Fabricated composite wall and construction method thereof
By using concave splicing bodies at the vertical joints of the prefabricated composite wall to form a rectangular splicing channel, and setting through insertion ribs and post-pouring concrete in the channel, the problem of difficulty in vertical connection construction in the prior art is solved, and efficient and strong wall connection is achieved.
Patent Information
- Application Number
- CN202411955498.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-28
- Publication Date
- 2025-03-14
AI Technical Summary
The vertical connections in existing prefabricated concrete structures are difficult to construct, which restricts the quality and efficiency of construction.
The concave font splicing body is spliced to form a rectangular splicing channel, and the penetration ribs and post-pouring concrete are set in the channel to realize the dry connection of adjacent composite wall panels and avoid a large amount of on-site wet operations.
It improves installation and disassembly efficiency, strengthens the stiffness and strength at the structural connections, reduces construction costs, reduces construction difficulty, and improves construction efficiency.
Smart Images

Figure CN119616098A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of assembled composite walls, and in particular relates to an assembled composite wall body and a construction method thereof. Background Art
[0002] Compared with traditional construction, prefabricated buildings adopt factory-based prefabrication of components, implement large-scale production and standardized construction, and achieve economies of scale through information integration and controllable management, promote energy conservation and emission reduction, reduce costs, and significantly reduce construction waste and dust, thereby achieving green construction.
[0003] One of the key technologies of prefabricated structures is the connection technology of prefabricated components. The stress performance of nodes and joints will largely determine the overall performance of the prefabricated shear wall structure, and the vertical joints mainly play the role of transmitting shear force between two horizontal shear walls. Among them, the connection technology of prefabricated wall panels can be divided into wet connection and dry connection according to the construction method. Dry connection is a method of connecting by implanting steel sleeves or embedded parts in prefabricated components through sleeve grouting, bolts or welding. Dry connection has the advantages of higher precision, shortened construction period, easy repair of nodes damaged after earthquake, and convenient installation in remote areas. It is the development trend of prefabricated connection technology in the future.
[0004] At present, the commonly used vertical connection forms in prefabricated concrete structures mainly include sleeve grouting connection, steel bar welding connection and constrained lap grouting anchor connection. However, in actual construction, the sleeve cost is high, the grouting quality is difficult to control, the welding quality is uneven, and the cross-section is weak due to a large number of holes. These problems have increased the difficulty of construction and restricted the quality and efficiency of construction. Therefore, how to reduce construction costs, reduce construction difficulty and improve construction efficiency while ensuring the quality of vertical connections of prefabricated shear walls is still a difficult problem that needs to be overcome in the promotion of shear wall assembly structures. Summary of the invention
[0005] In view of the technical problems existing in the prior art, the present invention provides a prefabricated composite wall and a construction method thereof to solve the technical problems that the vertical connection in the existing prefabricated concrete structure is difficult to construct and restricts the quality and efficiency of the construction.
[0006] In order to achieve the above object, the technical solution adopted by the present invention is: The present invention provides an assembled composite wall, comprising a first composite wall panel, a second composite wall panel, through-reinforced bars and post-cast concrete; The splicing end of the first composite wall panel is provided with a first concave-shaped splicing body, and the splicing end of the second composite wall panel is provided with a second concave-shaped splicing body; at the vertical joint between the first composite wall panel and the second composite wall panel, the first concave-shaped splicing body and the second concave-shaped splicing body are spliced together to form a rectangular splicing channel; The through-rebar is vertically inserted in the center of the rectangular splicing channel; the post-cast concrete is poured into the rectangular splicing channel and wrapped around the through-rebar.
[0007] Furthermore, a plurality of first pre-embedded anchor bars are arranged on the side walls of the first concave-shaped splicing body, and a plurality of second pre-embedded anchor bars are arranged on the side walls of the second concave-shaped splicing body; the plurality of first pre-embedded anchor bars and the plurality of second pre-embedded anchor bars are all arranged horizontally and are distributed at intervals in the vertical direction; wherein the first pre-embedded anchor bars and the second pre-embedded anchor bars are parallel to each other and are respectively arranged on both sides of the through-inserted bars.
[0008] Furthermore, one end of the first pre-embedded anchor bar is anchored on the side wall of the first concave-shaped splicing body, and the other end of the first pre-embedded anchor bar extends into the post-cast concrete; wherein the anchoring end of the first pre-embedded anchor bar is arranged close to one side of the second composite wall panel.
[0009] Furthermore, one end of the second embedded anchor bar is anchored on the side wall of the second concave-shaped splicing body, and the other end of the second embedded anchor bar extends into the post-cast concrete; wherein the anchoring end of the second embedded anchor bar is arranged close to one side of the first composite wall panel.
[0010] Furthermore, the first pre-embedded anchor bars and the second pre-embedded anchor bars are staggered with each other in both vertical and horizontal directions.
[0011] Furthermore, weather-resistant sealant is poured into the joint seam between the first concave-shaped joint body and the second composite wall panel, and into the joint seam between the second concave-shaped joint body and the first composite wall panel.
[0012] Furthermore, the surface of the joint between the first concave-shaped joint body and the second composite wallboard and the surface of the joint between the second concave-shaped joint body and the first composite wallboard are both provided with hole-filling mortar.
[0013] Furthermore, both the first composite wall panel and the second composite wall panel are prefabricated composite wall panels.
[0014] Furthermore, the prefabricated composite wall panel includes a concrete frame and a lightweight ecological filling block embedded in the concrete frame.
[0015] The present invention provides a construction method of an assembled composite wall, comprising: producing a first composite wall panel and a second composite wall panel; The first composite wall panel and the second composite wall panel are hoisted to a preset position; wherein, at the vertical joint between the first composite wall panel and the second composite wall panel, the first concave-shaped splicing body and the second concave-shaped splicing body are spliced together to form a rectangular splicing channel; Inserting the through-reinforcement bars vertically through the center of the rectangular splicing channel; Fine stone concrete is poured into the rectangular splicing channel to form post-cast concrete.
[0016] Compared with the prior art, the present invention has the following beneficial effects: The assembled composite wall and the construction method provided by the present invention form a rectangular splicing channel between two adjacent composite wall panels by splicing a concave splicing body, and arrange through dowel bars and post-cast concrete in the rectangular splicing channel, so as to realize dry connection of adjacent composite wall panels without a large amount of on-site wet work. Compared with the traditional dry connection, the process of connecting the connectors and the embedded parts by bolts or welding is eliminated, and the installation and disassembly efficiency is improved. Among them, by arranging through dowel bars and local post-cast concrete at the splicing of adjacent composite wall panels, the rigidity and strength of the structural connection are greatly strengthened, and the establishment and transmission between the wall panels are effectively guaranteed. The present invention has a simple structure and can greatly reduce the construction cost and the construction difficulty while ensuring the vertical connection quality of the prefabricated shear wall, and greatly improve the construction efficiency.
[0017] Furthermore, by arranging embedded anchor bars at the joints of adjacent composite wall panels and staggering the anchor bars on the composite wall panels on both sides in height and horizontal direction, it is ensured that the steel bars of the assembled composite wall will not affect each other or even be damaged during hoisting, thereby improving the convenience and safety of on-site assembly construction.
[0018] Furthermore, by providing weather-resistant sealant in the vertical joints and filling the holes with mortar, the joints are dense and the waterproof effect of the structure is enhanced. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0020] Figure 1 A transverse cross-sectional view of the assembled composite wall provided by the present invention; Figure 2 is a transverse cross-sectional view of the first composite wall panel and the second composite wall panel in the present invention; Figure 3 It is a front view of the first composite wall panel and the second composite wall panel of the present invention; Figure 4 for Figure 3 Enlarged schematic diagram and top view of point A in the middle.
[0021] Among them, 1 is a first composite wall panel, 2 is a second composite wall panel, 3 is a through-inserted reinforcement, 4 is a post-cast concrete, 5 is a weather-resistant sealant, 6 is a hole-filling mortar; 11 is a first concave-shaped splicing body, 12 is a first pre-buried anchor bar; 21 is a second concave-shaped splicing body, and 22 is a second pre-buried anchor bar. DETAILED DESCRIPTION
[0022] In order to make the technical problems, technical solutions and beneficial effects solved by this application clearer, the technical solutions in the embodiments of this application will be described clearly and completely in combination with the drawings in the embodiments of this application; obviously, the described embodiments are only part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0023] Example 1 As attached Figure 1-4 As shown, this embodiment 1 provides an assembled composite wall, including a first composite wall panel 1, a second composite wall panel 2, through-reinforcement bars 3 and post-cast concrete 4.
[0024] The first composite wall panel 1 and the second composite wall panel 2 are both prefabricated composite wall panels, which include a concrete frame and a lightweight ecological filling block embedded in the concrete frame. Compared with ordinary reinforced concrete cast-in-place, the prefabricated composite wall panel has the advantages of light weight, good ductility, excellent seismic performance, and economic applicability.
[0025] Specifically, the prefabricated composite wall panel includes two side rib columns, a plurality of middle rib columns, a plurality of rib beams, building blocks and a concrete outer layer; the two side rib columns are vertically arranged in parallel, a plurality of middle rib columns are vertically arranged at intervals between the two side rib columns, and a plurality of rib beams are horizontally arranged in parallel between the side rib columns and the middle rib columns; wherein the side rib columns, the middle rib columns and the rib beams are spliced together to form a concrete frame, the building blocks are filled in the concrete frame, and the building blocks are made of lightweight ecological filling blocks; the concrete outer layer is wrapped around the outside of the concrete frame, and the building blocks are bonded and fixed to the concrete outer layer on all sides.
[0026] A first concave-shaped splicing body 11 is provided at the splicing end of the first composite wall panel 1, and the first concave-shaped splicing body 11 is vertically arranged along the splicing end of the first composite wall panel 1; wherein the horizontal cross-section of the first concave-shaped splicing body 11 is a first concave-shaped structure, and the opening of the first concave-shaped structure is arranged toward one side of the inner surface of the first composite wall panel 1.
[0027] Specifically, the first concave-shaped splicing body 11 includes a first splicing seam extension body and a first splicing protrusion, wherein the first splicing seam extension body is arranged at the splicing end of the first composite wall panel 1 and is arranged close to the outer surface of the first composite wall panel 1; wherein one end of the first splicing seam extension body is connected to the splicing end of the first composite wall panel 1, and the other end of the first splicing seam extension body extends toward the vertical seam direction of two adjacent composite wall panels; the first splicing protrusion is arranged at the inner surface end of the first splicing seam extension body and is arranged away from the splicing end of the first composite wall panel 1; wherein one end of the first splicing protrusion is connected to the inner surface of the extension end of the first splicing seam extension body, and the other end of the first splicing protrusion extends toward the inner surface direction of the first composite wall panel 1.
[0028] It should be noted that the first concave-shaped splicing body 11 and the first composite wall panel 1 are an integrally formed structure, that is, the first splicing seam extension body, the first splicing protrusion and the first composite wall panel 1 are integrally formed; wherein, the first splicing seam extension body is formed by extending one side of the outer surface of the splicing end of the first composite wall panel 1 toward the vertical seam direction of the two adjacent composite wall panels, and the first splicing protrusion is formed by extending the inner side surface of the extension end of the first splicing seam extension body toward the inner surface direction of the first composite wall panel 1.
[0029] A second concave-shaped splicing body 21 is provided at the splicing end of the second composite wall panel 2, and the second concave-shaped splicing body 21 is vertically arranged along the splicing end of the second composite wall panel 2; wherein the horizontal cross-section of the second concave-shaped splicing body 11 is a second concave-shaped structure, and the opening of the second concave-shaped structure is arranged toward one side of the outer surface of the second composite wall panel 2.
[0030] Specifically, the second concave-shaped splicing body 21 includes a second splicing seam extension body and a second splicing protrusion, wherein the second splicing seam extension body is arranged at the splicing end of the second composite wall panel 2 and is arranged close to the inner surface of the second composite wall panel 2; wherein one end of the second splicing seam extension body is connected to the splicing end of the second composite wall panel 2, and the other end of the second splicing seam extension body extends toward the vertical splicing direction of two adjacent composite wall panels; the second splicing protrusion is arranged at the outer surface end of the second splicing seam extension body and is arranged away from the splicing end of the second composite wall panel 2; wherein one end of the second splicing protrusion is connected to the outer surface of the extension end of the second splicing seam extension body, and the other end of the second splicing protrusion extends toward the outer surface direction of the second composite wall panel 2.
[0031] It should be noted that the second concave-shaped splicing body 21 and the second composite wall panel 2 are an integrally formed structure, that is, the second seam extension body, the second splicing protrusion and the second composite wall panel 2 are integrally formed; wherein, the second seam extension body is formed by extending one side of the inner surface of the seam end of the second composite wall panel 2 toward the vertical seam direction of the two adjacent composite wall panels, and the second splicing protrusion is formed by extending the outer side surface of the extension end of the second seam extension body toward the outer surface direction of the second composite wall panel 2.
[0032] When the first composite wall panel 1 and the second composite wall panel 2 are vertically spliced, at the vertical joint between the first composite wall panel 1 and the second composite wall panel 2, the first concave-shaped splicing body 11 and the second concave-shaped splicing body 21 are spliced with each other to form a rectangular splicing channel; wherein the rectangular splicing channel vertically penetrates through the center of the vertical joint between the first composite wall panel 1 and the second composite wall panel 2, and the rectangular splicing channel is a hollow vertical channel with a rectangular horizontal cross-section.
[0033] The stitching process of the rectangular stitching channel is as follows: When the first composite wall panel 1 and the second composite wall panel 2 are vertically spliced, the extended end of the first seam extension body is connected to the splicing end surface of the second composite wall panel 2, the extended end of the second seam extension body is connected to the splicing end surface of the first composite wall panel 1, the end of the first splicing protrusion is connected to the outer surface of the second seam extension body, and the end of the second splicing protrusion is connected to the inner surface of the first seam extension body, so that the inner surface of the first seam extension body, the first splicing protrusion, the outer surface of the second seam extension body and the second splicing protrusion are sequentially combined to form a vertical hollow channel with a rectangular cross-section.
[0034] The through-rebar 3 is vertically inserted in the center of the rectangular splicing channel; the through-rebar 3 is arranged from the top of the vertical joint between the first composite wall panel 1 and the second composite wall panel 2, from top to bottom along the vertical center line of the matrix splicing channel; wherein the length of the through-rebar 3 is adapted to the height of the first composite wall panel 1 or the second composite wall panel 2.
[0035] The post-cast concrete 4 is poured into the rectangular splicing channel and wrapped around the through-inserted reinforcement 3; wherein the post-cast concrete 4 is made of fine stone concrete and is poured at the top of the rectangular splicing channel.
[0036] Construction process: The construction method of the assembled composite wall described in this embodiment 1 includes the following steps: Step 1, producing the first composite wall panel 1 and the second composite wall panel 2; specifically, firstly tie the edge member longitudinal reinforcement, edge member stirrups, wall horizontal distribution reinforcement and vertical distribution reinforcement to form a prefabricated wall reinforcement cage; then put the prefabricated wall reinforcement cage into the assembled steel mold for fixation, and install and fix the blocks; then, pour the concrete and vibrate and smooth it; after the prefabrication is completed, perform standard curing, and when the strength reaches the requirement, remove the template to form the prefabricated composite wall panel.
[0037] Step 2: Lay out and locate the position of the prefabricated shear wall, and then hoist the first composite wall panel 1 and the second composite wall panel 2 to the preset position; wherein, at the vertical joint between the first composite wall panel 1 and the second composite wall panel 2, the first concave-shaped splicing body 11 and the second concave-shaped splicing body 21 are spliced together to form a rectangular splicing channel.
[0038] Step 3, vertically insert the through-reinforcement bar 3 into the center of the rectangular splicing channel; pour fine stone concrete into the rectangular splicing channel to form post-cast concrete; then level and plaster the surface, perform standard curing, and when the strength reaches the requirement, remove the formwork to complete the splicing.
[0039] Example 2 As attached Figure 1-4 As shown, the structure and splicing principle of the assembled composite wall provided in this embodiment 2 are basically the same as those of the assembled composite wall described in the above embodiment 1; the difference is as follows: A plurality of first pre-embedded anchor bars 12 are arranged on the side wall of the first concave-shaped splicing body 11, and the plurality of first pre-embedded anchor bars 12 are arranged horizontally and spaced apart in the vertical direction; one end of the first pre-embedded anchor bar 12 is anchored on the side wall of the first concave-shaped splicing body 11, and the other end of the first pre-embedded anchor bar 12 extends into the post-cast concrete 4; wherein the anchoring end of the first pre-embedded anchor bar 12 is arranged close to one side of the second composite wall panel 2; specifically, the anchoring end of the first pre-embedded anchor bar 12 is embedded and fixed in the first splicing protrusion.
[0040] A plurality of second pre-embedded anchor bars 22 are arranged on the side wall of the second concave-shaped splicing body 21, and the plurality of second pre-embedded anchor bars 22 are arranged horizontally and spaced apart in the vertical direction; one end of the second pre-embedded anchor bar 22 is anchored on the side wall of the second concave-shaped splicing body 21, and the other end of the second pre-embedded anchor bar 22 extends into the post-cast concrete 4; wherein the anchoring end of the second pre-embedded anchor bar 22 is arranged close to one side of the first composite wall panel 1; specifically, the anchoring end of the second pre-embedded anchor bar 22 is embedded and fixed in the second splicing protrusion.
[0041] It should be noted that the first pre-embedded anchor bars 12 and the second pre-embedded anchor bars 22 are arranged horizontally and spaced apart in the vertical direction; wherein the first pre-embedded anchor bars 12 and the second pre-embedded anchor bars 22 are parallel to each other and are respectively arranged on both sides of the through-inserted bars 3; the first pre-embedded anchor bars 12 and the second pre-embedded anchor bars 22 are staggered with each other in the vertical and horizontal directions.
[0042] In the present embodiment 2, a plurality of first pre-embedded anchor bars 12 are arranged on the side wall of the first concave-shaped splicing body 11, and a plurality of first pre-embedded anchor bars 22 are arranged on the side wall of the second concave-shaped splicing body 21, so that the post-cast concrete 4, the first concave-shaped splicing body 11 and the second concave-shaped splicing body 21 are connected into a whole by the pre-embedded anchor bars, thereby improving the rigidity and strength of the splicing structure; at the same time, the pre-embedded anchor bars on both sides are staggered in height and horizontal directions, thereby avoiding the problem of inconvenience in construction and installation.
[0043] The construction method of the prefabricated composite wall described in this embodiment 2 is basically the same as the construction method of the prefabricated composite wall in the above-mentioned embodiment 1; the difference is that: when the prefabricated composite wall panel is produced, the first embedded anchor bar 12 and the second embedded anchor bar 22 are respectively embedded in the first concave-shaped splicing body 11 and the second concave-shaped splicing body 12; the remaining structures and construction processes are the same and will not be repeated here.
[0044] Example 3 As attached Figure 1-4As shown, the structure and splicing principle of the assembled composite wall provided in this embodiment 3 are basically the same as those of the assembled composite wall described in the above embodiment 1 or 2; the difference is as follows: Weather-resistant sealant 5 is poured into the joints between the first concave-shaped splicing body 11 and the second composite wall panel 2, and into the joints between the second concave-shaped splicing body 21 and the first composite wall panel 1; filling mortar 6 is provided on the surface of the joints between the first concave-shaped splicing body 11 and the second composite wall panel 2, and on the surface of the joints between the second concave-shaped splicing body 21 and the first composite wall panel 1.
[0045] In this embodiment 3, by providing weather-resistant sealant 5 in the vertical joints and sealing the surface gaps with filling mortar 6, the compactness of the joints can be effectively guaranteed and the waterproof effect of the structure can be enhanced.
[0046] The construction process of the weatherproof sealant 5 and the hole-filling mortar 6 is as follows: After the splicing in step 3 of the above embodiment 1 is completed, weather-resistant glue is directly injected into the vertical joints, and then the holes are filled with mortar and leveled.
[0047] The present invention provides an assembled composite wall and a construction method thereof. The prefabricated composite wall panels are prefabricated by using concrete frames with smaller cross-sections and reinforcements and embedded lightweight ecological filling blocks. Compared with ordinary reinforced concrete cast-in-place, the prefabricated composite wall panels have the advantages of light weight, good ductility, excellent seismic performance, and economic applicability. The assembled composite wall is constructed in the form of a concave groove on the shear wall connection side, and is provided with embedded anchor bars, which are connected to adjacent assembled shear walls. The adjacent assembled composite walls are formed by splicing two shear wall concave grooves at the connection to form a rectangular opening, and a through dowel bar is provided at the center of the rectangular opening. Concrete is poured into the rectangular opening at the shear wall connection to achieve dry connection of the connected composite wall panels and avoid a large amount of on-site wet work. Compared with other forms of dry connection, the process of connecting the connector and the embedded parts by bolts or welding is eliminated, thereby improving the installation and disassembly efficiency. The connection method does not require formwork, and adopts the form of providing dowel bars at the connection and locally pouring concrete, which greatly strengthens the rigidity and strength of the structural connection.
[0048] In the present invention, embedded anchor bars are arranged at the concave-shaped joint bodies of the prefabricated composite wall panels, and the embedded anchor bars on the adjacent two sides are staggered in height and horizontal directions, ensuring that the steel bars of the prefabricated composite wall panels will not affect each other or even be damaged during hoisting; there are vertical seams between the prefabricated composite wall panels, and this connection form has high installation accuracy and small vertical seams. After the installation is completed, weather-resistant sealant is injected at the vertical seams, so that the structure not only ensures strength but also takes into account the waterproof function, enhances the safety and stability of the structure, has good joint density and enhances the waterproof effect of the structure; secondly, compared with other vertical seam connection forms, this connection method only uses steel bars, concrete and waterproof materials in the connection, has fewer types of materials and low cost.
[0049] The above embodiment is only one of the implementation methods that can realize the technical solution of the present invention. The scope of protection claimed by the present invention is not limited only to this embodiment, but also includes changes, replacements and other implementation methods that can be easily thought of by any technician familiar with the technical field within the technical scope disclosed by the present invention.
Claims
1. An assembled composite wall, characterized in that: It comprises a first composite wall panel (1), a second composite wall panel (2), through-reinforced reinforcing bars (3) and post-cast concrete (4); The splicing end of the first composite wall panel (1) is provided with a first concave-shaped splicing body (11), and the splicing end of the second composite wall panel (2) is provided with a second concave-shaped splicing body (21); at the vertical joint between the first composite wall panel (1) and the second composite wall panel (2), the first concave-shaped splicing body (11) and the second concave-shaped splicing body (21) are spliced together to form a rectangular splicing channel; The through-rebar (3) is vertically inserted into the center of the rectangular splicing channel; the post-cast concrete (4) is poured into the rectangular splicing channel and wrapped around the through-rebar (3).
2. The assembled composite wall according to claim 1, characterized in that: A plurality of first pre-embedded anchor bars (12) are arranged on the side wall of the first concave-shaped splicing body (11), and a plurality of second pre-embedded anchor bars (22) are arranged on the side wall of the second concave-shaped splicing body (21); the plurality of first pre-embedded anchor bars (12) and the plurality of second pre-embedded anchor bars (22) are arranged horizontally and are spaced apart in the vertical direction; wherein the first pre-embedded anchor bars (12) and the second pre-embedded anchor bars (22) are parallel to each other and are respectively arranged on both sides of the through-inserted bars (3).
3. The assembled composite wall according to claim 2, characterized in that: One end of the first pre-embedded anchor bar (12) is anchored on the side wall of the first concave-shaped splicing body (11), and the other end of the first pre-embedded anchor bar (12) extends into the post-cast concrete (4); wherein the anchoring end of the first pre-embedded anchor bar (12) is arranged close to one side of the second composite wall panel (2).
4. The assembled composite wall according to claim 2, characterized in that: One end of the second embedded anchor bar (22) is anchored on the side wall of the second concave-shaped splicing body (21), and the other end of the second embedded anchor bar (22) extends into the post-cast concrete (4); wherein the anchoring end of the second embedded anchor bar (22) is arranged close to one side of the first composite wall panel (1).
5. The assembled composite wall according to claim 2, characterized in that: The first pre-embedded anchor bars (12) and the second pre-embedded anchor bars (22) are arranged staggered with each other in both vertical and horizontal directions.
6. The assembled composite wall according to claim 1, characterized in that: Weather-resistant sealant (5) is injected into the joint seam between the first concave-shaped joint body (11) and the second composite wall panel (2), and into the joint seam between the second concave-shaped joint body (21) and the first composite wall panel (1).
7. The assembled composite wall according to claim 1, characterized in that: The surface of the joint between the first concave-shaped joint body (11) and the second composite wall panel (2) and the surface of the joint between the second concave-shaped joint body (21) and the first composite wall panel (1) are both provided with hole-filling mortar (6).
8. The assembled composite wall according to claim 1, characterized in that: The first composite wall panel (1) and the second composite wall panel (2) are both prefabricated composite wall panels.
9. The assembled composite wall according to claim 8, characterized in that: The prefabricated composite wall panel comprises a concrete frame and a lightweight ecological filling block embedded in the concrete frame.
10. The construction method of an assembled composite wall according to any one of claims 1 to 9, characterized in that: include: Producing a first composite wall panel (1) and a second composite wall panel (2); The first composite wall panel (1) and the second composite wall panel (2) are hoisted to a preset position; wherein, at the vertical joint between the first composite wall panel (1) and the second composite wall panel (2), the first concave-shaped splicing body (11) and the second concave-shaped splicing body (21) are spliced together to form a rectangular splicing channel; Inserting a through-reinforcement bar (3) vertically through the center of the rectangular splicing channel; Fine stone concrete is poured into the rectangular splicing channel to form post-cast concrete (4).
Citation Information
Patent Citations
PC component splicing method and PC component splicing structure
CN110359582A
Concrete light steel composite wallboard
CN114704027A
Fabricated partition wall multiple anti-seepage structure and assembling method thereof
CN115217262A
Reinforced concrete lattice assembly type light wallboard
CN202248503U
Prefabricated assembly type light filler wall
CN215406744U
Cited By
Steel wire mesh frame perlite composite insulation board core board seam occlusion reinforcing structure and method
CN120537340A