Movable air source supply device and supply method for shooting range
By designing a mobile gas source supply device, including gas supply, booster and gas storage modules, the transfer and connection problems of the gas source device between the launch area and the landing area in the prior art are solved, and the test flight cost is reduced and the acceleration is achieved. Prepare the effect of the cycle.
Patent Information
- Application Number
- CN202411689888.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-25
- Publication Date
- 2025-02-18
AI Technical Summary
In the prior art, the gas source device of the low-temperature liquid vaporization gas supply method is not easy to transfer and quickly connect the entirely between the launching area and the landing area, resulting in high test flight costs and long construction periods.
A mobile gas source supply device is designed, including a gas supply mobile module, a booster mobile module and a gas storage mobile module. It is connected to the booster equipment through a helium cylinder truck and a nitrogen cylinder truck to realize the overall transfer of the gas source system and Quick connection.
The device can reduce the cost of test flights, speed up the preparation cycle of shooting range launch, provide air supply sources of different media and pressure levels, and has the functions of overall movement and quick connection, solving the problems of space limitations and cumbersome pipeline interface layout.
Smart Images

Figure CN119468060A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of rocket launching, and in particular to a mobile gas source supply device and a supply method for range launching. Background Art
[0002] At present, with the development of reusable rockets and the successive development of flight test verification work, the future "fast, reliable and cheap" reusable space transportation needs are being met. The biggest feature of this type of rocket is that it can be reused, and post-test processing is required after landing. The gas source device completes the supply of gas medium before the rocket takes off to ensure the normal take-off of the rocket; after the rocket lands, it cooperates with the rocket to complete the work of blowing off the tank and engine to return to temperature and supply air. The launch area and the landing area are far apart, and the gas source device needs to have the functions of overall transfer, local fixation, and quick connection to realize multiple functions such as distribution of multiple gas source media and gas supply pressure control.
[0003] In the past, the launch area gas source device used a cryogenic liquid vaporization gas supply method. During the actual construction and system operation of the new model, there are the following deficiencies: 1. The main equipment of the cryogenic liquid vaporization gas supply method includes cryogenic storage tanks, cryogenic pumps, vaporizers, high-pressure gas cylinders, etc., and these products are large-scale equipment, which are not easy to transfer as a whole and quickly connect between the launch area and the landing area. 2. The gas source device provides the rocket with gas sources of different pressure levels. It uses a cryogenic liquid vaporization gas supply method. Cryogenic pumps, vaporizers, high-pressure gas cylinders and gas supply pipelines and other equipment must be designed according to the highest gas supply pressure. The higher the product design pressure level, the more expensive it will be, and the test flight cost will increase accordingly. In addition, the new model test flight must be launched at a temporary field in the launch area, and cryogenic pumps, vaporizers and other equipment must be purchased, resulting in a long launch range construction period and a significant increase in test flight costs.
[0004] Therefore, a mobile gas supply device and method for range launch is needed, which can not only enable the gas source system to have overall transfer and quick connection, but also reduce the cost of flight tests and speed up the preparation cycle for range launch. Summary of the invention
[0005] In view of the above problems, the present invention aims to provide a mobile gas source supply device and supply method for range launch.
[0006] In a first aspect, a mobile gas source supply device for target range launch is provided, comprising a gas supply mobile module, a pressurization mobile module and a gas storage mobile module; the gas supply mobile module comprises a helium gas cylinder trolley and a nitrogen gas cylinder trolley; the gas storage mobile module comprises a helium gas storage bottle group and a nitrogen gas storage bottle group; the pressurization mobile module comprises a helium gas pressurization device and a nitrogen gas pressurization device, the helium gas pressurization device is respectively connected to the helium gas cylinder trolley and the helium gas storage bottle group, and the nitrogen gas pressurization device is respectively connected to the nitrogen gas cylinder trolley and the nitrogen gas storage bottle group.
[0007] The mobile gas source supply device for range launch of the present invention can enable the gas source system to have overall transfer and rapid connection through the gas supply mobile module, the booster mobile module and the gas storage mobile module; and can reduce the test flight cost and speed up the preparation period for range launch.
[0008] Furthermore, the helium tanker is a high-pressure helium tanker, which is connected to the helium booster equipment and is also connected to the high-pressure helium source interface of the power distribution platform; the nitrogen tanker is a high-pressure nitrogen tanker, which is connected to the nitrogen booster equipment and is also connected to the high-pressure nitrogen source interfaces of the power distribution platform and the connector distribution platform.
[0009] Furthermore, the helium cylinder cart is connected to the input port of the helium gas collecting row through a helium hose, the output port of the helium gas collecting row is connected to the high-pressure helium source interface of the power gas distribution platform, and a helium source air release valve and a helium source gas supply valve are sequentially arranged on the helium hose; the nitrogen cylinder cart is connected to the input port of the nitrogen gas collecting row through a nitrogen hose, the output port of the nitrogen gas collecting row is connected to the power gas distribution platform, the output port of the nitrogen gas collecting row is connected to the high-pressure nitrogen source interface of the connector gas distribution platform, and a nitrogen source air release valve and a nitrogen source gas supply valve are sequentially arranged on the nitrogen hose; the helium gas collecting row is provided with one input port and three output ports; the nitrogen gas collecting row is provided with one input port and five output ports; a helium filter is arranged on the helium hose between the helium cylinder cart and the helium source air release valve, and a nitrogen filter is arranged on the nitrogen hose between the nitrogen cylinder cart and the nitrogen source air release valve.
[0010] Furthermore, the helium cylinder cart is connected to the input port of the helium gas collecting row, and the output port of the helium gas collecting row is connected to the air inlet of the helium gas boosting equipment; the nitrogen cylinder cart is connected to the input port of the nitrogen gas collecting row, and the output port of the nitrogen gas collecting row is connected to the air inlet of the nitrogen gas boosting equipment; a helium gas inlet valve is arranged in front of the air inlet of the helium gas boosting equipment, and a nitrogen gas inlet valve is arranged in front of the air inlet of the nitrogen gas boosting equipment.
[0011] Furthermore, the driving air port of the helium boosting device and the driving air port of the nitrogen boosting device are both connected to the output port of the nitrogen gas collecting row, and a boosting device driving air valve is set at the outlet of the output port of the nitrogen gas collecting row; the output port of the helium gas collecting row and the output port of the nitrogen gas collecting row are connected through a conversion pipeline, and a nitrogen-helium conversion valve is set on the conversion pipeline; the nitrogen-helium conversion valve is set in two, and a nitrogen-helium conversion venting valve is set on the conversion pipeline between the two nitrogen-helium conversion valves.
[0012] Furthermore, the output end of the helium booster equipment is connected to the helium gas storage cylinder group, and the helium gas storage cylinder group is connected to the ultra-high pressure helium gas source interface of the power distribution platform to provide an ultra-high pressure helium gas source; the output end of the nitrogen booster equipment is connected to the nitrogen gas storage cylinder group, and the nitrogen gas storage cylinder group is connected to the ultra-high pressure nitrogen gas source interface of the power distribution platform to provide an ultra-high pressure nitrogen gas source; the helium gas cylinder cart is set to one, and the nitrogen gas cylinder cart is set to two.
[0013] In a second aspect, a mobile gas source supply method for range launch is provided, which is implemented based on the mobile gas source supply device for range launch as described in the above technical solution, and includes the following stages and steps:
[0014] Testing and preparation stage: according to the actual needs, set up one helium cylinder vehicle and one nitrogen cylinder vehicle, and first fill the helium gas storage cylinder group and the nitrogen gas storage cylinder group with helium and nitrogen respectively;
[0015] When the pressure of the helium cylinder vehicle and the helium gas storage cylinder group is balanced and / or when the pressure of the nitrogen cylinder vehicle and the nitrogen gas storage cylinder group is balanced, the helium booster device and / or the nitrogen booster device are started to perform ultra-high pressure filling of helium and / or nitrogen, and simultaneously perform real-time online ultra-high pressure gas supply;
[0016] Normal launch phase: according to the actual needs, set up a helium tanker and at least two nitrogen tankers, and fill the gas cylinders of the helium tanker and the nitrogen tanker with helium and nitrogen of set pressure values respectively; if the gas pressure in the gas cylinder drops to the set threshold low pressure, replace the helium tanker and / or the nitrogen tanker;
[0017] Post-processing stage of the landing area: gas is supplied by a nitrogen bottle truck.
[0018] Furthermore, based on the mobile gas source supply device for range launch as described in the above technical solution, the gas supply includes the following steps:
[0019] Providing a high-pressure helium source: operating the helium cylinder vehicle, closing the helium source purge valve, and opening the helium source supply valve; allowing the helium source to enter the high helium source input end of the power gas distribution platform through the helium source filter and the helium source supply valve, thereby providing a high-pressure helium source for the power gas distribution platform;
[0020] Providing a high-pressure nitrogen source: operating the nitrogen cylinder vehicle, closing the nitrogen source air release valve, and opening the nitrogen source air supply valve; allowing the nitrogen source to enter the high-pressure nitrogen source input end of the power gas distribution platform and the connector gas distribution platform through the nitrogen source filter and the nitrogen source air supply valve, and providing a high-pressure nitrogen source for the power gas distribution platform and the connector gas distribution platform;
[0021] Providing an ultra-high pressure helium source: operating the high pressure helium cylinder vehicle, closing the helium source air release valve, and opening the helium source air supply valve and the helium air intake valve in sequence; allowing the helium source to pass through the helium source filter, the helium source air supply valve, the helium air intake valve and the helium pressurizing device, and enter the helium storage cylinder for inflation;
[0022] When the helium pressure in the gas cylinders of the helium gas storage cylinder group reaches equilibrium with the pressure of the high-pressure helium gas in the helium gas cylinder vehicle, the nitrogen source gas supply valve and the booster driving gas valve are opened in sequence, the helium booster is started, and the helium gas storage cylinder group starts to be pressurized and inflated; when the gas pressure in the gas cylinders of the helium gas storage cylinder group increases to a set high pressure value, the helium booster is shut down; when the gas pressure in the gas cylinders of the helium gas storage cylinder group is lower than the pressure value to be boosted, the helium booster starts to pressurize the helium; when the gas pressure in the gas cylinders of the helium gas storage cylinder group is higher than the set pressure value to be exhausted, the helium booster starts to exhaust gas;
[0023] Providing an ultra-high-pressure nitrogen source: operating the high-pressure nitrogen cylinder vehicle, closing the nitrogen source air release valve, and opening the nitrogen source air supply valve and the nitrogen air intake valve in sequence; allowing the nitrogen source to pass through the nitrogen source filter, the nitrogen source air supply valve, the nitrogen air intake valve and the nitrogen pressurizing equipment, and enter the nitrogen storage cylinder for inflation;
[0024] When the nitrogen pressure in the cylinders of the nitrogen storage cylinder group reaches a balance with the pressure of the high-pressure nitrogen in the nitrogen cylinder vehicle, the nitrogen source supply valve and the booster driving valve are opened in sequence, the nitrogen booster is started, and the nitrogen storage cylinder group starts to be pressurized and inflated; when the gas pressure in the cylinders of the nitrogen storage cylinder group increases to a set high pressure value, the nitrogen booster is shut down; when the gas pressure in the cylinders of the nitrogen storage cylinder group is lower than the pressure value to be boosted, the nitrogen booster starts to pressurize the nitrogen; when the gas pressure in the cylinders of the nitrogen storage cylinder group is higher than the set pressure value to be exhausted, the nitrogen booster starts to exhaust.
[0025] Furthermore, during the testing and preparation stage, a nitrogen source is used instead of a helium source for testing; before switching the gas source, the helium source supply valve, the nitrogen source purge valve, and the purge valve are closed, and then the nitrogen source supply valve and the nitrogen-helium conversion valve are opened in sequence; so that the nitrogen source passes through the nitrogen-helium conversion valve and the nitrogen-helium conversion valve and enters the power distribution platform to achieve the conversion between the nitrogen source and the helium source.
[0026] Furthermore, based on the mobile gas source supply device for shooting at a target range as described in the above technical solution, when the gas pressure in the bottles of the two nitrogen cylinder trucks is lower than the set threshold low pressure, the nitrogen source gas supply valve of one of the nitrogen cylinder trucks is closed, and the nitrogen cylinder truck is replaced; during this process, the other nitrogen cylinder truck continues to supply gas; when one of the nitrogen cylinder trucks is replaced, the nitrogen source gas supply valve of the new nitrogen cylinder truck is opened, the nitrogen source gas supply valve of the other nitrogen cylinder truck is closed, and the nitrogen cylinder truck is replaced; staggered replacement of the nitrogen cylinder trucks and uninterrupted continuous gas supply are achieved;
[0027] During the testing and preparation phase and the landing area post-processing phase, when one of the nitrogen cylinder trucks is needed to complete the gas supply, the nitrogen hose is connected to the nitrogen cylinder truck, the nitrogen hose of the other nitrogen cylinder truck is not connected, and the nitrogen source supply valve of the other nitrogen cylinder truck is closed.
[0028] The embodiments of the present invention have the following advantages or beneficial effects:
[0029] 1. The present invention provides a mobile gas source supply device and supply method for range launch, which can enable the gas source system to have overall transfer and rapid connection; can also reduce the cost of test flight and speed up the preparation work for range launch; is convenient for providing rockets with gas sources of different media and different pressure levels; has the functions of overall movement and local fixation; solves the problems of space limitation and complicated pipeline interface layout; can realize the ability of rapid supply of high-pressure gas source before entering the field and connecting with the pipeline system, shorten the range launch preparation cycle, and thus better meet the needs of fast-launch carriers for optimization and simplification of test and launch processes; it can be successfully applied to the supply of mobile gas sources for commercial aerospace repeated rocket flight tests, and achieve good application effects.
[0030] The mobile gas source supply device for shooting range of the present invention can form a mobile modular skid body according to the functions of gas storage, pressurization, gas supply, etc.; it breaks the traditional fixed gas storage and supply mode of the shooting range and has strong mobility and flexibility.
[0031] 2. The present invention provides a mobile gas source supply device and supply method for target range launch. In order to meet the continuous supply of high-pressure gas source for delayed rocket launch, the system adopts online supply technology of boosting equipment, refines the gas supply period according to the launch process, and realizes the supply of high-pressure, low-cost and high-quality gas source; the mobile gas source supply device has automatic pressurization, automatic shutdown and automatic exhaust functions; the application of its boosting online gas supply technology can greatly reduce the number of required gas storage high-pressure gas cylinders, for example, the number of gas storage high-pressure gas cylinders can be reduced from 52 to 20, which greatly reduces the launch cost and improves the system's automatic gas supply level.
[0032] 3. The present invention provides a mobile gas source supply device and supply method for range launch. The range gas supply is reserved according to the test phase, normal launch and delayed launch phase. Aiming at the large gas supply flow, technical research on the gas supply method is carried out to optimize the range gas supply process. In order to make full use of the effective gas supply rate of nitrogen cylinder trucks and effectively reduce the number of cylinder trucks, the system adopts the method of switching gas supply and staggered inflation of cylinder trucks, which extends the gas supply for delayed launch for 6 hours to 10 hours of continuous gas supply, and the gas supply capacity is extended by 4 hours, which greatly reduces the cost of flight test. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] The above and other features and advantages of the present invention will become more apparent by describing in detail exemplary embodiments thereof with reference to the attached drawings.
[0034] Figure 1 The present invention is a structural block diagram of a mobile gas source supply device used for range launch.
[0035] Figure 2 The present invention is a flow chart of an embodiment of a mobile gas source supply method for range launch.
[0036] Figure 3 The present invention is a flow chart of another embodiment of a mobile gas source supply method for range launch.
[0037] The reference numerals are described as follows:
[0038] QHe, helium cylinder car, QN1, QN2, nitrogen cylinder car, G1, helium filter, G2, G3, nitrogen filter, V1, helium source purge valve, V2, helium source supply valve, 101 helium gas collection row, 102 nitrogen gas collection row, 2, helium booster equipment intake pipe, V3, V6, nitrogen-helium conversion valve, V4, helium intake valve, V5, nitrogen-helium conversion purge valve, 3, 18MPa nitrogen source interface of connector gas distribution platform, V7, V9, nitrogen source purge valve, V8, V10, nitrogen source supply valve, 4 is the 18MPa nitrogen source interface of power gas distribution platform, 5, nitrogen booster equipment intake pipe, V11, nitrogen intake valve, V12, booster equipment drive valve, 6, helium booster equipment, 601, helium booster equipment , 602, the driving air port of the helium booster, 603, the output end of the helium booster, 7, the nitrogen booster, 701, the air inlet of the nitrogen booster, 702, the driving air port of the nitrogen booster, 703, the output end of the nitrogen booster, 8, the helium gas storage cylinder group, 801, the air inlet of the helium gas storage cylinder group, 802, the air outlet of the helium gas storage cylinder group, 9, the nitrogen gas storage cylinder group, 901, the air inlet of the nitrogen gas storage cylinder group, 902, the air outlet of the nitrogen gas storage cylinder group, 10, the 18MPa helium source interface of the connector gas distribution platform, 11, the 40MPa helium source interface of the connector gas distribution platform, 12, the 40MPa nitrogen source interface of the connector gas distribution platform, 13, the booster driving air pipe. DETAILED DESCRIPTION
[0039] Example embodiments will now be described more fully with reference to the accompanying drawings. However, example embodiments can be implemented in a variety of forms and should not be construed as limited to the embodiments set forth herein; rather, these embodiments are provided so that the present invention will be comprehensive and complete and fully convey the concepts of the example embodiments to those skilled in the art. The same reference numerals in the figures represent the same or similar structures, and thus their detailed description will be omitted.
[0040] The terms "a", "an", "the", and "said" are used to indicate the presence of one or more elements / components / etc.; the terms "comprising" and "having" are used to express an open-ended inclusive meaning and mean that additional elements / components / etc. may be present in addition to the listed elements / components / etc.
[0041] Figure 1 The present invention is a structural block diagram of a mobile gas source supply device used for range launch. Figure 2 The present invention is a flow chart of a mobile gas source supply method for range launch. The above schematic diagram is not to be regarded as the actual scale of the actual product.
[0042] Embodiment 1
[0043] Please refer to Figure 1 , a mobile gas source supply device for range launch according to an embodiment of the present invention comprises a gas supply mobile module, a pressurization mobile module and a gas storage mobile module;
[0044] The gas supply mobile module includes helium tanker QHe and nitrogen tanker QN1 and QN2;
[0045] The gas storage mobile module includes a helium gas storage cylinder group 8 and a nitrogen gas storage cylinder group 9;
[0046] The pressurized mobile module includes a helium pressurizing device 6 and a nitrogen pressurizing device 7. The helium pressurizing device 6 is connected to a helium cylinder vehicle QHe and a helium gas storage cylinder group 8 respectively, and the nitrogen pressurizing device 7 is connected to a nitrogen cylinder vehicle QHe and a nitrogen gas storage cylinder group 9 respectively.
[0047] Among them, the gas supply mobile module, the pressurization mobile module and the gas storage mobile module can respectively form a mobile modular skid body with gas supply, pressurization and gas storage functions.
[0048] Compared with the fixed storage and supply mode of the target range in the prior art, the mobile gas supply device of this embodiment has stronger maneuverability and flexibility; it can not only enable the gas source system to have overall transfer and quick connection; it can also reduce the cost of flight tests and speed up the preparation cycle for the target range launch.
[0049] Specifically, one helium tank truck QHe is provided, and two nitrogen tank trucks are provided, namely, nitrogen tank trucks QN1 and QN2.
[0050] In one embodiment, the helium tanker QHe is a high-pressure helium tanker QHe, which is connected to the helium booster 6 device, and is also connected to the 18MPa helium source interface 10 of the power gas distribution platform; the nitrogen tankers QN1 and QN2 are high-pressure nitrogen tankers QN1 and QN2, which are connected to the nitrogen booster 7 device, and are also connected to the 18MPa nitrogen source interface 4 of the power gas distribution platform and the 18MPa nitrogen source interface 3 of the connector gas distribution platform.
[0051] Specifically, the gas source can be divided into two pressure levels according to the gas supply pressure level and gas supply period, namely 40MPa gas source and 18MPa gas source. In the launch area and landing area, 18MPa nitrogen source and helium source are provided by rented tube bundle container gas cylinder trucks. Nitrogen is filled at the filling station, and helium is purchased separately and filled in the tube bundle container gas cylinder truck. The 40MPa nitrogen source and helium source are provided by the tube bundle container gas cylinder truck with a gas source of about 18MPa, and then pressurized to 40MPa through the nitrogen booster 7 and the helium booster 6 respectively, and then enter the nitrogen gas storage cylinder group 9 and the helium gas storage cylinder group 8 respectively, and are inflated to 40MPa. The 40MPa gas source system is equipped with automatic pressurization, automatic shutdown, and automatic exhaust functions, and existing technology products can be used. The 40MPa gas source system adjusts the boost flow rate by controlling the speed regulating valve and is equipped with a shutdown switch. It automatically shuts down when the rear end pressure increases to 40MPa, starts automatically boosting when it is lower than the set boost pressure value, and automatically exhausts when the rear end pressure exceeds the set exhaust pressure value. The set boost pressure value can be set to 26MPa, and the set exhaust pressure value can be set to 41MPa.
[0052] The specific parameters of the air supply mobile module are as follows:
[0053] The helium cylinder truck QHe is a tube bundle container cylinder truck that provides 10-18MPa helium source for the rocket. The volume is 25.3m 3 , the nominal working pressure is 20MPa.
[0054] Nitrogen cylinder trucks QN1 and QN2 are tube-bundle container cylinder trucks that provide 10-18MPa nitrogen source for rockets. The volume is 23.6m 3 The nominal working pressure is 20MPa, and the nitrogen filling is completed at the launch site filling station.
[0055] Helium booster equipment 6: pressurizes the 9-18MPa helium source of the helium tank car QHe to 40MPa, providing a high-pressure helium source for the rocket.
[0056] Nitrogen booster equipment 7: boosts the 9-18MPa helium source of nitrogen tank cars QN1 and QN2 to 40MPa, providing a high-pressure nitrogen source for the rocket.
[0057] Helium storage cylinder group 8: It consists of ten V50LPN40MPa helium cylinder groups, which are used to perform airtightness inspection and inflation for rocket helium cylinders and booster cylinders.
[0058] Nitrogen storage cylinder group 9: It consists of six V50LPN40MPa nitrogen cylinder groups, which are used to check the air tightness and inflate the rocket nitrogen cylinders and pressure-boosting cylinders.
[0059] Among them, V50LPN40MPa means that the volume of the small gas cylinder is 50L and the pressure resistance is 40MPa.
[0060] In one embodiment, the helium cylinder cart QHe is connected to the input port of the helium gas collecting row through a helium hose, and the output port of the helium gas collecting row is connected to the 18MPa helium source interface 10 of the power gas distribution platform, and the helium source purge valve V1 and the helium source supply valve V2 are sequentially arranged on the helium hose; the nitrogen cylinder carts QN1 and QN2 are connected to the input port of the nitrogen gas collecting row 102 through a nitrogen hose, and the output port of the nitrogen gas collecting row 102 is connected to the 18MPa nitrogen source interface 4 of the power gas distribution platform, and the output port of the nitrogen gas collecting row 102 is connected to the 18MPa nitrogen source interface 3 of the connector gas distribution platform, and the nitrogen source purge valves V7, V9 and nitrogen source supply valves V8, V10 are sequentially arranged on the nitrogen hose; the helium gas collecting row is provided with one input port and three output ports; the nitrogen gas collecting row 102 is provided with one input port and five output ports;
[0061] A helium filter G1 is provided on the helium hose between the helium cylinder cart QHe and the helium source purge valve V1, and nitrogen filters G1 and G2 are provided on the nitrogen hoses between the nitrogen cylinder carts QN1 and QN2 and the nitrogen source purge valves V7 and V9.
[0062] Among them, the nitrogen filter G1 is arranged on the nitrogen hose between the nitrogen bottle truck QN1 and the nitrogen source purge valve V7, and the nitrogen filter G2 is arranged on the nitrogen hose between the nitrogen bottle truck QN2 and the nitrogen source purge valve V9.
[0063] Specifically, the helium gas cylinder cart QHe is connected to the input port of the helium gas collecting row, and the output port of the helium gas collecting row is connected to the air inlet 601 of the helium gas boosting device; the nitrogen gas cylinder carts QN1 and QN2 are connected to the input port of the nitrogen gas collecting row 102, and the output port of the nitrogen gas collecting row 102 is connected to the air inlet 701 of the nitrogen gas boosting device;
[0064] A helium inlet valve V4 is provided in front of the inlet port 601 of the helium boosting device, and a nitrogen inlet valve V11 is provided in front of the inlet port 701 of the nitrogen boosting device.
[0065] The front and rear directions refer to Figure 1 left and right directions shown.
[0066] The output port of the helium collecting row can be connected to the air inlet 601 of the helium supercharging device through the helium supercharging device air inlet pipe 2, and the helium air inlet valve V4 is arranged on the helium supercharging device air inlet pipe 2.
[0067] The output port of the nitrogen collecting row 102 can be connected to the air inlet 701 of the nitrogen supercharging device through the nitrogen supercharging device air inlet pipe 5 , and the nitrogen air inlet valve V11 is arranged on the nitrogen supercharging device air inlet pipe 5 .
[0068] Specifically, the driving air port 602 of the helium boosting device and the driving air port 702 of the nitrogen boosting device are both connected to the output port of the nitrogen gas collecting row 102, and the outlet of the output port of the nitrogen gas collecting row 102 is provided with a boosting device driving air valve V12; the output port of the helium gas collecting row and the output port of the nitrogen gas collecting row 102 are connected through a conversion pipeline, and nitrogen-helium conversion valves V3 and V6 are provided on the conversion pipeline; a nitrogen-helium conversion venting valve V5 is provided on the conversion pipeline between the nitrogen-helium conversion valves V3 and V6.
[0069] Specifically, the output end 603 of the helium booster equipment is connected to the helium gas storage cylinder group 8, which is connected to the 40MPa helium source interface 11 of the power distribution platform to provide a high-pressure helium source; the output end 703 of the nitrogen booster equipment is connected to the nitrogen gas storage cylinder group 9, which is connected to the 40MPa nitrogen source interface 12 of the power distribution platform to provide a high-pressure nitrogen source.
[0070] The output end 603 of the helium booster device is connected to the gas inlet 801 of the helium gas storage cylinder group, and the gas outlet 802 of the helium gas storage cylinder group is connected to the 40MPa high-pressure helium source interface 11 of the power distribution platform.
[0071] The output end 703 of the nitrogen booster device is connected to the gas inlet 901 of the nitrogen gas storage bottle group, and the gas outlet 902 of the nitrogen gas storage bottle group is connected to the 40MPa high-pressure nitrogen source interface 12 of the power distribution platform.
[0072] The function of the gas source device is to provide a pressure source, which is used to supply gas to the connector gas distribution platform and the power gas distribution platform. 18MPa gas is provided by the gas cylinder truck, and 40MPa gas is provided by the gas storage cylinder group. The 40MPa gas is provided by the gas cylinder truck and is pressurized by the booster equipment and then stored in the gas storage cylinder group.
[0073] Among them, high pressure refers to 10-20MPa, such as 18MPa; ultra-high pressure refers to 35-45MPa, such as 40MPa.
[0074] Embodiment 2
[0075] Please refer to Figure 1 and Figure 2 A mobile gas source supply method for range launch according to an embodiment of the present invention is implemented based on the mobile gas source supply device for range launch as described in Example 1, and includes the following stages and steps:
[0076] Step S11, testing and preparation stage: according to the actual needs, a helium cylinder vehicle QHe and a nitrogen cylinder vehicle QN1 are set up, and the helium gas storage cylinder group 8 and the nitrogen gas storage cylinder group 9 are respectively filled with helium and nitrogen;
[0077] When the pressure between the helium cylinder truck QHe and the helium gas storage cylinder group 8 is balanced and or when the pressure between the nitrogen cylinder truck QN1 and the nitrogen gas storage cylinder group 9 is balanced, the helium booster 6 and / or the nitrogen booster 7 are started to perform ultra-high pressure filling of helium and / or nitrogen and simultaneously perform real-time online ultra-high pressure gas supply.
[0078] Among them, two tube-bundle gas cylinder trucks can be used for gas supply, one is a nitrogen cylinder truck QN1, and the other is a helium cylinder truck QHe;
[0079] Step S12, normal launch phase: according to the actual needs, set a helium cylinder car QHe and at least two nitrogen cylinder cars QN1, QN2, and fill the gas cylinders of the helium cylinder car QHe and the nitrogen cylinder car QN1, QN2 with helium and nitrogen of set pressure values respectively; if the gas pressure in the gas cylinder drops to the set threshold low pressure, replace the helium cylinder car QHe and / or the nitrogen cylinder car QN1, QN2;
[0080] Among them, six tube-bundle gas cylinder trucks can be used for gas supply, of which five are nitrogen cylinder trucks and one is helium cylinder truck QHe. The six tube-bundle gas cylinder trucks are filled to 18MPa at the launch base. The nitrogen supply adopts the simultaneous gas supply mode of two nitrogen cylinder trucks. The threshold low pressure can be set to 10MPa. When the nitrogen pressure in the gas cylinder of the nitrogen cylinder truck drops to 10MPa, the nitrogen gas source supply switch is turned off in turn, and the nitrogen cylinder trucks are replaced one by one.
[0081] Please refer to Figure 1 and Figure 3 In one embodiment, after step S11 of the test and preparation phase and before step S12 of the normal transmission phase, the following steps are also included:
[0082] Step S121, delayed launch phase: When the launch is delayed for more than six hours or the gas source is obviously insufficient, the switched nitrogen cylinder truck can return to the launch base charging station for charging. The launch base charging station can have a nitrogen filling capacity of 600Nm3 / h. It takes about 3.5 hours for a single nitrogen cylinder truck to be filled with 18Mpa. Five nitrogen cylinder trucks are cyclically charged to ensure a 10-hour delayed launch. On the day of launch, the helium gas storage cylinder group 8 and the nitrogen gas storage cylinder group 9 are filled to 40MPa respectively. When the cylinder pressure is lower than 26MPa, the booster equipment is started and real-time online charging is adopted.
[0083] Step S13, landing area post-processing stage: gas is supplied through a nitrogen cylinder truck QN1.
[0084] In one embodiment, the gas supply includes the following steps:
[0085] Step S21, providing 18MPa high-pressure helium source: operate the helium cylinder car QHe, close the helium source air release valve V1, and open the helium source air supply valve V2; so that the helium source enters the 18MPa helium source input end of the power gas distribution platform through the helium source filter G1 and the helium source air supply valve V2, and provides 18MPa high-pressure helium source for the power gas distribution platform;
[0086] Step S22, providing 18MPa nitrogen source: operate the nitrogen cylinder vehicles QN1 and QN2, close the nitrogen source air release valves V7 and V9, and open the nitrogen source air supply valves V8 and V10; allow the nitrogen source to enter the 18MPa nitrogen source interface 4 of the power distribution platform and the 18MPa nitrogen source interface 3 of the connector distribution platform through the nitrogen source filters G2 and G3 and the nitrogen source air supply valves V8 and V10, and provide an 18MPa high-pressure nitrogen source for the power distribution platform;
[0087] Step S23, providing a 40MPa high-pressure helium source: operating the high-pressure helium cylinder vehicle QHe, closing the helium source purge valve V1, and opening the helium source supply valve V2 and the helium intake valve V4 in sequence; allowing the helium source to pass through the helium source filter G1, the helium source supply valve V2, the helium intake valve V4 and the helium booster device 6, and enter the helium storage cylinder 8 for inflation;
[0088] When the helium pressure in the gas cylinders of the helium gas storage cylinder group 8 reaches equilibrium with the helium pressure in the high-pressure helium gas cylinder vehicle QHe, the nitrogen source gas supply valve V2 and the booster driving valve V12 are opened in sequence, the helium booster 6 is started, and the helium gas storage cylinder group 8 begins to be pressurized and inflated; when the gas pressure in the gas cylinders of the helium gas storage cylinder group 8 increases to a set high pressure value, the helium booster 6 is shut down; when the gas pressure in the gas cylinders of the helium gas storage cylinder group 8 is lower than the pressure value to be boosted, the helium booster 6 begins to boost the helium; when the gas pressure in the gas cylinders of the helium gas storage cylinder group 8 is higher than the set pressure value to be exhausted, the helium booster 6 begins to exhaust;
[0089] Step S24, providing a 40MPa high-pressure nitrogen source: operate the high-pressure nitrogen cylinder vehicles QN1 and QN2, close the nitrogen source air release valves V7 and V9, and open the nitrogen source air supply valves V8 and V10 and the nitrogen air intake valve V11 in sequence; so that the nitrogen source passes through the nitrogen source filters G2 and G3, the nitrogen source air supply valves V8 and V10, the nitrogen air intake valve V11 and the nitrogen booster device 7, and enters the nitrogen storage cylinder 9 for inflation;
[0090] When the helium pressure in the gas cylinders of the helium gas storage cylinder group 8 reaches equilibrium with the helium pressure in the high-pressure helium gas cylinder vehicle QHe, the nitrogen source gas supply valves V8 and V10 and the booster driving valve V12 are opened in sequence, the helium booster 6 is started, and the helium gas storage cylinder group 8 begins to be pressurized and inflated; when the gas pressure in the gas cylinders of the helium gas storage cylinder group 8 increases to a set high pressure value, the helium booster 6 is shut down; when the gas pressure in the gas cylinders of the helium gas storage cylinder group 8 is lower than the pressure value to be boosted, the helium booster 6 begins to boost the helium; when the gas pressure in the gas cylinders of the helium gas storage cylinder group 8 is higher than the set pressure value to be exhausted, the helium booster 6 begins to exhaust;
[0091] Among them, before the mobile gas source supply device is used, the helium cylinder truck QHe, nitrogen cylinder truck QN1, QN2 are subjected to dew point inspection and gas content analysis, and are put into normal use after passing the inspection;
[0092] In one embodiment, during the test and preparation stage, a nitrogen source is used instead of a helium source for testing; before the gas source is switched, the helium source supply valve V2, the nitrogen source purge valves V7 and V9, and the nitrogen-helium conversion purge valve V5 are closed, and then the nitrogen source supply valves V8 and V10 and the nitrogen-helium conversion valves V3 and V6 are opened in sequence; so that the nitrogen source enters the power distribution platform 1 after passing through the nitrogen-helium conversion valves V3 and V6, thereby realizing the switch between the nitrogen source and the helium source.
[0093] Among them, using nitrogen source instead of helium source for testing can save helium;
[0094] In one embodiment, when the gas pressure in the bottles of the two nitrogen cylinder trucks QN1 and QN2 is lower than the set threshold low pressure, the nitrogen source gas supply valve V8 of one of the nitrogen cylinder trucks QN1 is closed, and the nitrogen cylinder truck QN1 is replaced; during this process, the other nitrogen cylinder truck QN2 continues to supply gas; when one of the nitrogen cylinder trucks QN1 is replaced, the nitrogen source gas supply valve V8 of the new nitrogen cylinder truck QN1 is opened, the nitrogen source gas supply valve V10 of the other nitrogen cylinder truck QN2 is closed, and the nitrogen cylinder truck QN2 is replaced; the staggered replacement of the nitrogen cylinder trucks QN1 and QN2 and the uninterrupted continuous gas supply are realized;
[0095] Among them, the set threshold low pressure can be 10MPa.
[0096] During the testing and preparation phase and the landing area post-processing phase, when one of the nitrogen cylinder trucks QN1 is needed to complete the gas supply, the nitrogen hose is connected to the nitrogen cylinder truck QN1, the nitrogen hose of the other nitrogen cylinder truck QN2 is not connected, and the nitrogen source supply valve V10 of the other nitrogen cylinder truck QN2 is closed.
[0097] In the embodiments of the present invention, the term "plurality" refers to two or more than two, unless otherwise clearly defined. The terms "installation", "connection", "fixation" and the like should be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection. For those of ordinary skill in the art, the specific meanings of the above terms in the embodiments of the present invention can be understood according to specific circumstances.
[0098] In the description of the embodiments of the present invention, it needs to be understood that the directions or positional relationships indicated by the terms "upper" and "lower" are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the embodiments of the present invention and simplifying the description, rather than indicating or implying that the device or unit referred to must have a specific direction, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the embodiments of the present invention.
[0099] In the description of this specification, the description of the terms "one embodiment", "a preferred embodiment", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the embodiment of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0100] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A mobile gas source supply device for range launch, characterized in that: It includes a gas supply mobile module, a pressurization mobile module and a gas storage mobile module; The gas supply mobile module includes a helium cylinder truck and a nitrogen cylinder truck; The gas storage mobile module includes a helium gas storage cylinder group and a nitrogen gas storage cylinder group; The pressurized mobile module includes a helium pressurizing device and a nitrogen pressurizing device. The helium pressurizing device is connected to the helium cylinder vehicle and the helium gas storage cylinder group respectively, and the nitrogen pressurizing device is connected to the nitrogen cylinder vehicle and the nitrogen gas storage cylinder group respectively.
2. The mobile gas source supply device for range launch according to claim 1, characterized in that: The helium tanker is a high-pressure helium tanker, which is connected to the helium booster equipment and connected to the high-pressure helium source interface of the power distribution platform; the nitrogen tanker is a high-pressure nitrogen tanker, which is connected to the nitrogen booster equipment and connected to the high-pressure nitrogen source interfaces of the power distribution platform and the connector distribution platform.
3. The mobile gas source supply device for range launch according to claim 2, characterized in that: The helium cylinder vehicle is connected to the input port of the helium gas collecting row through a helium hose, the output port of the helium gas collecting row is connected to the high-pressure helium source interface of the power gas distribution platform, and a helium source air release valve and a helium source gas supply valve are sequentially arranged on the helium hose; the nitrogen cylinder vehicle is connected to the input port of the nitrogen gas collecting row through a nitrogen hose, the output port of the nitrogen gas collecting row is connected to the high-pressure nitrogen source interface of the power gas distribution platform, the output port of the nitrogen gas collecting row is connected to the high-pressure nitrogen source interface of the connector gas distribution platform, and a nitrogen source air release valve and a nitrogen source gas supply valve are sequentially arranged on the nitrogen hose; the helium gas collecting row is provided with one input port and three output ports; the nitrogen gas collecting row is provided with one input port and five output ports; A helium filter is arranged on the helium hose between the helium cylinder vehicle and the helium source air release valve, and a nitrogen filter is arranged on the nitrogen hose between the nitrogen cylinder vehicle and the nitrogen source air release valve.
4. The mobile gas source supply device for range launch according to claim 3, characterized in that: The helium cylinder vehicle is connected to the input port of the helium gas collecting row, and the output port of the helium gas collecting row is connected to the air inlet of the helium gas supercharging device; the nitrogen cylinder vehicle is connected to the input port of the nitrogen gas collecting row, and the output port of the nitrogen gas collecting row is connected to the air inlet of the nitrogen gas supercharging device; A helium inlet valve is arranged in front of the air inlet of the helium boosting device, and a nitrogen inlet valve is arranged in front of the air inlet of the nitrogen boosting device.
5. The mobile gas source supply device for range launch according to claim 4, characterized in that: The driving air port of the helium boosting device and the driving air port of the nitrogen boosting device are both connected to the output port of the nitrogen gas collecting row, and the outlet of the output port of the nitrogen gas collecting row is provided with a boosting device driving air valve; the output port of the helium gas collecting row and the output port of the nitrogen gas collecting row are connected through a conversion pipeline, and a nitrogen-helium conversion valve is provided on the conversion pipeline; The nitrogen-helium conversion valves are provided in two, and a nitrogen-helium conversion venting valve is provided on the conversion pipeline between the two nitrogen-helium conversion valves.
6. The mobile gas source supply device for range launch according to claim 5, characterized in that: The output end of the helium booster device is connected to the helium gas storage cylinder group, and the helium gas storage cylinder group is connected to the ultra-high pressure helium gas source interface of the power distribution platform to provide an ultra-high pressure helium gas source; the output end of the nitrogen booster device is connected to the nitrogen gas storage cylinder group, and the nitrogen gas storage cylinder group is connected to the ultra-high pressure nitrogen gas source interface of the power distribution platform to provide an ultra-high pressure nitrogen source; The number of the helium cylinder vehicle is one, and the number of the nitrogen cylinder vehicle is two.
7. A mobile gas source supply method for range launch, characterized in that: The mobile gas source supply device for range launch according to any one of claims 1 to 6 is implemented, comprising the following stages and steps: Testing and preparation stage: according to the actual needs, set up one helium cylinder vehicle and one nitrogen cylinder vehicle, and first fill the helium gas storage cylinder group and the nitrogen gas storage cylinder group with helium and nitrogen respectively; When the pressure of the helium cylinder vehicle and the helium gas storage cylinder group is balanced and / or when the pressure of the nitrogen cylinder vehicle and the nitrogen gas storage cylinder group is balanced, the helium booster device and / or the nitrogen booster device are started to perform ultra-high pressure filling of helium and / or nitrogen, and simultaneously perform real-time online ultra-high pressure gas supply; Normal launch phase: according to the actual needs, set up a helium tanker and at least two nitrogen tankers, and fill the gas cylinders of the helium tanker and the nitrogen tanker with helium and nitrogen of set pressure values respectively; if the gas pressure in the gas cylinder drops to the set threshold low pressure, replace the helium tanker and / or the nitrogen tanker; Post-processing stage of the landing area: gas is supplied by a nitrogen bottle truck.
8. A mobile gas source supply method for range launch, characterized in that: The mobile gas source supply device for range launch according to claim 5 or 6 is implemented, and the gas supply includes the following steps: Providing a high-pressure helium source: operating the helium cylinder vehicle, closing the helium source purge valve, and opening the helium source supply valve; allowing the helium source to enter the high helium source input end of the power gas distribution platform through the helium source filter and the helium source supply valve, thereby providing a high-pressure helium source for the power gas distribution platform; Providing a high-pressure nitrogen source: operating the nitrogen cylinder vehicle, closing the nitrogen source air release valve, and opening the nitrogen source air supply valve; allowing the nitrogen source to enter the high-pressure nitrogen source input end of the power gas distribution platform and the connector gas distribution platform through the nitrogen source filter and the nitrogen source air supply valve, and providing a high-pressure nitrogen source for the power gas distribution platform and the connector gas distribution platform; Providing an ultra-high pressure helium source: operating the high pressure helium cylinder vehicle, closing the helium source air release valve, and opening the helium source air supply valve and the helium air intake valve in sequence; allowing the helium source to pass through the helium source filter, the helium source air supply valve, the helium air intake valve and the helium pressurizing device, and enter the helium storage cylinder for inflation; When the helium pressure in the gas cylinders of the helium gas storage cylinder group reaches equilibrium with the pressure of the high-pressure helium gas in the helium gas cylinder vehicle, the nitrogen source gas supply valve and the booster driving gas valve are opened in sequence, the helium booster is started, and the helium gas storage cylinder group starts to be pressurized and inflated; when the gas pressure in the gas cylinders of the helium gas storage cylinder group increases to a set high pressure value, the helium booster is shut down; when the gas pressure in the gas cylinders of the helium gas storage cylinder group is lower than the pressure value to be boosted, the helium booster starts to pressurize the helium; when the gas pressure in the gas cylinders of the helium gas storage cylinder group is higher than the set pressure value to be exhausted, the helium booster starts to exhaust gas; Providing an ultra-high-pressure nitrogen source: operating the high-pressure nitrogen cylinder vehicle, closing the nitrogen source air release valve, and opening the nitrogen source air supply valve and the nitrogen air intake valve in sequence; allowing the nitrogen source to pass through the nitrogen source filter, the nitrogen source air supply valve, the nitrogen air intake valve and the nitrogen pressurizing equipment, and enter the nitrogen storage cylinder for inflation; When the nitrogen pressure in the cylinders of the nitrogen storage cylinder group reaches a balance with the pressure of the high-pressure nitrogen in the nitrogen cylinder vehicle, the nitrogen source supply valve and the booster driving valve are opened in sequence, the nitrogen booster is started, and the nitrogen storage cylinder group starts to be pressurized and inflated; when the gas pressure in the cylinders of the nitrogen storage cylinder group increases to a set high pressure value, the nitrogen booster is shut down; when the gas pressure in the cylinders of the nitrogen storage cylinder group is lower than the pressure value to be boosted, the nitrogen booster starts to pressurize the nitrogen; when the gas pressure in the cylinders of the nitrogen storage cylinder group is higher than the set pressure value to be exhausted, the nitrogen booster starts to exhaust.
9. The mobile gas source supply method for range launch according to claim 8, characterized in that: During the testing and preparation stage, a nitrogen source is used instead of a helium source for testing; before switching the gas source, the helium source supply valve, the nitrogen source purge valve, and the purge valve are closed, and then the nitrogen source supply valve and the nitrogen-helium conversion valve are opened in sequence; the nitrogen source passes through the nitrogen-helium conversion valve and the nitrogen-helium conversion valve and enters the power distribution platform to achieve the conversion between the nitrogen source and the helium source.
10. A mobile gas source supply method for range launch, characterized in that: Based on the mobile gas source supply device for shooting at a target range as described in claim 5 or 6, when the gas pressure in the bottles of the two nitrogen cylinder trucks is lower than the set threshold low pressure, the nitrogen source gas supply valve of one of the nitrogen cylinder trucks is closed, and the nitrogen cylinder truck is replaced; during this process, the other nitrogen cylinder truck continues to supply gas; when one of the nitrogen cylinder trucks is replaced, the nitrogen source gas supply valve of the new nitrogen cylinder truck is opened, the nitrogen source gas supply valve of the other nitrogen cylinder truck is closed, and the nitrogen cylinder truck is replaced; Achieve staggered replacement of the nitrogen cylinder trucks and uninterrupted continuous gas supply; During the testing and preparation phase and the landing area post-processing phase, when one of the nitrogen cylinder trucks is needed to complete the gas supply, the nitrogen hose is connected to the nitrogen cylinder truck, the nitrogen hose of the other nitrogen cylinder truck is not connected, and the nitrogen source supply valve of the other nitrogen cylinder truck is closed.