Quick mounting bracket for large-section hard rock tunnel water milling drill and using method of quick mounting bracket for large-section hard rock tunnel water milling drill
By designing a quick installation bracket for large-section hard rock tunnels, the problems of low installation efficiency and inconvenient rapid replacement of positions in the prior art are solved, rapid adjustment of water grinding drills and simultaneous start of multiple sets, and construction is improved efficiency.
Patent Information
- Application Number
- CN202411470315.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-21
- Publication Date
- 2025-02-18
AI Technical Summary
The existing water grinding drill mounting brackets are inefficient in installation in large section hard rock tunnels, and are inconvenient to quickly change positions to continue drilling.
A quick installation bracket including four bases, columns, mounting components, translation slots, threaded rods and adjustment components is designed. Through the cooperation of threaded rods and sleeve rods, the translation and position adjustment of the water grinding drill is achieved.
It realizes rapid adjustment of water grinding drills and simultaneous start of multiple sets, improves construction efficiency, and supports rapid replacement of positions to continue drilling.
Smart Images

Figure CN119466599A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of water-grinding drill installation equipment, and more specifically, to a large-section hard rock tunnel water-grinding drill quick installation bracket and a use method thereof. Background Art
[0002] During the tunnel excavation process, different excavation methods are often required according to the geological conditions in the tunnel. For example, when excavating a tunnel in a large-section hard rock geology, it is often necessary to use a water-grinding drill to carry out excavation construction in order to ensure the safety of the construction.
[0003] Before the water-grinding drill is used for drilling construction, it is often necessary to fix the water-grinding drill in the required position through an installation bracket to prevent the water-grinding drill from shaking or even falling during the drilling process. Some existing installation brackets are used by drilling a small hole on the inner wall of the tunnel, and inserting an anchor rod, which is one of the components of the installation bracket, into the hole to fix the position of the installation bracket, and then the water-grinding drill is installed on the installation bracket for use. This results in low installation efficiency of the installation bracket and is inconvenient to quickly change position to continue drilling after the water-grinding drill completes the drilling operation, which needs to be improved.
[0004] In order to solve the above problems, the present application provides a large-section hard rock tunnel water-grinding drill quick installation bracket and a use method. Summary of the invention
[0005] The present application provides a large-section hard rock tunnel water-grinding drill quick installation bracket and a method of use, which adopts the following technical solutions: A large-section hard rock tunnel water grinding drill quick installation bracket and use method, including four bases, the tops of the four bases are fixedly installed with columns, the outer walls of the four columns are jointly mounted with an installation component, the installation component includes four sets of blocks, and the four sets of blocks are jointly connected with a fixed frame, the front and rear side walls of the fixed frame are provided with translation grooves, the two translation grooves are provided with threaded rods, the outer walls of the threaded rods are movably mounted with two sets of rods, two connecting plates are provided below the fixed frame, the tops of the two connecting plates are respectively fixedly connected to the two sets of rods, the tops of the connecting plates are provided with slide grooves, the slide grooves are provided with second threaded rods, the outer walls of the second threaded rods are movably mounted with two translation components, a water grinding drill is provided directly below the connecting plate, and the front and rear side walls of the fixed frame are connected with adjustment components.
[0006] Through the above technical solution, the threaded rod rotates to drive a sleeve rod to rotate, and the sleeve rod drives the connecting plate and the water drill located below the connecting plate to move positions, so that the water drill can be adjusted to the required position for use.
[0007] Furthermore, the translation assembly includes a slider, a mounting block is fixedly connected to the outer wall of the slider, two grooves are provided at the bottom end of the mounting block, and rotating rods are rotatably installed in the two grooves, and the bottom ends of the rotating rods are fixedly connected to rotating clamps.
[0008] Through the above technical solution, the second threaded rod is rotated to drive the slider to move in translation in the slide groove, thereby driving the water drill to adjust its position for use.
[0009] Furthermore, two connecting screws are provided between the two rotating clamps, and two threaded through holes are provided on the two rotating clamps, and the diameter of the threaded through holes on the rotating clamps is the same as the diameter of the connecting screws.
[0010] Through the above technical solution, the rotating clamp is attached to the water-grinding drill, and then the two rotating clamps are connected together by a connecting screw, so that the two rotating clamps can clamp the water-grinding drill to fix the position of the water-grinding drill.
[0011] Furthermore, the adjustment assembly includes a fixed plate, a side of the fixed plate close to the fixed frame is provided with a plurality of balance rods, a side of the fixed plate away from the balance rod is provided with a groove, and a third threaded rod is provided in the groove, a movable block is movably sleeved on the outer wall of the third threaded rod, a U-shaped block is provided on the top of the movable block, a rotating shaft is rotatably installed in the U-shaped groove on the U-shaped block, an L-shaped rotating plate is fixedly connected to the outer wall of the rotating shaft, a threaded through hole is provided on the L-shaped rotating plate, and an adjusting screw is provided in the threaded through hole, a mounting panel is rotatably connected to one side of the adjusting screw, a support plate and an arc-shaped clamping plate are provided on the side of the mounting panel away from the adjusting screw, and the arc-shaped clamping plate is located above the support plate.
[0012] Through the above technical solution, the third threaded rod is rotated to drive the movable block to move in translation, so as to adjust the position of the U-shaped block. This makes it convenient to adjust the position of the water drill on the support plate by moving the movable block in translation after the water drill is placed on the top of the support plate.
[0013] Furthermore, a threaded hole is provided on the L-shaped rotating plate, and a limiting screw is provided in the threaded hole.
[0014] Through the above technical solution, the limiting screw rotates and fits the bottom inner wall of the fixed frame and makes the bottom end of the adjusting screw contact the top of the fixed frame, which can avoid the water drill being misaligned due to the rotating shaft rotating autonomously during the operation of the water drill.
[0015] Furthermore, two translation rods are fixedly mounted on the installation panel, and the translation rods penetrate the L-shaped rotating plate and extend into the U-shaped groove on the U-shaped block.
[0016] Through the above technical solution, when the installation panel is moved by rotating the adjusting screw, the translation rod moves translationally, and the installation panel will not rotate due to the rotation of the adjusting screw to connect the installation panel.
[0017] Furthermore, the rear back surface of the support plate and the arc-shaped clamping plate near the front end surface of the fixing frame are provided with a clamping block, and the front end surface of the support plate and the arc-shaped clamping plate near the rear end surface of the fixing frame are provided with a clamping groove matching the clamping block.
[0018] Through the above technical solution, after the two adjustment components are fitted together, the card block is inserted into the card slot to connect the two support plates and the two arc-shaped clamping plates into a whole, thereby preventing the support plates and the arc-shaped clamping plates from being deformed due to the water-grinding drill being too heavy.
[0019] Furthermore, the four sleeve blocks are each provided with a threaded through hole, and positioning screws are each provided in the threaded through holes.
[0020] Through the above technical solution, the positioning screw passes through the sleeve block to connect the column, so that the height of the sleeve block can be fixed by the positioning screw.
[0021] Furthermore, a plurality of threaded holes are vertically arranged on the outer wall of the column, and the diameter of the threaded holes is the same as the diameter of the positioning screw.
[0022] The above technical solution makes it easy to fix the positioning screw at different heights for use.
[0023] Furthermore, the left side wall of the threaded rod passes through the left inner wall of the translation slot and extends to the left side of the fixed frame, and a handle is fixedly installed on the left side of the threaded rod.
[0024] With the technical solution, during use, by holding the handle and controlling the rotation of the threaded rod, the sleeve rod can be driven to move in translation in the translation groove.
[0025] In summary, this application includes the following beneficial technical effects: (1) The sleeve block is adjusted to the required height on the column, and the threaded rod is controlled to rotate, which drives the connecting plate and the water-grinding drill to adjust the position in translation. Then, the second threaded rod is controlled to rotate, which drives the slider to move and adjust the position of the water-grinding drill for a second time. The water-grinding drill can be adjusted to different positions for horizontal drilling, and the water-grinding drill can be quickly set up for use and quickly changed to continue drilling after the water-grinding drill completes the drilling operation.
[0026] (2) During use, multiple sets of installation components can be added according to construction requirements to facilitate the simultaneous start of multiple sets of water-grinding drills for horizontal drilling, thereby speeding up construction efficiency.
[0027] (3) The water drill is placed on the top of the two support plates and fixed by the arc-shaped clamping plates. The third threaded rod is controlled to rotate to adjust the position of the water drill. The sleeve is controlled to move on the column to adjust the position so that the water drill fits the inner wall of the tunnel, which makes it easier to control the water drill to perform vertical drilling.
[0028] (4) Control the rotation of the two adjusting screws so that the two arc-shaped clamping plates and the two supporting plates on the two adjusting components fit together. The water drill can be removed from the rotating clamping plate on the translation component and placed on the top of the two supporting plates and clamped and fixed by the arc-shaped clamping plates. Through simple disassembly and installation, the horizontal drilling and vertical drilling brackets can be quickly converted, which can improve the overall applicability and save installation time and cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 This is a schematic diagram of the overall structure of this application; Figure 2 This is a schematic diagram of the installation component structure of this application; Figure 3 This is a schematic diagram of the partial structure of the installation components of this application; Figure 4 This is a schematic diagram of the translation component structure of this application; Figure 5 This is a schematic diagram of the structure of the regulating component of this application; Figure 6 This is a schematic diagram of the partial structure of the regulating component of this application.
[0030] Description of the numbers in the figure: 1. Base; 2. Column; 3. Mounting assembly; 4. Bushing block; 5. Positioning screw; 6. Fixed frame; 7. Translation slot; 8. Threaded rod; 9. Bushing rod; 10. Connecting plate; 11. Slide slot; 12. Second threaded rod; 13. Translation assembly; 14. Water-grinding drill; 15. Slider; 16. Mounting block; 17. Turning rod; 18. Rotating splint; 19. Connecting screw; 20. Adjusting assembly; 21. Fixed plate; 22. Balance rod; 23. Third threaded rod; 24. Movable block; 25. U-shaped block; 26. Rotating shaft; 27. L-shaped turning plate; 28. Adjusting screw; 29. Translation rod; 30. Mounting panel; 31. Support plate; 32. Arc splint; 33. Limiting screw. DETAILED DESCRIPTION
[0031] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application; obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments in the present application without making creative work are within the scope of protection of the present application.
[0032] In the description of the present application, it should be noted that the terms "upper", "lower", "inner", "outer", "top / bottom" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as limiting the present application. In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0033] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "set / connected", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0034] Example: The present application discloses a large-section hard rock tunnel water-grinding drill quick installation bracket and a method of use. Figure 1 , Figure 2 , Figure 3, including four bases 1, the tops of the four bases 1 are fixedly installed with columns 2, the outer walls of the four columns 2 are jointly covered with a mounting assembly 3, the mounting assembly 3 includes four sets of blocks 4, the four sets of blocks 4 are jointly connected with a fixed frame 6, four balance plates are fixedly installed on the inner frame side wall of the fixed frame 6, the stability of the fixed frame 6 can be increased by the balance plate, the front and rear side walls of the fixed frame 6 are provided with translation grooves 7, the two translation grooves 7 are provided with threaded rods 8, the outer walls of the threaded rods 8 are movably covered with two sets of rods 9, two connecting plates 10 are provided at the bottom of the fixed frame 6, the tops of the two connecting plates 10 are respectively fixedly connected to the two sets of rods 9, the top of the connecting plate 10 is provided with a slide groove 11, the slide groove 11 is provided with a second threaded rod 12, the slide groove 11 is provided with a rotating motor, the rotating motor is connected to the second threaded rod 12, and the second threaded rod 12 is driven to rotate by the rotating motor, It can be convenient to control the sliding block 15 to translate in the sliding groove 11, two translation components 13 are movably mounted on the outer wall of the second threaded rod 12, a water drill 14 is provided just below the connecting plate 10, and the front and rear side walls of the fixed frame 6 are connected with adjustment components 20, and the two sleeve rods 9 located in the same translation groove 7 are provided with through holes matching the diameter of the threaded rod 8, and the inner wall of the through hole of one of the two sleeve rods 9 located in the same translation groove 7 is provided with a thread matching the threaded rod 8, and the inner wall of the through hole on the other sleeve rod 9 is smooth, and the sleeve rod 9 with a smooth inner wall of the through hole will not be driven to rotate during the rotation of the threaded rod 8. The threaded rod 8 is rotated to drive one sleeve rod 9 to rotate, and the sleeve rod 9 drives the connecting plate 10 and the water drill 14 located below the connecting plate 10 to move, so that the water drill 14 can be adjusted to the desired position for use.
[0035] See also Figure 4 The translation assembly 13 includes a slider 15, a mounting block 16 is fixedly connected to the outer wall of the slider 15, two grooves are provided at the bottom end of the mounting block 16, and a rotating rod 17 is rotatably installed in the two grooves, and a rotating clamp 18 is fixedly connected to the bottom end of the rotating rod 17. The front and rear sides of the slider 15 are provided with threaded through holes matching the diameter of the second threaded rod 12, and the slider 15 is sleeved on the outer wall of the second threaded rod 12. By rotating the second threaded rod 12, the slider 15 can be driven to translate in the slide groove 11, and the water drill 14 can be driven to adjust its position for use.
[0036] See also Figure 4Two connecting screws 19 are provided between the two rotating clamps 18, and two threaded through holes are provided on the two rotating clamps 18. The diameter of the threaded through holes on the rotating clamps 18 is the same as the diameter of the connecting screws 19. An arc-shaped groove is provided on the rotating clamps 18, and the curvature of the arc-shaped groove is the same as the curvature of the water-grinding drill 14, which is convenient for fitting the rotating clamps 18 to the water-grinding drill 14, and then connecting the two rotating clamps 18 together through the connecting screws 19, so that the two rotating clamps 18 can clamp the water-grinding drill 14 to fix the position of the water-grinding drill 14.
[0037] See also Figure 5 , Figure 6 The adjustment assembly 20 includes a fixed plate 21. A plurality of balancing rods 22 are provided on one side of the fixed plate 21 close to the fixed frame 6. The balancing rods 22 are fixedly mounted on the fixed frame 6. A groove is provided on one side of the fixed plate 21 away from the balancing rods 22, and a third threaded rod 23 is provided in the groove. A movable block 24 is movably sleeved on the outer wall of the third threaded rod 23. A U-shaped block 25 is provided on the top of the movable block 24. A rotating shaft 26 is rotatably installed in the U-shaped groove on the U-shaped block 25. By rotating the rotating shaft 26, the adjusting screw 28 can be tilted upward to prevent it from affecting the translational movement of the sleeve rod 9 in the translation groove 7. An L-shaped rotating plate 27 is fixedly connected to the outer wall of the rotating shaft 26. A threaded through hole is provided on the L-shaped rotating plate 27, and an adjusting screw 28 is provided in the threaded through hole. One side of the adjusting screw 28 rotates A mounting panel 30 is connected, and a support plate 31 and an arc-shaped clamping plate 32 are provided on the side of the mounting panel 30 away from the adjusting screw 28. The support plate 31 is provided with an arc-shaped groove, and the inner circle curvature of the arc-shaped groove on the support plate 31 and the arc-shaped clamping plate 32 is the same as the diameter of the water drill 14, which is convenient for fixing the position of the water drill 14, and the arc-shaped clamping plate 32 is located above the support plate 31. A rotating motor is connected to one side of the third threaded rod 23, and the other side is rotatably connected to a sleeve block 4. The third threaded rod 23 is driven to rotate by the rotating motor, which can drive the movable block 24 to move in translation, so as to adjust the position of the U-shaped block 25, so that after the water drill 14 is placed on the top of the support plate 31, the movable block 24 can move in translation, so as to adjust the position of the water drill 14 on the support plate 31.
[0038] See also Figure 5 , Figure 6 A threaded hole is provided on the L-shaped rotating plate 27, and a limiting screw 33 is provided in the threaded hole. By rotating the limiting screw 33 and fitting the bottom inner wall of the fixed frame 6 and making the bottom end of the adjusting screw 28 contact the top of the fixed frame 6, it can be avoided that the rotating shaft 26 rotates autonomously during the operation of the water grinding drill 14 and causes the water grinding drill 14 to deviate. By rotating the limiting screw 33 and fitting the front and rear inner walls of the fixed frame 6, the adjusting screw 28 can be kept in a tilted state, and it can be avoided that the rotating shaft 26 cannot be rotated significantly due to the adjusting screw 28 passing through the U-shaped groove on the U-shaped block 25, so that the L-shaped rotating plate 27 cannot adjust the angle.
[0039] See also Figure 5 , Figure 6 Two translation rods 29 are fixedly mounted on the mounting panel 30, and the translation rods 29 pass through the L-shaped rotating plate 27 and extend into the U-shaped groove on the U-shaped block 25, so that when the mounting panel 30 is moved by rotating the adjusting screw 28, the translation rods 29 can move in translation, and the mounting panel 30 will not rotate due to the rotation of the adjusting screw 28 and the connection.
[0040] See also Figure 5 , Figure 6 The back surfaces of the support plate 31 and the arc-shaped splint 32 near the front end surface of the fixed frame 6 are provided with card blocks, and the front end surfaces of the support plate 31 and the arc-shaped splint 32 near the back end surface of the fixed frame 6 are provided with card slots matching the card blocks. After the two adjustment components 20 are fitted together, the card blocks are inserted into the card slots to connect the two support plates 31 and the two arc-shaped splints 32 into a whole, thereby preventing the water-grinding drill 14 from being too heavy and causing deformation of the support plate 31 and the arc-shaped splint 32.
[0041] See also Figure 1 , Figure 2 , Figure 3 , four sleeve blocks 4 are all provided with threaded through holes, and positioning screws 5 are provided in the threaded through holes. The positioning screws 5 pass through the sleeve blocks 4 and connect to the columns 2, so that the height of the sleeve blocks 4 can be fixed by the positioning screws 5.
[0042] See also Figure 1 , Figure 2 , Figure 3 A plurality of threaded holes are vertically arranged on the outer wall of the column 2, and the diameter of the threaded holes is the same as the diameter of the positioning screw 5, so as to facilitate fixing the positioning screw 5 at different heights for use.
[0043] See also Figure 1 , Figure 2 , Figure 3 The left side wall of the threaded rod 8 passes through the left inner wall of the translation groove 7 and extends to the left side of the fixed frame 6, and a handle is fixedly installed on the left side of the threaded rod 8, and the right side of the threaded rod 8 is rotatably connected to the inner wall of the translation groove 7, so that during use, by holding the handle and controlling the rotation of the threaded rod 8, the sleeve rod 9 can be driven to translate in the translation groove 7.
[0044] The implementation principle of this embodiment is as follows: when in use, firstly start the electrical appliance on the mounting bracket through an external power supply, fix the column 2 at the desired position, adjust the sleeve block 4 on the column 2 to the desired height, connect the column 2 through the positioning screw 5, fix the position of the fixing frame 6, then control the threaded rod 8 to rotate, drive the connecting plate 10 and the water-grinding drill 14 to adjust the position in translation, then control the second threaded rod 12 to rotate, drive the slider 15 to move, and adjust the position of the water-grinding drill 14 for a second time, and then start the water-grinding drill 14 to perform horizontal drilling. When it is necessary to drill vertically in the tunnel, the two adjusting screws 28 are controlled to rotate so that the two arc-shaped clamping plates 32 and the two supporting plates 31 on the two adjusting components 20 fit together, and the water drill 14 can be removed from the rotating clamping plate 18 on the translation component 13 and placed on the top of the two supporting plates 31 and clamped and fixed by the arc-shaped clamping plates 32. Then the third threaded rod 23 is controlled to rotate to adjust the position of the water drill 14, and the sleeve block 4 is controlled to move on the column 2 to adjust the position so that the water drill 14 fits the inner wall of the tunnel, and drilling can begin.
[0045] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A large-section hard rock tunnel water-grinding drill quick installation bracket and use method, comprising four bases (1), characterized in that: The tops of the four bases (1) are fixedly mounted with columns (2), the outer walls of the four columns (2) are collectively sleeved with a mounting assembly (3), the mounting assembly (3) comprises four sleeve blocks (4), the four sleeve blocks (4) are collectively connected with a fixing frame (6), the fixing frame (6) is provided with translation grooves (7) on the front and rear side walls, the two translation grooves (7) are each provided with a threaded rod (8), the outer walls of the threaded rods (8) are movably sleeved with two sleeve rods (9), the fixing frame (6) ) are provided below the connecting plates (10), the top ends of the two connecting plates (10) are fixedly connected to the two sleeve rods (9) respectively, the top ends of the connecting plates (10) are provided with a slide groove (11), a second threaded rod (12) is provided in the slide groove (11), two translation components (13) are movably mounted on the outer wall of the second threaded rod (12), a water-grinding drill (14) is provided directly below the connecting plates (10), and adjustment components (20) are connected to the front and rear side walls of the fixed frame (6).
2. A large-section hard rock tunnel water-grinding drill quick installation bracket and use method according to claim 1, characterized in that: The translation assembly (13) comprises a slider (15), the outer wall of which is fixedly connected to a mounting block (16), the bottom end of which is provided with two grooves, and a rotating rod (17) is rotatably mounted in each of the two grooves, the bottom end of each of which is fixedly connected to a rotating clamping plate (18).
3. A large-section hard rock tunnel water-grinding drill quick installation bracket and use method according to claim 2, characterized in that: Two connecting screws (19) are arranged between the two rotating clamping plates (18), and two threaded through holes are arranged on the two rotating clamping plates (18), and the diameter of the threaded through holes on the rotating clamping plates (18) is the same as the diameter of the connecting screws (19).
4. A large-section hard rock tunnel water-grinding drill quick installation bracket and use method according to claim 1, characterized in that: The adjustment assembly (20) comprises a fixing plate (21), a side of the fixing plate (21) close to the fixing frame (6) is provided with a plurality of balancing rods (22), a side of the fixing plate (21) away from the balancing rods (22) is provided with a groove, and a third threaded rod (23) is provided in each groove, a movable block (24) is movably sleeved on the outer wall of the third threaded rod (23), a U-shaped block (25) is provided at the top of the movable block (24), and the U-shaped block (25) is rotatable in the U-shaped groove A rotating shaft (26) is installed, an L-shaped rotating plate (27) is fixedly connected to the outer wall of the rotating shaft (26), a threaded through hole is provided on the L-shaped rotating plate (27), an adjusting screw (28) is provided in the threaded through hole, a mounting panel (30) is rotatably connected to one side of the adjusting screw (28), a supporting plate (31) and an arc-shaped clamping plate (32) are provided on the side of the mounting panel (30) away from the adjusting screw (28), and the arc-shaped clamping plate (32) is located above the supporting plate (31).
5. A large-section hard rock tunnel water-grinding drill quick installation bracket and use method according to claim 4, characterized in that: The L-shaped rotating plate (27) is provided with a threaded hole, and a limiting screw (33) is provided in the threaded hole.
6. A large-section hard rock tunnel water-grinding drill quick installation bracket and use method according to claim 4, characterized in that: Two translation rods (29) are fixedly mounted on the installation panel (30), and the translation rods (29) penetrate the L-shaped rotating plate (27) and extend into the U-shaped groove on the U-shaped block (25).
7. A large-section hard rock tunnel water-grinding drill quick installation bracket and use method according to claim 4, characterized in that: The rear surfaces of the support plate (31) and the arc-shaped clamping plate (32) close to the front end surface of the fixed frame (6) are both provided with a clamping block, and the front ends of the support plate (31) and the arc-shaped clamping plate (32) close to the rear end surface of the fixed frame (6) are both provided with a clamping groove matching the clamping block.
8. The large-section hard rock tunnel water-grinding drill quick installation bracket and use method according to claim 1, characterized in that: The four sleeve blocks (4) are each provided with a threaded through hole, and a positioning screw (5) is each provided in the threaded through hole.
9. The large-section hard rock tunnel water-grinding drill quick installation bracket and use method according to claim 1, characterized in that: A plurality of threaded holes are vertically arranged on the outer wall of the column (2), and the diameter of the threaded holes is the same as the diameter of the positioning screw (5).
10. The large-section hard rock tunnel water-grinding drill quick installation bracket and use method according to claim 1, characterized in that: The left side wall of the threaded rod (8) passes through the left inner wall of the translation slot (7) and extends to the left side of the fixed frame (6), and a handle is fixedly mounted on the left side of the threaded rod (8).