Engineering geological exploration drilling machine
By adopting the structure of mounting cylinders, conical drilling cylinders, bucket-shaped cylinders and partition cylinders in the engineering geological survey drilling rig, combined with the separation and extraction mechanism of the extraction tubes, the problem of mud doping is solved and the detection accuracy is improved.
Patent Information
- Application Number
- CN202411115823.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2025-03-07
AI Technical Summary
During the drilling process of existing engineering geological survey drilling rigs, mixed doping of mud flowing out of different time periods is prone to affect the representativeness of mud detection.
An engineering geological survey drilling rig was designed, using a structure of mounting cylinders, conical drilling cylinders, bucket-shaped cylinders and partition cylinders. Through the separation and extraction mechanism of extraction tubes one and extraction tube two, the classification and transportation of different muds are ensured and doped avoided.
It effectively avoids the doping of mud, improves the detection accuracy of mud, and ensures accurate judgment of geological conditions.
Smart Images

Figure CN119572225A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of drilling rigs, and in particular to an engineering geological survey drilling rig. Background Art
[0002] An engineering geological survey drill rig is an existing drilling equipment in the prior art that is used to survey the geological conditions of a certain area before carrying out engineering construction in the area. The engineering geological survey drill rig is moved to a designated location in the area, the drilling angle and position of the drill bit and drill rod are adjusted, and then the drill bit and drill rod begin to drill into the formation. As the drill bit and drill rod continue to go deeper, the rock and soil in the borehole and the water added during the drilling process will mix into mud during the rotation of the drill rod. As the drill bit and drill rod rotate downward, the mud in the borehole is gradually discharged through the borehole, forming a mud pool in the drilling area on the surface of the formation. At regular intervals, people will sample and collect the mud discharged from the borehole, and judge the geological conditions deeper in the area by testing the components in the mud samples.
[0003] However, the above-mentioned method for detecting regional geological conditions still has some problems. First, when the drill bit and drill rod drill downward in the borehole, because the drill rod and the inner wall of the borehole are sealed and fitted, if the drill rod encounters smaller objects such as stones during rotation, it is easy for the stones and other objects to be directly bounced up, causing the stones to cause harm to the surrounding operators. In addition, in the prior art, when the engineering geological survey drilling rig drives the drill bit and drill rod to drill downward and the mud flows out through the borehole, it is easy for the subsequent flowing mud to mix with the previous mud before being sampled, thereby affecting the representativeness of the components in the mud for the geological conditions when the subsequent mud is sampled. Summary of the invention
[0004] The present invention proposes an engineering geological survey drilling rig, which solves the problem that when the engineering geological survey drilling rig in the related technology is sampling the mud taken out by the drill during the process of drilling into the formation, the mud flowing out in different time periods is easily mixed, which affects the subsequent judgment of the discharged mud.
[0005] The technical solution of the present invention is as follows: an engineering geological survey drilling rig, comprising a drilling rig body and a movable slide rail, a hydraulic moving device is arranged between the movable slide rail and the drilling rig body, a drill rod driving device is slidably arranged on the movable slide rail, and further comprising: A mounting cylinder, the mounting cylinder being located at the lower side of the drill rod driving device, and a moving assembly being arranged between the mounting cylinder and the drill rod driving device; A conical drilling cylinder, the conical drilling cylinder being rotatably connected to the outer wall of the mounting cylinder; An outer protective structure, which is arranged between the installation cylinder and the outer wall of the conical drilling cylinder; A bucket-shaped cylinder, the bucket-shaped cylinder is arranged at the bottom of the conical drilling cylinder, and a lifting assembly is arranged between the bucket-shaped cylinder and the installation cylinder; Wherein, through openings are correspondingly opened between the installation cylinder, the conical drilling cylinder and the bucket-shaped cylinder, and the interior of the installation cylinder is sealed and fixedly connected with a partition cylinder; A mud discharge mechanism is provided between the installation cylinder and the bucket-shaped cylinder.
[0006] In order to protect the surroundings of the conical drilling cylinder, further, the outer protective structure includes an arc-shaped protective plate, an extension ring belt and a position moving assembly. The number of the arc-shaped protective plates is set to multiple, and the multiple arc-shaped protective plates are circumferentially arranged on the outside of the conical drilling cylinder. The extension ring belt is arranged between two adjacent arc-shaped protective plates, and the position moving assembly is arranged between the arc-shaped protective plate and the mounting cylinder.
[0007] In order to enable multiple arc-shaped protective plates and multiple extension ring belts to move longitudinally, on the basis of the above-mentioned scheme, the position moving assembly includes a rotating member, a rotating shaft, a rotating frame and a connecting rod. The rotating member is fixedly connected to the top of the mounting cylinder, the rotating shaft is rotatably connected inside the rotating member, a coil spring is arranged between the rotating shaft and the rotating member, the rotating frame is arranged on the arc-shaped protective plate through an elastic plate, the rotating frame is also rotatably connected to the rotating shaft, and the connecting rod is arranged between the two rotating shafts.
[0008] In order to adjust the position of the mounting cylinder, further, the moving assembly includes a driving electric cylinder, which is arranged at the bottom of the drill rod driving device, and a fixed plate is fixedly connected to the mounting cylinder, and the output end of the driving electric cylinder is fixedly connected to the fixed plate.
[0009] In order to drive the bucket-shaped cylinder to move longitudinally within the conical drilling cylinder, the lifting assembly further includes a sliding plate body, a meshing gear and a first drive motor. The sliding plate body is slidably connected to the bottom of the mounting cylinder, the sliding plate body is fixedly connected to the top of the bucket-shaped cylinder, a meshing gear plate is fixedly connected to the sliding plate body, the meshing gear is meshed on the meshing gear plate, the first drive motor is arranged in the mounting cylinder, and the meshing gear is arranged on the output end of the first drive motor.
[0010] In order to remove the mud generated during the drilling process from the conical drilling cylinder, on the basis of the present scheme, the mud discharge mechanism includes a slurry delivery pump, a mud extraction assembly and a mud discharge assembly. The slurry delivery pump is arranged on the top of the mounting cylinder, the mud extraction assembly is arranged between the bucket-shaped cylinder, the mounting cylinder and the input end of the slurry delivery pump, and the mud discharge assembly is arranged between the slurry delivery pump and one of the arc-shaped protective plates.
[0011] In order to extract different muds by category, on the basis of the above-mentioned scheme, further, the mud extraction assembly includes a connecting cylinder, an extraction pipe 1, an extraction pipe 2, a connecting conveyor belt and a water inlet pipe, the connecting cylinder is fixedly connected to the bottom of the mounting cylinder, and the two sides of the bottom of the connecting cylinder are respectively connected with the extraction pipe 1 and the extraction pipe 2, wherein the extraction pipe 1 is connected with the side wall of the bucket-shaped cylinder, and the extraction pipe 2 extends into the interior of the bucket-shaped cylinder, and valves are provided on the extraction pipe 1 and the extraction pipe 2, the connecting cylinder and the input end of the slurry delivery pump are connected with the connecting conveyor belt, and the connecting cylinder and the mounting cylinder are connected with the water inlet pipe.
[0012] In order to discharge different muds separately, on the basis of the above-mentioned scheme, further, the mud discharge assembly includes a discharge cylinder, a discharge pipe and a sliding seat, the output end of the slurry conveying pump is connected to the discharge cylinder, and the discharge cylinder is connected to a plurality of the discharge pipes, and the valve is also provided on the discharge pipe, and an arc-shaped groove is provided at the top of one of the arc-shaped protective plates, and the discharge pipe is slidably set on the arc-shaped groove through a sliding seat.
[0013] In order to control the different flow directions of mud, on the basis of the present solution, it further includes a closed ring plate, which is arranged at the inner bottom of the conical drilling cylinder, and the closed ring plate is fixedly connected to the bottom end of the mounting cylinder through a connecting plate, and the extraction pipe 2 is connected to the closed ring plate.
[0014] In order to drive the conical drilling barrel to rotate on the outer wall of the mounting barrel, on the basis of the present solution, it further includes a conical gear ring and a second drive motor, the conical gear ring is fixedly connected to the top of the conical drilling barrel, a conical gear is meshed on the conical gear ring, the second drive motor is arranged in the mounting barrel, and the conical gear is arranged on the output end of the second drive motor.
[0015] The working principle and beneficial effects of the present invention are: 1. In the present invention, when it is necessary to detect the geology of a certain area, the drilling rig body is moved to the designated position, and the drilling positions of the drill rod and the drill bit are adjusted so that the drill rod and the drill bit are perpendicular to the ground. Then, the drill rod driving device drives the drill rod and the drill bit to rotate, so that the drill bit and the drill rod pass through the installation cylinder, the conical drilling cylinder, the bucket cylinder and the partition cylinder, and first drill a hole on the ground. At this time, the conical drilling cylinder is driven to rotate and descend, so that the conical drilling cylinder contacts the ground during the rotation process, and the borehole is expanded, so that most of the conical drilling cylinder is moved into the ground. When the drill bit and the conical drilling cylinder perform drilling operations on the ground, multiple arc-shaped protective plates and extended ring belts can be used to protect stones splashed during the drilling process, and when the mud is sampled later, the operator can be effectively protected; 2. In the present invention, during the drilling process of the drill bit and the drill rod, the water used to cool the drill rod is mixed with the rock and soil in the borehole to form mud and is discharged from the borehole, at which time the bucket-shaped cylinder is driven to rise in the conical drilling cylinder. After the mud enters the conical drilling cylinder, the bottom end of the bucket-shaped cylinder is blocked by a closed ring plate, so that the mud flows into the outer wall of the bucket-shaped cylinder and between the conical drilling cylinder. By starting the slurry delivery pump, the extraction pipe 1 is used to extract and discharge the mud. After the mud to be sampled enters the conical drilling cylinder, the bucket-shaped cylinder is driven to descend, so that the bottom end of the bucket-shaped cylinder is fitted with the inner bottom wall of the conical drilling cylinder, so that the sampled mud enters the bucket-shaped cylinder, and the sampled mud is extracted through the extraction pipe 2. After the mud is discharged, the operator can collect the mud and subsequently judge the geological conditions of the area. 3. The engineering geological survey drilling rig can transport different muds through different paths to avoid the mixing of different muds and affect the accuracy of mud detection. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0017] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a schematic diagram of the structure of the movable slide rail, the installation cylinder and the outer protective structure in the present invention; Figure 3 It is a schematic diagram of a partial cross-section of the structure of the installation cylinder, the conical drilling cylinder, the outer protective structure and the moving assembly in the present invention; Figure 4 For the present invention Figure 3 A schematic diagram of the local enlarged structure at point A in the middle; Figure 5 For the present invention Figure 3 A schematic diagram of the local enlarged structure at B in the middle; Figure 6 It is a partial cross-sectional structural schematic diagram of the cooperation of the loading cylinder, the conical drilling cylinder, the bucket-shaped cylinder, the partition cylinder and the moving assembly in the present invention; Figure 7 It is a partial cross-sectional structural schematic diagram of the cooperation of the installation cylinder, the conical drilling cylinder, the bucket cylinder, the lifting assembly and the mud discharge mechanism in the present invention; Figure 8 It is a schematic diagram of a partial cross-section structure of the installation cylinder, the conical drilling cylinder, the bucket cylinder, the lifting assembly and the mud discharge mechanism in the present invention from another perspective; In the figure: 100, outer protective structure; 200, moving assembly; 300, lifting assembly; 400, mud discharge mechanism; 1. Drilling rig body; 2. Mobile slide rail; 3. Hydraulic mobile equipment; 4. Drill rod driving equipment; 5. Installation cylinder; 6. Conical drilling cylinder; 7. Bucket cylinder; 8. Partition cylinder; 9. Arc protection plate; 10. Extension ring belt; 11. Rotating part; 12. Rotating shaft; 13. Coil spring; 14. Rotating frame; 15. Connecting rod; 16. Driving electric cylinder; 17. Fixed plate; 18. Sliding plate; 19. Engagement Gear; 20, meshing gear plate; 21, first drive motor; 22, slurry delivery pump; 23, connecting cylinder; 24, extraction pipe 1; 25, extraction pipe 2; 26, connecting conveyor belt; 27, water inlet pipe; 28, discharge cylinder; 29, discharge pipe; 30, sliding seat; 31, closed ring plate; 32, connecting plate; 33, conical gear ring; 34, conical gear; 35, second drive motor; 36, screw transmission equipment. DETAILED DESCRIPTION The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0018] like Figures 1 to 8As shown, this embodiment proposes an engineering geological survey drilling rig, including a drilling rig body 1 and a movable slide rail 2, a hydraulic moving device 3 is arranged between the movable slide rail 2 and the drilling rig body 1, a drill rod driving device 4 is slidably arranged on the movable slide rail 2, the drilling rig body 1 is a common device in the prior art for moving the movable slide rail 2 and the drill rod and other equipment, the hydraulic moving device 3 is also a prior art device for driving the movable slide rail 2 to move and adjusting the angle of the movable slide rail 2, a lead screw transmission device 36 is arranged in the movable slide rail 2, the lead screw transmission device 36 is used to drive the drill rod driving device 4 to move on the movable slide rail 2, the drill rod driving device 4 is a device for driving the drill bit and the drill rod to rotate, and connecting the drill rods together, and the drilling rig body 1, the movable slide rail 2, the hydraulic moving device 3, the drill rod driving device 4 and the lead screw transmission device 36 are all conventional components on the engineering geological survey drilling rig in the prior art, and are prior art devices well known to those skilled in the art; It also includes an installation cylinder 5, which is located at the lower side of the drill rod driving device 4. A moving assembly 200 is arranged between the installation cylinder 5 and the drill rod driving device 4. The moving assembly 200 includes a driving electric cylinder 16, which is arranged at the bottom of the drill rod driving device 4. A fixing plate 17 is fixedly connected to the installation cylinder 5. The output end of the driving electric cylinder 16 is fixedly connected to the fixing plate 17. When it is necessary to drive the installation cylinder 5 and the conical drilling cylinder 6 to descend, the driving electric cylinder 16 is started to drive the fixing plate 17 to descend, so that the installation cylinder 5 and the conical drilling cylinder 6 are descended accordingly, so that the bottom of the conical drilling cylinder 6 is in contact with the ground; The conical drilling barrel 6 is rotatably connected to the outer wall of the mounting barrel 5, and also includes a conical gear ring 33 and a second drive motor 35. The conical gear ring 33 is fixedly connected to the top of the conical drilling barrel 6, and a conical gear 34 is meshed on the conical gear ring 33. The second drive motor 35 is arranged in the mounting barrel 5, and the conical gear 34 is arranged on the output end of the second drive motor 35. After the drill bit and the drill rod drill a hole on the ground, in order to expand the top of the borehole by the conical drilling barrel 6, the second drive motor 35 is started, and the conical drilling barrel 6 is driven to rotate on the outer wall of the mounting barrel 5 through the meshing relationship between the conical gear ring 33 and the conical gear 34, so that the conical drilling barrel 6 contacts the ground during the rotation process, and when the electric cylinder 16 is driven to drive the mounting barrel 5 and the conical drilling barrel 6 to descend, the conical drilling barrel 6 expands the borehole while most of the conical drilling barrel 6 enters the borehole.
[0019] like Figures 1 to 5As shown, in the present embodiment, an outer protective structure 100 is arranged between the outer wall of the mounting cylinder 5 and the conical drilling cylinder 6, and the outer protective structure 100 includes an arc-shaped protective plate 9, an extension ring belt 10 and a position moving assembly 200. The number of the arc-shaped protective plates 9 is set to be multiple, and the multiple arc-shaped protective plates 9 are arranged in a circle on the outer side of the conical drilling cylinder 6. An extension ring belt 10 is arranged between two adjacent arc-shaped protective plates 9. A position moving assembly 200 is arranged between the arc-shaped protective plate 9 and the mounting cylinder 5. The position moving assembly 200 includes a rotating member 11, a rotating shaft 12, a rotating frame 14 and a connecting rod 15. The rotating member 11 is fixedly connected to the top of the mounting cylinder 5, and the rotating member 11 is rotatably connected with the rotating shaft 12. A coil spring 13 is arranged between the rotating shaft 12 and the rotating member 11. The rotating frame 14 is arranged on the arc-shaped protective plate 9 through an elastic plate. The rotating frame 14 is also rotatably connected with the rotating shaft 12. A connecting rod 15 is arranged between the two rotating shafts 12. The rod 15 drives the electric cylinder 16 to drive the conical drilling cylinder 6 to descend, so that the bottom end of the arc-shaped protective plate 9 contacts the ground, so that the arc-shaped protective plate 9 and the extended ring belt 10 block the stones splashed during the drilling process of the drill bit. In the process of the installation cylinder 5 continuing to descend, the connecting rod 15 gradually tilts between the rotating member 11 and the rotating frame 14 through the two rotating shafts 12, so that the arc-shaped protective plate 9 does not affect the descending operation of the conical drilling cylinder 6. In the process of the rotation of the rotating shaft 12 located in the rotating member 11, the coil spring 13 is gradually tightened. In the process of the installation cylinder 5 rising, under the action of the torsion of the coil spring 13, the arc-shaped protective plate 9 continues to contact the ground to block the stones that may be splashed during the removal of the conical drilling cylinder 6 and the drill rod from the borehole. Because the ground in the drilling area is sometimes not flat enough, the extension ring belt 10 can be bent upward with a certain arc to achieve comprehensive protection during the drilling process.
[0020] like Figures 1 to 3 and Figures 6 to 8As shown, in this embodiment, the bucket-shaped cylinder 7 is arranged at the bottom of the conical drilling cylinder 6, and a lifting assembly 300 is arranged between the bucket-shaped cylinder 7 and the mounting cylinder 5. The lifting assembly 300 includes a sliding plate body 18, a meshing gear 19 and a first drive motor 21. The sliding plate body 18 passes through and is slidably connected to the bottom of the mounting cylinder 5. The sliding plate body 18 is fixedly connected to the top of the bucket-shaped cylinder 7. A meshing gear plate 20 is fixedly connected inside the sliding plate body 18, and a meshing gear 19 is meshed on the meshing gear plate 20. The first drive motor 21 is arranged in the mounting cylinder 5, and the meshing gear 19 is arranged on the output end of the first drive motor 21. Among them, corresponding through openings are opened between the mounting cylinder 5, the conical drilling cylinder 6 and the bucket-shaped cylinder 7. The interior of the mounting cylinder 5 is sealed and fixedly connected with a partition cylinder 8, and also includes a closed ring plate 31. The closed ring plate 31 is arranged at the inner bottom of the conical drilling cylinder 6, and the closed ring plate 31 is fixedly connected to the bottom end of the mounting cylinder 5 through a connecting plate 32. , the extraction pipe 25 is connected to the closed ring plate 31. When the mud is discharged through the borehole, the bucket-shaped cylinder 7 rises in the conical drilling cylinder 6, leaving a gap between the outer wall of the bucket-shaped cylinder 7 and the inner wall of the conical drilling cylinder 6. At this time, the closed ring plate 31 fits with the inner bottom wall of the bucket-shaped cylinder 7, so that the mud will flow into the space between the outer wall of the bucket-shaped cylinder 7 and the inner wall of the conical drilling cylinder 6, and be collected through the extraction pipe 1 24. When the mud to be sampled and collected flows out of the borehole, the start The first driving motor 21, through the meshing relationship between the meshing gear plate 20 and the meshing gear 19, causes the sliding plate body 18 and the bucket-shaped cylinder 7 to descend in the conical drilling cylinder 6, and the bottom end of the bucket-shaped cylinder 7 fits with the inner bottom wall of the conical drilling cylinder 6, while the closed ring plate 31 does not descend. At this time, after the mud is discharged through the borehole, the mud will enter the bucket-shaped cylinder 7 through the gap between the closed ring plate 31 and the inner wall of the bucket-shaped cylinder 7, and the mud will be collected through the extraction pipe 25.
[0021] like Figures 1 to 3 and Figures 6 to 8As shown, in this embodiment, a mud discharge mechanism 400 is arranged between the installation cylinder 5 and the bucket-shaped cylinder 7. The mud discharge mechanism 400 includes a slurry delivery pump 22, a mud extraction assembly and a mud discharge assembly. The slurry delivery pump 22 is arranged on the top of the installation cylinder 5. The mud extraction assembly is arranged between the bucket-shaped cylinder 7, the installation cylinder 5 and the input end of the slurry delivery pump 22. The mud discharge assembly is arranged between the slurry delivery pump 22 and one of the arc-shaped protective plates 9. The mud extraction assembly includes a connecting cylinder. The connecting cylinder 23, the extraction pipe 1 24, the extraction pipe 25, the connecting conveyor belt 26 and the water inlet pipe 27 are connected to the connecting cylinder 23. The connecting cylinder 23 is fixedly connected to the bottom of the installation cylinder 5. The bottom sides of the connecting cylinder 23 are connected with the extraction pipe 1 24 and the extraction pipe 25 respectively. Among them, the extraction pipe 1 24 is connected to the side wall of the bucket-shaped cylinder 7, and the extraction pipe 25 extends into the inside of the bucket-shaped cylinder 7. The extraction pipe 1 24 and the extraction pipe 25 are both provided with valves. The connecting cylinder 23 is connected to the input end of the slurry delivery pump 22. The connecting conveyor belt 26 is connected to the connecting cylinder 23 and the installation cylinder 5 through a water inlet pipe 27. When it is necessary to extract the mud flowing into the outer wall of the bucket-shaped cylinder 7 and the inner wall of the conical drilling cylinder 6, the valve on the extraction pipe 25 is closed, and the slurry delivery pump 22 is started to allow the mud to enter the slurry delivery pump 22 through the extraction pipe 1 24, the connecting cylinder 23 and the connecting conveyor belt 26. When it is necessary to extract the mud in the bucket-shaped cylinder 7, the valve on the extraction pipe 1 24 is closed to allow the mud to flow into the slurry delivery pump 22. The slurry enters the slurry delivery pump 22 through the extraction pipe 25, the connecting cylinder 23 and the connecting conveyor belt 26. In order to ensure the cleanliness of the connecting cylinder 23, the connecting conveyor belt 26 and the slurry delivery pump 22 and avoid the problem of multiple slurries being mixed together, water can be supplied to the connecting pipeline through the water inlet pipe 27, so that the water passes through the connecting cylinder 23, the connecting conveyor belt 26 and the slurry delivery pump 22 to clean and deliver the connecting cylinder 23, the connecting conveyor belt 26 and the slurry delivery pump 22; The mud discharge assembly includes a discharge cylinder 28, a discharge pipe 29 and a sliding seat 30. The output end of the slurry delivery pump 22 is connected to the discharge cylinder 28. A plurality of discharge pipes 29 are connected to the discharge cylinder 28. A valve is also provided on the discharge pipe 29. An arc chute is provided at the top of one of the arc-shaped protective plates 9. The discharge pipe 29 is slidably arranged on the arc chute through the sliding seat 30. When different muds need to be transported to different areas, after the slurry delivery pump 22 transports the mud into the discharge cylinder 28, the valve on any discharge pipe 29 is opened to discharge the mud through the corresponding discharge pipe 29. The discharge pipe 29 can slide on the arc chute through the sliding seat 30. The sliding seat 30 is slidably connected to the arc chute to adjust the position of the discharge pipe 29. The water added into the connecting cylinder 23 through the water inlet pipe 27 can flush the discharge cylinder 28 and the discharge pipe 29 after entering the slurry delivery pump 22 or the discharge cylinder 28.
[0022] The working principle of the engineering geological survey drilling rig is as follows: first, the drilling rig body 1 is moved to the designated position, and the position of the movable slide rail 2 and the drill rod driving device 4 is adjusted by the hydraulic moving device 3, so that the drill rod driving device 4 drives the drill bit and the drill rod to pass through the partition cylinder 8, the bucket cylinder 7 and the conical drilling cylinder 6, and the drill rod driving device 4 drives the drill rod and the drill rod to rotate, and drill holes are drilled on the ground, and then the driving electric cylinder 16 is started to drive the fixed plate 17 to descend, so that the installation cylinder 5 and the conical drilling cylinder 6 are descended accordingly, so that The bottom of the conical drilling cylinder 6 is in contact with the ground. During the descent of the conical drilling cylinder 6, the second driving motor 35 is started to drive the conical drilling cylinder 6 to rotate on the outer wall of the mounting cylinder 5 through the meshing relationship between the conical gear ring 33 and the conical gear 34, so that the conical drilling cylinder 6 is in contact with the ground during the rotation process. During the descent of the mounting cylinder 5 and the conical drilling cylinder 6 by driving the electric cylinder 16, the conical drilling cylinder 6 expands the borehole while most of the conical drilling cylinder 6 enters the borehole. During the process of the installation cylinder 5 continuing to descend, the connecting rod 15 gradually tilts between the rotating member 11 and the rotating frame 14 through the two rotating shafts 12, so that the arc-shaped protective plate 9 does not affect the descending operation of the conical drilling cylinder 6. During the rotation of the rotating shaft 12 located in the rotating member 11, the coil spring 13 is gradually tightened. During the process of the installation cylinder 5 ascending, under the torsion of the coil spring 13, the arc-shaped protective plate 9 continues to contact the ground to block stones that may be splashed when the conical drilling cylinder 6 and the drill rod are removed from the borehole. When the mud is discharged through the borehole, the bucket-shaped cylinder 7 rises in the conical drilling cylinder 6, leaving a gap between the outer wall of the bucket-shaped cylinder 7 and the inner wall of the conical drilling cylinder 6, and at this time, the closed ring plate 31 fits with the inner bottom wall of the bucket-shaped cylinder 7, so that the mud will flow into the space between the outer wall of the bucket-shaped cylinder 7 and the inner wall of the conical drilling cylinder 6, and the slurry delivery pump 22 is started, so that the mud enters the slurry delivery pump 22 through the extraction pipe 24, the connecting cylinder 23 and the connecting conveyor belt 26, and then the mud is transported to the discharge cylinder 28, so that the mud is discharged through the corresponding discharge pipe 29. When the mud that needs to be sampled and collected flows out of the borehole, the first drive motor 21 is started, and the meshing gear plate 20 and the meshing gear 19 are engaged. The meshing relationship between them causes the sliding plate body 18 and the bucket-shaped cylinder 7 to descend in the conical drilling cylinder 6, and the bottom end of the bucket-shaped cylinder 7 fits against the inner bottom wall of the conical drilling cylinder 6, while the closed ring plate 31 does not descend. At this time, after the mud is discharged through the borehole, the mud will enter the bucket-shaped cylinder 7 through the gap between the closed ring plate 31 and the inner wall of the bucket-shaped cylinder 7, and the valve on the extraction pipe 1 24 is closed to allow the mud to enter the slurry delivery pump 22 through the extraction pipe 2 25, the connecting cylinder 23 and the connecting conveyor belt 26. After the mud is transported to the discharge cylinder 28, the valve on any discharge pipe 29 is opened to allow the mud to be discharged through the corresponding discharge pipe 29, so that the operator can sample and collect the mud.
[0023] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. An engineering geological survey drilling rig, comprising a drilling rig body (1) and a movable slide rail (2), a hydraulic moving device (3) being arranged between the movable slide rail (2) and the drilling rig body (1), a drill rod driving device (4) being slidably arranged on the movable slide rail (2), characterized in that: Also includes: A mounting cylinder (5), the mounting cylinder (5) being located at the lower side of the drill rod driving device (4), and a moving assembly (200) being arranged between the mounting cylinder (5) and the drill rod driving device (4); A conical drilling cylinder (6), the conical drilling cylinder (6) being rotatably connected to the outer wall of the mounting cylinder (5); An outer protective structure (100), the outer protective structure (100) being arranged between the outer walls of the installation cylinder (5) and the conical drilling cylinder (6); A bucket-shaped cylinder (7), the bucket-shaped cylinder (7) being arranged at the bottom of the conical drilling cylinder (6), and a lifting assembly (300) being arranged between the bucket-shaped cylinder (7) and the installation cylinder (5); Wherein, through openings are correspondingly provided between the installation cylinder (5), the conical drilling cylinder (6) and the bucket-shaped cylinder (7), and the interior of the installation cylinder (5) is sealed and fixedly connected to a partition cylinder (8); A mud discharge mechanism (400) is provided between the installation cylinder (5) and the bucket-shaped cylinder (7).
2. The engineering geological survey drilling rig according to claim 1, characterized in that: The outer protective structure (100) comprises: An arc-shaped protective plate (9), wherein the number of the arc-shaped protective plates (9) is set to be multiple, and the multiple arc-shaped protective plates (9) are arranged in a circular shape on the outer side of the conical drilling cylinder (6); An extended ring belt (10), wherein the extended ring belt (10) is arranged between two adjacent arc-shaped protection plates (9); A position moving component (200) is provided between the arc-shaped protection plate (9) and the installation cylinder (5).
3. The engineering geological survey drilling rig according to claim 2, characterized in that: The position moving component (200) comprises: A rotating member (11), the rotating member (11) being fixedly connected to the top of the mounting cylinder (5); A rotating shaft (12), the rotating shaft (12) being rotatably connected inside the rotating member (11), and a coil spring (13) being arranged between the rotating shaft (12) and the rotating member (11); A rotating frame (14), the rotating frame (14) being arranged on the arc-shaped protective plate (9) via an elastic plate, and a rotating shaft (12) being rotatably connected inside the rotating frame (14); A connecting rod (15) is provided between the two rotating shafts (12).
4. The engineering geological survey drilling rig according to claim 3, characterized in that: The moving component (200) comprises: A driving electric cylinder (16) is arranged at the bottom of the drill rod driving device (4); a fixing plate (17) is fixedly connected to the mounting cylinder (5); and an output end of the driving electric cylinder (16) is fixedly connected to the fixing plate (17).
5. The engineering geological survey drilling rig according to claim 4, characterized in that: The lifting assembly (300) comprises: A sliding plate body (18), the sliding plate body (18) passing through and slidably connected to the bottom of the mounting cylinder (5), the sliding plate body (18) being fixedly connected to the top end of the bucket-shaped cylinder (7); A meshing gear (19), wherein a meshing tooth plate (20) is fixedly connected inside the sliding plate body (18), and the meshing gear (19) is meshed on the meshing tooth plate (20); A first drive motor (21), wherein the first drive motor (21) is arranged in the installation cylinder (5), and the meshing gear (19) is arranged on an output end of the first drive motor (21).
6. The engineering geological survey drilling rig according to claim 5, characterized in that: The mud discharge mechanism (400) comprises: A slurry delivery pump (22), wherein the slurry delivery pump (22) is arranged on the top of the mounting cylinder (5); A slurry extraction assembly, the slurry extraction assembly being arranged between the bucket-shaped cylinder (7), the mounting cylinder (5) and the input end of the slurry delivery pump (22); A slurry discharge assembly, wherein the slurry discharge assembly is arranged between the slurry delivery pump (22) and one of the arc-shaped protective plates (9).
7. The engineering geological survey drilling rig according to claim 6, characterized in that: The mud extraction assembly comprises: A connecting cylinder (23), wherein the connecting cylinder (23) is fixedly connected to the bottom of the mounting cylinder (5); Extraction pipe 1 (24) and extraction pipe 2 (25), the two sides of the bottom of the connecting cylinder (23) are respectively connected to the extraction pipe 1 (24) and the extraction pipe 2 (25); The extraction pipe 1 (24) is in communication with the side wall of the bucket-shaped cylinder (7), the extraction pipe 2 (25) extends into the interior of the bucket-shaped cylinder (7), and valves are provided on both the extraction pipe 1 (24) and the extraction pipe 2 (25); A connecting conveyor belt (26), wherein the connecting cylinder (23) and the input end of the slurry delivery pump (22) are connected by the connecting conveyor belt (26); A water inlet pipe (27), wherein the water inlet pipe (27) is connected between the communicating cylinder (23) and the mounting cylinder (5).
8. The engineering geological survey drilling rig according to claim 7, characterized in that: The mud discharge assembly comprises: a discharge cylinder (28), the discharge cylinder (28) being connected to the output end of the slurry delivery pump (22); a discharge pipe (29), wherein a plurality of the discharge pipes (29) are connected to the discharge cylinder (28), and the valve is also provided on the discharge pipe (29); A sliding seat (30), wherein a top end of one of the arc-shaped protective plates (9) is provided with an arc-shaped sliding groove, and the discharge pipe (29) is slidably arranged on the arc-shaped sliding groove through the sliding seat (30).
9. The engineering geological survey drilling rig according to claim 8, characterized in that: Also includes: A closed ring plate (31), the closed ring plate (31) being arranged at the inner bottom of the conical drilling cylinder (6), the closed ring plate (31) being fixedly connected to the bottom end of the mounting cylinder (5) via a connecting plate (32), and the second extraction pipe (25) being in communication with the closed ring plate (31).
10. The engineering geological survey drilling rig according to claim 9, characterized in that: Also includes: A conical gear ring (33), the conical gear ring (33) being fixedly connected to the top of the conical drilling barrel (6), and a conical gear (34) being meshed on the conical gear ring (33); A second drive motor (35), wherein the second drive motor (35) is arranged in the mounting cylinder (5), and the bevel gear (34) is arranged on an output end of the second drive motor (35).
Citation Information
Cited By
Small multifunctional drilling machine suitable for narrow space construction
CN120312117A
A small multifunctional drilling rig suitable for construction in narrow spaces
CN120312117B