Enterprise asset management method and system for asset full life cycle
By obtaining the asset management stage and related information of enterprise assets, using the asset management adjustment model to determine the asset management switching factor, and providing asset management switching suggestions, it solves the problem of difficult to efficiently manage the asset utilization method in the existing technology, and achieves smarter and more efficient asset management.
Patent Information
- Application Number
- CN202510091291.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-21
- Publication Date
- 2025-02-28
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
It is difficult for the existing technology to efficiently manage the use of assets throughout the entire life cycle of assets, especially in the links such as asset leasing and sale.
By obtaining the asset management stage and related information of the enterprise's assets, using the asset management adjustment model to determine the asset management switching factor, and then providing asset management switching suggestions to optimize the way of asset utilization.
It improves the intelligence and effectiveness of asset management, and can adjust asset management strategies more scientifically and maximize the utilization of asset value.
Smart Images

Figure CN119539296A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of enterprise asset management, and more specifically, to an enterprise asset management method and system for the entire life cycle of assets. Background Art
[0002] Enterprise Asset Management (EAM) systems are used to manage and optimize the entire life cycle of an enterprise's physical assets. EAM systems can help enterprises effectively plan, operate, maintain and retire their assets, thereby improving asset utilization efficiency and reliability and reducing maintenance costs. Traditional asset management methods are mostly manual records and paper document management, which is not only inefficient but also prone to information lags and errors. Modern enterprise asset management systems integrate information technology to achieve full life cycle management of assets from asset procurement, use, maintenance to scrapping. This management method not only improves asset utilization and production efficiency, but also reduces failure rates and maintenance costs through preventive maintenance and data analysis.
[0003] In the existing enterprise asset management, there are three ways to use assets: directly producing products or services, leasing assets, and selling assets. Directly producing products or services through assets is the most basic way to use enterprise assets. Leasing and selling assets are important links in enterprise asset management, especially in the middle and late stages of the asset life cycle. These two methods can help enterprises optimize asset allocation and maximize the use of asset value. In the asset leasing model, enterprises lease idle or redundant assets to third parties for use, which not only reduces the idle cost of assets, but also obtains additional income through rental income. The management of leasing and selling assets involves complex contract management, asset tracking and maintenance, and traditional asset management methods are difficult to cope with these challenges. Existing asset management methods are difficult to efficiently manage the use of assets throughout the entire life cycle of assets. Summary of the invention
[0004] The purpose of this application is to provide an enterprise asset management method and system for the entire life cycle of assets, which solves the technical problem of difficulty in efficiently managing the way assets are used throughout the entire life cycle of assets, and achieves the technical effect of efficiently managing the way assets are used throughout the entire life cycle of assets.
[0005] An embodiment of the present application provides an enterprise asset management method for the entire life cycle of assets, the method comprising: obtaining the asset management stage of the enterprise assets and the asset management information corresponding to the asset management stage; determining an asset management switching factor according to the asset management stage and the asset management information corresponding to the asset management stage through an asset management adjustment model, and determining an asset management switching recommendation for the enterprise assets according to the asset management switching factor.
[0006] In one possible implementation, asset management stages of enterprise assets and asset management information corresponding to the asset management stages are obtained, including: obtaining, through an enterprise asset management component, multiple asset management stages of enterprise assets in management and multiple asset management information corresponding to each asset management stage, and performing data integrity verification on the multiple asset management stages of enterprise assets and the multiple asset management information corresponding to each asset management stage through the enterprise asset management component; when the multiple asset management stages of enterprise assets and the multiple asset management information corresponding to each asset management stage pass the data integrity verification, the multiple asset management stages and the multiple asset management information corresponding to each asset management stage are sent to the data analysis component.
[0007] In another possible implementation, a data integrity check is performed on multiple asset management stages of enterprise assets and multiple asset management information corresponding to each asset management stage through an enterprise asset management component, including: obtaining management time periods corresponding to all asset management stages of the enterprise assets, and when the blank time between all management time periods is greater than or equal to a preset blank time, determining that the multiple asset management stages of the enterprise assets and the multiple asset management information corresponding to each asset management stage do not pass the data integrity check; when the blank time between all management time periods is less than a preset blank time, determining that the multiple asset management stages of the enterprise assets and the multiple asset management information corresponding to each asset management stage pass the data integrity check.
[0008] In another possible implementation, data integrity verification is performed on multiple asset management stages of enterprise assets and multiple asset management information corresponding to each asset management stage through an enterprise asset management component, which also includes: when the asset management stage is a leasing stage, obtaining asset leasing contract information and asset leasing contract terms corresponding to the leasing stage; when the blank time between all management time periods is less than a preset blank time, and when the asset leasing contract information and the asset leasing contract terms meet the preset leasing contract conditions, it is determined that the multiple asset management stages of enterprise assets and the multiple asset management information corresponding to each asset management stage have passed the data integrity verification; when the asset management stage is a selling stage, the asset leasing contract information, asset leasing contract terms and asset acceptance information at the end of the asset leasing are obtained; when the blank time between all management time periods is less than a preset blank time, when the asset leasing contract information and the asset leasing contract terms meet the preset leasing contract conditions, and when the asset acceptance information meets the preset asset acceptance information conditions, it is determined that the multiple asset management stages of enterprise assets and the multiple asset management information corresponding to each asset management stage have passed the data integrity verification.
[0009] In another possible implementation, an asset management switching factor is determined according to the asset management stage and the asset management information corresponding to the asset management stage through an asset management adjustment model, including: when the asset management stage is the production stage, the asset management switching factor is determined according to the production status information and asset maintenance information in the production stage through the asset management adjustment model in the data analysis component; when the asset management stage is the leasing stage, the asset management switching factor is determined according to the production status information and asset maintenance information in the production stage, and the production status information and asset maintenance information in the leasing stage through the asset management adjustment model in the data analysis component; when the asset management stage is the selling stage, the asset management switching factor is determined according to the production status information and asset maintenance information in the production stage, the production status information and asset maintenance information in the leasing stage, the selling stage duration and the potential buyer's bid information in the selling stage through the asset management adjustment model in the data analysis component.
[0010] In another possible implementation, asset management switching recommendations for enterprise assets are determined based on asset management switching factors, including: when the asset management switching factor satisfies a first switching condition, determining the asset management switching recommendation as switching the asset management stage corresponding to the enterprise assets to the production stage; when the asset management switching factor satisfies a second switching condition, determining the asset management switching recommendation as switching the asset management stage corresponding to the enterprise assets to the leasing stage; when the asset management switching factor satisfies a third switching condition, determining the asset management switching recommendation as switching the asset management stage corresponding to the enterprise assets to the selling stage.
[0011] In another possible implementation, the method also includes: when the asset management switching factor satisfies the first switching condition, obtaining the market evaluation index of the product or service produced by the enterprise assets; when the market evaluation index satisfies the preset first market evaluation index condition, determining the asset management switching recommendation to switch the asset management stage corresponding to the enterprise assets to the production stage; when the market evaluation index does not meet the preset first market evaluation index condition, determining the asset management switching recommendation to switch the asset management stage corresponding to the enterprise assets to the leasing stage.
[0012] In another possible implementation, the method also includes: when the asset management switching factor satisfies the third switching condition, obtaining the market evaluation index of the product or service produced by the enterprise assets; when the market evaluation index satisfies the preset second market evaluation index condition, determining the asset management switching recommendation to switch the asset management stage corresponding to the enterprise assets to the selling stage; when the market evaluation index does not meet the preset second market evaluation index condition, determining the asset management switching recommendation to switch the asset management stage corresponding to the enterprise assets to the leasing stage.
[0013] An embodiment of the present application also provides an enterprise asset management system for the entire life cycle of an asset, including a unit for executing any of the methods described above.
[0014] An embodiment of the present application also provides an enterprise asset management system for the entire life cycle of an asset, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements any of the methods described above when executing the computer program.
[0015] An embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method described in any one of the above items is implemented.
[0016] An embodiment of the present application also provides a computer program product, including a computer program, which implements the steps of any of the methods described above when executed by a processor.
[0017] Compared with the prior art, the embodiments of the present invention have the following beneficial effects: The embodiment of the present application provides an enterprise asset management method for the entire life cycle of assets, and the method includes: obtaining the asset management stage of the enterprise assets and the asset management information corresponding to the asset management stage; determining the asset management switching factor according to the asset management stage and the asset management information corresponding to the asset management stage through the asset management adjustment model, and determining the asset management switching suggestion for the enterprise assets according to the asset management switching factor. In the embodiment of the present application, whether the asset management method needs to be switched is determined by the asset management information in the asset management stage, which improves the intelligence of asset management and can improve the effect of asset management. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0019] Figure 1 A flowchart of an enterprise asset management method for the entire asset life cycle provided in an embodiment of the present application; Figure 2 A schematic diagram of a workflow of an enterprise asset management method for the entire asset life cycle provided in an embodiment of the present application; Figure 3 A flowchart of another enterprise asset management method for the entire asset life cycle provided by an embodiment of the present application; Figure 4 A schematic diagram of another workflow of an enterprise asset management method for the entire asset life cycle provided in an embodiment of the present application; Figure 5 A logical structure diagram of an enterprise asset management system for the entire life cycle of an asset provided by an embodiment of the present application; Figure 6 A schematic diagram of the entity structure of an enterprise asset management system for the entire life cycle of assets provided in an embodiment of the present application. DETAILED DESCRIPTION
[0020] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, wholes, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or combinations thereof.
[0021] It should also be understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.
[0022] As used in the specification and appended claims of this application, the term "if" can be interpreted as "when" or "uponce" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrase "if it is determined" or "if [described condition or event] is detected" can be interpreted as meaning "uponce it is determined" or "in response to determining" or "uponce [described condition or event] is detected" or "in response to detecting [described condition or event]", depending on the context.
[0023] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.
[0024] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.
[0025] In existing enterprise asset management, assets can be used in three ways: directly producing products or services, leasing assets, and selling assets. The existing asset management methods make it difficult to efficiently manage the way assets are used throughout their entire life cycle.
[0026] Based on the above reasons, an embodiment of the present application provides an enterprise asset management method for the entire life cycle of assets, and the method includes: obtaining the asset management stage of the enterprise assets and the asset management information corresponding to the asset management stage; determining the asset management switching factor according to the asset management stage and the asset management information corresponding to the asset management stage through the asset management adjustment model, and determining the asset management switching suggestion for the enterprise assets according to the asset management switching factor. In the embodiment of the present application, whether it is necessary to switch the asset management method is determined through the asset management information in the asset management stage, which improves the intelligence level of asset management and can improve the effect of asset management.
[0027] In some scenarios, an enterprise asset management method for the entire life cycle of an asset in an embodiment of the present application can be applied to asset management, which can optimize the enterprise's asset management methods, improve the intelligence of the enterprise's management decisions on various assets, and improve the asset management effects of multiple assets.
[0028] The following is a specific example of an enterprise asset management method for the entire life cycle of assets provided by an embodiment of the present application.
[0029] Figure 1 A flowchart of an enterprise asset management method for the entire asset life cycle provided in an embodiment of the present application is shown in FIG. Figure 1 As shown, the method includes S110 to S120, and S110 to S120 are described in detail below.
[0030] S110. Obtain the asset management stage of the enterprise assets and the asset management information corresponding to the asset management stage.
[0031] Figure 2 A workflow diagram of an enterprise asset management method for the entire asset life cycle provided in an embodiment of the present application is as follows: Figure 2 As shown, in the embodiment of the present application, in order to improve the asset management effect, the asset management stage of the enterprise assets and the asset management information corresponding to the asset management stage can be obtained, and then the enterprise's asset management strategy can be optimized according to the asset management stage of the enterprise assets and the asset management information corresponding to the asset management stage.
[0032] Exemplarily, the asset management stage of enterprise assets generally includes different asset management stages for asset management and utilization such as production of products or services, asset leasing and asset sales. Enterprise assets have different characteristics in different management methods used for production of products or services, asset leasing and asset sales. Therefore, the asset management method can be adjusted according to the asset management stage of the enterprise assets and the asset management information corresponding to the asset management stage to improve the enterprise's asset management effect.
[0033] S120. Determine an asset management switching factor according to the asset management stage and the asset management information corresponding to the asset management stage through the asset management adjustment model, and determine an asset management switching recommendation for the enterprise assets according to the asset management switching factor.
[0034] When adjusting the asset management method, the asset management adjustment model can be used to determine the asset management switching factor based on the asset management stage and the asset management information corresponding to the asset management stage. The asset management switching factor represents the asset management characteristics determined by the current asset management stage and the asset management information corresponding to the asset management stage. Furthermore, the asset management switching recommendations for the enterprise's assets can be determined based on the asset management switching factor to achieve adjustments to the asset management method.
[0035] Exemplarily, the asset management switching factor can be represented by a numerical value, and then the asset management switching factor can be used to determine whether the asset management method needs to be switched, and the specific asset management method can be determined based on the asset management switching factor.
[0036] Exemplarily, the asset management adjustment model may be a neural network model trained by using collected asset management data.
[0037] The beneficial effect of the above-mentioned implementation method is that by adjusting the asset management method according to the asset management stage of the enterprise assets and the asset management information corresponding to the asset management stage, the scientific nature of the asset management method can be improved, and the scientific nature of the enterprise's adjustment of the asset management strategy and the asset utilization efficiency can be improved.
[0038] The beneficial effect of the above implementation method is that the asset management strategy is adjusted according to the asset management stage and the asset management information corresponding to the asset management stage, and assets can be switched between different asset management stages, thereby improving the flexibility and management effect of asset management.
[0039] Figure 3 A flowchart of another enterprise asset management method for the entire asset life cycle provided in an embodiment of the present application is as follows: Figure 3 As shown, in the above S110, the asset management stage of the enterprise assets and the asset management information corresponding to the asset management stage are obtained, including S111 to S112, and S111 to S112 are specifically described below.
[0040] S111. Obtain, through the enterprise asset management component, multiple asset management stages of the enterprise assets in management and multiple asset management information corresponding to each asset management stage, and perform data integrity verification on the multiple asset management stages of the enterprise assets and multiple asset management information corresponding to each asset management stage through the enterprise asset management component.
[0041] Figure 4 A workflow diagram of another enterprise asset management method for the entire asset life cycle provided in an embodiment of the present application is shown in FIG. Figure 4As shown, in an embodiment of the present application, in order to make asset management decisions based on asset management stages and asset management information corresponding to the asset management stages, the enterprise asset management component can be used to first obtain multiple asset management stages in the management of enterprise assets and multiple asset management information corresponding to each asset management stage.
[0042] Exemplarily, the enterprise asset management component is a data management system including a front-end page.
[0043] Exemplarily, when the enterprise asset management component obtains multiple asset management stages in the management of enterprise assets and multiple asset management information corresponding to each asset management stage, it can collect the management stage of the asset through RFID tags and obtain multiple asset management information corresponding to each asset management stage, thereby realizing rapid acquisition of asset management information of enterprise assets based on the Internet of Things.
[0044] After obtaining multiple asset management stages and multiple asset management information corresponding to each asset management stage, such as Figure 3 As shown, in order to ensure the reliability of subsequent adjustments to the asset management strategy, the enterprise asset management component can perform data integrity verification on multiple asset management stages of the enterprise assets and multiple asset management information corresponding to each asset management stage.
[0045] S112. When the multiple asset management stages of the enterprise assets and the multiple asset management information corresponding to each asset management stage pass the data integrity check, the multiple asset management stages and the multiple asset management information corresponding to each asset management stage are sent to the data analysis component.
[0046] After performing data integrity verification on multiple asset management stages and multiple asset management information corresponding to each asset management stage, when the multiple asset management stages of the enterprise assets and the multiple asset management information corresponding to each asset management stage pass the data integrity verification, it means that the next step of asset management strategy adjustment can be carried out, and then the multiple asset management stages and the multiple asset management information corresponding to each asset management stage can be sent to the data analysis component to facilitate the asset management strategy adjustment through the data analysis component.
[0047] When multiple asset management stages of an enterprise's assets and multiple asset management information corresponding to each asset management stage do not pass the data integrity check, the enterprise asset management component can prompt the user to complete the multiple asset management stages and multiple asset management information corresponding to each asset management stage to improve the reliability of asset management.
[0048] Exemplarily, the data analysis component may be a data analysis system independent of the enterprise asset management component, through which data analysis and mining can be performed to improve the effectiveness of asset management.
[0049] The beneficial effect of the above implementation method is that, by performing data integrity verification on multiple asset management stages of enterprise assets and multiple asset management information corresponding to each asset management stage through the enterprise asset management component, the reliability of subsequent adjustments to the asset management strategy can be ensured.
[0050] The beneficial effect of the above implementation method is that it provides decision-making support for asset management through data analysis components, thereby improving the intelligence level and management effect of asset management.
[0051] In some implementations, in the above S111, the enterprise asset management component performs data integrity verification on multiple asset management stages of enterprise assets and multiple asset management information corresponding to each asset management stage, including: obtaining management time periods corresponding to all asset management stages of enterprise assets, and when the blank time between all management time periods is greater than or equal to a preset blank time, determining that the multiple asset management stages of enterprise assets and the multiple asset management information corresponding to each asset management stage do not pass the data integrity verification. When the blank time between all management time periods is less than the preset blank time, determining that the multiple asset management stages of enterprise assets and the multiple asset management information corresponding to each asset management stage pass the data integrity verification.
[0052] When performing data integrity verification, the management time periods corresponding to all asset management stages of the enterprise assets can be obtained. The management time period is the time period in which each asset management stage is located.
[0053] Exemplarily, the management time period may be a lease management time period from December 1, 2022 to December 1, 2023.
[0054] After obtaining the management time periods corresponding to all asset management stages, when the blank duration between all management time periods is greater than or equal to the preset blank duration, it means that the blank duration between all management time periods is large, and some management time periods corresponding to some asset management stages may be missing, resulting in incomplete multiple asset management stages and multiple asset management information corresponding to each asset management stage. It can be determined that the multiple asset management stages of the enterprise assets and the multiple asset management information corresponding to each asset management stage do not pass the data integrity check, and it is necessary to complete the multiple asset management stages and the multiple asset management information corresponding to each asset management stage.
[0055] Exemplarily, the preset blank period may be 1 month.
[0056] Exemplarily, the preset blank period may be determined according to the enterprise asset type of the enterprise asset, so that the preset blank period can adapt to the asset management of enterprise assets of different enterprise asset types.
[0057] After obtaining the management time periods corresponding to all asset management stages, when the blank time between all management time periods is less than the preset blank time, it means that the blank time between all management time periods is small, and the management time periods corresponding to the asset management stages are not missing, and thus it can be determined that multiple asset management stages of the enterprise assets and multiple asset management information corresponding to each asset management stage have passed the data integrity verification, and thus intelligent decisions can be made on the asset management method through multiple asset management stages and multiple asset management information corresponding to each asset management stage.
[0058] The beneficial effect of the above-mentioned implementation method is that by performing data integrity verification on multiple asset management stages and multiple asset management information corresponding to each asset management stage based on the blank time between all management time periods being greater than or equal to the preset blank time, the intelligence level of intelligent decision-making on asset management methods can be improved.
[0059] The beneficial effect of the above-mentioned implementation method is that the data integrity verification of enterprise assets improves the data integrity of asset management from the source, can ensure that there are no data gaps in asset management, and improve the asset management effect.
[0060] In some implementations, in the above S111, the enterprise asset management component performs data integrity verification on multiple asset management stages of enterprise assets and multiple asset management information corresponding to each asset management stage, and further includes: when the asset management stage is the leasing stage, the asset leasing contract information and asset leasing contract terms corresponding to the leasing stage are obtained. When the blank duration between all management time periods is less than the preset blank duration, and when the asset leasing contract information and the asset leasing contract terms meet the preset leasing contract conditions, it is determined that the multiple asset management stages of enterprise assets and the multiple asset management information corresponding to each asset management stage pass the data integrity verification. When the asset management stage is the selling stage, the asset leasing contract information, asset leasing contract terms and asset acceptance information at the end of the asset leasing are obtained. When the blank duration between all management time periods is less than the preset blank duration, when the asset leasing contract information and the asset leasing contract terms meet the preset leasing contract conditions, and when the asset acceptance information meets the preset asset acceptance information conditions, it is determined that the multiple asset management stages of enterprise assets and the multiple asset management information corresponding to each asset management stage pass the data integrity verification.
[0061] When performing data integrity verification, data integrity verification can be performed based on the characteristics of the specific asset management stage to ensure the accuracy and scientificity of the switching recommendations for the subsequent asset management stage.
[0062] When the asset management stage is the leasing stage, in order to ensure the accuracy and scientificity of the intelligent switching suggestions for the asset management stage, the asset lease contract information and asset lease contract terms corresponding to the leasing stage can be obtained, and the asset management switching suggestions can be determined based on the asset lease contract information and asset lease contract terms corresponding to the leasing stage.
[0063] Exemplarily, the asset lease contract information may include information such as the counterparty information of the asset lease contract and the term of the asset lease contract.
[0064] Illustratively, the terms of an asset lease contract may include the specific contract terms of the asset lease, the consideration information for the asset lease, etc.
[0065] When the blank time between all management time periods is less than the preset blank time, and when the asset lease contract information and the asset lease contract terms meet the preset lease contract conditions, it means that there is no data missing in time between all management time periods, and the content of the asset lease contract information and the asset lease contract terms is not missing. It can be determined that multiple asset management stages of the enterprise's assets and the multiple asset management information corresponding to each asset management stage have passed the data integrity check. Subsequently, the asset management switching recommendations can be determined based on the multiple asset management stages and the multiple asset management information corresponding to each asset management stage, the asset lease contract information and the content of the asset lease contract terms, which can improve the reliability and scientificity of determining the asset management switching recommendations.
[0066] When performing data integrity verification, when the asset management stage is the sales stage, the asset lease contract information, asset lease contract terms and asset acceptance information at the end of the asset lease corresponding to the lease stage can be obtained, and then the asset management switching recommendation can be determined based on the data and asset acceptance information during the asset lease process.
[0067] When the blank time between all management time periods is less than the preset blank time, when the asset lease contract information and the asset lease contract terms meet the preset lease contract conditions, and when the asset acceptance information meets the preset asset acceptance information conditions, it means that there is no data missing in time between all management time periods, and the content of the asset lease contract information and the asset lease contract terms are not missing, and the asset acceptance information at the end of the lease meets the requirements, and then it can be determined that the multiple asset management stages of the enterprise assets and the multiple asset management information corresponding to each asset management stage have passed the data integrity check, and the asset management switching suggestion can be determined according to the asset lease contract information corresponding to the lease stage, the asset lease contract terms and the asset acceptance information at the end of the asset lease, which can improve the reliability and scientificity of determining the asset management switching suggestion.
[0068] Exemplarily, the asset acceptance information at the end of the asset lease may include asset status information, asset location information, etc.
[0069] The beneficial effect of the above-mentioned implementation method is that when the asset management stage is the leasing stage, the blank time between all management time periods is less than the preset blank time, and when the asset lease contract information and the asset lease contract terms meet the preset lease contract conditions as data integrity verification conditions, the scientificity and accuracy of the asset management switching recommendations determined in the leasing stage can be guaranteed.
[0070] The beneficial effect of the above-mentioned implementation method is that when the asset management stage is the sales stage, the asset lease contract information, asset lease contract terms and asset acceptance information at the end of the asset lease corresponding to all lease stages are used as data integrity verification conditions, which can ensure the scientificity and accuracy of the asset management switching recommendations determined in the sales stage.
[0071] In some implementations, in the above S120, the asset management switching factor is determined according to the asset management stage and the asset management information corresponding to the asset management stage through the asset management adjustment model, including: when the asset management stage is the production stage, the asset management switching factor is determined according to the production status information and asset maintenance information in the production stage through the asset management adjustment model in the data analysis component. When the asset management stage is the leasing stage, the asset management switching factor is determined according to the production status information and asset maintenance information in the production stage, and the production status information and asset maintenance information in the leasing stage through the asset management adjustment model in the data analysis component. When the asset management stage is the selling stage, the asset management switching factor is determined according to the production status information and asset maintenance information in the production stage, the production status information and asset maintenance information in the leasing stage, the selling stage duration in the selling stage, and the bid information of the potential buyer through the asset management adjustment model in the data analysis component.
[0072] When determining the asset management switching recommendation, when the asset management stage is the production stage, the asset management adjustment model in the data analysis component can be used to determine the asset management switching factor based on the production status information and asset maintenance information in the production stage, so as to determine whether the asset management method needs to be switched based on the production status information and asset maintenance information, thereby improving the accuracy and scientificity of determining whether the asset management method needs to be switched in the production stage.
[0073] Exemplarily, the production status information and asset maintenance information within the production stage may include information such as the production output and asset maintenance cost of the assets within the production period.
[0074] When the asset management stage is the leasing stage, the asset management adjustment model in the data analysis component can be used to determine the asset management switching factor based on the production status information and asset maintenance information in the production stage and the production status information and asset maintenance information in the leasing stage. This can achieve a comprehensive determination of whether the asset management method needs to be switched based on the production status information and asset maintenance information in the production stage and the production status information and asset maintenance information in the leasing stage, thereby improving the accuracy and scientificity of determining whether the asset management method in the leasing stage needs to be switched.
[0075] Exemplarily, the production status information and asset maintenance information during the lease period may include information such as the production output and asset maintenance costs of the assets during the lease period.
[0076] When the asset management stage is the selling stage, the asset management adjustment model in the data analysis component can be used to determine the asset management switching factor based on the production status information and asset maintenance information in the production stage, the production status information and asset maintenance information in the leasing stage, the selling stage duration and the bid information of potential buyers in the selling stage. This can comprehensively determine whether the asset management method needs to be switched based on the production status information and asset maintenance information in the production stage, the production status information and asset maintenance information in the leasing stage, the selling stage duration and the bid information of potential buyers in the selling stage, thereby improving the accuracy and scientificity of the asset management method for determining whether the asset management method in the selling stage needs to be switched.
[0077] For example, the potential buyer's bid information may include the current value of the asset and the buyer's bid information.
[0078] The beneficial effect of the above implementation method is that it determines whether the asset management method needs to be switched based on the production status information and the asset maintenance information, thereby improving the accuracy and scientificity of determining the asset management method within the production stage.
[0079] The beneficial effect of the above-mentioned implementation method is that it is to comprehensively determine whether the asset management method needs to be switched based on the production status information and asset maintenance information in the production stage and the production status information and asset maintenance information in the leasing stage, thereby improving the accuracy and scientificity of determining whether the asset management method in the leasing stage needs to be switched.
[0080] The beneficial effect of the above-mentioned implementation method is that it is determined comprehensively whether the asset management method needs to be switched based on the production status information and asset maintenance information in the production stage, the production status information and asset maintenance information in the leasing stage, the duration of the selling stage and the bidding information of potential buyers in the selling stage, thereby improving the accuracy and scientificity of determining whether the asset management method needs to be switched in the selling stage.
[0081] In some implementations, determining an asset management switching suggestion for an enterprise asset based on an asset management switching factor includes: when the asset management switching factor satisfies a first switching condition, determining the asset management switching suggestion is to switch the asset management stage corresponding to the enterprise asset to the production stage. When the asset management switching factor satisfies a second switching condition, determining the asset management switching suggestion is to switch the asset management stage corresponding to the enterprise asset to the leasing stage. When the asset management switching factor satisfies a third switching condition, determining the asset management switching suggestion is to switch the asset management stage corresponding to the enterprise asset to the selling stage.
[0082] After obtaining the asset management switching factor, when the asset management switching factor meets the first switching condition, the asset management switching suggestion can be determined to switch the asset management stage corresponding to the enterprise assets to the production stage. Subsequently, the asset management stage can be switched to the production stage for management according to the asset management switching suggestion, so as to improve the management efficiency of the enterprise assets through the production stage and realize the maximum utilization value of the enterprise assets.
[0083] Exemplarily, the asset management switching factor satisfying the first switching condition may be that the asset management switching factor is within a numerical range corresponding to the first switching condition.
[0084] After obtaining the asset management switching factor, when the asset management switching factor meets the second switching condition, the asset management switching suggestion is determined to switch the asset management stage corresponding to the enterprise assets to the leasing stage. Subsequently, the asset management stage can be switched to the leasing stage according to the asset management switching suggestion, so as to maximize the asset management value through the leasing stage.
[0085] Exemplarily, the asset management switching factor satisfying the second switching condition may be that the asset management switching factor is within a numerical range corresponding to the second switching condition.
[0086] After obtaining the asset management switching factor, when the asset management switching factor meets the third switching condition, the asset management switching suggestion is determined to switch the asset management stage corresponding to the enterprise assets to the sales stage. Subsequently, the asset management stage corresponding to the enterprise assets can be switched to the sales stage according to the asset management switching suggestion, so as to maximize the asset utilization value through the sales stage.
[0087] Exemplarily, the asset management switching factor satisfying the third switching condition may be that the asset management switching factor is within a numerical range corresponding to the third switching condition.
[0088] The beneficial effect of the above implementation method is that according to the different conditions satisfied by the asset management switching factor and the asset management switching suggestion, the asset management stage corresponding to the enterprise assets is switched to the production stage, the leasing stage and the sales stage, so as to maximize the management value of the enterprise assets.
[0089] In some implementations, the above method further includes: when the asset management switching factor meets the first switching condition, obtaining the market evaluation index of the product or service produced by the enterprise asset, and when the market evaluation index meets the preset first market evaluation index condition, determining the asset management switching suggestion to switch the asset management stage corresponding to the enterprise asset to the production stage. When the market evaluation index does not meet the preset first market evaluation index condition, determining the asset management switching suggestion to switch the asset management stage corresponding to the enterprise asset to the leasing stage.
[0090] After obtaining the asset management switching factor, and when the asset management switching factor meets the first switching condition, the market evaluation index of the products or services produced by the enterprise assets can be obtained. The market evaluation index characterizes the market prospect characteristics of the products or services produced by the enterprise assets in the production stage, and then the market evaluation index can be used to further determine whether it is necessary to switch the asset management stage of the enterprise assets.
[0091] For example, the market evaluation index can be obtained by quantitatively evaluating the market share of products or services produced by the enterprise assets, the predicted sales growth rate, etc.
[0092] When the asset management switching factor meets the first switching condition and when the market evaluation index meets the preset first market evaluation index condition, it means that the market evaluation prospects of the products or services produced by the enterprise assets are good. Therefore, the asset management switching recommendation can be determined as switching the asset management stage corresponding to the enterprise assets to the production stage, which can improve the management effect of the enterprise assets.
[0093] Exemplarily, the market evaluation index satisfying a preset first market evaluation index condition may be that the market evaluation index is within a numerical range corresponding to the preset first market evaluation index condition.
[0094] When the asset management switching factor meets the first switching condition and when the market evaluation index does not meet the preset first market evaluation index condition, it means that the market evaluation prospects of the products or services produced by the enterprise assets are not good. Therefore, it can be determined that the asset management switching recommendation is to switch the asset management stage corresponding to the enterprise assets to the leasing stage, which can improve the management effect of the enterprise assets through the leasing management model.
[0095] The beneficial effect of the above-mentioned implementation method is that when the asset management switching factor meets the first switching condition, it is further determined whether it is necessary to recommend the asset management switch to switch the asset management stage corresponding to the enterprise assets to the production stage based on the market evaluation prospects of the products or services produced by the enterprise assets. When the market evaluation prospects of the products or services produced by the enterprise assets are good, the management effect of the enterprise assets in the production stage can be improved.
[0096] The beneficial effect of the above-mentioned implementation method is that when the asset management switching factor meets the first switching condition and the market evaluation prospects of the products or services produced by the enterprise assets are not good, the asset management stage corresponding to the enterprise assets is switched to the leasing stage, which can improve the management effect of the enterprise assets through the leasing management model.
[0097] In some implementations, the above method further includes: when the asset management switching factor satisfies the third switching condition, obtaining the market evaluation index of the product or service produced by the enterprise asset, and when the market evaluation index satisfies the preset second market evaluation index condition, determining the asset management switching suggestion to switch the asset management stage corresponding to the enterprise asset to the selling stage. When the market evaluation index does not satisfy the preset second market evaluation index condition, determining the asset management switching suggestion to switch the asset management stage corresponding to the enterprise asset to the leasing stage.
[0098] After obtaining the asset management switching factor, when the asset management switching factor meets the third switching condition, the market evaluation index of the products or services produced by the enterprise assets can be further obtained. The market evaluation index of the products or services produced by the enterprise assets characterizes the market prospect characteristics of the products or services produced by the enterprise assets, and then whether it is necessary to switch the asset management stage to the leasing stage can be evaluated based on the market prospect of the products or services produced by the enterprise assets.
[0099] When the asset management switching factor meets the third switching condition and when the market evaluation index meets the preset second market evaluation index condition, it means that the market prospects of the products or services produced by the enterprise assets are good. The asset management switching recommendation can be further determined as switching the asset management stage corresponding to the enterprise assets to the sales stage, so as to improve the asset efficiency of the assets themselves through the sales stage.
[0100] Exemplarily, the market evaluation index satisfying a preset second market evaluation index condition may be that the market evaluation index is within a numerical range corresponding to the preset second market evaluation index condition.
[0101] Exemplarily, the numerical range corresponding to the preset first market evaluation index condition and the numerical range corresponding to the preset second market evaluation index condition may be different from each other.
[0102] When the asset management switching factor meets the third switching condition and when the market evaluation index does not meet the preset second market evaluation index condition, it means that the market prospects of the products or services produced by the enterprise assets are not good. It can be determined that the asset management switching recommendation is to switch the asset management stage corresponding to the enterprise assets to the leasing stage, so as to improve the management efficiency of the assets themselves through the leasing stage.
[0103] The beneficial effect of the above-mentioned implementation method is that when the asset management switching factor meets the third switching condition, the market evaluation index of the products or services produced by the enterprise assets is further obtained. When the market evaluation index indicates that the market prospects of the products or services produced by the enterprise assets are good, the asset management switching recommendation is determined to switch the asset management stage corresponding to the enterprise assets to the sales stage, so as to improve the asset efficiency of the assets themselves through the sales stage.
[0104] The beneficial effect of the above-mentioned implementation method is that when the asset management switching factor meets the third switching condition, the market evaluation index of the products or services produced by the enterprise assets is further obtained. When the market evaluation index indicates that the market prospects of the products or services produced by the enterprise assets are not good, the asset management switching recommendation is determined to switch the asset management stage corresponding to the enterprise assets to the leasing stage, so as to improve the management efficiency of the assets themselves through the leasing stage.
[0105] An embodiment of the present application also provides an enterprise asset management system for the entire life cycle of an asset, including a unit for executing any of the methods described above.
[0106] Figure 5 A logical structure diagram of an enterprise asset management system for the entire life cycle of an asset provided in an embodiment of the present application is shown in FIG. Figure 5 As shown, the system 1 of this embodiment includes a processing unit 11, a storage unit 12 and a transceiver unit 13. The processing unit 11 is used to process data, the storage unit 12 is used to store data, and the transceiver unit 13 is used to send and receive data. The processing unit 11, the storage unit 12 and the transceiver unit 13 cooperate with each other to implement the above method. The beneficial effects of the embodiment of the present application have been described in the above method and will not be repeated here.
[0107] An embodiment of the present application also provides an enterprise asset management system for the entire life cycle of an asset, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements any of the methods described above when executing the computer program.
[0108] Figure 6 A schematic diagram of the entity structure of an enterprise asset management system for the entire life cycle of an asset provided by an embodiment of the present application is shown in FIG. Figure 6 As shown, the system 2 of this embodiment includes: at least one processor 20 ( Figure 6 Only one processor 20 is shown in the figure), a memory 21, and a computer program 22 stored in the memory 21 and executable on the at least one processor 20, and the processor 20 implements the steps in any of the above-mentioned method embodiments when executing the computer program 22. The beneficial effects of the embodiments of the present application have been described in the above-mentioned methods and will not be repeated here.
[0109] It should be noted that the information interaction, execution process, etc. between the above-mentioned devices / units are based on the same concept as the method embodiment of the present application. Their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.
[0110] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0111] An embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in the above-mentioned method embodiments can be implemented.
[0112] An embodiment of the present application provides a computer program product. When the computer program product runs on a mobile terminal, the mobile terminal can implement the steps in the above-mentioned method embodiments when executing the computer program product.
[0113] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium can at least include: any entity or device that can carry the computer program code to the camera / terminal device, recording medium, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, RandomAccess Memory), electric carrier signal, telecommunication signal and software distribution medium. For example, a USB flash drive, a mobile hard disk, a magnetic disk or an optical disk. In some jurisdictions, according to legislation and patent practice, computer-readable media cannot be electric carrier signals and telecommunication signals.
[0114] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0115] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0116] In the embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the modules or units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0117] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0118] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.
Claims
1. An enterprise asset management method for the entire life cycle of assets, characterized in that: The method comprises: Obtain the asset management stage of the enterprise's assets and the asset management information corresponding to the asset management stage; Through the asset management adjustment model, the asset management switching factor is determined according to the asset management stage and the asset management information corresponding to the asset management stage, and the asset management switching recommendation of the enterprise assets is determined according to the asset management switching factor.
2. The method according to claim 1, characterized in that Obtain the asset management stage of the enterprise's assets and the asset management information corresponding to the asset management stage, including: Through the enterprise asset management component, multiple asset management stages of the enterprise assets in management and multiple asset management information corresponding to each asset management stage are obtained, and through the enterprise asset management component, data integrity verification is performed on the multiple asset management stages of the enterprise assets and multiple asset management information corresponding to each asset management stage; When multiple asset management stages of enterprise assets and multiple asset management information corresponding to each asset management stage pass the data integrity check, the multiple asset management stages and multiple asset management information corresponding to each asset management stage are sent to the data analysis component.
3. The method according to claim 2, characterized in that The enterprise asset management component performs data integrity verification on multiple asset management stages of enterprise assets and multiple asset management information corresponding to each asset management stage, including: The management time periods corresponding to all asset management stages of the enterprise's assets are obtained. When the blank time between all management time periods is greater than or equal to the preset blank time, it is determined that the multiple asset management stages of the enterprise's assets and the multiple asset management information corresponding to each asset management stage do not pass the data integrity check; when the blank time between all management time periods is less than the preset blank time, it is determined that the multiple asset management stages of the enterprise's assets and the multiple asset management information corresponding to each asset management stage pass the data integrity check.
4. The method according to claim 3, characterized in that The enterprise asset management component performs data integrity verification on multiple asset management stages of enterprise assets and multiple asset management information corresponding to each asset management stage, including: When the asset management stage is the leasing stage, the asset leasing contract information and asset leasing contract terms corresponding to the leasing stage are obtained; when the blank time between all management time periods is less than the preset blank time, and when the asset leasing contract information and asset leasing contract terms meet the preset leasing contract conditions, it is determined that multiple asset management stages of the enterprise assets and multiple asset management information corresponding to each asset management stage have passed the data integrity check; When the asset management stage is the selling stage, the asset lease contract information, asset lease contract terms and asset acceptance information at the end of the asset lease corresponding to the lease stage are obtained; when the blank time between all management time periods is less than the preset blank time, when the asset lease contract information and asset lease contract terms meet the preset lease contract conditions, and when the asset acceptance information meets the preset asset acceptance information conditions, it is determined that multiple asset management stages of the enterprise assets and multiple asset management information corresponding to each asset management stage have passed the data integrity check.
5. The method according to claim 4, characterized in that Through the asset management adjustment model, the asset management switching factor is determined according to the asset management stage and the asset management information corresponding to the asset management stage, including: When the asset management stage is the production stage, the asset management adjustment model in the data analysis component is used to determine the asset management switching factor according to the production status information and asset maintenance information in the production stage; When the asset management stage is the leasing stage, the asset management adjustment model in the data analysis component is used to determine the asset management switching factor based on the production status information and asset maintenance information in the production stage and the production status information and asset maintenance information in the leasing stage; When the asset management stage is the selling stage, the asset management adjustment model in the data analysis component is used to determine the asset management switching factor based on the production status information and asset maintenance information in the production stage, the production status information and asset maintenance information in the leasing stage, and the selling stage duration and potential buyer bid information in the selling stage.
6. The method according to claim 5, characterized in that Determine asset management switching recommendations for enterprise assets based on asset management switching factors, including: When the asset management switching factor meets the first switching condition, the asset management switching suggestion is determined to switch the asset management stage corresponding to the enterprise assets to the production stage; when the asset management switching factor meets the second switching condition, the asset management switching suggestion is determined to switch the asset management stage corresponding to the enterprise assets to the leasing stage; when the asset management switching factor meets the third switching condition, the asset management switching suggestion is determined to switch the asset management stage corresponding to the enterprise assets to the sales stage.
7. An enterprise asset management system for the entire life cycle of assets, characterized in that: Comprising means for performing the method according to any one of claims 1 to 6.
8. An enterprise asset management system for the entire life cycle of an asset, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the method according to any one of claims 1 to 6 is implemented.
9. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 6 is implemented.
10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.
Citation Information
Patent Citations
Metadata-based data asset management method and system
CN114881802A
Intelligent company asset optimization system
CN118864129A
EAM-based asset full life cycle management method and system
CN119151475A