Automatic steel bar component construction system and working method thereof
By designing an automated construction system for steel bars, using automatic telescopic adjustment rods and fully automatic total stations to achieve high-precision positioning and adjustment of steel bar mesh, and using AGV body to achieve unmanned transportation, solving the problem that steel bar mesh operation mode and positioning adjustment in the existing technology rely on manual operation, and improving the degree and efficiency of construction automation.
Patent Information
- Application Number
- CN202411878960.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-19
- Publication Date
- 2025-03-07
AI Technical Summary
In the existing construction methods of steel bar parts, the operation mode and positioning adjustment of steel bar mesh mainly relies on manual operations, resulting in low degree of automation and difficult to improve efficiency and quality.
An automated construction system for steel bar parts is designed, including steel bar parts construction device and steel bar mesh transportation device. The construction device realizes high-precision positioning and adjustment of the steel mesh through the combination of automatic telescopic adjustment rod and fully automatic total station; the transportation device uses the AGV vehicle body to realize unmanned transfer of the steel mesh and automatically insert the card slot.
It significantly improves the degree of automation of steel bar component construction, realizes the automatic transfer, positioning and installation of steel bar mesh, reduces manual intervention, and improves construction efficiency and quality.
Smart Images

Figure CN119571732A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of concrete bridge tower and box beam construction in bridge engineering, and in particular to an automated construction system for steel bar components and a working method thereof. Background Art
[0002] The componentized construction of steel bars is one of the future development directions of bridge tower construction technology. The steel bars are made into steel bar components in advance, and then hoisted to the docking position as a whole for installation. The use of componentized steel bar construction technology can effectively save the construction time of bridge tower steel bar binding and improve the quality of steel bar binding. Steel bar components can be mechanized or semi-mechanized in factories or special tire frames, which can effectively reduce labor intensity, improve the working environment, and reduce the risk of high-altitude operations.
[0003] For traditional steel component forming, placing the steel mesh into the frame, positioning the mesh, adjusting the position, fixing it, and inserting the hook bars all require a large number of people to operate, and the degree of automation and efficiency are low. In order to further improve the component forming efficiency, enhance the automation and intelligence of construction, and reduce the use of manpower, it is necessary to improve the traditional steel component construction method.
[0004] The applicant has previously applied for a patent application entitled "Device and method for preparing hook bars for steel mesh of bridge tower steel bar components". This patent, based on the demand for automated installation of steel bars in vertical steel bar component structures, starts from the installation method and proposes a method and equipment for installing hook bars suitable for industrialized construction. Combined with the requirements for precision control during the construction process, an industrialized construction method for hook bars of bridge tower steel bar components is formed. Compared with traditional methods, the installation difficulty is greatly reduced, while the labor intensity of workers is reduced and the installation efficiency and quality of hook bars are improved.
[0005] This patent discloses in detail the devices and methods for bending and welding steel bars in the process of preparing steel bar components. It does not involve the operation mode of the steel mesh prepared in the early stage and the positioning adjustment of the steel mesh in the preparation process. In the prior art, the processing method for the above links is generally through manual operation, which will greatly reduce the degree of automation of the entire steel bar component construction. Summary of the invention
[0006] In view of the above shortcomings of the prior art, the purpose of the present invention is to provide an automated construction system for steel bar components and a working method thereof. Compared with the prior art, the present invention optimizes the operation mode of the steel mesh of the preliminary preparation material and the positioning adjustment of the steel mesh in the steel bar component preparation link, thereby improving the degree of automation of the entire steel bar component construction.
[0007] The technical solution of the present invention is: an automated construction system for steel bar components, comprising:
[0008] A steel bar component construction device, the steel bar component construction device comprises a first construction frame and a second construction frame, a steel mesh positioning slot is provided between the first construction frame and the second construction frame; an automatic telescopic adjustment rod is connected to the top of the first construction frame;
[0009] A steel mesh transport device is used to transfer the steel mesh from the steel mesh production line to the steel component construction device.
[0010] According to an automated construction system for steel bar components provided by the present invention, both the first construction frame and the second construction frame are connected to work platform rails, and a robot work platform that can move up and down autonomously is connected to the work platform rails.
[0011] According to an automated construction system for steel bar components provided by the present invention, the robot working platform includes a frame, a power module, a robot slide rail, a robot and a silo, the power module is installed at both ends of the frame and is slidably connected to the working platform guide rail; the two ends of the robot slide rail are fixedly connected to the side walls of the power module; the robot is slidably connected to the robot slide rail; the silo is located below the robot slide rail and is connected to the inner wall of the frame.
[0012] According to an automated steel bar component construction system provided by the present invention, a frame moving guide rail is connected below the first construction frame.
[0013] According to an automated construction system for steel bar components provided by the present invention, the steel mesh transportation device includes an AGV body and a supporting platform, one end of the supporting platform is connected to a rotating shaft, the rotating shaft is fixedly connected to the rear of the AGV body, a telescopic rod is also connected between the AGV body and the supporting platform, and a plurality of pads and fixing clamps are fixedly connected to the supporting platform.
[0014] According to an automated construction system for steel bar components provided by the present invention, a positioning sensor is connected to the AGV body, and the positioning sensor is used to locate the relative position of the AGV body and the steel mesh positioning slot.
[0015] The present invention also provides a steel bar component automated construction working method, the working method is applicable to any of the above steel bar component automated construction systems, comprising:
[0016] Transporting the steel mesh: the steel mesh transport device transports the steel mesh from the production line to the steel mesh positioning slot;
[0017] Inserting the steel mesh: the steel mesh transport device slowly slides the steel mesh into the steel mesh positioning slot, the automatic telescopic adjustment rod turns to a flat state and clamps the steel mesh; the robot installs the prism to the top of the steel mesh; the steel mesh transport device automatically drives away and goes to the steel mesh production line;
[0018] Steel mesh adjustment: The prism at the top of the steel mesh is measured by an automatic total station, and the automatic telescopic adjustment rod performs telescopic movement and adjusts the inclination angle of the steel mesh until the position accuracy of the steel mesh measurement point meets the requirements;
[0019] Install the remaining steel mesh: repeat the above steps until all meshes are installed and adjusted in place; Automated construction of steel bar parts: the robot starts to automatically insert and bend the hook bars of the steel mesh;
[0020] Rebar component forming: the robot removes the prism on the top of the rebar mesh, and the automatic telescopic adjustment rod releases the clamping of the rebar mesh and rotates to a vertical state; a special lifting device for rebar components is used to lift out the formed rebar components.
[0021] According to a method for automated construction of steel bar components provided by the present invention, before the step of inserting the steel bar mesh, the first construction frame first moves along the frame moving guide rail away from the second construction frame to leave space for the steel bar mesh transportation device to perform the steel bar mesh insertion operation; after all the steel bar meshes are installed and adjusted into place, the first construction frame moves back to the initial position along the frame moving guide rail, and starts to perform automated construction of the steel bar components.
[0022] According to an automated construction method for steel bar components provided by the present invention, in the step of inserting the steel mesh, when the steel mesh transportation device is close to the steel mesh positioning slot, the positioning sensor installed on the AGV body will monitor the relative position of the steel mesh transportation device and the steel mesh positioning slot in real time to ensure that the steel mesh can be smoothly inserted into the steel mesh positioning slot.
[0023] According to an automated construction method for steel bar components provided by the present invention, in the step of inserting the steel mesh, when the steel mesh transportation device slowly slides the steel mesh into the steel mesh positioning slot, the telescopic rod will extend its own length, causing the supporting platform and the steel mesh to rotate around the rotating shaft until the steel mesh is vertically inserted into the steel mesh positioning slot.
[0024] The advantages of the present invention are:
[0025] 1. Unmanned transportation: The transportation of the steel mesh from the production line to the assembly frame is completed by the steel mesh transportation device, which includes an AGV body, which can realize the full automation of the transportation process;
[0026] 2. Automatic insertion into the slot: The steel mesh is automatically inserted into the steel mesh positioning slot by the steel mesh transport device without manual intervention, which greatly simplifies the construction process and improves production efficiency;
[0027] 3. High-precision positioning: Through the combined use of the automatic telescopic adjustment rod and the fully automatic total station, the positioning of the steel mesh in the steel bar construction device achieves extremely high accuracy and speed;
[0028] 4. Replace manual work: Use robots to place prisms on the top of the steel mesh, replacing the traditional method of manually placing prisms, significantly improving the safety of the construction site;
[0029] 4. All-round mobile hook bar assembly: The steel bar component construction device supports the robot to move freely in the vertical and horizontal directions, ensuring that the robot can cover all the hook bar insertion areas required by the steel bar components, thereby improving the flexibility and efficiency of construction;
[0030] 5. High degree of integration: The robot operation platform not only includes a power module for driving the platform to move and a robot involved in the hook reinforcement operation, but also integrates a silo. Compared with the traditional hook reinforcement frame, the structure of the present invention has a higher degree of integration;
[0031] 6. Unmanned operation throughout the entire process: The present invention realizes unmanned operation throughout the entire process of steel bar component forming, from the transportation of steel mesh to the insertion of the steel mesh into the positioning slot, to the positioning of the steel mesh, to the hooking operation of the steel bar component, and finally to the transportation of the steel bar component after forming. The entire process is automated and unmanned. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 It is a schematic plan view of the steel bar component construction device of the present invention;
[0033] Figure 2 It is a schematic diagram of the elevation structure of the steel bar component construction device of the present invention;
[0034] Figure 3 It is a structural schematic diagram of the robot working platform of the present invention;
[0035] Figure 4 It is a structural schematic diagram of the steel mesh transport device of the present invention;
[0036] Figure 5 It is a schematic structural diagram of another state of the steel mesh transport device of the present invention;
[0037] Figure 6 A schematic diagram of the step of inserting a steel mesh according to the present invention;
[0038] Figure 7 It is a schematic diagram of the steps of adjusting the position of the steel mesh of the present invention;
[0039] Figure 8 It is a schematic diagram of the automated construction steps of the steel bar component of the present invention;
[0040] Fig. 9 It is a schematic diagram of the steps of forming a steel bar component of the present invention;
[0041] Among them: 100-steel component construction device; 101-first construction frame; 102-second construction frame; 103-frame moving guide rail; 104-steel mesh positioning slot; 105-automatic telescopic adjustment rod; 106-working platform guide rail; 107-robot working platform; 1071-frame; 1072-power module; 1073-robot slide rail; 1074-robot; 1075-silo; 200-steel mesh transportation device; 201-AGV body; 202-supporting platform; 203-rotating shaft; 204-telescopic rod; 205-pad; 206-fixing fixture; 207-positioning sensor. DETAILED DESCRIPTION
[0042] The embodiments of the present invention are described in detail below, wherein the same or similar reference numerals throughout represent the same or similar elements or elements with the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0043] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0044] In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of indicated technical features. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "multiple" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined. Moreover, the terms "include", "comprise" or any other variant thereof are intended to cover non-exclusive inclusion, so that the process, method, article or equipment including a series of elements includes not only those elements, but also other elements that are not explicitly listed, or also includes elements inherent to such process, method, article or equipment. In the absence of more restrictions, the elements defined by the sentence "include one..." do not exclude the presence of other identical elements in the process, method, article or equipment including the elements.
[0045] The present invention relates to an automated construction system for steel bar components and a working method thereof. Compared with the prior art, the present invention optimizes the operation mode of the steel bar mesh of the preliminary preparation material and the positioning adjustment of the steel bar mesh in the steel bar component preparation link, thereby improving the degree of automation of the entire steel bar component construction.
[0046] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments:
[0047] A steel bar component automated construction system, specifically, Figure 1 , 2 As shown, it includes a steel bar component construction device 100 and a steel bar mesh transportation device 200. The steel bar component construction device 100 includes a first construction frame 101 and a second construction frame 102. A steel bar mesh positioning slot 104 is provided between the first construction frame 101 and the second construction frame 102; an automatic telescopic adjustment rod 105 is connected to the top of the first construction frame 101; the steel bar mesh transportation device 200 is used to transfer the steel bar mesh from the steel bar mesh production line to the steel bar component construction device 100.
[0048] In fact, the present invention includes a steel bar component construction part and a material transportation part, wherein the automated operation of the steel bar component construction part is completed by a steel bar component construction device 100, and the automated operation of the material transportation part is completed by a steel mesh transportation device 200;
[0049] Furthermore, the automated operations of the componentized steel bar construction part include hook bar bending operations and hook bar insertion operations. In the present embodiment, the automated operations of the hook bar bending operations are completed by the first construction frame 101, and the automated operations of the hook bar insertion operations are completed by the second construction frame 102.
[0050] In some embodiments, Figure 2 As shown, the first construction frame 101 and the second construction frame 102 are optimized. In this embodiment, the first construction frame 101 and the second construction frame 102 are both connected with a work platform rail 106, and the work platform rail 106 is connected with a robot work platform 107 that can move up and down autonomously.
[0051] During actual work, the robot work platform 107 can autonomously move up and down along the work platform guide rail 106 to realize the automated hook-rebar operation of the steel bar components. Among them, the robot work platform 107 on the first construction frame 101 is mainly used for the bending operation of the hook-rebar, and the robot work platform 107 on the second construction frame 102 is mainly used for the insertion operation of the hook-rebar.
[0052] In some embodiments, Figure 3 As shown, the robot work platform 107 is optimized. In this embodiment, the robot work platform 107 includes a frame 1071, a power module 1072, a robot slide rail 1073, a robot 1074 and a silo 1075. The power module 1072 is installed at both ends of the frame 1071 and is slidably connected to the work platform guide rail 106; both ends of the robot slide rail 1073 are fixedly connected to the side walls of the power module 1072; the robot 1074 is slidably connected to the robot slide rail 1073; the silo 1075 is located below the robot slide rail 1073 and is connected to the inner wall of the frame 1071.
[0053] In fact, the robot 1074 of the robot work platform 107 for automated hook bar bending operations mainly performs the bending operations of the hook bars; the robot 1074 of the robot work platform 107 for automated hook bar insertion operations mainly performs the insertion operations of the hook bars.
[0054] During actual operation, the robot work platform 107 is driven by the power module 1072 and moves up and down along the frame. The robot 1074 can slide left and right along the robot slide rail 1073 on the robot work platform 107. The robot 1074 visually recognizes the entire steel mesh, forms a steel mesh cloud map, and automatically plans the insertion path. The robot 1074 performing the hook bar insertion operation grabs an L-shaped hook bar from the hook bar material bin 1075 and adjusts it to a direction perpendicular to the plane of the steel mesh. The robot 1074 performing the hook bar insertion operation scans the steel mesh, determines the mesh to be inserted next, pushes the hook bar to the specified mesh, and the robot 1074 performing the hook bar insertion operation bends the end of the inner cavity hook bar and welds the hook bar to the steel mesh. Repeat the above steps, and the robot 1074 operates according to the path planned by the system until all the hook bars are inserted and bent.
[0055] In some embodiments, Figure 1 As shown, the first construction frame 101 is optimized, and a frame moving guide rail 103 is connected below the first construction frame 101 .
[0056] During actual work, before the steel mesh transportation device 200 transports the steel mesh to the steel component construction device 100, the first construction frame 101 first moves on the frame moving guide rail 103 in a direction away from the second construction frame 102, freeing up enough space for the steel mesh transportation device 200 to insert the steel mesh into the steel mesh positioning slot 104; when all the steel meshes are successfully inserted into the steel mesh positioning slot 104, the first construction frame 101 returns along the frame moving guide rail 103.
[0057] In some embodiments, Figure 4 , 5 As shown, the steel mesh transport device 200 is optimized. In this embodiment, the steel mesh transport device 200 includes an AGV body 201 and a supporting platform 202. One end of the supporting platform 202 is connected to a rotating shaft 203, and the rotating shaft 203 is fixedly connected to the rear of the AGV body 201. A telescopic rod 204 is also connected between the AGV body 201 and the supporting platform 202. A plurality of pads 205 and a fixing clamp 206 are fixedly connected to the supporting platform 202.
[0058] In fact, the AGV body 201 is provided with a navigation system inside, which can automatically drive to the position of the hook reinforcement assembly frame according to the navigation path; the AGV body 201 is also integrated with a variety of sensors (such as ultrasonic waves, cameras, etc.) to monitor the surrounding environment. If there are people or obstacles in front during the transportation process, the AGV body 201 can automatically stop driving;
[0059] In actual operation, the supporting platform 202 is used to place the steel mesh; a plurality of pads 205 are arranged between the supporting platform 202 and the steel mesh, and the pads 205 support the steel mesh to prevent the mesh from shifting during transportation; the supporting platform 202 and the steel mesh are connected by a fixing fixture 206;
[0060] The actual placement process of the steel mesh is as follows: first, the steel mesh processed on the production line is horizontally placed on multiple pads 205 on the supporting platform 202. After placement, the steel mesh is finally fixed on the supporting platform 202 by locking the fixing clamp 206 to complete the placement step of the steel mesh.
[0061] In some embodiments, Figure 4-6 As shown, the AGV body 201 is optimized. In this embodiment, a positioning sensor 207 is connected to the AGV body 201, and the positioning sensor 207 is used to locate the relative position of the AGV body 201 and the steel mesh positioning slot 104.
[0062] During actual operation, when the steel mesh transport device 200 approaches the steel mesh positioning slot 104, the positioning sensor 207 installed on the AGV body 201 will monitor the relative position of the steel mesh transport device 200 and the steel mesh positioning slot 104 in real time to ensure that the steel mesh can be smoothly inserted into the steel mesh positioning slot 104.
[0063] A working method applicable to any of the above-mentioned steel bar component automated construction systems, specifically, as follows:
[0064] Transporting steel mesh: first, place the steel mesh processed on the production line horizontally on the multiple pads 205 on the supporting platform 202. After placement, fix the steel mesh on the supporting platform 202 by locking the fixing fixture 206, and then move the steel mesh from the production line to the steel mesh positioning slot 104 by the steel mesh transport device 200;
[0065] Insert steel mesh: Figure 6 As shown, the steel mesh transport device 200 slowly slides the steel mesh into the steel mesh positioning slot 104, and the automatic telescopic adjustment rod 105 turns to a flat state and clamps the steel mesh; the robot 1074 installs the prism to the top of the steel mesh; the steel mesh transport device 200 automatically drives away and goes to the steel mesh production line;
[0066] Steel mesh adjustment: Figure 7 As shown, an automatic total station is used to measure the prism at the top of the steel mesh, and the automatic telescopic adjustment rod 105 performs telescopic movement and adjusts the inclination angle of the steel mesh until the position accuracy of the steel mesh measurement point meets the requirements;
[0067] Install the remaining steel mesh: Repeat the above steps until all meshes are installed and adjusted in place;
[0068] Automated construction of steel bar components: Figure 8As shown, the robot work platform 107 is driven by a power module 1072 and moves up and down along the frame. The robot 1074 can slide left and right along the robot slide rail 1073 on the robot work platform 107. The robot 1074 performs visual recognition on the entire steel mesh to form a steel mesh cloud map and automatically plans the insertion path. The robot 1074 that performs the hook bar insertion operation grabs an L-shaped hook bar from the hook bar silo 1075 and adjusts it to a direction perpendicular to the plane of the steel mesh. The robot 1074 that performs the hook bar insertion operation scans the steel mesh, determines the mesh to be inserted next, pushes the hook bar to the specified mesh, and the robot 1074 that performs the hook bar insertion operation bends the end of the inner cavity hook bar and welds the hook bar to the steel mesh. Repeat the above steps, and the robot 1074 operates according to the path planned by the system until all hook bars are inserted and bent;
[0069] Steel bar parts forming: Fig. 9 As shown, the robot 1074 removes the prism on the top of the steel mesh, and the automatic telescopic adjustment rod 105 releases the clamping of the steel mesh and rotates to a vertical state; a special lifting device for steel bar components is used to lift out the formed steel bar components.
[0070] In some embodiments, Figure 1 As shown, the above working method is optimized. In this embodiment, before the step of inserting the steel mesh, the first construction frame 101 first moves along the frame moving guide rail 103 away from the second construction frame 102 to leave space for the steel mesh transportation device 200 to perform the steel mesh insertion operation; after all the steel meshes are installed and adjusted into place, the first construction frame 101 moves back to the initial position along the frame moving guide rail 103, and starts to perform automated construction of the steel components.
[0071] In some embodiments, Figure 6 As shown, the step of inserting the steel mesh is optimized. In this embodiment, when the steel mesh transportation device 200 slowly slides the steel mesh into the steel mesh positioning slot 104, the telescopic rod 204 will extend its own length, causing the supporting platform 202 and the steel mesh to rotate around the rotating shaft 203. After the steel mesh is vertically inserted into the steel mesh positioning slot 104, the fixing clamp 206 releases the steel mesh to separate the steel mesh from the supporting platform 202 and the pad 205. After the separation is completed, the telescopic rod 204 retracts to cause the supporting platform 202 to rotate back to a horizontal state around the rotating shaft 203.
[0072] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. The present invention may be subject to various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. An automated construction system for steel bar components, characterized in that: include: A steel bar component construction device (100), the steel bar component construction device (100) comprising a first construction frame (101) and a second construction frame (102), a steel mesh positioning slot (104) being provided between the first construction frame (101) and the second construction frame (102); an automatic telescopic adjustment rod (105) being connected to the top of the first construction frame (101); A steel mesh transport device (200), wherein the steel mesh transport device (200) is used to transport the steel mesh from a steel mesh production line to the steel component construction device (100).
2. The automated construction system for steel bar components according to claim 1, characterized in that: The first construction frame (101) and the second construction frame (102) are both connected to a work platform guide rail (106), and the work platform guide rail (106) is connected to a robot work platform (107) that can move up and down autonomously.
3. The automated construction system for steel bar components according to claim 2, characterized in that: The robot working platform (107) comprises a frame (1071), a power module (1072), a robot slide rail (1073), a robot (1074) and a silo (1075); the power module (1072) is installed at both ends of the frame (1071) and is slidably connected to the working platform guide rail (106); both ends of the robot slide rail (1073) are fixedly connected to the side wall of the power module (1072); the robot (1074) is slidably connected to the robot slide rail (1073); the silo (1075) is located below the robot slide rail (1073) and is connected to the inner wall of the frame (1071).
4. The automated construction system for steel bar components according to claim 1, characterized in that: A frame moving guide rail (103) is connected below the first construction frame (101).
5. The automated construction system for steel bar components according to claim 1, characterized in that: The steel mesh transport device (200) comprises an AGV body (201) and a supporting platform (202), one end of the supporting platform (202) is connected to a rotating shaft (203), the rotating shaft (203) is fixedly connected to the rear of the AGV body (201), a telescopic rod (204) is also connected between the AGV body (201) and the supporting platform (202), and a plurality of pads (205) and a fixing clamp (206) are fixedly connected to the supporting platform (202).
6. The automated construction system for steel bar components according to claim 5, characterized in that: The AGV body (201) is connected to a positioning sensor (207), and the positioning sensor (207) is used to locate the relative position of the AGV body (201) and the steel mesh positioning slot (104).
7. A method for automated construction of steel bar components, characterized in that: The working method is applicable to an automated construction system for steel bar components as described in any one of claims 1 to 6, comprising: Transporting the steel mesh: the steel mesh transport device (200) transports the steel mesh from the production line to the steel mesh positioning slot (104); Inserting the steel mesh: the steel mesh transport device (200) slowly slides the steel mesh into the steel mesh positioning slot (104), the automatic telescopic adjustment rod (105) turns to a flat state and clamps the steel mesh; the robot (1074) installs a prism on the top of the steel mesh; the steel mesh transport device (200) automatically drives away and goes to the steel mesh production line; Adjusting the steel mesh: using an automatic total station to measure the prism at the top of the steel mesh, the automatic telescopic adjustment rod (105) performs telescopic movement and adjusts the inclination angle of the steel mesh until the position accuracy of the steel mesh measurement point meets the requirements; Install the remaining steel mesh: Repeat the above steps until all meshes are installed and adjusted in place; Automated construction of steel bar components: the robot (1074) begins to automatically insert and bend the hook bars of the steel mesh; Rebar component forming: the robot (1074) removes the prism on the top of the rebar mesh, and the automatic telescopic adjustment rod (105) releases the clamping of the rebar mesh and rotates to a vertical state; a special lifting device for rebar components is used to lift out the formed rebar components.
8. The automated construction method for steel bar components according to claim 7, characterized in that: Before the steel mesh inserting step, the first construction frame (101) is first moved along the frame moving guide rail (103) away from the second construction frame (102) to leave space for the steel mesh transportation device (200) to perform the steel mesh insertion operation; after all the steel meshes are installed and adjusted in place, the first construction frame (101) is moved back to the initial position along the frame moving guide rail (103) and starts to automatically construct the steel components.
9. An automated construction method for steel bar components as claimed in claim 7 or 8, characterized in that: In the step of inserting the steel mesh, when the steel mesh transport device (200) is close to the steel mesh positioning slot (104), the positioning sensor (207) installed on the AGV body (201) will monitor the relative position of the steel mesh transport device (200) and the steel mesh positioning slot (104) in real time to ensure that the steel mesh can be smoothly inserted into the steel mesh positioning slot (104).
10. An automated construction method for steel bar components according to any one of claims 7 to 9, characterized in that: In the steel mesh inserting step, when the steel mesh transport device (200) slowly slides the steel mesh into the steel mesh positioning slot (104), the telescopic rod (204) will extend its own length, causing the supporting platform (202) and the steel mesh to rotate around the rotating shaft (203) until the steel mesh is vertically inserted into the steel mesh positioning slot (104).