Load-bearing iron component structure for tower body of electric power tower
By installing the load-bearing reinforced triangle frame and angle steel end assembly frame on the inner side of the equilateral right-angle steel iron component of the electric tower body load-bearing main material, the problem of insufficient structural strength of the load-bearing main material in the prior art is solved, and the deformation and tensile resistance of the tower body is significantly improved, ensuring the stability of the structure under harsh conditions.
Patent Information
- Application Number
- CN202510040300.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-10
- Publication Date
- 2025-02-28
AI Technical Summary
The load-bearing main material of the existing electric tower body uses right-angle steel iron components, which has poor load-bearing quality and poor deformation and tensile resistance. It is difficult to ensure structural stability in the working conditions that increase load-bearing and strong wind weather.
Equilateral right-angle steel iron components are used as the main material of the tower body load-bearing, and a load-bearing reinforced triangle sheet frame is installed on the inside to avoid the assembly through holes, and the angle steel end assembly sheet frame and welding auxiliary corner frame are installed by welding to enhance the load-bearing quality and structural strength of the connecting part.
It greatly strengthens the structural strength of the main material of the tower body, improves the resistance to deformation and tensile quality, and ensures structural stability in increasing load-bearing and strong windy weather.
Smart Images

Figure CN119531656A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of electric power facilities, and in particular to a load-bearing iron component structure for a tower body of an electric power tower. Background Art
[0002] Power towers are transmission line towers, which are tower-shaped buildings used for power transmission. Their structural characteristics are that all types of towers are space truss structures, and the rods are mainly composed of single equilateral angle steel or combined angle steel. The entire tower is composed of angle steel, connecting steel plates and bolts. Individual components such as tower feet are welded from several steel plates into an assembly. The structure of the power tower is generally divided into tower head, tower leg and tower body. The use of such a spatial truss structure design can effectively disperse and bear loads from all directions. The connection between its various parts mainly adopts rough bolt connection, which is simple and reliable and can withstand shear force; the tower head is the part where the cross-section of the tower changes sharply from the tower leg to the top. If there is no sharp change in the cross-section, the part above the lower chord of the lower cross arm is the tower head; the tower leg is the first section of the tower above the foundation; and the tower body is the part between the tower leg and the tower head. The load-bearing iron structure of the tower body of the power tower is a vital component of the power transmission system. It is directly related to the safety and stability of the power line. Therefore, the load-bearing iron structure of the tower body of the power tower is an important guarantee for ensuring the safe operation of the power line because of its durability, easy installation and maintenance, etc.
[0003] The parts that make up the tower structure can be divided into main materials, diagonal materials, horizontal materials, auxiliary materials and the bolt fastener structure that connects them; the main materials are the angle steels that bear the main force of the tower and the materials that constitute the main frame of the tower, the diagonal materials are the cross materials that connect the two main materials, and the horizontal materials are the horizontal materials that connect the two main materials. The auxiliary materials are the angle steel materials other than the main materials, diagonal materials and horizontal materials.
[0004] The load-bearing main iron member of the tower structure is the main material structure, that is, the main frame structure of the tower body, which directly acts on the load-bearing hand force of the tower body. The load-bearing main iron member of the tower body is generally a single equilateral right-angle steel. Bolt assembly holes for connecting angle steels are opened near the ends of the load-bearing main iron member, and then the angle steels are fixed with bolts through the assembly holes at the ends, so as to realize the connection between the main materials and the main materials, as well as the connection between the main materials and the oblique materials and the cross materials. Assembly holes are often opened in the middle of the load-bearing main iron member to provide angle steels for assembly of the main materials and the oblique materials. The assembly holes opened at the ends and the middle of the load-bearing main iron member must be distributed along the same center line (the center line of the hole), and the center line distance (the distance between the back of the angle steel and the center line of the hole) is generally half of the width of the load-bearing main iron member to ensure uniform force load.
[0005] At present, the main load-bearing material of the tower body of the power tower adopts right-angle steel iron components as the frame load-bearing structure, which needs to be reinforced by setting a plurality of horizontal cross members and obliquely installed diagonal members. However, its own load-bearing quality is poor, and its deformation resistance and tensile strength are also poor, which is not conducive to ensuring its own structural stability under the working conditions of increased load-bearing and strong wind weather conditions; and because the iron components of the main load-bearing materials of the tower body are connected to other main materials or diagonal and horizontal materials through angle steels, the connection and assembly points are basically side walls, which makes it difficult to assemble and fix from the ends of the angle steels, which is not conducive to enhancing the load-bearing quality and structural strength of the connection parts. Summary of the invention
[0006] In view of the deficiencies in the prior art, the present invention provides a load-bearing iron component structure for a power tower body, which solves the problems raised in the above-mentioned background technology.
[0007] In order to achieve the above object, the present invention adopts the following technical solutions:
[0008] A load-bearing iron component structure for a power tower body, comprising:
[0009] The main load-bearing iron member of the tower body is an equilateral right-angle steel iron member;
[0010] A first angle steel assembly through hole and a second angle steel assembly through hole, wherein the first angle steel assembly through hole and the second angle steel assembly through hole are respectively opened at the end and the middle of the tower body load-bearing main iron member;
[0011] The load-bearing and strengthening triangular frame is welded and installed on the inner side of the main load-bearing iron member of the tower body, away from the first angle steel assembly through hole and the second angle steel assembly through hole;
[0012] The first angle steel material end assembly frame and the first welding auxiliary angle frame, the first welding auxiliary angle frame is welded and installed on the edge of the side wall of the first angle steel material end assembly frame, and the first angle steel material end assembly frame and the first welding auxiliary angle frame are both welded and fixed to the inner wall of the tower body load-bearing main iron member;
[0013] The second angle steel end assembly frame and the second welding auxiliary angle frame are welded and installed on the side wall edge of the second angle steel end assembly frame. The second angle steel end assembly frame and the second welding auxiliary angle frame are both welded and fixed to the inner wall of the tower body load-bearing main iron component.
[0014] Preferably, the first angle steel end assembly frame includes a first angle steel end assembly frame and a first end assembly hole, and the first end assembly hole is penetrated and opened in the middle part of the plate surface of the first angle steel end assembly frame; the second angle steel end assembly frame includes a second angle steel end assembly frame and a second end assembly hole, and the second end assembly hole is penetrated and opened in the plate surface of the second angle steel end assembly frame, and the number of the second end assembly holes is two, and the two second end assembly holes are respectively located at the diagonally opposite corners of the second angle steel end assembly frame close to the outer edge of the tower body load-bearing main iron member.
[0015] Preferably, the first welding auxiliary angle bracket is welded and fixed to the edge of the first angle steel material end assembly plate frame, welding straight grooves are provided on both sides of the first welding auxiliary angle bracket, welding half grooves are provided at both ends of the outer edge of the first welding auxiliary angle bracket away from the first angle steel material end assembly plate frame, the welding straight grooves and welding half grooves arranged on both sides of the first welding auxiliary angle bracket are staggered, and the inner edges of the welding straight grooves and welding half grooves are provided with first welding auxiliary grooves.
[0016] Preferably, the second welding auxiliary angle bracket is welded and fixed to the edge of the second angle steel material end assembly plate frame, and a narrow-diameter arc groove for welding spot is provided on the side of the second welding auxiliary angle bracket close to the second angle steel material end assembly plate frame, and a wide-diameter arc groove for welding spot is provided on the side of the second welding auxiliary angle bracket away from the second angle steel material end assembly plate frame, the curvature and depth of the wide-diameter arc groove for welding spot are both greater than those of the narrow-diameter arc groove for welding spot, and a second welding auxiliary groove is provided at the inner edge of the narrow-diameter arc groove for welding spot and the wide-diameter arc groove for welding spot.
[0017] Preferably, the number of the load-bearing reinforced triangular sheet frames is multiple, and the multiple load-bearing reinforced triangular sheet frames are distributed in two sections, and each section of the load-bearing reinforced triangular sheet frames is evenly distributed.
[0018] Preferably, the load-bearing reinforced triangular frame includes a triangular iron structure and a through triangular punched groove, the through triangular punched groove is punched and opened at the center of the triangular iron structure plate surface, the triangular iron structure is an isosceles right-angled triangle iron sheet structure, and the two right-angled sides of the triangular iron structure are welded and fixed to the inner side of the main load-bearing iron member of the tower body, and the two acute angles of the triangular iron structure near the outer edge of the main load-bearing iron member of the tower body are cut flat along the wall of the main load-bearing iron member of the tower body.
[0019] Preferably, the first angle steel assembly through hole is a hole position for assembling and connecting the main material, the oblique material and the cross material of the tower body through the angle steel member, and the second angle steel assembly through hole is a hole position for assembling and connecting the oblique material and the cross material of the tower body through the angle steel member; the apertures of the first angle steel assembly through hole and the second angle steel assembly through hole are equal, the first angle steel assembly through hole and the second angle steel assembly through hole are distributed along the two side walls of the tower body load-bearing main iron member, and the first angle steel assembly through hole and the second angle steel assembly through hole on each side wall of the tower body load-bearing main iron member are distributed on the same center line.
[0020] Preferably, the number of the first angle steel assembly through holes is sixteen, and eight of the sixteen first angle steel assembly through holes are respectively arranged near both ends of the tower body load-bearing main iron member, and the eight first angle steel assembly through holes at both ends of the tower body load-bearing main iron member are symmetrically and equidistantly distributed along its two side walls; the number of the second angle steel assembly through holes is twelve, and the twelve second angle steel assembly through holes are respectively arranged in two sections, six in each section, near the middle of the tower body load-bearing main iron member, and the six second angle steel assembly through holes in each section are symmetrically and equidistantly distributed along its two side walls.
[0021] Preferably, the first angle steel end assembly plate and the first welding auxiliary angle bracket are welded and installed on the inner wall of the tower body load-bearing main iron member near the first angle steel assembly through hole, and the first welding auxiliary angle bracket is welded and installed on the side of the first angle steel end assembly plate away from the first angle steel assembly through hole; the number of the first angle steel end assembly plate and the first welding auxiliary angle bracket are both two, and the two first angle steel end assembly plate frames and the first welding auxiliary angle brackets are respectively distributed on the opposite sides of the first angle steel assembly through holes at both ends of the tower body load-bearing main iron member.
[0022] Preferably, the second angle steel end assembly plate frame and the second welding auxiliary angle frame are welded and installed on the inner wall of the tower body load-bearing main iron member near the second angle steel assembly through hole, and the second welding auxiliary angle frame is welded and installed on the side of the second angle steel end assembly plate frame away from the second angle steel assembly through hole; the number of the second angle steel end assembly plate frame and the second welding auxiliary angle frame are both four, and the four second angle steel end assembly plate frames are respectively distributed on both sides of the two sections of the second angle steel assembly through holes.
[0023] Compared with the prior art, the present invention has the following beneficial effects:
[0024] 1. The load-bearing iron component structure for the tower body of an electric power tower is fixed on the inner side of the load-bearing main iron component of the tower body by arranging a load-bearing reinforcement triangular frame, avoiding the first angle steel assembly through hole and the second angle steel assembly through hole, and welding and installing the first angle steel end assembly frame and the second angle steel end assembly frame on the inner side wall of the tower body load-bearing main iron component, so that the strength of the structure of the tower body load-bearing main iron component itself can be greatly reinforced, and the deformation resistance and tensile strength of the structure are greatly improved, which greatly ensures the structural stability under the working conditions of increased load-bearing and strong wind weather conditions, and achieves the effect of reinforcing the load-bearing main structural member of the tower body.
[0025] 2. The load-bearing iron component structure for the tower body of an electric power tower is installed on the inner side of the load-bearing main iron component of the tower body by arranging a first angle steel end assembly frame and a second angle steel end assembly frame, and the first angle steel end assembly frame and the second angle steel end assembly frame are auxiliaryly reinforced and welded by arranging a first welding auxiliary angle frame and a second welding auxiliary angle frame, so that the first angle steel end assembly frame and the second angle steel end assembly frame can be assembled and fixed with the end of the added angle steel through the holes on their end faces, thereby increasing the points for assembly with the angle steel, making the load-bearing main iron component more stable when connected to other main materials or oblique and horizontal materials through the angle steel, greatly reinforcing and enhancing the load-bearing quality and structural strength of the tower body connection part structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a three-dimensional view of the structure of the present invention;
[0027] Figure 2 Another stereoscopic view of the structure of the present invention;
[0028] Figure 3 It is an enlarged stereoscopic view of the local structure of the present invention;
[0029] Figure 4 It is an enlarged stereoscopic view of another partial structure of the present invention;
[0030] Figure 5 This is an enlarged three-dimensional view of the load-bearing reinforced triangular frame of the present invention;
[0031] Figure 6 It is an enlarged stereoscopic view of the first angle steel material end assembly frame and the first welding auxiliary angle frame of the present invention;
[0032] Figure 7 This is an enlarged stereoscopic view of the second angle steel end assembly bracket and the second welding auxiliary angle bracket of the present invention.
[0033] In the figure: 1. Iron component of the main load-bearing material of the tower body; 2. Assembly through hole of the first angle steel; 3. Assembly through hole of the second angle steel; 4. Load-bearing reinforcement triangular frame; 5. Assembly frame of the first angle steel end; 6. First welding auxiliary angle frame; 7. Welding straight groove; 8. Welding half groove; 9. First welding auxiliary groove; 10. Assembly frame of the second angle steel end; 11. Second welding auxiliary angle frame; 12. Welding point narrow-diameter arc groove; 13. Welding point wide-diameter arc groove; 14. Second welding auxiliary groove; 401. Triangular iron component; 402. Through triangular punching groove; 501. Assembly frame of the first angle steel end; 502. First end assembly hole; 1001. Assembly frame of the second angle steel end; 1002. Second end assembly hole. DETAILED DESCRIPTION
[0034] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0035] Reference Figure 1-7 , a load-bearing iron component structure for a power tower body, comprising:
[0036] The main load-bearing iron member 1 of the tower body is an equilateral right-angle steel iron member;
[0037] The first angle steel assembly through hole 2 and the second angle steel assembly through hole 3 are respectively opened at the end and the middle of the tower body load-bearing main iron member 1;
[0038] The load-bearing and strengthening triangular frame 4 is welded and installed on the inner side of the main load-bearing iron member 1 of the tower body, away from the first angle steel assembly through hole 2 and the second angle steel assembly through hole 3;
[0039] The first angle steel material end assembly frame 5 and the first welding auxiliary angle frame 6 are welded and installed on the side wall edge of the first angle steel material end assembly frame 5. The first angle steel material end assembly frame 5 and the first welding auxiliary angle frame 6 are both welded and fixed to the inner wall of the tower body load-bearing main iron member 1;
[0040] The second angle steel end assembly frame 10 and the second welding auxiliary angle frame 11 are welded and installed on the side wall edge of the second angle steel end assembly frame 10. The second angle steel end assembly frame 10 and the second welding auxiliary angle frame 11 are both welded and fixed to the inner wall of the tower body load-bearing main iron component 1.
[0041] In the present invention, the first angle steel end assembly frame 5 includes a first angle steel end assembly frame 501 and a first end assembly hole 502, and the first end assembly hole 502 is opened through the middle of the first angle steel end assembly frame 501 plate surface; the second angle steel end assembly frame 10 includes a second angle steel end assembly frame 1001 and a second end assembly hole 1002, and the second end assembly hole 1002 is opened through the plate surface of the second angle steel end assembly frame 1001, and the number of the second end assembly holes 1002 is two, and the two second end assembly holes 1002 are respectively located at the diagonally opposite corners of the second angle steel end assembly frame 1001 close to the outer edge of the tower body load-bearing main iron member 1;
[0042] More specifically, two second end assembly holes 1002 are respectively located at the diagonally opposite corners of the second angle steel end assembly frame 1001 close to the outer edge of the tower body load-bearing main iron component 1, so that during assembly, the two second end assembly holes 1002 are symmetrically positioned, thereby improving the stability of assembly.
[0043] In the present invention, the first welding auxiliary angle bracket 6 is welded and fixed to the edge of the first angle steel material end assembly plate frame 501, and welding straight grooves 7 are provided on both sides of the first welding auxiliary angle bracket 6. Welding half grooves 8 are provided at both ends of the outer edge of the first welding auxiliary angle bracket 6 away from the first angle steel material end assembly plate frame 501. The welding straight grooves 7 and welding half grooves 8 provided on both sides of the first welding auxiliary angle bracket 6 are staggered, and the inner edges of the welding straight grooves 7 and the welding half grooves 8 are provided with first welding auxiliary grooves 9.
[0044] More specifically, by providing the first welding auxiliary groove 9, it is easier to insert the welding rod when adding welding points, thereby facilitating the operation.
[0045] In the present invention, the second welding auxiliary angle bracket 11 is welded and fixed to the edge of the second angle steel material end assembly plate frame 1001, and a welding point narrow diameter arc groove 12 is provided on the side of the second welding auxiliary angle bracket 11 close to the second angle steel material end assembly plate frame 1001, and a welding point wide diameter arc groove 13 is provided on the side of the second welding auxiliary angle bracket 11 away from the second angle steel material end assembly plate frame 1001, and the arc and depth of the welding point wide diameter arc groove 13 are greater than the welding point narrow diameter arc groove 12, and a second welding auxiliary groove 14 is provided at the inner edge of the welding point narrow diameter arc groove 12 and the welding point wide diameter arc groove 13;
[0046] More specifically, by arranging the welding point narrow diameter arc grooves 12 and the welding point wide diameter arc grooves 13 to be staggered, it is convenient to weld from the welding point narrow diameter arc grooves 12 and the welding point wide diameter arc grooves 13, thereby greatly increasing the welding points and improving the stability of welding.
[0047] In the present invention, the number of the load-bearing and strengthening triangular sheet frames 4 is multiple, and the multiple load-bearing and strengthening triangular sheet frames 4 are distributed in two sections, and each section of the load-bearing and strengthening triangular sheet frames 4 is evenly distributed;
[0048] More specifically, by arranging each section of the load-bearing reinforcement triangular frame 4 to be evenly distributed, the points of the reinforcement structure are made more dispersed and uniform.
[0049] In the present invention, the load-bearing reinforced triangular sheet frame 4 includes a triangular iron sheet 401 and a through triangular punching groove 402. The through triangular punching groove 402 is punched and opened at the center of the plate surface of the triangular iron sheet 401. The triangular iron sheet 401 is an isosceles right-angled triangular iron sheet structure, and the two right-angled sides of the triangular iron sheet 401 are welded and fixed to the inner side of the tower body load-bearing main iron member 1, and the two acute angles of the triangular iron sheet 401 near the outer edge of the tower body load-bearing main iron member 1 are cut flat along the wall of the tower body load-bearing main iron member 1.
[0050] More specifically, by setting a through triangular punched groove 402 punched in the center of the triangular iron structure 401, the stability of the entire triangle is ensured, the consumables are reduced, and a lightweight design is achieved.
[0051] In the present invention, the first angle steel assembly through hole 2 is a hole position for assembling and connecting the tower body main material, the tower body oblique material and the tower body cross material through the angle steel member, and the second angle steel assembly through hole 3 is a hole position for assembling and connecting the tower body oblique material and the tower body cross material through the angle steel member; the apertures of the first angle steel assembly through hole 2 and the second angle steel assembly through hole 3 are equal, and the first angle steel assembly through hole 2 and the second angle steel assembly through hole 3 are distributed along the two side walls of the tower body load-bearing main iron member 1, and the first angle steel assembly through hole 2 and the second angle steel assembly through hole 3 on each side wall of the tower body load-bearing main iron member 1 are distributed along the same center line;
[0052] More specifically, the first angle steel assembly through hole 2 and the second angle steel assembly through hole 3 on each side wall of the tower body load-bearing main iron member 1 are distributed along the same center line, ensuring consistency of stress points after structural assembly.
[0053] In the present invention, the number of first angle steel assembly through holes 2 is sixteen, and eight of the sixteen first angle steel assembly through holes 2 are respectively arranged near both ends of the tower body load-bearing main iron member 1, and the eight first angle steel assembly through holes 2 at both ends of the tower body load-bearing main iron member 1 are symmetrically and equidistantly distributed along the two side walls thereof; the number of second angle steel assembly through holes 3 is twelve, and six of the twelve second angle steel assembly through holes 3 are respectively arranged in two sections near the middle of the tower body load-bearing main iron member 1, and the six second angle steel assembly through holes 3 in each section are symmetrically and equidistantly distributed along the two side walls thereof;
[0054] More specifically, the six second angle steel assembly through holes 3 of each section are symmetrically and evenly distributed along the two side walls thereof, so that during assembly and fixing, the points are evenly distributed, which is beneficial to the assembly operation.
[0055] In the present invention, the first angle steel end assembly bracket 5 and the first welding auxiliary bracket 6 are welded and installed on the inner wall of the tower body load-bearing main iron member 1 near the first angle steel assembly through hole 2, and the first welding auxiliary bracket 6 is welded and installed on the side of the first angle steel end assembly bracket 5 away from the first angle steel assembly through hole 2; the number of the first angle steel end assembly bracket 5 and the first welding auxiliary bracket 6 are both two, and the two first angle steel end assembly brackets 5 and the first welding auxiliary bracket 6 are respectively distributed on the opposite sides of the first angle steel assembly through holes 2 at both ends of the tower body load-bearing main iron member 1;
[0056] More specifically, by arranging the first welding auxiliary angle brackets 6 respectively distributed on the opposite sides of the first angle steel assembly through holes 2 at both ends of the tower body load-bearing main iron member 1, end connection assembly of the angle steel is provided at both ends, so that the assembly reinforcement at both ends is consistent.
[0057] In the present invention, the second angle steel end assembly bracket 10 and the second welding auxiliary bracket 11 are welded and installed on the inner wall of the tower body load-bearing main iron member 1 near the second angle steel assembly through hole 3, and the second welding auxiliary bracket 11 is welded and installed on the side of the second angle steel end assembly bracket 10 away from the second angle steel assembly through hole 3; the number of the second angle steel end assembly bracket 10 and the second welding auxiliary bracket 11 are both four, and the four second angle steel end assembly brackets 10 are respectively distributed on both sides of the two sections of the second angle steel assembly through hole 3;
[0058] More specifically, four second angle steel end assembly sheet frames 10 are arranged respectively on both sides of the two sections of second angle steel assembly through holes 3, so that the distribution is uniform, and the connected angle steel can be fixed at any end, thereby improving adaptability.
[0059] Working principle:
[0060] When assembling the entire tower body load-bearing main iron member 1, the first angle steel assembly through hole 2 at the end of the tower body load-bearing main iron member 1 is installed with the angle steel fixed to other main materials and horizontal and oblique iron members. When assembling the conventional two side walls, the end of the angle steel is pressed against the first angle steel end assembly frame 5. By assembling the end face of the angle steel with the first angle steel end assembly frame 5, if the end face against which the angle steel is pressed is through and lacks an end sheet structure, the end face of the angle steel can be welded with a pre-punched hole. The iron sheet component can also increase the installation points from the end face of the angle steel; similarly, when assembling the angle steel connecting the horizontal material and the oblique material at the second angle steel assembly through hole 3 in the middle of the tower body load-bearing main iron component 1, the angle steel is also abutted against the end face of the second angle steel end assembly plate frame 10 to assemble and fix the end face structure. If the angle steel lacks an end face fixing structure, the above-mentioned welding operation of the additional end plate structure of the angle steel connected to the first angle steel assembly through hole 2 is repeated, thereby realizing the assembly operation of increasing the connection structure points.
[0061] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0062] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A load-bearing iron component structure for a power tower, characterized in that: include: The tower body load-bearing main iron member (1) is an equilateral right-angle steel iron member; A first angle steel assembly through hole (2) and a second angle steel assembly through hole (3), wherein the first angle steel assembly through hole (2) and the second angle steel assembly through hole (3) are respectively provided at the end and the middle of the tower body load-bearing main iron member (1); A load-bearing reinforced triangular frame (4), wherein the load-bearing reinforced triangular frame (4) is welded and installed on the inner side of the tower body load-bearing main iron member (1) at a position away from the first angle steel assembly through hole (2) and the second angle steel assembly through hole (3); A first angle steel material end assembly frame (5) and a first welding auxiliary angle frame (6), wherein the first welding auxiliary angle frame (6) is welded and installed on the side wall edge of the first angle steel material end assembly frame (5), and the first angle steel material end assembly frame (5) and the first welding auxiliary angle frame (6) are both welded and fixed to the inner wall of the tower body load-bearing main iron member (1); The second angle steel material end assembly frame (10) and the second welding auxiliary angle frame (11) are welded and installed on the side wall edge of the second angle steel material end assembly frame (10). The second angle steel material end assembly frame (10) and the second welding auxiliary angle frame (11) are both welded and fixed to the inner wall of the tower body load-bearing main iron member (1).
2. The load-bearing iron component structure for a power tower body according to claim 1 is characterized in that: The first angle steel end assembly frame (5) comprises a first angle steel end assembly frame (501) and a first end assembly hole (502), wherein the first end assembly hole (502) is formed through the middle of the plate surface of the first angle steel end assembly frame (501); the second angle steel end assembly frame (10) comprises a second angle steel end assembly frame (1001) and a second end assembly hole (1002), wherein the second end assembly hole (1002) is formed through the plate surface of the second angle steel end assembly frame (1001), and the number of the second end assembly holes (1002) is two, and the two second end assembly holes (1002) are respectively located at diagonally opposite corners of the second angle steel end assembly frame (1001) close to the outer edge of the tower body load-bearing main iron member (1).
3. The load-bearing iron component structure for a power tower body according to claim 2, characterized in that: The first welding auxiliary angle frame (6) is welded and fixed to the edge of the first angle steel material end assembly plate frame (501), and welding straight grooves (7) are provided on both sides of the first welding auxiliary angle frame (6). Welding half grooves (8) are provided at both ends of the outer edge of the first welding auxiliary angle frame (6) away from the first angle steel material end assembly plate frame (501). The welding straight grooves (7) and welding half grooves (8) provided on both sides of the first welding auxiliary angle frame (6) are staggered, and the inner edges of the welding straight grooves (7) and welding half grooves (8) are provided with first welding auxiliary grooves (9).
4. The load-bearing iron component structure for a power tower body according to claim 2, characterized in that: The second welding auxiliary angle frame (11) is welded and fixed to the edge of the second angle steel material end assembly frame (1001); a welding point narrow diameter circular arc groove (12) is provided on the side of the second welding auxiliary angle frame (11) close to the second angle steel material end assembly frame (1001); a welding point wide diameter circular arc groove (13) is provided on the side of the second welding auxiliary angle frame (11) away from the second angle steel material end assembly frame (1001); the arc and depth of the welding point wide diameter circular arc groove (13) are greater than those of the welding point narrow diameter circular arc groove (12); and a second welding auxiliary groove (14) is provided at the inner edges of the welding point narrow diameter circular arc groove (12) and the welding point wide diameter circular arc groove (13).
5. The load-bearing iron component structure for a power tower body according to claim 1, characterized in that: The number of the load-bearing reinforced triangular sheet frames (4) is multiple, and the multiple load-bearing reinforced triangular sheet frames (4) are distributed in two sections, and each section of the load-bearing reinforced triangular sheet frames (4) is evenly distributed.
6. The load-bearing iron component structure for a power tower body according to claim 5, characterized in that: The load-bearing reinforced triangular sheet frame (4) comprises a triangular iron sheet (401) and a through triangular punched groove (402), wherein the through triangular punched groove (402) is punched and opened at the center of the plate surface of the triangular iron sheet (401), the triangular iron sheet (401) is an isosceles right-angled triangular iron sheet structure, and the right-angled two sides of the triangular iron sheet (401) are welded and fixed to the inner side of the tower body load-bearing main iron member (1), and the two acute angles of the triangular iron sheet (401) close to the outer edge of the tower body load-bearing main iron member (1) are cut flat along the wall of the tower body load-bearing main iron member (1).
7. The load-bearing iron component structure for a power tower body according to claim 1, characterized in that: The first angle steel assembly through hole (2) is a hole position for assembling and connecting the tower body main material, the tower body oblique material and the tower body cross member through the angle steel member, and the second angle steel assembly through hole (3) is a hole position for assembling and connecting the tower body oblique material and the tower body cross member through the angle steel member; the first angle steel assembly through hole (2) and the second angle steel assembly through hole (3) have the same hole diameter, the first angle steel assembly through hole (2) and the second angle steel assembly through hole (3) are both distributed along the two side walls of the tower body load-bearing main iron member (1), and the first angle steel assembly through hole (2) and the second angle steel assembly through hole (3) on each side wall of the tower body load-bearing main iron member (1) are distributed on the same center line.
8. The load-bearing iron component structure for a power tower body according to claim 7, characterized in that: The number of the first angle steel assembly through holes (2) is sixteen, and eight of the sixteen first angle steel assembly through holes (2) are respectively arranged near both ends of the tower body load-bearing main iron member (1), and the eight first angle steel assembly through holes (2) at both ends of the tower body load-bearing main iron member (1) are symmetrically and evenly distributed along its two side walls; the number of the second angle steel assembly through holes (3) is twelve, and six of the twelve second angle steel assembly through holes (3) are respectively arranged in two sections near the middle of the tower body load-bearing main iron member (1), and the six second angle steel assembly through holes (3) in each section are symmetrically and evenly distributed along its two side walls.
9. The load-bearing iron component structure for a power tower body according to claim 8, characterized in that: The first angle steel end assembly frame (5) and the first welding auxiliary angle frame (6) are welded and installed on the inner wall of the tower body load-bearing main iron member (1) near the first angle steel assembly through hole (2), and the first welding auxiliary angle frame (6) is welded and installed on the side of the first angle steel end assembly frame (5) away from the first angle steel assembly through hole (2); the number of the first angle steel end assembly frame (5) and the first welding auxiliary angle frame (6) is two, and the two first angle steel end assembly frame (5) and the first welding auxiliary angle frame (6) are respectively distributed on the opposite sides of the first angle steel assembly through holes (2) at both ends of the tower body load-bearing main iron member (1).
10. The load-bearing iron component structure for a power tower body according to claim 8, characterized in that: The second angle steel end assembly frame (10) and the second welding auxiliary angle frame (11) are welded and installed on the inner wall of the tower body load-bearing main iron member (1) near the second angle steel assembly through hole (3), and the second welding auxiliary angle frame (11) is welded and installed on the side of the second angle steel end assembly frame (10) away from the second angle steel assembly through hole (3); the number of the second angle steel end assembly frame (10) and the second welding auxiliary angle frame (11) are both four, and the four second angle steel end assembly frame (10) are respectively distributed on both sides of the two sections of the second angle steel assembly through hole (3).