Concrete tower column construction platform and installation method thereof

By designing a concrete tower column construction platform including brackets and panels, the installation risk and low efficiency caused by high altitude laying are solved, and a safer and more efficient construction process is achieved.

CN119507341APending Publication Date: 2025-02-25CHINA RAILWAY BRIDGE BUREAU NO 7 ENG CO LTD +1
View PDF 11 Cites 0 Cited by

Patent Information

Application Number
CN202411937949.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-26
Publication Date
2025-02-25

AI Technical Summary

Technical Problem

During the installation of concrete tower column construction platform, the panels need to be laid at high altitudes, resulting in high installation risk and low efficiency.

Method used

A concrete tower column construction platform is designed, which includes a bracket and a panel. The bracket consists of chariot legs and distribution beams. The panel is laid on the distribution beams and is welded and connected to the brackets through installation holes. Installation is simplified by opening and closing cover plates. process.

Benefits of technology

By pre-paving the panel and installing the brackets on the ground, the difficulty and number of high-altitude operations are reduced, and construction safety and efficiency are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119507341A_ABST
    Figure CN119507341A_ABST
Patent Text Reader

Abstract

The invention discloses a concrete tower column construction platform and a mounting method thereof, and relates to the field of bridge construction, the concrete tower column construction platform comprises a bracket and a distributive girder, the end part of the bracket is used for being connected with a tower column, and the distributive girder is placed on the top surface of the bracket. The panel is laid on the top face of the distribution beam, the panel abuts against the tower column, the panel is provided with installation holes penetrating through the panel face of the panel, and a cover plate capable of being opened and closed is arranged in each installation hole. According to the embodiment of the invention, the panel is provided with the mounting holes, and each mounting hole is provided with the cover plate capable of being opened and closed, so that during construction, the panel and the distributive girder of the bracket can be pre-mounted into a whole, the bracket of the bracket and the tower column are fixed, the whole is hoisted to the top surface of the bracket, the cover plates are opened, and the distributive girder is welded through the mounting holes; the panel does not need to be laid at high altitude, the safety of installation construction is improved, and the installation efficiency can be improved due to the fact that the panel is installed on the ground.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of bridge construction, and in particular to a concrete tower column construction platform and an installation method thereof. Background Art

[0002] When constructing the middle and upper cross beams of concrete towers of suspension bridges and cable-stayed bridges, a tower construction platform is required. Construction workers can use the elevator to reach the work surface through the construction platform for construction. In related technologies, it is necessary to set up the bracket in advance, then fix the bracket to the embedded parts on the tower, and finally lay the panel on the bracket. Due to the large number of panels, the large laying range, and the high-altitude laying, the installation is more dangerous and the installation efficiency is low. Summary of the invention

[0003] The embodiment of the present application provides a concrete tower construction platform and an installation method thereof to solve the problem in the related art that, during the installation process of the concrete tower construction platform, the panels are all laid at high altitude, the installation is relatively dangerous and the installation efficiency is low.

[0004] A concrete tower column construction platform, comprising:

[0005] The bracket comprises a corbel and a distribution beam, wherein the end of the corbel is used to be connected to the tower column, and the distribution beam is placed on the top surface of the corbel;

[0006] A panel is laid on the top surface of the distribution beam, the panel is supported by the tower column, the panel is provided with mounting holes penetrating the panel surface, and each mounting hole is provided with an openable and closable cover plate.

[0007] Furthermore, the concrete tower construction platform includes a first construction platform, a second construction platform and a third construction platform. The first construction platform and the third construction platform are located at opposite ends of the second construction platform and are perpendicular to the second construction platform. The first construction platform, the second construction platform and the third construction platform all include brackets and panels. The distribution beam of the first construction platform and the distribution beam of the third construction platform are respectively erected at opposite ends of the distribution beam of the second construction platform.

[0008] Furthermore, the mounting hole is located above the intersection of the distribution beam and the corbel, and one side of each cover plate is hinged to the panel via a hinge.

[0009] Furthermore, each of the corbels includes a cross bar and a diagonal brace, the end of the cross bar is used to connect with the tower column, the distribution beam is placed on the top surface of the cross bar, one end of the diagonal brace is connected to the cross bar, and the other end is provided with a supporting plate for being attached and fixed to the tower column.

[0010] Furthermore, the tower column is provided with a fixing piece, and the end of the corbel is provided with a connecting plate for connecting with the fixing piece, one end of the fixing piece is connected to the tower column, and the other end is detachably connected to the connecting plate.

[0011] Furthermore, a stiffening plate is provided at the connection between the connecting plate and the corbel, and a part of the stiffening plate is connected to the connecting plate, and a part of the stiffening plate is connected to the corbel.

[0012] Furthermore, the support comprises a plurality of corbels arranged side by side, a column is provided at the end of each corbel away from the tower column, and the plurality of columns are connected by horizontal rods to form a fence.

[0013] A construction method based on the above concrete tower column construction platform is also provided, comprising:

[0014] Fix the ends of the bracket's corbels to the tower column;

[0015] Lay the panel on the top surface of the distribution beam of the bracket, and hoist the panel and the distribution beam to the preset installation position, so that the distribution beam is placed on the top surface of the corbel and the panel is supported on the tower column;

[0016] Open the cover plate and weld the distribution beam and the corbel under the panel to form a concrete tower column construction platform.

[0017] Furthermore, the concrete tower column construction platform includes a first construction platform, a second construction platform and a third construction platform, and the construction method includes:

[0018] Fix the ends of the corbels of the first platform, the second platform and the third platform to the three side walls of the tower column respectively, so that the corbels of the first platform and the third platform are higher than the corbels of the second platform;

[0019] The panels of the first construction platform, the second construction platform and the third construction platform are laid on the top surfaces of the corresponding distribution beams respectively, and the panels and distribution beams of the first construction platform, the second construction platform and the third construction platform are hoisted to the top surfaces of the corresponding corbels, so that the distribution beams of the first construction platform and the third construction platform are erected on the top surface of the distribution beam of the second construction platform;

[0020] Open the cover plates of the first construction platform, the second construction platform and the third construction platform, and weld the distribution beams and corbels under the panels to form a concrete tower column construction platform.

[0021] Furthermore, each of the brackets includes a crossbar and a diagonal brace, and a supporting plate is provided at the end of the diagonal brace. Fixing the end of the bracket of the bracket to the tower column includes:

[0022] The end of the cross bar is fixedly connected to the tower column, and the supporting plate at the end of the diagonal support is attached to the tower column, so that the supporting plate is fixedly connected to the tower column.

[0023] The beneficial effects of the technical solution provided by this application include:

[0024] The embodiment of the present application provides a concrete tower column construction platform and an installation method thereof. Since the panel is provided with installation holes, and each installation hole is provided with an openable cover plate, during construction, the panel and the distribution beam of the bracket can be pre-installed as a whole, and the bracket of the bracket is fixed to the tower column, and the whole is hoisted to the top surface of the bracket, the cover plate is opened, and the distribution beam under the panel is welded through the installation hole. This method can pre-lay the panel on the ground, and there is no need to lay the panel at high altitude, which ensures the safety of the installation construction. In addition, the panel is installed on the ground, which can improve the installation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0026] Figure 1 This is a schematic diagram of the overall structure of an embodiment of the present application;

[0027] Figure 2 for Figure 1 Schematic diagram of the distribution beam structure of the first construction platform;

[0028] Figure 3 for Figure 1 Schematic diagram of the distribution beam structure of the second construction platform;

[0029] Figure 4 for Figure 1 Schematic diagram of the distribution beam structure of the third construction platform;

[0030] Figure 5 for Figure 1 A schematic diagram of the structure in which the crossbar is connected to the tower column;

[0031] Figure 6 for Figure 5 A schematic diagram of the structure of the fixing parts;

[0032] Figure 7 for Figure 5 A schematic diagram of the structure of the crossbar in FIG.

[0033] Figure 8 for Figure 7 AA cross-sectional diagram of ;

[0034] Fig. 9 for Figure 7 BB cross-section diagram;

[0035] Fig.10 for Figure 7 A schematic diagram of the structure of the connecting plate in FIG.

[0036] Fig.11 for Figure 5 The structural diagram of the diagonal rod in FIG.

[0037] Fig.12 for Fig.11 Schematic diagram of CC cross section.

[0038] Reference numerals:

[0039] 1. Bracket; 11. Corbel; 111. Crossbar; 112. Diagonal brace; 113. Stiffener; 12. Distribution beam; 2. Tower column; 3. Fixings; 4. Support plate; 5. Panel; 6. Cover plate; 7. Connecting plate; 8. Stiffener; 9. Hinge; 10. Column; 13. Horizontal bar; 14. Skirting board; 15. Tower column crossbeam; 16. Elevator. DETAILED DESCRIPTION

[0040] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.

[0041] The embodiment of the present application provides a concrete tower construction platform and an installation method thereof, which can solve the problem that during the installation of the construction platform, the components of the bracket cannot be adjusted when laying the panel, thereby affecting the stability of the bracket.

[0042] like Figure 1 As shown, a concrete tower construction platform includes a bracket 1 and a panel 5.

[0043] The bracket 1 includes a bracket 11 and a distribution beam 12. The end of the bracket 11 is used to connect with the tower column 2. The distribution beam 12 is placed on the top surface of the bracket 11. The panel 5 is laid on the top surface of the distribution beam 12, and the panel 5 is abutted against the tower column 2. The panel 5 is provided with mounting holes penetrating the panel surface, and each mounting hole is provided with an openable cover plate 6.

[0044] Specifically, the above-mentioned concrete tower column construction platform may include one construction platform or multiple construction platforms, each of which includes a bracket 1 and a panel 5. Different construction platforms can be set on different side walls of the tower column 2. The number of brackets 1 in each construction platform 1 can be set according to actual conditions.

[0045] Specifically, the brackets 1 of the same construction platform are arranged side by side, that is, the top surfaces of the brackets 11 of the brackets 1 of the same construction platform are located at the same horizontal plane, ensuring the stability of the panel 5 above the brackets 11. In addition, there is a distance between each two adjacent brackets 11. Preferably, the distance between each two adjacent brackets 11 is equal, so that each bracket 11 can be evenly stressed, and the panel 5 can be balanced, thereby enhancing the bearing capacity and overall structural stability of the bracket 1. The number of brackets 11 of each bracket 1 can be determined according to actual conditions.

[0046] Specifically, the number of distribution beams 12 of each bracket 1 can also be determined according to actual conditions. In the embodiment of the present application, the distribution beam 12 of each bracket 1 is perpendicular to the corbel 11, and the distribution beams 12 are evenly placed on the top surface of the corbel 11 of the bracket 1, and the distance between each two adjacent distribution beams 12 is equal, so that the distribution beam 12 can evenly transfer the load of the panel 5 to the corbel 11 below to avoid concentrated loads or eccentric loads that affect the overall structural stability of the bracket 1. In other embodiments, the distribution beam 12 can also have an inclined angle relative to the corbel 11. Optionally, the above-mentioned distribution beam 12 can be made of I-10 steel.

[0047] Furthermore, the mounting hole is located above the intersection of the distribution beam 12 and the corbel 11 , and one side of each cover plate 6 is hinged to the panel 5 via a hinge 9 .

[0048] Specifically, in the embodiment of the present application, each mounting hole of the panel 5 is a square hole, and the mounting hole has four hole walls, one of which is provided with a hinge 9. The cover plate 6 is also a square plate-shaped structure, and the size of the cover plate 6 is the same as the size of the mounting hole. When the cover plate 6 covers the mounting hole, the top surface of the cover plate 6 is flush with the top surface of the panel 5, ensuring the flatness of the top surface of the panel 5. In other embodiments, the shape of the mounting hole can be determined according to actual conditions, and the shape and size of the cover plate 6 are the same as the mounting hole. Optionally, the above-mentioned cover plate 6 can adopt a 6mm thick patterned steel plate.

[0049] Specifically, in the embodiment of the present application, the number of mounting holes is multiple rows, and each row of mounting holes is arranged along the extension direction of the distribution beam 12, and the mounting holes are located above the intersection of the distribution beam 12 and the corbel 11, that is, the cover plate 6 is located above the intersection of the distribution beam 12 and the corbel 11. The position of the mounting holes is a weak force area of ​​the panel 5. When the cover plate 6 is subjected to a downward load, the distribution beam 12 and the corbel 11 can give the cover plate 6 an upward support force. The distribution beam 12 and the corbel 11 play a role in strengthening the structure at the mounting holes, ensuring the overall bearing capacity of the panel 5. Preferably, each row of mounting holes is evenly arranged to ensure that the panel 5 is subjected to a balanced force.

[0050] Specifically, in the embodiment of the present application, the side wall of the tower column 2 is irregularly shaped, and there is a distance between the inner edge of each panel 5 and the side wall of the tower column 2. A cover plate 6 is provided within the distance, and one side of the cover plate 6 is hinged to the inner edge of the panel 5 through a hinge 9, and the other side of the cover plate 6 is against the side wall of the tower column 2. A cover plate 6 with the same shape as the chamfer is also provided at the chamfer. When installing and disassembling the concrete tower column construction platform of the embodiment of the present application, the cover plate 6 can be opened to facilitate the installation and disassembly of the bracket 1 and the tower column 2 at high altitude, thereby improving the construction efficiency. Optionally, the above-mentioned cover plate 6 can adopt a 6mm thick patterned steel plate.

[0051] Further, such as Figures 5 to 10 As shown, the tower column 2 is provided with a fixing member 3, and the end of the corbel 11 is provided with a connecting plate 7 for connecting with the fixing member 3, one end of the fixing member 3 is connected to the tower column 2, and the other end is detachably connected to the connecting plate 7.

[0052] Specifically, in the embodiment of the present application, each corbel 11 includes a crossbar 111 and a diagonal brace 112, the end of the crossbar 111 is used to connect with the tower column 2, and the distribution beam 12 is placed on the top surface of the crossbar 111. The above-mentioned connecting plate 7 is vertically arranged, which is perpendicular to the corbel 11. Specifically, the connecting plate 7 is perpendicular to the crossbar 111 of the corbel 11. When constructing the tower column 2, the fixing member 3 is pre-buried, one end of the fixing member 3 is buried in the interior of the tower column 2, and the other end passes through the connecting plate 7 and is detachably connected to the connecting plate 7. When the bracket 1 needs to be removed, it is only necessary to separate the fixing member 3 from the connecting plate 7 to separate the corbel 11 from the tower column 2. The structure is simple, easy to install and disassemble, and can improve the installation efficiency. The above-mentioned fixing member 3 can be a climbing cone, and the crossbar 111 of each corbel 11 is connected to the tower column 2 through two climbing cones. The connecting plate 7 has two through holes, and the two climbing cones pass through the through holes of the connecting plate 7 and are fixed by bolts. In other embodiments, the number of climbing cones can be determined according to actual conditions.

[0053] Furthermore, a stiffening plate 8 is provided at the connection between the connecting plate 7 and the corbel 11 , and a part of the stiffening plate 8 is connected to the connecting plate 7 , and a part of the stiffening plate 8 is connected to the corbel 11 .

[0054] Specifically, the stiffening plates 8 play a role in strengthening the corbels 11. Each corbel 11 includes a crossbar 111 and a diagonal brace 112. The end of the crossbar 111 is used to connect with the tower column 2, and the distribution beam 12 is placed on the top surface of the crossbar 111. In the embodiment of the present application, the number of stiffening plates 8 is three, and the three stiffening plates 8 form a gate-shaped structure. The gate-shaped structure is arranged across the top surface of the crossbar 111 of the corbel 11. The stiffening plates 8 are fixedly connected to the crossbar of the corbel 11 and are fixedly connected to the connecting plate 7.

[0055] Further, such as Figure 5 , Figures 11 to 12 As shown, each corbel 11 includes a cross bar 111 and a diagonal brace 112. The end of the cross bar 111 is used to connect with the tower column 2. The distribution beam 12 is placed on the top surface of the cross bar 111. One end of the diagonal brace 112 is connected to the cross bar 111, and the other end is provided with a supporting plate 4 for being attached and fixed to the tower column 2.

[0056] Specifically, in the embodiment of the present application, the crossbar 111 of each corbel 11 is horizontally arranged, and one end of the crossbar 111 is used to connect with the tower column 2, and the diagonal brace 112 of each corbel 11 plays a role in strengthening the crossbar 111. The crossbar 111, the diagonal brace 112 of the corbel 11 and the side wall of the tower column 2 form a triangular structure, which ensures the stability of the corbel 11. In the embodiment of the present application, a vertical stiffening rod 113 is also arranged between each crossbar 111 and the diagonal brace 112, one end of the stiffening rod 113 is connected to the crossbar 111, and the other end is connected to the diagonal brace 112, which is conducive to enhancing the structural stability and bearing capacity of the corbel 11. Optionally, the crossbar 111, the diagonal brace 112 and the stiffening rod 113 of the above-mentioned corbel 11 are all double-jointed channel steel structures.

[0057] Specifically, a support plate 4 is provided at the end of the diagonal brace 112, and the support plate 4 is closely fitted with the side wall of the tower column 2, which can reduce the use of the fixing member 3, thereby reducing the embedded components inside the tower column 2, so as to avoid adverse effects on the structure of the tower column 2. In addition, when the support plate 4 is fitted with the side wall of the tower column 2, the crossbar 111 of the corbel 11 is in a horizontal state.

[0058] Furthermore, Figures 2 to 4 As shown, the concrete tower column construction platform of the embodiment of the present application includes a first construction platform, a second construction platform and a third construction platform. The first construction platform and the third construction platform are located at opposite ends of the second construction platform and are perpendicular to the second construction platform. The first construction platform, the second construction platform and the third construction platform all include a bracket 1 and a panel 5. The distribution beam 12 of the first construction platform and the distribution beam 12 of the third construction platform are respectively set up at opposite ends of the second construction platform.

[0059] Specifically, in the embodiment of the present application, the concrete tower column construction platform of the embodiment of the present application includes a first construction platform, a second construction platform and a third construction platform, and the number of panels 5 is three. The three panels are laid on the top surfaces of the brackets of the three construction platforms respectively, and each panel 5 is against different side walls of the tower column 2 to ensure a tight connection with the side wall of the tower column 2 to avoid accidents of falling from a high altitude. Each panel 5 is provided with a mounting hole, and the number of mounting holes provided on each panel 5 can be determined according to actual conditions. Preferably, the mounting holes on each panel 5 are evenly arranged to ensure that the panel 5 is evenly stressed.

[0060] Specifically, in the embodiment of the present application, the first construction platform, the second construction platform and the third construction platform are surrounded by the three side walls of the tower column 2, and construction workers can walk freely on the panels 5 of the first construction platform, the second construction platform and the third construction platform to ensure sufficient construction space.

[0061] Specifically, in the embodiment of the present application, both ends of the distribution beam 12 of the second construction platform extend out of the side wall of the tower column 2, the distribution beam 12 of the first construction platform extends out of the side wall of the tower column 2 adjacent to the end of the second construction platform, and the distribution beam 12 of the third construction platform extends out of the side wall of the tower column 2 adjacent to the end of the second construction platform. The portion of the distribution beam 12 of the first construction platform extending out of the side wall and the portion of the distribution beam 12 of the third construction platform extending out of the side wall are both arranged at the opposite ends of the distribution beam 12 of the second construction platform extending out of the side wall, so as to ensure the structural stability of the junction of the first construction platform, the second construction platform and the third construction platform. In the embodiment of the present application, the distribution beams 12 of the first construction platform, the second construction platform and the third construction platform are exactly the same, the positions of the corbels 11 of the first construction platform and the third construction platform are higher than the position of the corbels 11 of the second construction platform, and the height difference is exactly the height of the distribution beam 12. When the distribution beams 12 of the first construction platform, the second construction platform and the third construction platform are different, the height difference between the position of the corbel 11 of the first construction platform and the position of the corbel 11 of the second construction platform is the height of the distribution beam 12 of the first construction platform, and the height difference between the position of the corbel 11 of the third construction platform and the position of the corbel 11 of the second construction platform is the height of the distribution beam 12 of the third construction platform.

[0062] In the embodiment of the present application, the first construction platform is adjacent to the elevator 16 , and the third construction platform is adjacent to the tower beam 15 . It can be known that the first construction platform should avoid the position of the elevator 16 , and the third construction platform should avoid the position of the tower beam 15 .

[0063] Furthermore, the support 1 includes a plurality of corbels 11 arranged side by side, and a column 10 is provided at the end of each corbel 11 away from the tower column 2. The plurality of columns 10 are connected by horizontal rods 13 to form a fence.

[0064] Specifically, in the embodiment of the present application, each bracket 1 includes a plurality of brackets 11 arranged side by side, and a column 10 is provided at the end of the cross bar 111 of each bracket 11 away from the tower column 2, and the plurality of columns 10 are connected by horizontal rods 13, and the height of the column 10 and the number of horizontal rods 13 can be determined according to actual conditions. In the embodiment of the present application,

[0065] Specifically, in the embodiment of the present application, a skirting board 14 is also provided at the bottom of the fence. The skirting board 14 is a vertically provided board. The skirting board 14 is simultaneously connected to a plurality of columns 10. The skirting board 14 can prevent the construction materials and tools on the panel 5 from falling from a high altitude, thereby ensuring the safety of the construction. The height of the skirting board 14 can be determined according to the actual situation. In the embodiment of the present application, the height of the skirting board 14 is 25 cm, and a 6 mm thick patterned steel plate can be used. The columns 10 and the horizontal rods 13 of the fence can both use a 48 mm diameter construction steel pipe.

[0066] The embodiment of the present application also includes a construction method based on the above concrete tower column construction platform, which includes the following steps:

[0067] Step 1: Fix the end of the bracket 11 of the bracket 1 to the tower column 2.

[0068] Step 2: Lay the panel 5 on the top surface of the distribution beam 12 of the bracket 1, and hoist the panel 5 and the distribution beam 12 to the preset installation position, so that the distribution beam 12 is placed on the top surface of the corbel 11, and the panel 5 is supported on the tower column 2.

[0069] Step 3: Open the cover plate 6, and weld the distribution beam 12 under the panel 5 to the corbel 11 to form a concrete tower column construction platform.

[0070] Specifically, in the above step 1, each corbel 11 includes a crossbar 111 and a diagonal brace 112, and the end of the crossbar 111 of the corbel 11 is fixed to the tower column 2.

[0071] Specifically, in the above step 2, the panel 5 and the distribution beam 12 are pre-installed as a whole on the ground, and then the whole is hoisted. Only the distribution beam 12 needs to be welded at high altitude, which reduces the difficulty and process of high-altitude operations and ensures the safety of the installation process. In addition, pre-installing the panel 5 on the ground can improve the installation efficiency.

[0072] Specifically, in the above step 3, the distribution beam 12 and the corbel 11 can be welded through the mounting hole. After the welding is completed, the cover plate 6 can be covered, which is simple to operate.

[0073] Specifically, in the above steps 1 and 2, the end of the bracket 11 of the bracket 1 can be first fixed to the tower column 2, and then the panel 5 and the distribution beam 12 of the bracket 1 are installed as a whole, and the panel 5 and the distribution beam 12 are hoisted to the preset installation position, so that the distribution beam 12 is placed on the top surface of the bracket 11. The panel 5 and the distribution beam 12 of the bracket 1 can also be installed as a whole first, and then the end of the bracket 11 of the bracket 1 is fixed to the tower column 2, and the panel 5 and the distribution beam 12 are hoisted to the preset installation position, so that the distribution beam 12 is placed on the top surface of the bracket 11. It is also possible to fix the end of the bracket 11 of the bracket 1 to the tower column 2 and install the panel 5 and the distribution beam 12 of the bracket 1 as a whole at the same time, and then hoist the panel 5 and the distribution beam 12 to the preset installation position, so that the distribution beam 12 is placed on the top surface of the bracket 11.

[0074] Furthermore, the above concrete tower column construction platform includes a first construction platform, a second construction platform and a third construction platform, and the above construction method includes:

[0075] The ends of the corbels 11 of the first platform, the second platform and the third platform are fixed to the three side walls of the tower column 2 respectively, so that the corbels 11 of the first platform and the third platform are higher than the corbels 11 of the second platform.

[0076] The panels 5 of the first construction platform, the second construction platform and the third construction platform are laid on the top surfaces of the corresponding distribution beams 12 respectively, and the panels 5 and the distribution beams 12 of the first construction platform, the second construction platform and the third construction platform are hoisted to the top surfaces of the corresponding corbels 11, so that the distribution beams 12 of the first construction platform and the third construction platform are erected on the top surface of the distribution beam 12 of the second construction platform.

[0077] The cover plates 6 of the first construction platform, the second construction platform and the third construction platform are opened, and the distribution beam 12 under the panel 5 is welded to the corbel 11 to form a concrete tower column construction platform.

[0078] Specifically, in the above steps, both ends of the distribution beam 12 of the second construction platform extend out of the side walls of the tower column 2, the distribution beam 12 of the first construction platform extends out of the side wall of the tower column 2 at the end adjacent to the second construction platform, and the distribution beam 12 of the third construction platform extends out of the side wall of the tower column 2 at the end adjacent to the second construction platform. The portion of the distribution beam 12 of the first construction platform extending out of the side wall and the portion of the distribution beam 12 of the third construction platform extending out of the side wall are arranged at the opposite ends of the distribution beam 12 of the second construction platform extending out of the side wall, thereby ensuring the structural stability of the junction of the first construction platform, the second construction platform and the third construction platform.

[0079] Specifically, in the above steps, the distribution beams 12 of the first construction platform, the second construction platform and the third construction platform are exactly the same, the positions of the corbels 11 of the first construction platform and the third construction platform are higher than the position of the corbel 11 of the second construction platform, and the height difference is exactly the height of the distribution beam 12. When the distribution beams 12 of the first construction platform, the second construction platform and the third construction platform are different, the height difference between the position of the corbel 11 of the first construction platform and the position of the corbel 11 of the second construction platform is the height of the distribution beam 12 of the first construction platform, and the height difference between the position of the corbel 11 of the third construction platform and the position of the corbel 11 of the second construction platform is the height of the distribution beam 12 of the third construction platform.

[0080] Furthermore, each corbel 11 includes a crossbar 111 and a diagonal brace 112, and a supporting plate 4 is provided at the end of the diagonal brace 112. The above step 1 includes:

[0081] The end of the cross bar 111 is fixedly connected to the tower column 2, and the support plate 4 at the end of the diagonal brace 112 is attached to the tower column 2, so that the support plate 4 is fixedly connected to the tower column 2. The support plate 4 is completely fitted with the side wall of the tower column 2, and the cross bar 111 is ensured to be in a horizontal state.

[0082] Taking a project constructed by the applicant as an example, a construction method based on the above-mentioned concrete tower column construction platform in an embodiment of the present application is introduced:

[0083] Step S1: According to the design drawings, the panels 5 of the first construction platform, the second construction platform and the third construction platform are welded to the distribution beam 12 as a whole, and the through holes of the connecting plate 7 on the corbel 11 are determined to match the size and position of the fixing member 3. Multiple columns 10 are installed on the outer edges of the first construction platform, the second construction platform and the third construction platform. The multiple columns 10 are evenly arranged. The multiple columns 10 of the same construction platform are connected by horizontal rods 13 to form a fence. The baseboards 14 are installed at the bottom of the multiple columns 10 as a safety protection measure for high-altitude operations.

[0084] Step S2: When constructing the tower column 2, the fixing part 3 is embedded in advance, and the fixing part 3 is a climbing cone, and the position of the fixing part 3 is ensured to be consistent with the design drawing. The distribution beams 12 of the first construction platform, the second construction platform and the third construction platform are exactly the same, and the positions of the brackets 11 of the first construction platform and the third construction platform are higher than the position of the bracket 11 of the second construction platform, and the height difference is exactly the height of the distribution beam 12.

[0085] Step S3: Use lifting equipment to install the corbels 11 of the first construction platform, the second construction platform and the third construction platform in sequence, and connect the connecting plate 7 of the cross bar 111 of the corbel 11 to the fixed part on the tower column 2 by bolts, and attach the supporting plate 4 of the diagonal brace 112 of the corbel 11 to the side wall of the tower column 2.

[0086] Step S4: Use the second construction platform of the lifting equipment. During lifting, the cover plate 6 between the inner edge of the panel 5 of the second construction platform and the side wall of the tower column 2 is in an open state. The distribution beam 12 of the second construction platform is placed on the top surface of the cross bar 111 of the corbel 11 of the second construction platform. Open the cover plate 6 at the intersection of the distribution beam 12 and the corbel 11 of the second construction platform, weld the distribution beam 12 and the corbel 11 to fix them, and cover all the cover plates 6 after welding to ensure that the panel 5 of the second construction platform is fully closed.

[0087] Step S5: Use the first construction platform of the lifting equipment. During lifting, the cover plate 6 between the inner edge of the panel 5 of the first construction platform and the side wall of the tower column 2 and the cover plate 6 at the chamfer are all in an open state. Place the distribution beam 12 of the first construction platform on the top surface of the cross bar 111 of the corbel 11 of the first construction platform, open the cover plate 6 at the intersection of the distribution beam 12 and the corbel 11 of the first construction platform, weld and fix the distribution beam 12 and the corbel 11, and cover all the cover plates 6 after welding to ensure that the panel 5 of the first construction platform is fully closed.

[0088] Step S6: Use the third construction platform of the lifting equipment. During lifting, the cover plate 6 between the inner edge of the panel 5 of the third construction platform and the side wall of the tower column 2 and the cover plate 6 at the chamfer are both in an open state. Place the distribution beam 12 of the third construction platform on the top surface of the cross bar 111 of the corbel 11 of the third construction platform, open the cover plate 6 at the intersection of the distribution beam 12 and the corbel 11 of the third construction platform, weld and fix the distribution beam 12 and the corbel 11, and cover all the cover plates 6 after welding to ensure that the panel 5 of the third construction platform is fully enclosed, and complete the installation of the concrete tower column construction platform.

[0089] Step S7: After the construction of the tower column 2 is completed, the third construction platform, the first construction platform, and the second construction platform are hoisted and dismantled in turn. When dismantling, first open the cover plate 6 between the inner edge of the panel 5 of the second construction platform and the side wall of the tower column 2, the cover plate 6 and the cover plate 6 at the chamfer between the inner edge of the panel 5 of the first construction platform and the side wall of the tower column 2, and the cover plate 6 and the cover plate 6 at the chamfer between the inner edge of the panel 5 of the third construction platform and the side wall of the tower column 2, then disassemble the fixing part 3 and the cross bar 111 of the corbel 11, and decorate the position of the fixing part 3.

[0090] In the description of the present application, it should be noted that the terms "upper", "lower", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. Unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present application can be understood according to the specific circumstances.

[0091] It should be noted that, in this application, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.

[0092] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.

Claims

1. A concrete tower column construction platform, characterized in that: include: A support (1) comprising a bracket (11) and a distribution beam (12), wherein the end of the bracket (11) is used to be connected to a tower column (2), and the distribution beam (12) is placed on the top surface of the bracket (11); A panel (5) is laid on the top surface of the distribution beam (12), the panel (5) is supported on the tower column (2), the panel (5) is provided with mounting holes penetrating the panel surface, and each mounting hole is provided with an openable cover plate (6).

2. The concrete tower column construction platform according to claim 1, characterized in that: The concrete tower column construction platform comprises a first construction platform, a second construction platform and a third construction platform. The first construction platform and the third construction platform are located at opposite ends of the second construction platform and are perpendicular to the second construction platform. The first construction platform, the second construction platform and the third construction platform all comprise a bracket (1) and a panel (5). The distribution beam (12) of the first construction platform and the distribution beam (12) of the third construction platform are respectively erected at opposite ends of the distribution beam (12) of the second construction platform.

3. The concrete tower column construction platform as claimed in claim 2, characterized in that: The mounting hole is located above the intersection of the distribution beam (12) and the corbel (11), and one side of each cover plate (6) is hinged to the panel (5) via a hinge (9).

4. The concrete tower column construction platform according to claim 1, characterized in that: Each of the corbels (11) comprises a crossbar (111) and a diagonal brace (112); the end of the crossbar (111) is used to be connected to the tower column (2); the distribution beam (12) is placed on the top surface of the crossbar (111); one end of the diagonal brace (112) is connected to the crossbar (111); and the other end is provided with a supporting plate (4) for being attached and fixed to the tower column (2).

5. The concrete tower column construction platform according to claim 1, characterized in that: The tower column (2) is provided with a fixing piece (3), and the end of the bracket (11) is provided with a connecting plate (7) for connecting with the fixing piece (3), one end of the fixing piece (3) is connected to the tower column (2), and the other end is detachably connected to the connecting plate (7).

6. The concrete tower column construction platform as claimed in claim 5, characterized in that: A stiffening plate (8) is provided at the connection between the connecting plate (7) and the corbel (11); a portion of the stiffening plate (8) is connected to the connecting plate (7) and a portion of the stiffening plate (8) is connected to the corbel (11).

7. The concrete tower column construction platform according to claim 1, characterized in that: The support (1) comprises a plurality of brackets (11) arranged side by side, and a column (10) is provided at the end of each bracket (11) away from the tower column (2), and the plurality of columns (10) are connected by horizontal rods (13) to form a fence.

8. A construction method based on the concrete tower column construction platform according to claim 1, characterized in that: include: Fixing the end of the bracket (11) of the bracket (1) to the tower column (2); Laying the panel (5) on the top surface of the distribution beam (12) of the bracket (1), and hoisting the panel (5) and the distribution beam (12) to a preset installation position, so that the distribution beam (12) is placed on the top surface of the corbel (11), and the panel (5) is supported on the tower column (2); The cover plate (6) is opened, and the distribution beam (12) and the bracket (11) below the panel (5) are welded and connected to form a concrete tower column construction platform.

9. The construction method of the concrete tower column construction platform according to claim 8, characterized in that: The concrete tower column construction platform includes a first construction platform, a second construction platform and a third construction platform, and the construction method includes: The ends of the corbels (11) of the first platform, the second platform and the third platform are fixed to the three side walls of the tower column (2) respectively, so that the corbels (11) of the first platform and the third platform are higher than the corbels (11) of the second platform; The panels (5) of the first construction platform, the second construction platform and the third construction platform are laid on the top surfaces of the corresponding distribution beams (12) respectively, and the panels (5) and the distribution beams (12) of the first construction platform, the second construction platform and the third construction platform are hoisted to the top surfaces of the corresponding brackets (11), so that the distribution beams (12) of the first construction platform and the third construction platform are erected on the top surface of the distribution beam (12) of the second construction platform; The cover plates (6) of the first construction platform, the second construction platform and the third construction platform are opened, and the distribution beam (12) below the panel (5) is welded to the corbel (11) to form a concrete tower column construction platform.

10. The construction method of the concrete tower column construction platform according to claim 9, characterized in that: Each of the brackets (11) comprises a crossbar (111) and a diagonal brace (112), and a supporting plate (4) is provided at the end of the diagonal brace (112). The method of fixing the end of the bracket (11) of the support (1) to the tower column (2) comprises: The end of the crossbar (111) is fixedly connected to the tower column (2), and the support plate (4) at the end of the diagonal support (112) is attached to the tower column (2) so that the support plate (4) is fixedly connected to the tower column (2).

Citation Information

Patent Citations

  • Fabricated construction platform suitable for different gradients

    CN114717953A

  • Erecting method and erecting component of bridge jacking platform

    CN117646397A

  • A operation platform that is used for high pier binder, bent cap construction usefulness

    CN205088574U

  • No. 0 piece multipurpose triangle -shaped bracket construction equipment on continuous beam pier top

    CN205205694U

  • Continuous rigid frame bridge case roof beam 0# piece does not have bracket cast -in -place support and overlaps roof beam

    CN208201663U