Overhanging type steel structure installation platform
By designing a cantilevered steel structure installation platform including flip and steering mechanism, the construction efficiency and safety hazards of the installation of cantilevered steel structures in high-rise buildings under the influence of wind and weather is solved, and the wind is high Installation and construction efficiency are improved under circumstances.
Patent Information
- Application Number
- CN202411994146.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-31
- Publication Date
- 2025-02-21
Smart Images

Figure CN119491587A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of building construction application equipment, and in particular relates to a cantilever steel structure installation platform. Background Art
[0002] With the rapid development of science and technology in my country and the continuous improvement of the level of architecture, novel and unique buildings have become places where people like to check in and try, such as suspended glass bridges and suspended balconies. In particular, the suspended balcony, whose design protrudes from the entire floor, allows people standing on it to better feel the suspension and unobstructedness, and is therefore loved by people.
[0003] At present, there are two main installation methods for cantilever steel structure balconies. One is to use the traditional steel pipe fastener structure system for construction. This method meets the needs of ground-floor buildings. For high-rise buildings, it not only has a long construction period, but also poses a safety hazard. The other is that workers use a hanging basket to drill holes and install brackets, and then use a tower crane to hoist the pre-welded cantilever steel structure platform to the corresponding position before installing it. This method can fully meet the installation needs of cantilever steel structures in high-rise buildings.
[0004] However, the construction and installation period of the hanging basket is long and is greatly affected by the weather. Construction cannot be carried out when the wind speed is above level 5. The restrictions are high, which in turn affects the construction period and construction efficiency. Summary of the invention
[0005] Aiming at the technical problems existing in the installation of a cantilever steel structure platform, the present invention proposes a cantilever steel structure installation platform which has reasonable design, simple structure, convenient processing, few restrictions and convenient construction.
[0006] In order to achieve the above-mentioned purpose, the technical solution adopted by the present invention is: the present invention provides a cantilever steel structure installation platform, including a first main beam and a second main beam whose ends are used to be fixed on the building floor, the first main beam and the second main beam are arranged at intervals, a walking channel is arranged below the first main beam and the second main beam, an installation channel is arranged at a vertical angle to the walking channel, and steel cable connecting rings are arranged at the end of the first main beam and the second main beam away from the building and at both ends of the installation channel.
[0007] Preferably, a lifting cylinder is arranged on the walking channel, and the lifting cylinder is arranged on both sides of the end of the walking channel. A connecting plate is arranged between the first main beam and the second main beam, and the connecting plate is arranged between the first main beam and the second main beam, and the piston end of the lifting cylinder is fixedly connected to the connecting plate.
[0008] Preferably, the installation channel can be flipped and arranged at the end of the walking channel.
[0009] Preferably, the installation channel can be flipped at the end of the walking channel through a flipping mechanism, and the flipping mechanism includes a flipping plate arranged at the end of the walking channel and a flipping cylinder arranged on the flipping plate. One end of the installation channel close to the walking channel is hinged to the flipping plate, and the output end of the flipping cylinder is hinged to the bottom of the installation channel.
[0010] Preferably, a steering mechanism for installing channel steering is also provided at the bottom of the walking channel, and the steering mechanism includes a steering plate arranged at the bottom of the walking channel and a connecting universal joint arranged on the steering plate, a steering cylinder is arranged at the end of the connecting universal joint away from the steering plate, the output end of the steering cylinder is connected to a steering universal joint, and the end of the steering universal joint away from the steering cylinder is fixed on the flip plate, bogies are arranged on both sides of the steering cylinder, a placement groove is arranged at the end of the bogie close to the flip plate, a steering shaft matching the steering groove is arranged on the flip plate, a limit plate for limiting the steering shaft is arranged on the bogie, and the limit plate is telescopically arranged above the placement groove.
[0011] Preferably, an electromagnet is provided on the side of the walking channel, and a magnetic attraction portion matching the electromagnet is provided at the end of the installation channel.
[0012] Compared with the prior art, the advantages and positive effects of the present invention are:
[0013] The present invention provides a cantilever steel structure installation platform. By installing the entire platform on a building floor, the platform can be installed even in a situation of strong wind. At the same time, by utilizing a flip mechanism, an installation channel can be vertically arranged below a walking channel, which is convenient for lifting by a tower crane. By utilizing the setting of a steering mechanism, the vertical direction of the installation channel and the walking channel can be changed, thereby making the platform more applicable. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0015] Figure 1 A schematic diagram of the structure of the cantilevered steel structure installation platform provided in Example 1 in a folded state;
[0016] Figure 2 A front view of the cantilevered steel structure installation platform provided in Example 1 in a folded state;
[0017] Figure 3 A schematic structural diagram of the cantilever steel structure installation platform provided in Example 1 in an unfolded state;
[0018] Figure 4 A schematic structural diagram of the cantilever steel structure installation platform provided in Example 1 in an unfolded state at another angle;
[0019] Figure 5 A front view of the cantilevered steel structure installation platform provided in Example 1 in an unfolded state;
[0020] In the above figures, 1. first main beam; 2. second main beam; 3. connecting plate; 4. steel cable connecting ring; 5. walking channel; 51. lifting cylinder; 6. installation channel; 7. flipping mechanism; 71. flipping plate; 72. flipping cylinder; 8. steering mechanism; 81. steering plate; 82. connecting universal joint; 83. steering cylinder; 84. steering universal joint; 85. bogie; 851. placement groove; 86. steering shaft; 87. limit plate; 88. pushing cylinder. DETAILED DESCRIPTION
[0021] In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is further described below in conjunction with the accompanying drawings and embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.
[0022] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments of the following disclosure.
[0023] Embodiment 1, as Figure 1 to Figure 5 As shown, the present embodiment aims to provide another installation platform for installing a cantilever steel structure platform, so as to reduce the problem that the existing hanging basket installation is greatly affected by wind force. To this end, the cantilever steel structure installation platform provided in the present embodiment includes a first main beam 1 and a second main beam 2 whose ends are used to be fixed on the building floor. In the art, the end used to be fixed on the building floor is also called the head end, which is fixed to the building floor by anchor bolts. This structure is applied to the existing cantilever unloading platform. For this reason, it is not described in detail in the present embodiment.
[0024] The first main beam 1 and the second main beam 2 are arranged at intervals, and a walking passage 5 is arranged below the first main beam 1 and the second main beam 2. Since the anchor bolts and the brackets need to be installed below the building floor, the walking passage 5 is arranged below the main beam. In this embodiment, the passage refers to a base frame and a base plate arranged on the base frame, and guardrails are arranged on both sides of the base plate to form a rectangular passage.
[0025] An installation channel 6 is provided at one end of the walking channel 5 away from the building, the installation channel 6 is provided at a vertical angle to the walking channel 5, and the installation channel 6 is provided horizontally with the walking channel 5. At the same time, a steel cable connecting ring 4 is provided at one end of the first main beam 1 and the second main beam 2 away from the building and at both ends of the installation channel 6. The steel cable connecting ring 4 is used to connect the steel cable to form a safety protection for the entire platform.
[0026] In this way, through the above-mentioned settings, the installation of wall rivets can be realized. The length of the walking channel 5 is based on the positions of the first main beam 1 and the second main beam 2. For example, the first main beam 1 and the second main beam 2 are installed at the positions of the side windows, and the cantilevered steel structure platform needs to be installed at the position of the main window, which is set at an angle. At this time, the walking channel 5 needs to be longer.
[0027] Considering the height of an adult, if the height of the walking channel 5 is set too high, the volume of the entire platform will be too large. For this reason, in this embodiment, a lifting cylinder 51 is provided on the walking channel 5. The lifting cylinder 51 is provided on both sides of the end of the walking channel 5, that is, four lifting cylinders 51 are provided. At the same time, a connecting plate 3 is provided between the first main beam 1 and the second main beam 2. The connecting plate 3 is arranged between the first main beam 1 and the second main beam 2 at intervals, and the piston end of the lifting cylinder 51 is fixedly connected to the connecting plate 3. In this way, since the first main beam 1 and the second main beam 2 are in a fixed state, the lifting cylinder 51 acts, so that the walking channel 5 will move downward, thereby adjusting the distance between the walking channel 5 and the first main beam 1 and the second main beam 2, thereby reducing the volume of the entire platform.
[0028] In order to facilitate the tower crane lifting, in this embodiment, the installation channel 6 can be flipped and set at the end of the walking channel 5. The purpose is to flip the installation channel 6 to the bottom of the walking channel 5 so that the horizontal vertical adjustment is vertical, so that the area in the horizontal direction becomes smaller, thereby facilitating lifting. To this end, in this embodiment, the installation channel 6 can be flipped and set at the end of the walking channel 5 through a flip mechanism 7. Specifically, the flip mechanism 7 includes a flip plate 71 set at the end of the walking channel 5 and a flip cylinder 72 set on the flip plate 71. One end of the installation channel 6 close to the walking channel 5 is hinged to the flip plate 71, and the output end of the flip cylinder 72 is hinged to the bottom of the installation channel 6. In this way, under the action of the flip cylinder 72, the installation channel 6 is flipped 90°, thereby facilitating lifting.
[0029] Taking into account that the cantilever steel structure platform may be installed on the left side or the right side of the main beam, a steering mechanism 8 for installing the steering of the channel 6 is also provided at the bottom of the walking channel 5 for the convenience of installation. The steering mechanism 8 includes a steering plate 81 provided at the bottom of the walking channel 5 and a connecting universal joint 82 provided on the steering plate 81. The universal joint is also called a shaft coupling. A steering cylinder 83 is provided at the end of the connecting universal joint 82 away from the steering plate 81. The output end of the steering cylinder 83 is connected to a steering universal joint 84. The end of the steering universal joint 84 away from the steering cylinder 83 is fixed on the flip plate 71. At the same time, bogies 85 are provided on both sides of the steering cylinder 83. A placement groove 851 is provided at the end of the bogie 85 close to the flip plate 71. A steering shaft 86 matching the steering groove is provided on the flip plate 71. A limiting plate 87 for limiting the steering shaft 86 is provided on the bogie 85. The limiting plate 87 is telescopically arranged above the placement groove 851. Specifically, a pushing cylinder 88 is provided on the bogie 85, and the power end of the pushing cylinder 88 is connected to the limit plate 87. Of course, it is also possible not to rely on the limit plate 87, and the power end of the pushing cylinder 88 only needs to be above the steering shaft 86. In this way, when the pushing cylinder 88 on one side of the steering cylinder 83 works, when the steering cylinder 83 works, the flip plate 71 will rotate around the steering shaft 86 on this side, so that left and right switching can be achieved.
[0030] In order to further ensure safety, an electromagnet is provided on the side of the walking channel 5, and a magnetic attraction part matching the electromagnet is provided at the end of the installation channel 6. In this way, the entire installation channel 6 is triple-fixed by the steel cable, the steering cylinder 83 and the electromagnet, thereby ensuring safety in use.
[0031] The above description is only a preferred embodiment of the present invention and does not limit the present invention in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. A cantilever steel structure installation platform, characterized in that: It includes a first main beam and a second main beam whose ends are used to be fixed on the building floor. The first main beam and the second main beam are arranged at an interval. A walking passage is arranged below the first main beam and the second main beam. An installation passage is arranged at an end of the walking passage away from the building. The installation passage is arranged at a vertical angle to the walking passage. Steel cable connecting rings are arranged at the end of the first main beam and the second main beam away from the building and at both ends of the installation passage.
2. The cantilever steel structure installation platform according to claim 1, characterized in that: A lifting cylinder is arranged on the walking channel, and the lifting cylinder is arranged on both sides of the end of the walking channel. A connecting plate is arranged between the first main beam and the second main beam, and the connecting plate is arranged between the first main beam and the second main beam at intervals. The piston end of the lifting cylinder is fixedly connected to the connecting plate.
3. The cantilever steel structure installation platform according to claim 2, characterized in that: The installation channel can be flipped and arranged at the end of the walking channel.
4. The cantilever steel structure installation platform according to claim 3, characterized in that: The installation channel can be flipped and set at the end of the walking channel through a flip mechanism. The flip mechanism includes a flip plate set at the end of the walking channel and a flip cylinder set on the flip plate. One end of the installation channel close to the walking channel is hinged to the flip plate, and the output end of the flip cylinder is hinged to the bottom of the installation channel.
5. The cantilever steel structure installation platform according to claim 4, characterized in that: A steering mechanism for installing channel steering is also provided at the bottom of the walking channel, and the steering mechanism includes a steering plate arranged at the bottom of the walking channel and a connecting universal joint arranged on the steering plate, a steering cylinder is provided at the end of the connecting universal joint away from the steering plate, the output end of the steering cylinder is connected to a steering universal joint, and the end of the steering universal joint away from the steering cylinder is fixed on the flip plate, bogies are provided on both sides of the steering cylinder, a placement groove is provided at the end of the bogie close to the flip plate, a steering shaft matching the steering groove is provided on the flip plate, a limit plate for limiting the steering shaft is provided on the bogie, and the limit plate is telescopically arranged above the placement groove.
6. The cantilever steel structure installation platform according to claim 5, characterized in that: An electromagnet is arranged on the side of the walking channel, and a magnetic attraction part matching the electromagnet is arranged on the end of the installation channel.