Lifting platform foundation structure for entrance and exit of logistics warehouse

By designing the force transmission method of the plain concrete cushion layer and concrete foundation at the entrance and exit of the logistics warehouse, and combining the slot structure of the lower concrete wall and the upper concrete wall, the problems of increasing self-weight and high construction costs in the existing technology are solved, and the effect of reducing the bottom area and engineering investment is achieved, while ensuring the safety and stability of the structure.

CN119615960APending Publication Date: 2025-03-14SIPPR ENG GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510037997.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-10
Publication Date
2025-03-14

AI Technical Summary

Technical Problem

When the infrastructure of the existing tail plate slot lifting platform ensures bearing capacity and stability, the foundation weight increases, resulting in an expansion of the bottom area and high construction costs, which requires improvement in the design of the infrastructure.

Method used

The force transmission method of plain concrete cushion layer and concrete foundation is adopted, combined with the design of the lower concrete wall and the upper concrete wall, a slot structure is formed to support the lifting platform, and the bottom area of ​​the foundation structure is reduced by cast-in-place concrete.

Benefits of technology

It has achieved the reduction of the base area and engineering investment of the infrastructure, while ensuring the safety and stability of the infrastructure, and the design is easy to install HVAC, reducing construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119615960A_ABST
    Figure CN119615960A_ABST
Patent Text Reader

Abstract

The lifting platform foundation structure comprises a plain concrete cushion layer laid on a foundation and a concrete foundation poured on the plain concrete cushion layer, a lower concrete enclosing wall with an opening in one side is poured on the concrete foundation, and a platform bottom plate is poured on the top of the lower concrete enclosing wall. An upper concrete enclosing wall is poured on the platform bottom plate, the upper concrete enclosing wall is provided with a side entrance and exit, a mounting hole is formed in one side wall of the lower concrete enclosing wall, and the mounting hole is opposite to a side opening of the lower concrete enclosing wall. The side enclosing wall, the foundation and the platform bottom plate are formed by concrete in a cast-in-place mode, the concrete foundation is poured on the hard plain concrete layer, the force transmission mode of the concrete foundation is the concrete wall, the platform bottom plate, the concrete foundation and the foundation, safety and stability of the whole foundation structure are guaranteed, the bottom face area of the foundation structure can be obviously reduced, and the construction cost is reduced. The engineering investment is reduced; mounting holes can be formed in the lower concrete enclosing wall, so that heating and ventilation air pipes can be conveniently mounted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of logistics and warehousing, and in particular to a lifting platform infrastructure used at an import and export of a logistics warehouse. Background Art

[0002] In the field of logistics and warehousing, a lifting platform is usually required to be installed at the entrance and exit of the warehouse. The lifting platform is an important equipment that is indispensable for the storage and retrieval of goods in the warehouse. When storing and retrieving goods, the goods enter and exit the warehouse through the lifting platform. The foundation on which the lifting platform is located often needs to have a large bearing capacity, high stability and certain deformability to meet the requirements of the warehouse. The conventional structure of the foundation structure of the existing tailgate slot lifting platform is a concrete bottom plate + vertical sintered solid brick wall. The foundation is located on the top surface of the bearing layer. A vertical sintered solid brick wall is set on the foundation. A reinforced concrete lifting platform plate is set on the top surface of the wall, and then a vertical sintered solid brick wall is set. The force is transmitted in the way of "brick wall → concrete plate → brick wall → foundation → foundation". However, in actual engineering, in order to ensure the support width of the concrete slab and the outer backfill soil and load, the solid brick wall will increase accordingly. As the thickness of the solid brick wall increases, the self-weight of the entire foundation increases, and the bottom surface area of ​​the foundation needs to be increased, which greatly increases the construction cost. The comprehensive cost is greatly increased, and it is urgent to improve the foundation of the lifting platform with a tailgate slot. Summary of the invention

[0003] In view of this, the present invention proposes a lifting platform infrastructure for the import and export of a logistics warehouse.

[0004] To achieve the above object, the present invention adopts the following technical solutions: The lifting platform foundation structure for the entrance and exit of a logistics warehouse described in the present invention comprises a plain concrete cushion layer laid on a foundation and a concrete foundation cast on the plain concrete cushion layer, a lower concrete wall with an opening on one side is cast on the concrete foundation, a platform bottom plate for supporting the lifting platform is cast on the top of the lower concrete wall, an upper concrete wall is cast on the platform bottom plate, the upper concrete wall has a side entrance and exit, the side entrance and exit are in the same direction as the side opening of the lower concrete wall, the upper concrete wall and the platform bottom plate form a slot, the slot has a first section and a second section, the width of the first section is d 1 Greater than the width of the second segment d 2; A mounting hole is provided on one side wall of the lower concrete enclosure, and the mounting hole is opposite to the side opening of the lower concrete enclosure. The beneficial effects are as follows: the side enclosure, foundation and platform bottom plate of the present invention are formed by cast-in-place concrete, and the concrete foundation is cast on a hard plain concrete layer, and the force transmission method is concrete wall, platform bottom plate → concrete foundation → foundation, which ensures the safety and stability of the entire infrastructure structure; the present invention adopts cast-in-place concrete, which can also significantly reduce the bottom surface area of ​​the infrastructure and reduce engineering investment; mounting holes can be provided on the lower concrete enclosure to facilitate the installation of HVAC ducts.

[0005] Preferably, the lower part of the steel cage of the lower concrete wall is tied to the steel cage of the concrete foundation, the upper part of the steel cage of the lower concrete wall is tied to the steel cage of the platform floor, and the steel cage of the upper concrete wall is tied to the steel cage of the platform floor, so that the steel cages of the concrete foundation, platform floor, lower concrete wall and upper concrete wall are connected to form a whole, thereby improving the overall stability.

[0006] Preferably, the outer end face and the corner end face of the upper concrete fence are both provided with anti-collision rubber blocks, and a reinforcing steel plate is pre-embedded in the upper concrete fence corresponding to each of the anti-collision rubber blocks through anchor bars, and the anti-collision rubber block is fixedly connected to the reinforcing steel plate through a connector. The present invention pre-embeds reinforcing steel plates at locations prone to collision to improve structural strength; and anti-collision rubber blocks are installed on the reinforcing steel plates to provide protection.

[0007] Preferably, the connecting member is an anchor bolt of L-shaped structure, the anchor bolt is pre-buried in the upper concrete wall, the threaded connection portion of the anchor bolt passes outwardly through the reinforcing steel plate and the anti-collision rubber block and is screwed with a fastening nut.

[0008] Preferably, the upper edge of the inner side surface of the upper concrete fence and its side opening are pre-embedded with reinforced angle steels to improve the anti-collision performance at the edge and extend the maintenance cycle.

[0009] Compared with the prior art, the advantages of the present invention are: the two side walls, foundation and platform bottom plate of the present invention are formed by cast-in-place concrete, and the concrete foundation is cast on a hard plain concrete layer. The force transmission method is concrete wall, platform bottom plate → concrete foundation → foundation, which ensures the safety and stability of the entire infrastructure structure; the present invention adopts cast-in-place concrete, which can also significantly reduce the bottom surface area of ​​the infrastructure and reduce project investment; installation holes can be opened on the lower concrete wall to facilitate the installation of HVAC ventilation ducts and reduce construction costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 It is a plan view of the present invention.

[0011] Figure 2 yes Figure 1 1-1 cross-sectional view.

[0012] Figure 3 yes Figure 1 2-2 cross-sectional view.

[0013] Figure 4 It is a perspective view of the present invention.

[0014] Figure 5 It is a schematic diagram of the anti-collision rubber block of the present invention.

[0015] Figure 6 yes Figure 5 AA section view.

[0016] Figure 7 yes Figure 5 BB section view. DETAILED DESCRIPTION

[0017] The following is a detailed description of an embodiment of the present invention in conjunction with the accompanying drawings. This embodiment is implemented on the premise of the technical solution of the present invention, and a detailed implementation method and a specific operation process are given, but the protection scope of the present invention is not limited to the following embodiment.

[0018] It should be noted that, in the description of the present invention, relational terms such as “first” and “second” are merely used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations.

[0019] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected" and "connection" that may appear should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0020] like Figure 1-4As shown, the lifting platform foundation structure for the entrance and exit of the logistics warehouse described in the present invention comprises a plain concrete cushion layer 1 laid on the foundation and a concrete foundation 2 cast on the plain concrete cushion layer 1, a lower concrete wall 3 with an opening on one side is cast on the concrete foundation 2, a platform bottom plate 4 for supporting the lifting platform is cast on the top of the lower concrete wall 3, an upper concrete wall 5 with a side entrance and exit on one side is cast on the platform bottom plate 4, the side entrance and exit of the upper concrete wall 5 and the side opening direction of the lower concrete wall 3 are consistent, and both are located outside the warehouse; the upper concrete wall 5 and the platform bottom plate 4 form a slot with a side opening, the slot has a first section and a second section, and the width of the first section is d 1 Greater than the width of the second paragraph d 2 , that is, the slot expansion setting is convenient for the entry and exit of the rear of the freight truck, providing a certain space for its tailboard, thereby realizing the connection between the rear of the freight truck and the lifting platform, and facilitating the entry and exit of goods; A mounting hole 10 is provided on one side wall of the lower concrete enclosure 3 , and the mounting hole is opposite to the side opening of the lower concrete enclosure 3 , which is convenient for installing the HVAC duct, thereby reducing the antifreeze investment and operating costs.

[0021] During actual construction, after the plain concrete layer solidifies, the steel cage of the concrete foundation 2 is tied, and the steel cage of the lower concrete wall 3 is tied thereon, the lower part of the steel cage of the lower concrete wall 3 and the steel cage of the concrete foundation 2 are tied together, and then the concrete foundation 2 is poured; after the concrete foundation 2 reaches the design strength, the steel cage of the platform bottom plate 4 is tied to the steel cage of the lower concrete wall 3, and then the lower concrete wall 3 is poured; after the lower concrete wall 3 reaches the design strength, the upper concrete wall 5 is tied to the steel cage of the platform bottom plate 4, and then the platform bottom plate 4 and the upper concrete wall 5 are poured, and the steel cages of the concrete foundation 2, the lower concrete wall 3, the platform bottom plate 4 and the upper concrete wall 5 are tied together, which effectively improves the structural strength and stability.

[0022] During actual construction, the steel cages of the concrete foundation 2, the lower concrete wall 3, the platform floor 4 and the upper concrete wall 5 can be tied in sequence first, and then cast as a whole: first tie the steel cage of the concrete foundation 2 (composed of longitudinal steel bars and transverse steel bars); then tie the steel cage of the lower concrete side wall, which has vertical steel bars and horizontal steel bars, the horizontal steel bars and the vertical steel bars are tied together, and the lower part of the vertical steel bars is tied together with the steel cage of the concrete foundation 2; tie the steel cage of the platform floor 4 to the steel cage of the lower concrete wall 3, and tie the steel cage on the platform floor 4 to the steel cage of the upper concrete side wall, so that their steel cages are tied together to form a whole, and then cast as a whole to ensure the structural strength and stability of the entire foundation.

[0023] Combination Figure 1 , 4 -7 It can be seen that anti-collision rubber blocks 6 are provided on the outer end faces and corner end faces of the upper concrete fence 5. The outer end faces and corner end faces are both parts that are prone to collision. The anti-collision rubber blocks 6 can effectively protect the upper concrete fence 5 to prevent the rear end of a freight truck from entering and causing damage to the fence due to collision. In order to further protect the concrete walls at these parts that are prone to collision, a reinforcing steel plate 7 can be pre-buried at each part that is prone to collision when the steel cage of the upper concrete fence 5 is in place. A plurality of anchor bars 8 are welded to the inner surface of the reinforcing steel plate 7, and the anchor bars 8 are anchored in the upper concrete fence 5. In order to facilitate the installation of the anti-collision rubber block 6, an anchor bolt 9 with an L-shaped structure is pre-buried when the reinforcing steel plate 7 is pre-buried. The threaded connector of the anchor bolt 9 passes through the reinforcing steel plate 7 and the upper concrete fence 5 outwardly. A countersunk hole corresponding to the anchor bolt 9 is opened on the anti-collision rubber block 6. The threaded connector is located in the countersunk hole of the anti-collision rubber block 6. The anti-collision rubber block 6 can be fixedly installed by screwing the tightening nut. After being put into use, when the anti-collision rubber block 6 is damaged, the upper concrete wall 5 can be protected by the reinforcing steel plate 7, so as to avoid damage to the upper concrete wall 5 as much as possible, extend the maintenance cycle, and facilitate timely replacement of new anti-collision rubber blocks 6.

[0024] Combination Figure 2-3 7, the upper edge of the inner side of the upper concrete fence 5 and the side entrance and exit of the upper concrete fence 5 are pre-buried with reinforcing angle steels 11 to improve the anti-collision performance of the upper inner edge and the side entrance and exit of the upper concrete fence 5 and extend the maintenance cycle. Among them, the reinforcing angle steels 11 at the corresponding positions of the upper concrete fence 5 are fixedly connected to the steel cage of the upper concrete fence 5, and are fixedly connected to the reinforcing angle steels 11 at the corresponding positions of the platform bottom plate 4 and the steel cage of the platform bottom plate 4.

[0025] Finally, it should be emphasized that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions recorded in the aforementioned embodiments without creative work, or replace some of the technical features therein with equivalents. Therefore, any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A lifting platform infrastructure for the entrance and exit of a logistics warehouse, characterized by: The utility model comprises a plain concrete cushion layer laid on the foundation and a concrete foundation cast on the plain concrete cushion layer, a lower concrete wall with an opening on one side is cast on the concrete foundation, a platform bottom plate for supporting a lifting platform is cast on the top of the lower concrete wall, an upper concrete wall is cast on the platform bottom plate, the upper concrete wall has a side inlet and outlet, the side inlet and outlet are in the same direction as the side opening of the lower concrete wall, the upper concrete wall and the platform bottom plate form a slot, the slot has a first section and a second section, the width of the first section is d 1 Greater than the width of the second segment d 2 A mounting hole is provided on one side wall of the lower concrete enclosure, and the mounting hole is opposite to the side opening of the lower concrete enclosure.

2. The lifting platform infrastructure for the entrance and exit of a logistics warehouse according to claim 1 is characterized in that: The lower part of the steel cage of the lower concrete wall is tied to the steel cage of the concrete foundation, the upper part of the steel cage of the lower concrete wall is tied to the steel cage of the platform bottom plate, and the steel cage of the upper concrete wall is tied to the steel cage of the platform bottom plate.

3. The lifting platform infrastructure for the entrance and exit of a logistics warehouse according to claim 1 is characterized by: Anti-collision rubber blocks are arranged on the outer end face and corner end face of the upper concrete fence, and a reinforcing steel plate is pre-embedded in the upper concrete fence corresponding to each anti-collision rubber block through anchor bars, and the anti-collision rubber block is fixedly connected to the reinforcing steel plate through a connecting piece.

4. The lifting platform infrastructure for the entrance and exit of a logistics warehouse according to claim 3 is characterized by: The connecting piece is an anchor bolt of L-shaped structure, and the anchor bolt is pre-buried in the upper concrete wall. The threaded connection part of the anchor bolt passes through the reinforcing steel plate and the anti-collision rubber block outward and is screwed with a fastening nut.

5. The lifting platform infrastructure for the entrance and exit of a logistics warehouse according to claim 3 is characterized by: Reinforcement angle steels are pre-embedded at the upper edge of the inner side surface of the upper concrete enclosure wall and at its side opening.