Equipment for simultaneously carrying out biological treatment on waste water and waste gas of garbage compression station
By introducing turbines and electromagnetic components into biological treatment equipment, affecting the bubble rise speed and optimizing gas delivery, the problem of low oxygen utilization in existing equipment is solved, and more efficient wastewater and waste gas treatment is achieved.
Patent Information
- Application Number
- CN202411923634.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-25
- Publication Date
- 2025-03-04
- Estimated Expiration
- 2044-12-25
AI Technical Summary
When existing biological treatment equipment deals with waste water and exhaust gas from garbage compression stations, the gas utilization rate is low, resulting in the inability to fully utilize oxygen.
A device including a box assembly and an electromagnetic assembly is designed to drive the micro generator to generate electricity through a turbine, and the electromagnetic magnets generate a magnetic field, affect the bubble rise rate, improve oxygen utilization, and optimize gas transportation and stirring through a stirring structure and gas replenishment control component.
It effectively improves the utilization rate of oxygen, ensures the full utilization of gas in the biological treatment process, and enhances the equipment's ability to treat wastewater and waste gas.
Smart Images

Figure CN119551806A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of garbage station treatment, in particular to a device for simultaneously biologically treating waste water and waste gas from a garbage compression station. Background Art
[0002] In garbage compression stations, the treatment of wastewater and waste gas is a crucial link. If the wastewater and waste gas are directly discharged into the external environment, it will cause pollution to the external environment. Therefore, biological treatment equipment is needed to treat the wastewater and waste gas generated by the garbage compression station, so as to avoid the wastewater and waste gas being directly discharged into the environment and causing pollution.
[0003] Existing biological treatment equipment uses aeration during its operation to enable aerobic bacteria in sewage to work. However, the buoyancy of gas in water is large, which will cause the bubbles to float up too quickly, so that the oxygen in the bubbles cannot be well utilized, resulting in low oxygen utilization.
[0004] Therefore, it is necessary to design a device for biologically treating wastewater and waste gas from garbage compression stations at the same time in response to the above problems. Summary of the invention
[0005] The purpose of the present invention is to provide a device for simultaneously biologically treating wastewater and waste gas from a garbage compression station, so as to solve the problems raised in the above-mentioned background technology.
[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a device for simultaneously performing biological treatment on wastewater and waste gas from a garbage compression station, comprising a box assembly and an electromagnetic assembly, a stirring assembly is installed inside the box assembly, and the lower end of the stirring assembly is connected to a connecting assembly, the electromagnetic assembly is located at the lower right end of the box assembly, and the electromagnetic assembly comprises a transmission chain, a micro-generator, a connecting wire, an electromagnet and a magnetic ring, the right end of the transmission chain is connected to a micro-generator, and the power output end of the micro-generator is connected to a connecting wire, the end of the connecting wire away from the micro-generator is connected to an electromagnet, and the magnetic force generating end of the electromagnet is connected to a magnetic ring, and a voltage stabilizing assembly is installed inside the stirring assembly.
[0007] Furthermore, the lower end of the connecting component is connected to the conveying component, and the lower end of the conveying component is connected to the air supply control component, the lower end of the air supply control component is connected to the air supply pipeline, the middle of the upper end of the conveying component is connected to the top pressure component, and the top pressure component drives the upper end to be connected to the speed increasing component, and the lower right end of the speed increasing component is connected to the transmission component.
[0008] Furthermore, the box assembly includes a treatment box, an anaerobic biofilm and an aerobic biofilm, and the anaerobic biofilm is installed at the upper end of the interior of the treatment box, and the aerobic biofilm is installed at the lower end of the interior of the treatment box.
[0009] Furthermore, the stirring assembly includes a stirring shaft, a stirring blade and a jet blade, and the stirring blade is installed at the outer upper end of the stirring shaft, and the jet blade is installed at the outer lower end of the stirring shaft. The pressure stabilizing assembly includes a fourth spring and a pressure stabilizing piston, and the lower end of the fourth spring is connected to the pressure stabilizing piston.
[0010] Furthermore, the connecting assembly includes a first connecting head, an external clamping rod, a steel ball and a second connecting head, and the outside of the first connecting head is connected to the external clamping rod, the upper end of the external clamping rod is embedded with a steel ball, and the upper end of the first connecting head is provided with a second connecting head.
[0011] Furthermore, the conveying assembly includes a conveying pipe, a first turbine, a second turbine and a connecting pipe, and the first turbine is installed on the left side of the conveying pipe, the second turbine is installed on the right side of the conveying pipe, and the right end of the conveying pipe is connected to the connecting pipe.
[0012] Furthermore, the air replenishment control assembly includes a knife gate valve core, a connecting plate, a first spring, a connecting rope and a counterweight, and the upper end of the knife gate valve core is connected to the connecting plate, the lower ends of the left and right sides of the connecting plate are connected to the first spring, and the upper end of the connecting plate is connected to the connecting rope, and a counterweight is installed in the middle of the connecting rope.
[0013] Furthermore, the top pressure assembly includes a connecting pipe, a sleeve rod, a movable piston, a push rod and an L-frame, and the upper end of the connecting pipe is connected to the sleeve rod, the movable piston is installed inside the sleeve rod, and the left side of the movable piston is connected to the push rod, and the left end of the push rod is connected to the L-frame.
[0014] Furthermore, the speed increasing assembly includes a slide rail, a fixed plate, a second spring, a mounting frame, a bearing, a rotating rod and a friction wheel, and the left end of the slide rail is connected to the fixed plate, the lower end of the slide rail is slidably connected to the mounting frame, and the left side of the mounting frame is connected to the second spring, the lower end of the mounting frame is installed with a bearing, and the inside of the bearing is installed with a rotating rod, and the upper end of the rotating rod is connected to the friction wheel.
[0015] Furthermore, the transmission assembly includes a connecting plate, a third spring, a telescopic rod, a first docking plate and a second docking plate, and the lower end of the connecting plate is connected to the third spring, the middle part of the third spring is equipped with a telescopic rod, and the lower end of the telescopic rod is connected to the first docking plate, and the lower end of the first docking plate is provided with a second docking plate.
[0016] Compared with the prior art, the beneficial effects of the present invention are as follows: the device can drive the turbine to work through the flow rate during gas delivery, generate electricity through the rotation of the turbine, thereby supplying the electromagnet, forming a magnetic field inside the device, affecting the rising speed of the bubbles, and facilitating the device to fully utilize the oxygen. At the same time, the impact force when the gas is filled into the device drives the stirring structure to work, thereby better breaking up the bubbles, facilitating the device to utilize the oxygen in the bubbles. When the pressure of the filled gas is insufficient, the gas flow will be utilized through the turbine to compensate for the rotation of the stirring structure, facilitating the continuous operation of the rotating structure of the device. The present application can also automatically adjust the supply of oxygen by the supply of exhaust gas. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a front view structural schematic diagram of a device for simultaneously biologically treating waste water and waste gas from a garbage compression station according to the present invention;
[0018] Figure 2 It is a partial cross-sectional structural schematic diagram of a stirring assembly of a device for simultaneously biologically treating wastewater and waste gas from a garbage compression station according to the present invention;
[0019] Figure 3 It is a cross-sectional rear-view enlarged structural schematic diagram of a conveying component of a device for simultaneously biologically treating wastewater and waste gas from a garbage compression station according to the present invention;
[0020] Figure 4 It is a schematic diagram of an enlarged top view of the second turbine of a device for simultaneously biologically treating waste water and waste gas from a garbage compression station according to the present invention;
[0021] Figure 5 It is a rear enlarged structural schematic diagram of a second turbine of a device for simultaneously biologically treating waste water and waste gas from a garbage compression station according to the present invention;
[0022] Figure 6 It is an enlarged structural schematic diagram of an air supply control component of a device for simultaneously biologically treating waste water and waste gas from a garbage compression station according to the present invention;
[0023] Figure 7 It is a cross-sectional enlarged structural schematic diagram of a top pressure component of a device for simultaneously biologically treating waste water and waste gas from a garbage compression station according to the present invention;
[0024] Figure 8 It is a schematic diagram of the enlarged structure of a speed increasing component of a device for simultaneously biologically treating waste water and waste gas from a garbage compression station according to the present invention;
[0025] Fig. 9 This is a schematic diagram of an enlarged structure of a transmission assembly of a device for simultaneously biologically treating wastewater and waste gas from a garbage compression station according to the present invention after connection.
[0026] In the figure: 1. Box assembly; 101. Treatment box; 102. Anaerobic biofilm; 103. Aerobic biofilm; 2. Stirring assembly; 201. Stirring shaft; 202. Stirring blade; 203. Jet blade; 3. Connecting assembly; 301. First connector; 302. External clamping rod; 303. Steel ball; 304. Second connector; 4. Conveying assembly; 401. Conveying pipeline; 402. First turbine; 403. Second turbine; 404. Connecting pipeline; 5. Electromagnetic assembly; 501. Transmission chain; 502. Micro generator; 503. Connecting wire; 504. Electromagnet; 505. Magnetic ring; 6. Air supply pipeline; 7. Air supply control assembly; 701. Knife gate valve core ; 702, connecting plate; 703, first spring; 704, connecting rope; 705, counterweight; 8, top pressure assembly; 801, connecting pipe; 802, sleeve rod; 803, movable piston; 804, push rod; 805, L frame; 9, speed increasing assembly; 901, slide rail; 902, fixed plate; 903, second spring; 904, mounting frame; 905, bearing; 906, rotating rod; 907, friction wheel; 10, transmission assembly; 1001, connecting plate; 1002, third spring; 1003, telescopic rod; 1004, first docking plate; 1005, second docking plate; 11, pressure stabilizing assembly; 1101, fourth spring; 1102, pressure stabilizing piston. DETAILED DESCRIPTION
[0027] like Figure 1 , Figure 2 and Figure 3 As shown, the present invention provides a technical solution: a device for simultaneously biologically treating wastewater and waste gas from a garbage compression station, comprising a box assembly 1 and an electromagnetic assembly 5, wherein a stirring assembly 2 is installed inside the box assembly 1, and the lower end of the stirring assembly 2 is connected to a connecting assembly 3, the electromagnetic assembly 5 is located at the lower right end of the box assembly 1, and the electromagnetic assembly 5 comprises a transmission chain 501, a micro generator 502, a connecting wire 503, an electromagnet 504 and a magnetic ring 505, the right end of the transmission chain 501 is connected to the micro generator 502, and the power output end of the micro generator 502 is connected to the connecting wire 503, the end of the connecting wire 503 away from the micro generator 502 is connected to the electromagnet 504, and the magnetic force generating end of the electromagnet 504 is connected to the magnetic ring 505, and a voltage stabilizing assembly 11 is installed inside the stirring assembly 2;
[0028] The specific operation is as follows. During the working process, the second turbine 403 will drive the micro generator 502 to work through the transmission chain 501, so that the micro generator 502 generates electricity, and the electricity is transmitted to the electromagnet 504 through the connecting wire 503, so that the electromagnet 504 generates magnetic force, and the magnetic force is diffused through the magnetic ring 505. The electromagnet 504 and the magnetic ring 505 are arranged at the upper and lower ends of the box assembly 1, so that a magnetic field from top to bottom can be formed in the box assembly 1. The bubbles are affected by the turbine force, the mechanical effect of the magnetic field, the influence of the magnetic field on the bubble shape, and the magnetizing force, so that the rising speed of the bubbles is slowed down, which is convenient for oxygen to be better integrated into the wastewater and aerobic bacteria to work.
[0029] like Figures 3 to 9 As shown, the lower end of the connecting component 3 is connected to the conveying component 4, and the lower end of the conveying component 4 is connected to the air supply control component 7, the lower end of the air supply control component 7 is connected to the air supply pipeline 6, the middle part of the upper end of the conveying component 4 is connected to the top pressure component 8, and the top pressure component 8 drives the upper end to be connected to the speed increasing component 9, and the lower right end of the speed increasing component 9 is connected to the transmission component 10.
[0030] like Figure 1 As shown, the box assembly 1 includes a treatment box 101 , an anaerobic biofilm 102 and an aerobic biofilm 103 , and the anaerobic biofilm 102 is installed at the upper end of the treatment box 101 , and the aerobic biofilm 103 is installed at the lower end of the treatment box 101 .
[0031] like Figure 1 and Figure 2 As shown, the stirring assembly 2 includes a stirring shaft 201, a stirring blade 202 and an air jet blade 203, and the stirring blade 202 is installed at the outer upper end of the stirring shaft 201, and the air jet blade 203 is installed at the outer lower end of the stirring shaft 201;
[0032] The exhaust gas is transported to the inside of the stirring shaft 201 through the transport component 4, and then the exhaust gas is ejected from the jet blades 203, thereby driving the stirring blades 202 to rotate and stir the inside of the equipment, thereby making it easier for oxygen and water to mix and for aerobic bacteria to work.
[0033] like Figure 2 As shown, the pressure stabilizing assembly 11 includes a fourth spring 1101 and a pressure stabilizing piston 1102, and the lower end of the fourth spring 1101 is connected to the pressure stabilizing piston 1102;
[0034] Relying on the elastic structure between the pressure-stabilizing piston 1102 and the fourth spring 1101, the pressure-stabilizing piston 1102 can balance the air pressure inside the stirring shaft 201, thereby reducing the air pressure fluctuation inside the stirring shaft 201, facilitating the stabilization of the gas ejected by the jet blade 203, and thus facilitating the stable stirring work of the stirring blade 202.
[0035] like Figure 3 As shown, the connection assembly 3 includes a first connection head 301, an outer clamp rod 302, a steel ball 303 and a second connection head 304, and the outer clamp rod 302 is connected to the outside of the first connection head 301, the upper end of the outer clamp rod 302 is inlaid with a steel ball 303, and the upper end of the first connection head 301 is provided with the second connection head 304;
[0036] The steel ball 303 is embedded in the outer clamp rod 302. Through the structure of the steel ball 303 and the outer clamp rod 302, the second connecting head 304 can be locked, so that the second connecting head 304 is tightly connected to the first connecting head 301 to avoid air leakage. At the same time, the contact characteristics between the steel ball 303 and the second connecting head 304 will not affect the rotation between the second connecting head 304 and the first connecting head 301, thereby realizing the connection between the stirring shaft 201 and the connecting pipe 404 without affecting the rotation of the stirring shaft 201.
[0037] like Figures 3 to 5 As shown, the conveying assembly 4 includes a conveying pipe 401, a first turbine 402, a second turbine 403 and a connecting pipe 404, and the first turbine 402 is installed on the left side of the interior of the conveying pipe 401, the second turbine 403 is installed on the right side of the interior of the conveying pipe 401, and the right end of the conveying pipe 401 is connected to the connecting pipe 404.
[0038] like Figure 6 As shown, the air supply control assembly 7 includes a knife gate valve core 701, a connecting plate 702, a first spring 703, a connecting rope 704 and a counterweight 705, and the upper end of the knife gate valve core 701 is connected to the connecting plate 702, the lower ends of the left and right sides of the connecting plate 702 are connected to the first spring 703, and the upper end of the connecting plate 702 is connected to the connecting rope 704, and the middle part of the connecting rope 704 is installed with a counterweight 705;
[0039] When the exhaust gas is transported in large quantities, the rotation speed of the first turbine 402 will be accelerated, thereby increasing the centrifugal force of the counterweight block 705, thereby increasing the upward traction of the connecting rope 704 on the connecting plate 702, thereby moving the knife gate valve core 701 upward, and increasing the amount of air supplemented in the air supply pipe 6, thereby avoiding the situation where the aerobic bacteria cannot keep up with the oxygen when the exhaust gas is large, thereby affecting the working effect of the aerobic bacteria.
[0040] like Figure 7 As shown, the top pressure assembly 8 includes a connecting pipe 801, a sleeve rod 802, a movable piston 803, a push rod 804 and an L-frame 805, and the upper end of the connecting pipe 801 is connected to the sleeve rod 802, the movable piston 803 is installed inside the sleeve rod 802, and the left side of the movable piston 803 is connected to the push rod 804, and the left end of the push rod 804 is connected to the L-frame 805.
[0041] like Figure 8 As shown, the speed increasing assembly 9 includes a slide rail 901, a fixed plate 902, a second spring 903, a mounting frame 904, a bearing 905, a rotating rod 906 and a friction wheel 907, and the left end of the slide rail 901 is connected to the fixed plate 902, the lower end of the slide rail 901 is slidably connected to the mounting frame 904, and the left side of the mounting frame 904 is connected to the second spring 903, the lower end of the mounting frame 904 is installed with a bearing 905, and the rotating rod 906 is installed inside the bearing 905, and the upper end of the rotating rod 906 is connected to the friction wheel 907;
[0042] When the air pressure is lower than a certain level, the air pressure thrust on the moving piston 803 is reduced, so that the second spring 903 pushes the mounting frame 904, causing the friction wheel 907 to contact the stirring shaft 201. At the same time, the movement of the mounting frame 904 will also drive the first docking plate 1004 to move, thereby achieving the docking of the first docking plate 1004 and the second docking plate 1005, and causing the friction wheel 907 to rotate driven by the second turbine 403, thereby compensating for the rotation speed of the stirring shaft 201, so that the stirring shaft 201 can maintain a certain speed when the air pressure is low, thereby avoiding the stirring shaft 201 rotating too slowly when the air pressure is low and having no stirring effect, thereby affecting the operation of the equipment.
[0043] like Fig. 9 As shown, the transmission assembly 10 includes a connecting plate 1001, a third spring 1002, a telescopic rod 1003, a first docking plate 1004 and a second docking plate 1005, and the lower end of the connecting plate 1001 is connected to the third spring 1002, the middle part of the third spring 1002 is installed with the telescopic rod 1003, and the lower end of the telescopic rod 1003 is connected to the first docking plate 1004, and the lower end of the first docking plate 1004 is provided with the second docking plate 1005.
[0044] Working principle: first, a certain amount of waste water is injected into the equipment through the water injection port on the processing box 101, and then the exhaust gas is filled into the conveying pipe 401. The exhaust gas in the conveying pipe 401 will drive the first turbine 402 to rotate when passing through the first turbine 402. The rotation of the first turbine 402 can drive multiple connecting ropes 704 to rotate around the central axis of the first turbine 402. During the operation, the connecting rope 704 will cause the counterweight block 705 to be thrown outward by the centrifugal force, thereby pulling the connecting rope 704 outward, which will form an upward pulling force on the connecting plate 702, thereby controlling the blocking of the knife gate valve core 701 on the air supply pipe 6, so that the more exhaust gas is injected into the conveying pipe 401, the faster the first turbine 402 rotates, so that the knife gate valve core 701 rises higher, and the more oxygen is supplied to the air supply pipe 6, and the first spring 703 will form traction on the connecting plate 702, so that when the pulling force of the connecting rope 704 is reduced, the knife gate valve core 701 is easy to move downward.
[0045] The exhaust gas filled into the delivery pipe 401 and the oxygen in the air supply pipe 6 will eventually mix together at the rear of the delivery pipe 401. At this time, the mixed gas is transported to the sleeve rod 802 through the connecting pipe 801, thereby forming a thrust on the moving piston 803, causing the push rod 804 to extend from the sleeve rod 802, so that the push rod 804 drives the mounting frame 904 to move to the left through the L frame 805, thereby separating the first docking plate 1004 from the second docking plate 1005.
[0046] The mixed gas will also drive the second turbine 403 to rotate, thereby driving the micro generator 502 to work through the transmission chain 501. The micro generator 502 supplies power to the electromagnet 504 through the connecting wire 503, so that the magnetic ring 505 works. This will form a magnetic field from top to bottom inside the processing box 101, which will affect the bubbles through the turbine force, the mechanical effect of the magnetic field, the influence of the magnetic field on the shape of the bubbles, and the magnetizing force, thereby slowing down the rising speed of the bubbles.
[0047] The explanations of the turbine force, the magnetic field body mechanics effect, the influence of the magnetic field on the bubble shape and the magnetizing force are as follows:
[0048] Lorentz force: When a magnetic field exists, moving charged particles (usually various ions in liquid) will be affected by the Lorentz force. For the liquid around the bubble, the movement trajectory of the ions in it changes under the influence of the magnetic field. The movement of these ions will interact with the bubble, thereby affecting the rising speed of the bubble.
[0049] Magnetohydrodynamic effect: The magnetic field will cause the conductive fluid (in some cases, the liquid has a certain conductivity or contains magnetic particles, etc.) to generate an induced current. The interaction between the induced current and the magnetic field will generate an electromagnetic force, which is the volume force form of the Lorentz force. This volume force will act on the fluid and the bubbles in it. For bubbles in the magnetic liquid, the magnetic field will change the properties of the magnetic liquid, affecting the buoyancy and resistance of the bubbles, resulting in a change in the rising speed of the bubbles.
[0050] The influence of magnetic field on bubble shape: Under the action of magnetic field, bubbles will be affected by magnetic force and change shape. Bubbles may be stretched along the direction of magnetic field or deformed in other ways. This change in shape will affect the force applied to the bubbles. For example, the contact area between the stretched bubbles and the surrounding liquid will increase during the rising process, and the resistance will increase accordingly, resulting in a decrease in the rising speed. Or the change in shape will change the center of gravity of the bubble, affecting its rising stability and speed.
[0051] Magnetizing force: If the bubble itself has a certain degree of magnetism or magnetizability, the magnetic field will produce a direct magnetizing force on the bubble. This magnetizing force will cause the bubble to experience additional attraction or repulsion, affecting the upward movement of the bubble.
[0052] After the mixed gas passes through the second turbine 403, it will be transported to the stirring shaft 201 through the connecting pipe 404, and will be ejected from the jet blades 203, driving the stirring shaft 201 to rotate, thereby causing the stirring blades 202 to rotate, stirring the liquid inside the processing box 101, and relying on the elasticity between the pressure-stabilizing piston 1102 and the fourth spring 1101, the air pressure inside the stirring shaft 201 is stabilized, thereby facilitating the rotation speed of the stirring shaft 201 to remain stable.
[0053] When the gas supply decreases, the gas pressure in the sleeve rod 802 decreases, so that the thrust of the mobile piston 803 cannot resist the thrust of the second spring 903 on the mounting frame 904. At this time, the mounting frame 904 moves to the right by relying on the elastic structure formed by the slide rail 901, the second spring 903 and the fixed plate 902. During the movement, the mounting frame 904 will drive the L frame 805 to push the push rod 804, so that the mobile piston 803 moves to the right inside the sleeve rod 802. During the movement of the mounting frame 904, the first docking plate 1004 is also driven to move to the right. When the friction wheel 907 contacts the stirring shaft 201, the friction wheel 907 stops moving. At this time, the first A docking plate 1004 is located just above the second docking plate 1005. Relying on the elastic structure formed between the first docking plate 1004 and the connecting plate 1001 through the telescopic rod 1003 and the third spring 1002, the first docking plate 1004 and the second docking plate 1005 are conveniently connected tightly. When the amount of mixed gas decreases, the second turbine 403 will still rotate, thereby driving the second docking plate 1005 to rotate, so that the first docking plate 1004 drives the rotating rod 906 that forms a rotating structure between the bearing 905 and the mounting frame 904 to rotate, so that the friction wheel 907 drives the stirring shaft 201, so that the stirring shaft 201 can also perform stirring work when the gas supply is small.
[0054] After the gas enters the treatment box 101, it will be stirred and dispersed by the stirring blades 202. The aerobic bacteria on the aerobic biofilm 103 will first react and remove the organic matter in the wastewater and waste gas. The oxygen is concentrated and consumed at the bottom, and then the residual organic matter in the wastewater and waste gas will be removed through the anaerobic biofilm 102 above, thereby achieving biological treatment.
Claims
1. A device for simultaneously biologically treating wastewater and waste gas from a garbage compression station, characterized in that: The invention comprises a box assembly (1) and an electromagnetic assembly (5), wherein a stirring assembly (2) is installed inside the box assembly (1), and the lower end of the stirring assembly (2) is connected to a connecting assembly (3), the electromagnetic assembly (5) is located at the lower right end of the box assembly (1), and the electromagnetic assembly (5) comprises a transmission chain (501), a micro generator (502), a connecting wire (503), an electromagnet (504) and a magnetic conductive ring (505), the right end of the transmission chain (501) is connected to the micro generator (502), and the power output end of the micro generator (502) is connected to the connecting wire (503), the end of the connecting wire (503) away from the micro generator (502) is connected to the electromagnet (504), and the magnetic force generating end of the electromagnet (504) is connected to the magnetic conductive ring (505), and a voltage stabilizing assembly (11) is installed inside the stirring assembly (2).
2. The device for simultaneously biologically treating wastewater and waste gas from a garbage compression station according to claim 1 is characterized in that: The lower end of the connecting component (3) is connected to a conveying component (4), and the lower end of the conveying component (4) is connected to an air supply control component (7), and the lower end of the air supply control component (7) is connected to an air supply pipeline (6). The middle of the upper end of the conveying component (4) is connected to a pressing component (8), and the pressing component (8) drives the upper end to be connected to a speed increasing component (9), and the lower right end of the speed increasing component (9) is connected to a transmission component (10).
3. The device for biologically treating wastewater and waste gas from a garbage compression station according to claim 1 is characterized in that: The box assembly (1) comprises a treatment box (101), an anaerobic biofilm (102) and an aerobic biofilm (103), wherein the anaerobic biofilm (102) is installed at the upper end of the treatment box (101) and the aerobic biofilm (103) is installed at the lower end of the treatment box (101).
4. The device for simultaneously biologically treating wastewater and waste gas from a garbage compression station according to claim 1 is characterized in that: The stirring component (2) comprises a stirring shaft (201), a stirring blade (202) and an air jet blade (203), and the stirring blade (202) is installed at the outer upper end of the stirring shaft (201), and the air jet blade (203) is installed at the outer lower end of the stirring shaft (201). The pressure stabilizing component (11) comprises a fourth spring (1101) and a pressure stabilizing piston (1102), and the lower end of the fourth spring (1101) is connected to the pressure stabilizing piston (1102).
5. The device for simultaneously biologically treating wastewater and waste gas from a garbage compression station according to claim 1 is characterized in that: The connection assembly (3) comprises a first connection head (301), an external clamping rod (302), a steel ball (303) and a second connection head (304), wherein the outside of the first connection head (301) is connected to the external clamping rod (302), the upper end of the external clamping rod (302) is embedded with a steel ball (303), and the upper end of the first connection head (301) is provided with a second connection head (304).
6. The device for simultaneously biologically treating wastewater and waste gas from a garbage compression station according to claim 2 is characterized in that: The conveying assembly (4) comprises a conveying pipeline (401), a first turbine (402), a second turbine (403) and a connecting pipeline (404), wherein the first turbine (402) is installed on the left side of the conveying pipeline (401), the second turbine (403) is installed on the right side of the conveying pipeline (401), and the right end of the conveying pipeline (401) is connected to the connecting pipeline (404).
7. The device for biologically treating wastewater and waste gas from a garbage compression station according to claim 2 is characterized in that: The air replenishment control assembly (7) comprises a knife gate valve core (701), a connecting plate (702), a first spring (703), a connecting rope (704) and a counterweight (705), wherein the upper end of the knife gate valve core (701) is connected to the connecting plate (702), the lower ends of the left and right sides of the connecting plate (702) are connected to the first spring (703), the upper end of the connecting plate (702) is connected to the connecting rope (704), and the middle part of the connecting rope (704) is installed with a counterweight (705).
8. The device for biologically treating wastewater and waste gas from a garbage compression station according to claim 2 is characterized in that: The top pressure assembly (8) comprises a connecting pipe (801), a sleeve rod (802), a movable piston (803), a push rod (804) and an L-frame (805), wherein the upper end of the connecting pipe (801) is connected to the sleeve rod (802), the movable piston (803) is installed inside the sleeve rod (802), the left side of the movable piston (803) is connected to the push rod (804), and the left end of the push rod (804) is connected to the L-frame (805).
9. The device for biologically treating wastewater and waste gas from a garbage compression station according to claim 2 is characterized in that: The speed increasing assembly (9) comprises a slide rail (901), a fixed plate (902), a second spring (903), a mounting frame (904), a bearing (905), a rotating rod (906) and a friction wheel (907), wherein the left end of the slide rail (901) is connected to the fixed plate (902), the lower end of the slide rail (901) is slidably connected to the mounting frame (904), the left side of the mounting frame (904) is connected to the second spring (903), the lower end of the mounting frame (904) is installed with a bearing (905), the interior of the bearing (905) is installed with a rotating rod (906), and the upper end of the rotating rod (906) is connected to the friction wheel (907).
10. The device for biologically treating wastewater and waste gas from a garbage compression station according to claim 2 is characterized in that: The transmission assembly (10) comprises a connecting plate (1001), a third spring (1002), a telescopic rod (1003), a first docking plate (1004) and a second docking plate (1005), wherein the lower end of the connecting plate (1001) is connected to the third spring (1002), the middle part of the third spring (1002) is provided with the telescopic rod (1003), the lower end of the telescopic rod (1003) is connected to the first docking plate (1004), and the lower end of the first docking plate (1004) is provided with the second docking plate (1005).
Citation Information
Patent Citations
Gas-liquid mixing device
CN104587878A
Waste water and gas simultaneously biological treating plant for garbage compression station
CN1654364A
Submarine and mixed oxygen-enriched magnetic oxygen charger
CN1680196A
Waste water and waste gas treatment structure of garbage compression station
CN214880740U
Waste gas and waste water integrated treatment equipment for garbage transfer station
CN216005550U