-threaded screw 421, and the two drive motors simultaneously drive the two double-threaded screws 421 to rotate, driving the first slider 422 and the second slider 423 to approach each other, and the hinged rods 5 on the first slider 422 and the second slider 423 simultaneously abut the first I-beam 3, so that the first I-beam 3 can slide relative to the steel column 21 through the column sleeve 211, and the first I-beam 3 moves vertically upward, so that the power facilities move upward, thereby preventing the power equipment from tilting.

[0025] The present invention also provides a forming method, which is implemented based on a pressure-type anchor rod 12 power foundation mechanism, and includes the following steps: S1, opening a groove on the land 11, selecting a certain position in the groove, driving the stirring shaft to rotate through a power device, and driving the stirring blades to cut and stir the in-situ soil, and then, during the stirring process, injecting a curing agent such as cement slurry or cement mortar into the soil, and fully mixing with the soil to form a cement slurry mixture; S2, vertically inserting a second I-beam with an anti-adhesive coating on the surface into the cement slurry mixture, inserting an anchor rod 12 with a special adhesive coating on the surface into the cement slurry mixture, and after the cement slurry mixture solidifies, the cement slurry mixture forms a pile body 1, and then taking out the second I-beam; S3, filling the gap in the pile body 1 after the I-beam is taken out with cement slurry until the cement slurry solidifies; S4, fixing the steel plate 2 to the pile body 1 by bolts, and installing power facilities on the first I-beam 3 on the steel plate 2.

[0026] The above description is only by way of illustration of certain exemplary embodiments of the present invention. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.

Claims

1. A pressure-type anchor bolt power foundation mechanism, characterized in that: include: The pile is vertically buried in the ground with its upper end extending above the ground surface; At least one anchor rod, which is vertically fixedly connected to the pile body and has an upper end higher than the upper end of the pile body; A steel plate is fixedly connected to the pile body, a steel column is fixedly connected to the steel plate, a column sleeve is coaxially slidably connected to the steel column, and a height adjustment component is arranged between the column sleeve and the steel column; The first I-beam is fixedly connected to the column sleeve and is provided with a connecting piece connected to the power facility.

2. A pressure-type anchor bolt power foundation mechanism according to claim 1, characterized in that: A plurality of limit piles are slidably connected to the first I-beam, and each limit pile is inserted into the ground.

3. A pressure-type anchor bolt power foundation mechanism according to claim 1, characterized in that: The height adjustment assembly includes a connecting plate, a driving member, and a supporting plate fixedly mounted on the ground, wherein a double-threaded screw is rotatably connected to the supporting plate, and a first slider and a second slider are horizontally slidably connected to the supporting plate, and the first slider and the second slider are both threadedly connected to the double-threaded screw. The connecting plate is clamped in the recess of the first I-beam, and the first slider and the second slider are both hinged with articulated rods, and the other ends of the two articulated rods are hinged to the connecting plate, and the driving member is used to drive the double-threaded screw to rotate.

4. A pressure-type anchor bolt power foundation mechanism according to claim 3, characterized in that: The driving member comprises a driving motor, and an output shaft of the driving motor is coaxially and fixedly connected with the double-threaded screw.

5. A pressure-type anchor bolt power foundation mechanism according to claim 1, characterized in that: There are two anchor rods.

6. A pressure-type anchor bolt power foundation mechanism according to claim 1, characterized in that: The connecting piece comprises a plurality of screw holes, each of which is screwed with a threaded rod which is screwed with the electric power facility.

7. A pressure-type anchor bolt power foundation mechanism according to claim 1, characterized in that: The end of the anchor rod is fixedly connected with a bearing body.

8. A forming method, implemented based on a pressure-type anchor bolt power foundation mechanism according to any one of claims 1 to 7, characterized in that: The following steps are involved: S1, a trench is opened on the land, a certain position of the trench is selected, a stirring shaft is driven to rotate by a power device, and a stirring blade is driven to cut and stir the in-situ soil. Then, during the stirring process, a curing agent such as cement slurry or cement mortar is injected into the soil and fully mixed with the soil to form a cement slurry mixture; S2, vertically inserting a second I-beam coated with an anti-adhesive agent into the cement slurry mixture, inserting an anchor rod coated with a special adhesive agent into the cement slurry mixture, and forming a pile body after the cement slurry mixture solidifies, and then taking out the second I-beam; S3, filling the gap in the pile body after the I-beam is removed with cement slurry until the cement slurry solidifies; S4, fix the steel plate to the pile body by bolts, and install the power facilities on the first I-beam on the steel plate.

Citation Information

Patent Citations

  • Anti-deformation device of high-voltage tower, deformation monitoring system and anti-deformation monitoring method

    CN111608198A

  • Deep foundation pit supporting system and construction method thereof

    CN113981988A

  • Micro-disturbance anti-floating underground cylindrical structure and construction method thereof

    CN114108694A

  • Steel pipe pile suitable for collapsible loess and mounting method

    CN119041472A

  • Building foundation structure and construction method thereof

    JP2018159180A