Special vehicle automatic production scheduling data management method, device and equipment and storage medium
By automatically scheduling management processes in the production of special commodity vehicles, the problem of inefficient production scheduling in the existing technology is solved, information interoperability, transparent and fast scheduling management is achieved, and production efficiency and customer satisfaction are improved.
Patent Information
- Application Number
- CN202411521083.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-29
- Publication Date
- 2025-02-18
AI Technical Summary
In the prior art, the production scheduling process of special commercial vehicles consumes manpower and material resources, is inefficient, and cannot quickly and transparently track the production scheduling status and progress, affecting the timely delivery of orders.
By obtaining special models of special vehicles in the current production order, establishing vehicle model scheduling verification rules, batch import production scheduling data to obtain standard templates, performing automatic verification and production scheduling, and achieving information interoperability, transparent and fast production scheduling management.
It improves vehicle production efficiency, saves manpower and material resources, accelerates the production schedule of special models, realizes real-time and visible scheduling tracking, reduces error rates, and improves customer delivery satisfaction.
Smart Images

Figure CN119477339A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of commodity vehicle production management, and in particular to a method, device, equipment and storage medium for automatic production scheduling data management of special vehicles. Background Art
[0002] The existing production scheduling business for special commodity vehicles is based on the process of initiating the "Special Scheduling Demand Application for Special Commodity Vehicles" based on the demand unit, which is countersigned by product research and development, manufacturing technology, product engineering department, procurement department, and manufacturing plant; after receiving the application for approval, the vehicle production planner countersigns and approves it; begins to manually prepare an electronic version of the "Special Production Scheduling Table"; after the order is reported and resources are balanced for scheduling; then manually searches for special vehicles and schedules intervals, and makes electronic records after scheduling is completed; the entire process is conducted manually through offline telephone communication or face-to-face communication.
[0003] Existing problems: The entire process relies on manual data entry, scheduling and recording, which is time-consuming, labor-intensive and inefficient. Secondly, there is no support from any rules or systems, problems require repeated coordination and communication, the rules are confusing, and human omissions and errors directly affect the scheduling of vehicle model orders. Furthermore, it is impossible to quickly and transparently track the production status and progress of each vehicle model, and the tracking and handling progress of vehicle model offline problems cannot be quickly and effectively handled. It is even more impossible to meet the delivery requirements of customer sales orders. Summary of the invention
[0004] The main purpose of the present invention is to provide a method, device, equipment and storage medium for automatic production scheduling data management of special vehicles, aiming to solve the technical problems in the prior art that the production scheduling process of special commodity vehicles consumes manpower and material resources, is inefficient, cannot quickly and transparently track the production status and progress, cannot be processed quickly and effectively, and affects the timely delivery of orders.
[0005] In a first aspect, the present invention provides a method for managing automatic production scheduling data of special vehicles, the method comprising the following steps:
[0006] Obtain the special model of the special vehicle in the current production order, and establish the model scheduling verification rules for the special model;
[0007] Importing the production scheduling data of the special vehicle model in batches according to the vehicle model production scheduling verification rule to obtain a production scheduling standard template;
[0008] The special vehicle is automatically verified to obtain a verification result, and the special vehicle is automatically scheduled for production based on the verification result and the production scheduling standard template.
[0009] Optionally, the obtaining of a special model of a special vehicle in the current production order and establishing a model scheduling verification rule for the special model includes:
[0010] Get the special model corresponding to the special vehicle in the current production order;
[0011] A vehicle model production scheduling verification rule corresponding to the special vehicle model is established according to a preset interval production scheduling benchmark corresponding to the special vehicle model, a preset initial production scheduling template and vehicle model historical data.
[0012] Optionally, the step of importing the production scheduling data of the special vehicle model in batches according to the vehicle model production scheduling verification rule to obtain a production scheduling standard template includes:
[0013] According to the vehicle model production scheduling verification rules, add the SCF system single unit input function and EXCEL batch import function;
[0014] According to the single-unit input function of the SCF system, sales order requirements are received in real time through the SCF system order pool, and according to the EXCEL batch import function, production scheduling data of the special vehicle model is imported in batches through EXCEL;
[0015] Generate table items and drop-down options in corresponding formats according to the sales order requirements and the production scheduling data;
[0016] Obtaining the serial number, application year and month, organization, submitting unit, vehicle model, production attribute, interval reason, interval basis and first batch quantity from the table item;
[0017] A production scheduling standard template is generated according to the serial number, the application year and month, the organization, the submitting unit, the vehicle model, the production attribute, the interval reason, the interval benchmark, the first batch quantity and the drop-down options.
[0018] Optionally, the automatically verifying the special vehicle to obtain a verification result, and automatically scheduling the special vehicle according to the verification result and the scheduling standard template, includes:
[0019] Acquire preset verification conditions, automatically verify the special vehicle according to the preset verification conditions, and obtain verification results;
[0020] The special vehicle is automatically scheduled for production according to the verification result and the production scheduling standard template.
[0021] Optionally, the obtaining of preset verification conditions, automatically verifying the special vehicle according to the preset verification conditions, and obtaining verification results includes:
[0022] The preset batch identification, overdue verification model identification, verified model identification and preset batch production quantity determination are used as preset verification conditions;
[0023] Automatically verifying the special vehicle according to the preset verification conditions;
[0024] When the preset batch, overdue verification model, verified model or preset batch production quantity in the pending production order of the special vehicle does not meet the requirements, determining the first verification result is that the pending production order does not meet the production scheduling conditions;
[0025] When the preset batch, the overdue verification vehicle model, the verified vehicle model and the preset batch production quantity in the order to be produced meet the requirements, the second verification result is determined to be that the order to be produced meets the production scheduling conditions.
[0026] Optionally, the automatically scheduling the special vehicle according to the verification result and the scheduling standard template includes:
[0027] Collect different rule requirements for different sales units, different models, different interval scheduling rules, and different verification quantities within a preset time period to generate system rules;
[0028] Merging similar items in the system rules and classifying them according to preset dimensions to obtain production scheduling rules corresponding to different vehicle models;
[0029] When the verification result is that the to-be-produced order does not meet the production scheduling conditions, the BOM structure, vehicle production tact information, vehicle schedulable color, fuel type and constraints corresponding to the special vehicle are obtained, and the special vehicle is automatically scheduled according to the BOM structure, the vehicle production tact information, the vehicle schedulable color, the fuel type, the constraints, the scheduling rules and the scheduling standard template;
[0030] When the verification result shows that the production order meets the production scheduling conditions, the special vehicle is automatically scheduled according to the preset reply delivery date, the production scheduling rules and the production scheduling standard template.
[0031] Optionally, after automatically verifying the special vehicle to obtain a verification result, and automatically scheduling the special vehicle according to the verification result and the scheduling standard template, the special vehicle automatic scheduling data management method further includes:
[0032] The current production schedule is displayed on the visual interface, and when a query command is received, the target special vehicle model corresponding to the query command is displayed;
[0033] When it is detected that a special vehicle model has not been reported for production on time, a prompt message is generated and pushed to the terminal.
[0034] In a second aspect, in order to achieve the above-mentioned purpose, the present invention further proposes a special vehicle automatic production scheduling data management device, the special vehicle automatic production scheduling data management device comprising:
[0035] A rule establishment module is used to obtain a special model of a special vehicle in a current production order and establish a model scheduling verification rule for the special model;
[0036] A template acquisition module, used to batch import the production scheduling data of the special vehicle model according to the vehicle model production scheduling verification rule to obtain a production scheduling standard template;
[0037] The verification and production scheduling module is used to automatically verify the special vehicle, obtain the verification result, and automatically schedule the special vehicle according to the verification result and the production scheduling standard template.
[0038] In the third aspect, to achieve the above-mentioned purpose, the present invention also proposes a special vehicle automatic production scheduling data management device, the special vehicle automatic production scheduling data management device comprising: a memory, a processor, and a special vehicle automatic production scheduling data management program stored in the memory and executable on the processor, the special vehicle automatic production scheduling data management program being configured to implement the steps of the special vehicle automatic production scheduling data management method as described above.
[0039] In a fourth aspect, in order to achieve the above-mentioned purpose, the present invention also proposes a storage medium, on which a special vehicle automatic production scheduling data management program is stored, and when the special vehicle automatic production scheduling data management program is executed by a processor, the steps of the special vehicle automatic production scheduling data management method as described above are implemented.
[0040] The method for automatic production scheduling data management of special vehicles proposed in the present invention obtains the special model of the special vehicle in the current production order, establishes the model scheduling verification rules of the special model; imports the production scheduling data of the special model in batches according to the model scheduling verification rules to obtain the scheduling standard template; automatically verifies the special vehicle to obtain the verification result, and automatically schedules the special vehicle according to the verification result and the scheduling standard template, which can realize information exchange, transparency and speed, and has a zero error rate, thereby improving vehicle production efficiency, saving manpower and material resources, accelerating the scheduling progress of special models, and being able to check in real time, and timely handling problems in the process. The special model is automatically scheduled according to the rules, which improves the efficiency of planning; improves the customer's vehicle delivery satisfaction, and provides an effective basis for the development of new models; accelerates the special state to displacement production process; opens a green channel for the production of strategic special models, effectively improves the management of special models, and promotes the acceleration of the special order model to mass production model progress; improves the speed and efficiency of automatic production scheduling data management of special vehicles. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Figure 1 A schematic diagram of the device structure of the hardware operating environment involved in the embodiment of the present invention;
[0042] Figure 2 It is a flowchart of a first embodiment of a method for managing automatic production scheduling data of special vehicles according to the present invention;
[0043] Figure 3 It is a flow chart of a second embodiment of the method for managing automatic production scheduling data of special vehicles of the present invention;
[0044] Figure 4 A flowchart of a third embodiment of a method for managing automatic production scheduling data for special vehicles according to the present invention;
[0045] Figure 5 It is a flowchart of a fourth embodiment of a method for managing automatic production scheduling data of special vehicles according to the present invention;
[0046] Figure 6 It is a schematic diagram of the process of automatic production scheduling data in the special vehicle automatic production scheduling data management method of the present invention;
[0047] Figure 7 A flowchart of a fifth embodiment of a method for managing automatic production scheduling data for special vehicles according to the present invention;
[0048] Figure 8 This is a functional module diagram of the first embodiment of the automatic production scheduling data management device for special vehicles of the present invention.
[0049] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0050] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.
[0051] The solution of the embodiment of the present invention is mainly: by acquiring the special model of the special vehicle in the current production order, the model scheduling verification rule of the special model is established; according to the model scheduling verification rule, the scheduling data of the special model is imported in batches to obtain the scheduling standard template; the special vehicle is automatically verified to obtain the verification result, and the special vehicle is automatically scheduled according to the verification result and the scheduling standard template, which can realize information exchange, transparency and speed, zero error rate, improve vehicle production efficiency, save manpower and material resources, speed up the scheduling progress of special models, can be checked in real time, and problems in the process can be solved in time Timely processing, special vehicle production scheduling is automatically scheduled according to rules, which improves the efficiency of planning; improves customer satisfaction with vehicle delivery, and provides an effective basis for the development of new models; speeds up the process of converting special status to mass production; opens a green channel for the production of strategic special vehicles, effectively improves the management of special vehicles, and promotes the progress of accelerating the conversion of special order models to mass production models; improves the speed and efficiency of automatic production scheduling data management for special vehicles, and solves the technical problems in the existing technology that the production process of special commodity vehicles consumes manpower and material resources, is inefficient, cannot quickly and transparently track the production status and progress, cannot be processed quickly and effectively, and affects the timely delivery of orders.
[0052] Reference Figure 1 , Figure 1 The figure is a schematic diagram of the device structure of the hardware operating environment involved in the embodiment of the present invention.
[0053] like Figure 1 As shown, the device may include: a processor 1001, such as a CPU, a communication bus 1002, a user interface 1003, a network interface 1004, and a memory 1005. Among them, the communication bus 1002 is used to realize the connection and communication between these components. The user interface 1003 may include a display screen (Display), an input unit such as a keyboard (Keyboard), and the optional user interface 1003 may also include a standard wired interface and a wireless interface. The network interface 1004 may optionally include a standard wired interface and a wireless interface (such as a Wi-Fi interface). The memory 1005 may be a high-speed RAM memory, or it may be a stable memory (Non-Volatile Memory), such as a disk memory. The memory 1005 may optionally be a storage device independent of the aforementioned processor 1001.
[0054] Those skilled in the art will understand that Figure 1 The device structure shown in the figure does not constitute a limitation of the device, and may include more or less components than shown in the figure, or combine certain components, or arrange the components differently.
[0055] like Figure 1As shown, the memory 1005 as a storage medium may include an operating device, a network communication module, a user interface module, and a special vehicle automatic scheduling data management program.
[0056] The device of the present invention calls the special vehicle automatic production scheduling data management program stored in the memory 1005 through the processor 1001, and performs the following operations:
[0057] Obtain the special model of the special vehicle in the current production order, and establish the model scheduling verification rules for the special model;
[0058] Importing the production scheduling data of the special vehicle model in batches according to the vehicle model production scheduling verification rule to obtain a production scheduling standard template;
[0059] The special vehicle is automatically verified to obtain a verification result, and the special vehicle is automatically scheduled for production based on the verification result and the production scheduling standard template.
[0060] The device of the present invention calls the special vehicle automatic production scheduling data management program stored in the memory 1005 through the processor 1001, and also performs the following operations:
[0061] Get the special model corresponding to the special vehicle in the current production order;
[0062] A vehicle model production scheduling verification rule corresponding to the special vehicle model is established according to a preset interval production scheduling benchmark corresponding to the special vehicle model, a preset initial production scheduling template and vehicle model historical data.
[0063] The device of the present invention calls the special vehicle automatic production scheduling data management program stored in the memory 1005 through the processor 1001, and also performs the following operations:
[0064] According to the vehicle model production scheduling verification rules, add the SCF system single unit input function and EXCEL batch import function;
[0065] According to the single-unit input function of the SCF system, sales order requirements are received in real time through the SCF system order pool, and according to the EXCEL batch import function, production scheduling data of the special vehicle model is imported in batches through EXCEL;
[0066] Generate table items and drop-down options in corresponding formats according to the sales order requirements and the production scheduling data;
[0067] Obtaining the serial number, application year and month, organization, submitting unit, vehicle model, production attribute, interval reason, interval basis and first batch quantity from the table item;
[0068] A production scheduling standard template is generated according to the serial number, the application year and month, the organization, the submitting unit, the vehicle model, the production attribute, the interval reason, the interval benchmark, the first batch quantity and the drop-down options.
[0069] The device of the present invention calls the special vehicle automatic production scheduling data management program stored in the memory 1005 through the processor 1001, and also performs the following operations:
[0070] Acquire preset verification conditions, automatically verify the special vehicle according to the preset verification conditions, and obtain verification results;
[0071] The special vehicle is automatically scheduled for production according to the verification result and the production scheduling standard template.
[0072] The device of the present invention calls the special vehicle automatic production scheduling data management program stored in the memory 1005 through the processor 1001, and also performs the following operations:
[0073] The preset batch identification, overdue verification model identification, verified model identification and preset batch production quantity determination are used as preset verification conditions;
[0074] Automatically verifying the special vehicle according to the preset verification conditions;
[0075] When the preset batch, overdue verification model, verified model or preset batch production quantity in the pending production order of the special vehicle does not meet the requirements, determining the first verification result is that the pending production order does not meet the production scheduling conditions;
[0076] When the preset batch, the overdue verification vehicle model, the verified vehicle model and the preset batch production quantity in the order to be produced meet the requirements, the second verification result is determined to be that the order to be produced meets the production scheduling conditions.
[0077] The device of the present invention calls the special vehicle automatic production scheduling data management program stored in the memory 1005 through the processor 1001, and also performs the following operations:
[0078] Collect different rule requirements for different sales units, different models, different interval scheduling rules, and different verification quantities within a preset time period to generate system rules;
[0079] Merging similar items in the system rules and classifying them according to preset dimensions to obtain production scheduling rules corresponding to different vehicle models;
[0080] When the verification result is that the to-be-produced order does not meet the production scheduling conditions, the BOM structure, vehicle production tact information, vehicle schedulable color, fuel type and constraints corresponding to the special vehicle are obtained, and the special vehicle is automatically scheduled according to the BOM structure, the vehicle production tact information, the vehicle schedulable color, the fuel type, the constraints, the scheduling rules and the scheduling standard template;
[0081] When the verification result shows that the production order meets the production scheduling conditions, the special vehicle is automatically scheduled according to the preset reply delivery date, the production scheduling rules and the production scheduling standard template.
[0082] The device of the present invention calls the special vehicle automatic production scheduling data management program stored in the memory 1005 through the processor 1001, and also performs the following operations:
[0083] The current production schedule is displayed on the visual interface, and when a query command is received, the target special vehicle model corresponding to the query command is displayed;
[0084] When it is detected that a special vehicle model has not been reported for production on time, a prompt message is generated and pushed to the terminal.
[0085] Through the above scheme, this embodiment obtains the special model of the special vehicle in the current production order, establishes the model scheduling verification rules of the special model; imports the scheduling data of the special model in batches according to the model scheduling verification rules to obtain the scheduling standard template; automatically verifies the special vehicle to obtain the verification result, and automatically schedules the special vehicle according to the verification result and the scheduling standard template, which can realize information exchange, transparency and speed, and zero error rate, improve vehicle production efficiency, save manpower and material resources, speed up the scheduling progress of special models, can be checked in real time, and problems in the process can be dealt with in time. The special model is automatically scheduled according to the rules, which improves the efficiency of planning; improves the customer's vehicle delivery satisfaction, and provides an effective basis for the development of new models; speeds up the process of converting special status to mass production; opens a green channel for the production of strategic special models, effectively improves the management of special models, and promotes the progress of converting special order models to mass production models; improves the speed and efficiency of automatic scheduling data management of special vehicles.
[0086] Based on the above hardware structure, an embodiment of the automatic production scheduling data management method for special vehicles of the present invention is proposed.
[0087] Reference Figure 2 , Figure 2 It is a flowchart of the first embodiment of the method for managing automatic production scheduling data of special vehicles of the present invention.
[0088] In a first embodiment, the special vehicle automatic production scheduling data management method comprises the following steps:
[0089] Step S10: obtaining a special model of a special vehicle in the current production order, and establishing a model scheduling verification rule for the special model.
[0090] It should be noted that special vehicles are new platforms or replacement commercial vehicles determined according to different company strategic projects. Different special vehicles can be determined by different screening conditions such as different usage environments, product specifications, target numbers, target prices, unique selling propositions (USP), target performance and product positioning. The current production order is the vehicle order currently to be produced. Special vehicles can be found from the current production order, and the model corresponding to the special vehicle, that is, the special model, can be obtained, and then the model scheduling verification rules corresponding to the special model can be established.
[0091] Step S20: import the production scheduling data of the special vehicle model in batches according to the vehicle model production scheduling verification rule to obtain a production scheduling standard template.
[0092] It should be understood that the vehicle model production scheduling verification rules are rules for verification, identification and verification during the production scheduling process constructed for special vehicle models. According to the vehicle model production scheduling verification rules, the production scheduling data corresponding to the special vehicle model can be imported in batches to obtain the production scheduling standard template corresponding to the special vehicle model.
[0093] Step S30: automatically verify the special vehicle to obtain a verification result, and automatically schedule the special vehicle according to the verification result and the production scheduling standard template.
[0094] It can be understood that after the special vehicle is automatically verified, a corresponding verification result can be obtained, and the special vehicle can be automatically scheduled according to the verification result and the production scheduling standard template.
[0095] Through the above scheme, this embodiment obtains the special model of the special vehicle in the current production order, establishes the model scheduling verification rules of the special model; imports the scheduling data of the special model in batches according to the model scheduling verification rules to obtain the scheduling standard template; automatically verifies the special vehicle to obtain the verification result, and automatically schedules the special vehicle according to the verification result and the scheduling standard template, which can realize information exchange, transparency and speed, and zero error rate, improve vehicle production efficiency, save manpower and material resources, speed up the scheduling progress of special models, can be checked in real time, and problems in the process can be dealt with in time. The special model is automatically scheduled according to the rules, which improves the efficiency of planning; improves the customer's vehicle delivery satisfaction, and provides an effective basis for the development of new models; speeds up the process of converting special status to mass production; opens a green channel for the production of strategic special models, effectively improves the management of special models, and promotes the progress of converting special order models to mass production models; improves the speed and efficiency of automatic scheduling data management of special vehicles.
[0096] Further, Figure 3 FIG. 2 is a flow chart of a second embodiment of a method for managing automatic production scheduling data of special vehicles according to the present invention. Figure 3 As shown, a second embodiment of the method for managing special vehicle automatic production scheduling data of the present invention is proposed based on the first embodiment. In this embodiment, step S10 specifically includes the following steps:
[0097] Step S11, obtaining the special model corresponding to the special vehicle in the current production order.
[0098] It should be noted that the current production order contains a model corresponding to a special vehicle, namely a special model, and the model may be one or more types, which is not limited in this embodiment.
[0099] Step S12: establishing a model production scheduling verification rule corresponding to the special model according to the preset interval production scheduling benchmark corresponding to the special model, the preset initial production scheduling template and the model history data.
[0100] It can be understood that a vehicle model production scheduling verification rule corresponding to the special vehicle model can be established based on the preset interval production scheduling benchmark, the preset initial production scheduling template and the vehicle model historical data corresponding to the special vehicle model.
[0101] Through the above scheme, this embodiment obtains the special model corresponding to the special vehicle in the current production order; establishes the model production verification rule corresponding to the special model according to the preset interval production scheduling benchmark, preset initial production scheduling template and model history data corresponding to the special model, so as to quickly construct the model production verification rule, improve vehicle production efficiency, save manpower and material resources, and speed up the production scheduling progress of special models.
[0102] Further, Figure 4 FIG. 1 is a flow chart of a third embodiment of a method for managing automatic production scheduling data of special vehicles according to the present invention. Figure 4 As shown, a third embodiment of the method for managing automatic production scheduling data of special vehicles of the present invention is proposed based on the first embodiment. In this embodiment, step S20 specifically includes the following steps:
[0103] Step S21: adding a single-unit input function to the SCF system and a batch import function to EXCEL according to the vehicle model production scheduling verification rules.
[0104] It should be noted that, according to the vehicle model production scheduling verification rules, the SCF system single unit input function and EXCEL batch import function are added.
[0105] In the specific implementation, taking the special production scheduling of commercial vehicles in status A as an example, it is necessary to add single entry of the SCF system and batch import of EXCEL.
[0106] Step S22: receiving sales order requirements in real time through the SCF system order pool according to the single-unit entry function of the SCF system, and batch importing the production scheduling data of the special vehicle model through EXCEL according to the EXCEL batch import function.
[0107] It is understandable that the SCF system order pool will receive sales order demands in real time, and the production scheduling data of the special models can be imported in batches through EXCEL.
[0108] Step S23: Generate table items and drop-down options in corresponding formats according to the sales order requirements and the production scheduling data.
[0109] It should be understood that corresponding table items and drop-down options can be obtained according to the sales order requirements and the production scheduling data.
[0110] Step S24, obtaining the serial number, application year and month, organization, submitting unit, vehicle model, production attribute, interval reason, interval benchmark and first batch quantity from the table item.
[0111] It can be understood that the serial number, application year and month, organization, submitting unit, vehicle model, production attributes, interval reason, interval benchmark and first batch quantity are obtained from the table items. Of course, the table items can also be increased or reduced according to actual conditions, and this embodiment does not limit this.
[0112] Step S25, generating a production scheduling standard template according to the serial number, the application year and month, the organization, the submitting unit, the vehicle model, the production attribute, the interval reason, the interval benchmark, the first batch quantity and the drop-down options.
[0113] It should be understood that a standard production scheduling template can be constructed based on the serial number, the application year and month, the organization, the submitting unit, the vehicle model, the production attributes, the interval reason, the interval benchmark, the first batch quantity and the drop-down options. The standard production scheduling template corresponds to the special model of the current special vehicle, which is conducive to improving vehicle production efficiency, saving manpower and material resources, and speeding up the production schedule of special models.
[0114] Through the above scheme, this embodiment adds a single-unit entry function and an EXCEL batch import function to the SCF system according to the vehicle model production scheduling verification rules; receives sales order requirements in real time through the SCF system order pool according to the SCF system single-unit entry function, and imports the production scheduling data of the special vehicle model in batches through EXCEL according to the EXCEL batch import function; generates table items and drop-down options in corresponding formats according to the sales order requirements and the production scheduling data; obtains the serial number, application year and month, organization, reporting unit, vehicle model, production attributes, interval reason, interval benchmark and first batch quantity from the table items; generates a production scheduling standard template according to the serial number, the application year and month, the organization, the reporting unit, the vehicle model, the production attributes, the interval reason, the interval benchmark, the first batch quantity and the drop-down option, and can quickly generate a production scheduling standard template, thereby improving vehicle production efficiency, saving manpower and material resources, accelerating the production scheduling progress of special vehicle models, and improving the speed and efficiency of automatic production scheduling data management for special vehicles.
[0115] Further, Figure 5 FIG. 4 is a flow chart of a fourth embodiment of a method for managing automatic production scheduling data of special vehicles according to the present invention. Figure 5 As shown, a fourth embodiment of the method for managing automatic production scheduling data of special vehicles of the present invention is proposed based on the third embodiment. In this embodiment, step S30 specifically includes the following steps:
[0116] Step S31, obtaining preset verification conditions, automatically verifying the special vehicle according to the preset verification conditions, and obtaining a verification result.
[0117] It should be noted that the preset verification conditions are pre-set conditions for automatically verifying a special vehicle. According to the preset verification conditions, the special vehicle can be automatically verified to obtain a verification result.
[0118] Furthermore, the step S31 specifically includes the following steps:
[0119] The preset batch identification, overdue verification model identification, verified model identification and preset batch production quantity determination are used as preset verification conditions;
[0120] Automatically verifying the special vehicle according to the preset verification conditions;
[0121] When the preset batch, overdue verification model, verified model or preset batch production quantity in the pending production order of the special vehicle does not meet the requirements, determining the first verification result is that the pending production order does not meet the production scheduling conditions;
[0122] When the preset batch, the overdue verification vehicle model, the verified vehicle model and the preset batch production quantity in the order to be produced meet the requirements, the second verification result is determined to be that the order to be produced meets the production scheduling conditions.
[0123] It should be understood that preset batch identification, overdue verification vehicle model identification, verified vehicle model identification and preset batch production quantity judgment can be used as preset verification conditions. Of course, other verification conditions can also be set according to actual conditions, and this embodiment does not limit this. The special vehicle can be automatically verified according to the preset verification conditions. When the preset verification conditions are unqualified, it is determined that the production conditions are not met, that is, the verification result is determined to be that the order to be produced does not meet the production scheduling conditions. When the preset verification conditions are qualified, it is determined that the production conditions are met, that is, the verification result is determined to be that the order to be produced meets the production scheduling conditions.
[0124] It should be noted that the first and second mentioned above are used to distinguish the difference between the two verification results, and do not mean that there is a priority order between the two.
[0125] Step S32: Automatically schedule production of the special vehicle according to the verification result and the production scheduling standard template.
[0126] It is understandable that after obtaining the verification result, the special vehicle can be automatically scheduled for production based on the verification result and the production scheduling standard template.
[0127] Furthermore, the step S32 specifically includes the following steps:
[0128] Collect different rule requirements for different sales units, different models, different interval scheduling rules, and different verification quantities within a preset time period to generate system rules;
[0129] Merging similar items in the system rules and classifying them according to preset dimensions to obtain production scheduling rules corresponding to different vehicle models;
[0130] When the verification result is that the to-be-produced order does not meet the production scheduling conditions, the BOM structure, vehicle production tact information, vehicle schedulable color, fuel type and constraints corresponding to the special vehicle are obtained, and the special vehicle is automatically scheduled according to the BOM structure, the vehicle production tact information, the vehicle schedulable color, the fuel type, the constraints, the scheduling rules and the scheduling standard template;
[0131] When the verification result shows that the production order meets the production scheduling conditions, the special vehicle is automatically scheduled according to the preset reply delivery date, the production scheduling rules and the production scheduling standard template.
[0132] It should be understood that different rule requirements for different sales units, different vehicle models, different interval scheduling rules, and different verification quantities within a preset time period are collected to generate system rules; similar items in the system rules can be merged and then classified from preset dimensions to obtain scheduling rules corresponding to different vehicle models, so that when scheduling conditions are not met, the special vehicle can be automatically scheduled according to the BOM structure, the vehicle production rhythm information, the vehicle's schedulable color, the fuel type, the constraints, the scheduling rules and the scheduling standard template; when scheduling conditions are met, the special vehicle can be automatically scheduled according to the preset reply delivery date, the scheduling rules and the scheduling standard template.
[0133] In the specific implementation, establish the production scheduling verification rules for special models:
[0134] Step 1: Based on historical data, sort out 8 departments and 10 rules;
[0135]
[0136]
[0137] Step 2: Collect the data of different sales units, different models, different interval production scheduling rules, different verification quantities, and different rule requirements in the past six months to form system rules; make the rules clearer, more detailed, and more targeted;
[0138] Step 3: Find and sort out similar items in the data of 1 and 2 and merge the rules; classify them from 9 dimensions to determine the final production scheduling rules, providing key basis for the system's automatic production scheduling.
[0139] See also Figure 6 , Figure 6 FIG. 1 is a schematic diagram of a flow chart of automatic production scheduling data in a method for managing automatic production scheduling data of a special vehicle according to the present invention. Figure 6As shown, 1. "Process" of application form for special production demand of commercial vehicle in status A; 2. Establish interval production scheduling benchmark; 3. Special production scheduling of commercial vehicle in status A; 4. Verify the number of historical imports of vehicle models; if the verification fails, return to the step of "process" of application form for special production demand of commercial vehicle in status A; if the verification passes, the SCF system order pool receives the sales order demand in real time; 5. Verify whether the order is available for production scheduling, otherwise pass 1. BOM structure; 2. Vehicle production rhythm information; 3. Vehicle VIN code; 4. Color that can be scheduled; 5. Fuel type; 6. Constraints; Add verification conditions: Add small batch identification verification; Add overdue verification vehicle model identification; Verified vehicle model identification; Add small batch production quantity judgment; Yes, order resource balance, and schedule according to the reply delivery date; 6. Identify small batch production scheduling needs, and the system automatically schedules production in intervals; 1. It is a small batch; 2. The first batch quantity; 3. Interval production scheduling time.
[0140] Establish standard templates to automatically generate the system's special vehicle model production scheduling retrieval table; establish a system interface docking interface to implement application, approval, counter-signing process, production scheduling, data collection, and analysis in one system.
[0141] 3. Add validation conditions when submitting vehicle model orders for production;
[0142] 3.1 Add 4 special vehicle model order production project verification
[0143]
[0144]
[0145] 3.2 Based on the added 4 verifications, the system automatically searches and matches vehicle models on the daily order reporting interface, identifies and adds small batch logos, and enables parts MRP resource balancing procurement to accurately identify small batch vehicle models, and to match resources and manage progress in a targeted manner.
[0146] 3.3 After reporting and identifying a small batch production order, the data is automatically synchronized to the "Special Vehicle Model Production Scheduling" table to ensure that the data is synchronized at all times, providing a basis for the automatic production scheduling of subsequent models.
[0147] 4. The manufacturing scheduling system applies imported data to realize automatic scheduling for special scheduling requirements and improve planning efficiency;
[0148] After the parts resource response and balanced production scheduling are completed for the order, the production scheduling benchmark for the special vehicle model is started, and the reported quantity and interval verification benchmark are matched according to the vehicle model.
[0149] It should be noted that 1. The "process" of the application form for special production requirements of A-status commercial vehicles includes but is not limited to:
[0150] 1. The demand unit PT has not been put into mass production, and the sales have applied; 2. Product R&D ① Vehicle development status ② Design data freezing date ③ Temporary disposal plan completion time; 3. Product engineering manufacturing data extraction date; 4. Purchasing department special parts production preparation and supply; 5. Product planning department announcements, regulations and 3C status; 6. Xiangyang factory factory preparation status; 7. Quality department VES evaluation and other quality confirmation status; 8. Manufacturing management responsible for production scheduling opinions; 9. Order management interval scheduling according to interval scheduling rules; 10. Manufacturing management manager signs and approves; 11. The leader of the manufacturing management department signs and ends the process;
[0151] 2. The interval scheduling basis includes serial number, interval reason, interval basis and first batch quantity; the interval reasons include BCM data verification, part change verification, design change verification, production approval incomplete verification, PT problem re-verification, re-insurance project verification and PT first verification.
[0152] 3. Special production scheduling import template for commodity vehicles in status A
[0153] Added single entry into the SCF system and batch import of EXCEL; the template includes serial number, application year and month, organization, reporting unit, vehicle model, production attributes, interval reason, interval benchmark and first batch quantity; the organization item can be set to 3 drop-down options; the vehicle model item is reported according to the actual reported production model; the application year and month item can fill in the current application year and month; the reporting unit item can set drop-down items: select and system reporting unit; standard reporting unit: 1.8822 station wagon factory; 2. Overseas business department; 3. Trial assembly technology and quality; 4. New energy production and manufacturing department; 5. Marketing company; the interval reason item can set drop-down items: now "interval reason" needs to be added through the order planning room if added.
[0154] 4. Import vehicle model data verification
[0155] 1. Repeated vehicle model import, determine whether it has been verified in the past three months. If it has been verified, a duplicate reminder will be given and the application will be rejected;
[0156] 2. For duplicate models that have not been verified, the latest requirements will be used as a reminder and the history will be rejected;
[0157] 3. For those who have not reported small batch production and scheduling for more than 3 months, we will remind them and reject them;
[0158] 4. The production schedule has been verified and associated to display the production status.
[0159] 5. Automatically check whether small batch production is reported
[0160] After the order is submitted for production, the system automatically checks whether it is a small batch production report.
[0161] 6. Automatically generate small batch production schedule.
[0162] There are four main aspects of "special commodity vehicle production data penetration and application":
[0163] 1. Establish production scheduling verification rules for special models;
[0164] 2. Added batch import of EXCEL templates for production data of special models;
[0165] 3. Add 5 system automatic verification after the order model is reported for production;
[0166] 3.1 Increase the validation of small batch models;
[0167] 3.2 Added recognition of overdue verification models;
[0168] 3.3 The vehicle model identification has been verified;
[0169] 3.4 Add small batch production quantity verification;
[0170] 4. The system automatically schedules production based on the reported model, verification type, verification benchmark, interval days, and first batch quantity; the proposal realizes small-batch interval production of special models, from application submission and approval completion to automatic production scheduling, and the entire process is visible and traceable.
[0171] Through the above scheme, this embodiment obtains preset verification conditions, automatically verifies the special vehicle according to the preset verification conditions, and obtains the verification results; automatically schedules the special vehicle according to the verification results and the production scheduling standard template; can achieve information exchange, transparency and speed, with zero error rate, improve vehicle production efficiency, save manpower and material resources, speed up the production scheduling of special vehicle models, can be checked in real time, and problems in the process can be dealt with in time. The production of special vehicle models is automatically scheduled according to rules, which improves the efficiency of planning; and improves the speed and efficiency of automatic production scheduling data management of special vehicles.
[0172] Further, Figure 7 FIG. 5 is a flow chart of a fifth embodiment of a method for managing automatic production scheduling data of special vehicles according to the present invention. Figure 7 As shown, a fifth embodiment of the automatic production scheduling data management method for special vehicles of the present invention is proposed based on the first embodiment. In this embodiment, after step S30, the automatic production scheduling data management method for special vehicles of the present invention further includes the following steps:
[0173] Step S40: Display the current production schedule on the visual interface, and when a query instruction is received, display the target special vehicle model corresponding to the query instruction.
[0174] It should be noted that the current production schedule can be displayed on the visual interface, and when a query instruction is received, the target special vehicle model corresponding to the query instruction can be displayed.
[0175] Step S50: When it is detected that a special vehicle model has not been reported for production within the prescribed time limit, a prompt message is generated and pushed to the terminal.
[0176] It is understandable that when it is detected that a special vehicle model has not been reported for production on time, a prompt message is generated and pushed to the terminal.
[0177] In the specific implementation, abnormal handling can be visualized in time, and the handling can be tracked at any time; for special models that have not been reported for production for more than 3 months, the system will automatically push a prompt, and the chief planner will reject it to the reporting unit; for those who cannot realize the second production scheduling time on schedule, they can apply for adjustment of the scheduling time. After approval by the chief planner, the scheduling date will be automatically adjusted to give time to solve difficult problems and lay a solid foundation for the next smooth launch and conversion to production; establish a summary query of special models, quantities, and scheduling progress; after visual management, it effectively improves the management of special models, in order to promote and accelerate the conversion of special order models to mass production models; the system realizes special model production query, and each demand unit can independently query the model scheduling status; provide valuable information for the model designer, and provide a basis for new model development to avoid the recurrence of similar problems; (when different models are developed again, pay attention to the recurrence of a type of problem, for example: design changes when using parts from the same supplier, and synchronize the bill of materials (BOM) data in advance).
[0178] Through the above scheme, this embodiment displays the current production schedule on a visual interface, and when a query command is received, displays the target special vehicle model corresponding to the query command; when it is detected that there is an overdue special vehicle model, a prompt message is generated and pushed to the terminal; it can be visualized in real time, and the main designer can accurately control the production schedule of special vehicles; provide an effective basis for the development of new vehicles; speed up the production process of special status conversion; and open a green channel for the production of strategic special vehicles.
[0179] Correspondingly, the present invention further provides a special vehicle automatic production scheduling data management device.
[0180] Reference Figure 8 , Figure 8 This is a functional module diagram of the first embodiment of the automatic production scheduling data management device for special vehicles of the present invention.
[0181] In the first embodiment of the automatic production scheduling data management device for special vehicles of the present invention, the automatic production scheduling data management device for special vehicles comprises:
[0182] The rule establishing module 10 is used to obtain the special model of the special vehicle in the current production order and establish the model scheduling verification rule of the special model.
[0183] The template acquisition module 20 is used to batch import the production scheduling data of the special vehicle model according to the vehicle model production scheduling verification rule to obtain a production scheduling standard template.
[0184] The verification and production scheduling module 30 is used to automatically verify the special vehicle, obtain the verification result, and automatically schedule the special vehicle according to the verification result and the production scheduling standard template.
[0185] The rule establishing module 10 is also used to obtain the special model corresponding to the special vehicle in the current production order; and establish the model scheduling verification rule corresponding to the special model according to the preset interval scheduling benchmark, preset initial scheduling template and model history data corresponding to the special model.
[0186] The template acquisition module 20 is also used to add a single-unit entry function and an EXCEL batch import function to the SCF system according to the vehicle model production scheduling verification rules; receive sales order requirements in real time through the SCF system order pool according to the SCF system single-unit entry function, and batch import the production scheduling data of the special vehicle model through EXCEL according to the EXCEL batch import function; generate table items and drop-down options in corresponding formats according to the sales order requirements and the production scheduling data; obtain the serial number, application year and month, organization, reporting unit, vehicle model, production attributes, interval reason, interval benchmark and first batch quantity from the table items; generate a production scheduling standard template according to the serial number, the application year and month, the organization, the reporting unit, the vehicle model, the production attributes, the interval reason, the interval benchmark, the first batch quantity and the drop-down option.
[0187] The verification and production scheduling module 30 is also used to obtain preset verification conditions, automatically verify the special vehicle according to the preset verification conditions, and obtain the verification result; and automatically schedule the special vehicle according to the verification result and the production scheduling standard template.
[0188] The verification and scheduling module 30 is also used to use preset batch identification, overdue verification model identification, verified model identification and preset batch production quantity judgment as preset verification conditions; automatically verify the special vehicle according to the preset verification conditions; when the preset batch, overdue verification model, verified model or preset batch production quantity in the to-be-produced order of the special vehicle do not meet the requirements, determine the first verification result that the to-be-produced order does not meet the production scheduling conditions; when the preset batch, the overdue verification model, the verified model and the preset batch production quantity in the to-be-produced order meet the requirements, determine the second verification result that the to-be-produced order meets the production scheduling conditions.
[0189] The verification and scheduling module 30 is further used to collect different rule requirements for different sales units, different vehicle models, different interval scheduling rules, and different verification quantities within a preset time period to generate system rules; merge similar items in the system rules, and classify them from preset dimensions to obtain scheduling rules corresponding to different vehicle models; when the verification result is that the order to be produced does not meet the scheduling conditions, obtain the BOM structure, vehicle production rhythm information, vehicle scheduling color, fuel type and constraints corresponding to the special vehicle, and automatically schedule the special vehicle according to the BOM structure, the vehicle production rhythm information, the vehicle scheduling color, the fuel type, the constraints, the scheduling rules and the scheduling standard template; when the verification result is that the order to be produced meets the scheduling conditions, automatically schedule the special vehicle according to the preset reply delivery date, the scheduling rules and the scheduling standard template.
[0190] The verification and production scheduling module 30 is also used to display the current production scheduling progress on a visual interface. When a query instruction is received, the target special vehicle model corresponding to the query instruction is displayed; when a special vehicle model is detected that has not been reported for production on time, a prompt message is generated and pushed to the terminal.
[0191] Among them, the steps implemented by each functional module of the special vehicle automatic production scheduling data management device can refer to the various embodiments of the special vehicle automatic production scheduling data management method of the present invention, and will not be repeated here.
[0192] In addition, an embodiment of the present invention further provides a storage medium, on which a special vehicle automatic production scheduling data management program is stored. When the special vehicle automatic production scheduling data management program is executed by a processor, the following operations are implemented:
[0193] Obtain the special model of the special vehicle in the current production order, and establish the model scheduling verification rules for the special model;
[0194] Importing the production scheduling data of the special vehicle model in batches according to the vehicle model production scheduling verification rule to obtain a production scheduling standard template;
[0195] The special vehicle is automatically verified to obtain a verification result, and the special vehicle is automatically scheduled for production based on the verification result and the production scheduling standard template.
[0196] Furthermore, when the special vehicle automatic production scheduling data management program is executed by the processor, the following operations are also implemented:
[0197] Get the special model corresponding to the special vehicle in the current production order;
[0198] A vehicle model production scheduling verification rule corresponding to the special vehicle model is established according to a preset interval production scheduling benchmark corresponding to the special vehicle model, a preset initial production scheduling template and vehicle model historical data.
[0199] Furthermore, when the special vehicle automatic production scheduling data management program is executed by the processor, the following operations are also implemented:
[0200] According to the vehicle model production scheduling verification rules, add the SCF system single unit input function and EXCEL batch import function;
[0201] According to the single-unit input function of the SCF system, sales order requirements are received in real time through the SCF system order pool, and according to the EXCEL batch import function, production scheduling data of the special vehicle model is imported in batches through EXCEL;
[0202] Generate table items and drop-down options in corresponding formats according to the sales order requirements and the production scheduling data;
[0203] Obtaining the serial number, application year and month, organization, submitting unit, vehicle model, production attribute, interval reason, interval basis and first batch quantity from the table item;
[0204] A production scheduling standard template is generated according to the serial number, the application year and month, the organization, the submitting unit, the vehicle model, the production attribute, the interval reason, the interval benchmark, the first batch quantity and the drop-down options.
[0205] Furthermore, when the special vehicle automatic production scheduling data management program is executed by the processor, the following operations are also implemented:
[0206] Acquire preset verification conditions, automatically verify the special vehicle according to the preset verification conditions, and obtain verification results;
[0207] The special vehicle is automatically scheduled for production according to the verification result and the production scheduling standard template.
[0208] Furthermore, when the special vehicle automatic production scheduling data management program is executed by the processor, the following operations are also implemented:
[0209] The preset batch identification, overdue verification model identification, verified model identification and preset batch production quantity determination are used as preset verification conditions;
[0210] Automatically verifying the special vehicle according to the preset verification conditions;
[0211] When the preset batch, overdue verification model, verified model or preset batch production quantity in the pending production order of the special vehicle does not meet the requirements, determining the first verification result is that the pending production order does not meet the production scheduling conditions;
[0212] When the preset batch, the overdue verification vehicle model, the verified vehicle model and the preset batch production quantity in the order to be produced meet the requirements, the second verification result is determined to be that the order to be produced meets the production scheduling conditions.
[0213] Furthermore, when the special vehicle automatic production scheduling data management program is executed by the processor, the following operations are also implemented:
[0214] Collect different rule requirements for different sales units, different models, different interval scheduling rules, and different verification quantities within a preset time period to generate system rules;
[0215] Merging similar items in the system rules and classifying them according to preset dimensions to obtain production scheduling rules corresponding to different vehicle models;
[0216] When the verification result is that the to-be-produced order does not meet the production scheduling conditions, the BOM structure, vehicle production tact information, vehicle schedulable color, fuel type and constraints corresponding to the special vehicle are obtained, and the special vehicle is automatically scheduled according to the BOM structure, the vehicle production tact information, the vehicle schedulable color, the fuel type, the constraints, the scheduling rules and the scheduling standard template;
[0217] When the verification result shows that the production order meets the production scheduling conditions, the special vehicle is automatically scheduled according to the preset reply delivery date, the production scheduling rules and the production scheduling standard template.
[0218] Furthermore, when the special vehicle automatic production scheduling data management program is executed by the processor, the following operations are also implemented:
[0219] The current production schedule is displayed on the visual interface, and when a query command is received, the target special vehicle model corresponding to the query command is displayed;
[0220] When it is detected that a special vehicle model has not been reported for production on time, a prompt message is generated and pushed to the terminal.
[0221] Those skilled in the art will appreciate that all or part of the steps in the above-mentioned implementation method can be accomplished by instructing related hardware through a program, and the program is stored in a storage medium, including a number of instructions for enabling a device (which may be a single-chip microcomputer, chip, etc.) or a processor to execute all or part of the steps of the method described in each implementation method of the present application; and the aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, and other media that can store program codes.
[0222] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element.
[0223] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.
[0224] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A method for managing automatic production scheduling data of special vehicles, characterized in that: The special vehicle automatic production scheduling data management method comprises: Obtain the special model of the special vehicle in the current production order, and establish the model scheduling verification rules for the special model; Importing the production scheduling data of the special vehicle model in batches according to the vehicle model production scheduling verification rule to obtain a production scheduling standard template; The special vehicle is automatically verified to obtain a verification result, and the special vehicle is automatically scheduled for production based on the verification result and the production scheduling standard template.
2. The special vehicle automatic production scheduling data management method according to claim 1, characterized in that: The obtaining of the special model of the special vehicle in the current production order and establishing the model scheduling verification rule of the special model includes: Get the special model corresponding to the special vehicle in the current production order; A vehicle model production scheduling verification rule corresponding to the special vehicle model is established according to a preset interval production scheduling benchmark corresponding to the special vehicle model, a preset initial production scheduling template and vehicle model historical data.
3. The special vehicle automatic production scheduling data management method according to claim 1, characterized in that: The step of batch-importing the production scheduling data of the special vehicle model according to the vehicle model production scheduling verification rule to obtain a production scheduling standard template includes: According to the vehicle model production scheduling verification rules, add the SCF system single unit input function and EXCEL batch import function; According to the single-unit input function of the SCF system, sales order requirements are received in real time through the SCF system order pool, and according to the EXCEL batch import function, production scheduling data of the special vehicle model is imported in batches through EXCEL; Generate table items and drop-down options in corresponding formats according to the sales order requirements and the production scheduling data; Obtaining the serial number, application year and month, organization, submitting unit, vehicle model, production attribute, interval reason, interval basis and first batch quantity from the table item; A production scheduling standard template is generated according to the serial number, the application year and month, the organization, the submitting unit, the vehicle model, the production attribute, the interval reason, the interval benchmark, the first batch quantity and the drop-down options.
4. The special vehicle automatic production scheduling data management method according to claim 1, characterized in that: The automatic verification of the special vehicle to obtain a verification result, and automatic production scheduling of the special vehicle according to the verification result and the production scheduling standard template, includes: Acquire preset verification conditions, automatically verify the special vehicle according to the preset verification conditions, and obtain verification results; The special vehicle is automatically scheduled for production according to the verification result and the production scheduling standard template.
5. The special vehicle automatic production scheduling data management method according to claim 4, characterized in that: The obtaining of preset verification conditions, automatically verifying the special vehicle according to the preset verification conditions, and obtaining verification results includes: The preset batch identification, overdue verification model identification, verified model identification and preset batch production quantity determination are used as preset verification conditions; Automatically verifying the special vehicle according to the preset verification conditions; When the preset batch, overdue verification model, verified model or preset batch production quantity in the pending production order of the special vehicle do not meet the requirements, determining the first verification result that the pending production order does not meet the production scheduling conditions; When the preset batch, the overdue verification vehicle model, the verified vehicle model and the preset batch production quantity in the order to be produced meet the requirements, the second verification result is determined to be that the order to be produced meets the production scheduling conditions.
6. The special vehicle automatic production scheduling data management method according to claim 5, characterized in that: The automatic production scheduling of the special vehicle according to the verification result and the production scheduling standard template includes: Collect different rule requirements for different sales units, different models, different interval scheduling rules, and different verification quantities within a preset time period to generate system rules; Merging similar items in the system rules and classifying them according to preset dimensions to obtain production scheduling rules corresponding to different vehicle models; When the verification result is that the to-be-produced order does not meet the production scheduling conditions, the BOM structure, vehicle production tact information, vehicle schedulable color, fuel type and constraints corresponding to the special vehicle are obtained, and the special vehicle is automatically scheduled according to the BOM structure, the vehicle production tact information, the vehicle schedulable color, the fuel type, the constraints, the scheduling rules and the scheduling standard template; When the verification result shows that the production order meets the production scheduling conditions, the special vehicle is automatically scheduled according to the preset reply delivery date, the production scheduling rules and the production scheduling standard template.
7. The special vehicle automatic production scheduling data management method according to claim 1, characterized in that: After automatically verifying the special vehicle to obtain a verification result, and automatically scheduling the special vehicle according to the verification result and the scheduling standard template, the special vehicle automatic scheduling data management method further includes: The current production schedule is displayed on the visual interface, and when a query command is received, the target special vehicle model corresponding to the query command is displayed; When it is detected that a special vehicle model has not been reported for production on time, a prompt message is generated and pushed to the terminal.
8. A special vehicle automatic production scheduling data management device, characterized in that: The special vehicle automatic production scheduling data management device comprises: A rule establishment module is used to obtain a special model of a special vehicle in a current production order and establish a model scheduling verification rule for the special model; A template acquisition module, used to batch import the production scheduling data of the special vehicle model according to the vehicle model production scheduling verification rule to obtain a production scheduling standard template; The verification and production scheduling module is used to automatically verify the special vehicle, obtain the verification result, and automatically schedule the special vehicle according to the verification result and the production scheduling standard template.
9. A special vehicle automatic production scheduling data management device, characterized in that: The special vehicle automatic production scheduling data management device includes: a memory, a processor, and a special vehicle automatic production scheduling data management program stored in the memory and executable on the processor, wherein the special vehicle automatic production scheduling data management program is configured to implement the steps of the special vehicle automatic production scheduling data management method as described in any one of claims 1 to 7.
10. A storage medium, characterized in that: The storage medium stores a special vehicle automatic production scheduling data management program, and when the special vehicle automatic production scheduling data management program is executed by the processor, the steps of the special vehicle automatic production scheduling data management method as described in any one of claims 1 to 7 are implemented.