External flaring concrete pipe construction structure and construction method

By optimizing the support seat structure and connection method of the outer flared concrete pipe, axial constraints on the concrete pipe are achieved, and the problem of instability of the sealing of pipelines during construction in the prior art is solved, and the stability and sealing effect of construction are improved.

CN119617189APending Publication Date: 2025-03-14JINAN URBAN CONSTRUCTION GROUP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411883301.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-19
Publication Date
2025-03-14

AI Technical Summary

Technical Problem

The existing outer flared concrete pipe lacks axial constraint during construction, which leads to the newly entered pipes being loosened during the insertion and adjustment process, resulting in seal instability.

Method used

By optimizing the structure and connection method of the first support seat and the second support seat, the arc-shaped grooves and the connecting parts are used to cooperate with each other, the axial constraints of the concrete pipe are realized and further fixed by bolts and fixing hoops.

Benefits of technology

It effectively solves the problem of insufficient axial constraints in concrete pipes during construction, improves sealing stability, prevents the pipeline from loosening during insertion, and ensures the stability and sealing effect of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119617189A_ABST
    Figure CN119617189A_ABST
Patent Text Reader

Abstract

The invention relates to the field of civil construction, in particular to an external flaring concrete pipe construction structure and a construction method.The construction structure is used for installing an external flaring concrete pipe, the external flaring concrete pipe comprises a pipe body and a flaring section and comprises a first supporting seat and a second supporting seat, and a first arc-shaped groove is formed in the top face of the first supporting seat; a second arc-shaped groove is formed in the top surface of the second supporting seat; the first supporting seat is provided with a first connecting part, the second supporting seat is provided with a second connecting part, the outer flaring concrete pipe where the flaring section is located can be placed in the first arc-shaped groove in a matched mode, and the outer flaring concrete pipe where the pipe body is located can be placed in the second arc-shaped groove in a matched mode. The first connecting part of the first supporting seat can be connected with the second connecting part of the second supporting seat; the first supporting base and the second supporting base can be connected to the external flaring concrete pipe. By optimizing the structures and the connecting mode of the first supporting seat and the second supporting seat 4, the existing problems are effectively solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of civil construction, and in particular to an externally expanded concrete pipe construction structure and a construction method. Background Art

[0002] Externally flared concrete pipes are often used in municipal drainage pipe construction. An externally flared section is set at one end of the externally flared concrete pipe. During construction, adjacent concrete pipes are socketed with each other, that is, the externally flared section of one concrete pipe is inserted into the outside of the thinner end of another concrete pipe.

[0003] At present, for the on-site socket-and-spigot construction of such externally flared concrete pipes, a cushion layer is usually laid in advance in the construction area. In some working conditions, the sockets are directly spliced ​​one by one after the cushion layer is laid out, and the externally flared section is directly placed on the cushion layer. After the socket-and-spigot, a wedge is inserted into the side of the externally flared concrete pipe to prevent it from rolling. In some working conditions, such as the municipal drainage pipe laying structure and cushion block disclosed in the invention patent with publication number CN219327162U, cushion blocks are added to the cushion layer to support the externally flared concrete pipe.

[0004] At present, this type of bell-and-spigot pipe has less axial constraints on the pipeline during installation, especially the newly-placed pipeline is prone to loosening the sealed bell-and-spigot part during the bell-and-spigot and lateral adjustment process, resulting in the problem of unstable sealing.

[0005] Based on this, the applicant proposed an externally expanded concrete pipe construction structure and construction method to solve the problems existing in the prior art. Summary of the invention

[0006] In order to solve the above technical problems, the present invention provides an outward-flared concrete pipe construction structure and a construction method, which effectively solves the existing problems by optimizing the structure and connection method of the first support seat and the second support seat.

[0007] In order to solve the above problems, the present invention provides an externally expanded concrete pipe construction structure for installing an externally expanded concrete pipe, the externally expanded concrete pipe comprising a cylindrical pipe body and an expanded section formed at one end of the pipe body, the end of the pipe body away from the expanded section can be inserted into the inner side of the expanded section of another externally expanded concrete pipe, comprising a first support seat and a second support seat, the top surface of the first support seat is provided with a first arc groove, and the top surface of the second support seat has a second arc groove; the first support seat has a first connecting portion, and the second support seat has a second connecting portion, when the adjacent pipe body and the expanded section are inserted, the externally expanded concrete pipe where the expanded section is located can be placed in the first arc groove, the externally expanded concrete pipe where the pipe body is located can be placed in the second arc groove, and the first connecting portion of the first support seat can be connected to the second connecting portion of the second support seat; the first support seat and the second support seat can be connected to the externally expanded concrete pipe.

[0008] Furthermore, the first supporting seat is formed with the first connecting portion on the side of the expanded section protruding from the first supporting seat; and the second supporting seat is formed with a second connecting portion that can be plugged into and matched with the first connecting portion.

[0009] Furthermore, the first support seat is provided with a first connecting hole, and the second support seat is provided with a second connecting hole; the construction structure also includes a first bolt, which can pass through the first connecting hole and the second connecting hole and fix the first support seat and the second support seat.

[0010] Furthermore, the first arc-shaped groove includes a cylindrical section capable of cooperating with the side surface of the tube body and a deformation section capable of cooperating with the side surface of the expansion section.

[0011] Furthermore, the construction structure also includes a second fixing hoop plate, which can be connected to the second support seat and clamped and fixed on the pipe body.

[0012] Furthermore, the second fixing hoop plate includes an arc segment capable of cooperating with the side surface of the tube body and connecting segments respectively connected to both sides of the arc segment, and the connecting segment can be connected to the second support seat so that the arc segment and the inner surface of the second arc groove can clamp and fix the tube body.

[0013] Furthermore, the second support seat is provided with a slot for the connecting section to be inserted, the connecting section is provided with a connecting hole, the second support seat is provided with a threaded hole in the slot, and the construction structure also includes a second bolt, which can pass through the connecting hole and be fixed in the threaded hole.

[0014] Furthermore, a rubber strip groove is provided on the inner surface of the first arc-shaped groove and / or the inner surface of the second arc-shaped groove, and the construction structure further includes a rubber strip provided in the rubber strip groove.

[0015] Furthermore, the construction structure also includes a first fixing hoop plate, which can be connected to the first support seat and clamped and fixed on the pipe body.

[0016] The present invention also provides a construction method of an outward-flared concrete pipe. Based on the outward-flared concrete pipe construction structure, the construction method comprises: S1. Place a first support seat and a second support seat in the area where the externally expanded concrete pipe is to be placed, the first support seat corresponds to the expanded section position, and the second support seat corresponds to the pipe body position; S2, placing the externally expanded concrete pipe, and inserting the pipe body of the newly placed externally expanded concrete pipe into the expanded section of the already placed externally expanded concrete pipe; S3, move the first support seat and the second support seat, the newly placed second support seat can be connected to the first support seat that has been placed in the position of the externally expanded concrete pipe, the newly placed first support seat can cooperate with the expanding section at the corresponding position, and the newly placed first support seat and the second support seat are connected to the newly placed externally expanded concrete pipe.

[0017] The beneficial effect of the present invention is that the existing problems are effectively solved by optimizing the structure and connection method of the first support seat and the second support seat. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings: Figure 1 It is a structural schematic diagram of the movement process of a newly inserted concrete pipe in one embodiment of the present invention.

[0019] Figure 2 for Figure 1 Top view of the illustrated embodiment.

[0020] Figure 3 for Figure 2 Schematic diagram of the local cross-sectional structure at AA in the middle.

[0021] Among them: 1. tube body; 2. flared section; 3. first support seat; 4. second support seat; 5. first arc groove; 501. cylindrical section; 502. deformation section; 6. second arc groove; 7. first connecting part; 8. second connecting part; 9. first bolt; 10. second fixing hoop; 1001. arc section; 1002. connecting section; 11. slot; 12. second bolt; 13. rubber strip groove; 14. rubber strip; 15. first fixing hoop. DETAILED DESCRIPTION

[0022] In order to more clearly illustrate the overall concept of the present invention, a detailed description is given below in an exemplary manner in conjunction with the accompanying drawings.

[0023] It should be noted that many specific details are set forth in the following description to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.

[0024] In addition, in the description of the present invention, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0025] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral one; it can be directly connected, or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. However, if it is indicated as a direct connection, it means that the two connected bodies are not connected through an intermediate structure, but are only connected to form a whole through a connecting structure. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.

[0026] In the present invention, unless otherwise clearly specified and limited, the first feature "on" or "under" the second feature may be that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in an appropriate manner in any one or more embodiments or examples.

[0027] In the present invention, if Figure 1-3 As shown, a construction structure of an externally expanded concrete pipe is provided, which is used to install an externally expanded concrete pipe. The externally expanded concrete pipe includes a cylindrical pipe body 1 and a flared section 2 formed at one end of the pipe body 1. The end of the pipe body 1 away from the flared section 2 can be inserted into the inner side of the flared section 2 of another externally expanded concrete pipe, and includes a first support seat 3 and a second support seat 4. The top surface of the first support seat 3 is provided with a first arc groove 5, and the top surface of the second support seat 4 is provided with a second arc groove 6; the first support seat 3 has a first connecting portion 7, and the second support seat 4 has a second connecting portion 8. When the adjacent pipe body 1 and the flared section 2 are inserted, the externally expanded concrete pipe where the flared section 2 is located can be placed in the first arc groove 5, and the externally expanded concrete pipe where the pipe body 1 is located can be placed in the second arc groove 6, and the first connecting portion 7 of the first support seat 3 can be connected to the second connecting portion 8 of the second support seat 4; the first support seat 3 and the second support seat 4 can be connected to the externally expanded concrete pipe.

[0028] When the construction structure of the present invention is being constructed, the second support seat 4 and the first support seat 3 are first placed in the direction away from the already inserted concrete pipe at the position where the concrete pipe is to be inserted. At this time, the newly inserted concrete pipe can be placed on the first support seat 3 and the second support seat 4, and the newly inserted concrete pipe is axially moved at the same time. During the movement, the newly inserted concrete pipe synchronously drives the adjustment of the position of the first support seat 3 to perform the socket connection between the newly inserted concrete pipe and the already inserted concrete pipe. After the socket connection is completed, as shown in the figure, the position of the second support seat 4 can be fine-tuned at this time, so that the second support seat 4 can be matched and connected with the first support seat 3 at the position of the already inserted concrete pipe, and the second support seat 4 at this position is connected with the corresponding newly inserted concrete pipe, and the first support seat 3 is connected with the newly inserted concrete pipe at the corresponding position. At this time, the socket position of the newly inserted concrete pipe and the already inserted concrete pipe can be sealed by grouting. At this time, the next newly inserted concrete pipe can be installed.

[0029] The technical advantages of the present invention are as follows: First, by such a configuration, the two sections of concrete pipes can be laterally limited by means of the first support seat 3 and the second support seat 4 on both sides of the socket position of the concrete pipe, and the first support seat 3 is connected to the concrete pipe at the corresponding position, and the second support seat 4 is connected to the concrete pipe at the corresponding position, to provide axial constraints to the concrete pipe that has completed the socket. In this way, when the newly inserted concrete pipe is socketed again, the axial loosening of the inserted concrete pipe caused by the impact on the inserted concrete pipe during the socket process can be reduced, thereby maintaining the sealing stability of the socket position of the inserted concrete pipe. Second, after the overall completion of the socket construction, the adjacent concrete pipes can be connected at the socket position through the first support seat 3 and the second support seat 4, which can further stabilize the stability of the axial socket, so as to maintain the stability of the concrete pipe socket when micro-deformation of the formation and vibration disturbance occur, and further maintain the sealing effect.

[0030] In the embodiments of the present invention, in order to better describe the implementation process, the outward-flared concrete pipe is divided into a newly inserted concrete pipe and an already inserted concrete pipe at different stages. The specific basis for the distinction is that the already inserted concrete pipe is the one that has completed the socket and the first support seat 3 and the second support seat 4 at the corresponding position are respectively connected to the concrete pipe, and the newly inserted concrete pipe is the one that is in the adjustment and moving state during the construction process.

[0031] In a preferred embodiment, for the structure of the present invention, to be more specific, the first supporting seat 3 protrudes from the side of the flared section 2 to form the first connecting portion 7; the second supporting seat 4 is formed with a second connecting portion 8 that can be plugged into and fit with the first connecting portion 7.

[0032] As shown in the figure, by plugging and fitting the second connecting part 8 into the first connecting part 7, after the first support seat 3 and the second support seat 4 are connected, the constrained connection between the first support seat 3 and the second support seat 4 can be further stabilized to prevent the first support seat 3 and the second support seat 4 from lateral displacement.

[0033] As shown in the figure, the second connecting part 8 can be inserted on the outside of the first connecting part 7, so as to further ensure the coaxiality of the two sections of concrete pipes when connecting.

[0034] In a preferred embodiment, for the connection between the first support seat 3 and the second support seat 4 in the structure of the present invention, more specifically, the first support seat 3 is provided with a first connecting hole, and the second support seat 4 is provided with a second connecting hole; the construction structure also includes a first bolt 9, which can pass through the first connecting hole and the second connecting hole and fix the first support seat 3 and the second support seat 4.

[0035] As shown in the figure, after the newly inserted concrete pipe is inserted and plugged, the lateral position of the second support seat 4 and the cushion layer is relatively fixed. At this time, the second support seat 4 can be moved toward the direction of the inserted concrete pipe to make the first connection part 7 and the second connection part 8 plug in, and then the first support seat 3 and the second support seat 4 are connected by the first bolt 9. Then, the first support seat 3 is connected to the concrete pipe at the corresponding position, and the second support seat 4 is connected to the concrete pipe at the corresponding position.

[0036] In a preferred embodiment, for the structure of the present invention, more specifically, the first arc groove 5 includes a cylindrical section 501 capable of cooperating with the side of the tube body 1 and a deformation section 502 capable of cooperating with the side of the expansion section 2 .

[0037] As shown in the figure, after the first support seat 3 is connected to the concrete pipe, the deformation section 502 and the expansion section 2 cooperate to increase the difficulty of the first support seat 3 moving toward the new concrete pipe, thereby further improving the axial constraint effect after the first support seat 3 is connected to the concrete pipe at the corresponding position.

[0038] In a preferred embodiment, with regard to the connection method between the second support seat 4 and the concrete pipe in the structure of the present invention, to be more specific, the construction structure also includes a second fixing hoop plate 10, which can be connected to the second support seat 4 and clamped and fixed on the pipe body 1.

[0039] As shown in the figure, after completing the socketing and adjustment of the newly inserted concrete pipe and connecting the first support seat 3 and the second support seat 4, the second fixing hoop plate 10 can be cooperated with the second support seat 4 to be tightly installed on the outside of the concrete pipe. In this way, the friction between the second fixing hoop plate 10 and the second support seat 4 and the concrete pipe can be used to axially constrain the newly inserted concrete pipe to prevent the newly inserted concrete pipe from loosening in the axial direction.

[0040] In a preferred embodiment, for the structure of the present invention, further specifically, the second fixing hoop plate 10 includes an arc segment 1001 that can cooperate with the side of the tube body 1, and a connecting segment 1002 respectively connected to both sides of the arc segment 1001, and the connecting segment 1002 can be connected to the second support seat 4 so that the arc segment 1001 and the inner surface of the second arc groove 6 can clamp and fix the tube body 1.

[0041] As shown in the figure, the second fixing hoop plate 10 can be conveniently clamped on the outside of the tube body 1 from top to bottom, reducing the difficulty of assembling the second fixing hoop plate 10 and the tube body 1. The arc segment 1001 can also be used to provide a downward restraining force to the tube body 1, and the second arc surface of the second support seat 4 can be used to provide an upward supporting force to the tube body 1.

[0042] In a preferred embodiment, for the structure of the present invention, to be more specific, the second support seat 4 is provided with a slot 11 for the connecting section 1002 to be inserted, the connecting section 1002 is provided with a connecting hole, the second support seat 4 is provided with a threaded hole in the slot 11, and the construction structure further includes a second bolt 12, the second bolt 12 can pass through the connecting hole and be fixed in the threaded hole. As shown in the figure, the second fixing hoop plate 10 and the second support seat 4 can be connected by the second bolt 12, and the pressing force of the second bolt 12 on the connecting section 1002 can be adjusted to adjust the pressing force of the arc segment 1001 on the pipe body 1, so as to maintain the fixing effect of the arc segment 1001 and the second arc groove 6 on the pipe body 1, and prevent the pipe body 1 from being crushed.

[0043] In a preferred embodiment, for the structure of the present invention, to be more specific, the inner surface of the first arc groove 5 and / or the inner surface of the second arc groove 6 is provided with a rubber strip groove 13, and the construction structure also includes a rubber strip 14 arranged in the rubber strip groove 13.

[0044] As shown in the figure, by setting the rubber strip groove 13, a rubber strip 14 can be set in the rubber strip groove 13 to further improve the friction between the arc segment 1001 or the corresponding second arc groove 6 and the tube body 1, and further improve the axial restraint force on the tube body 1.

[0045] In the embodiment of the present invention, for the setting of the second fixing hoop plate 10, it is preferred to use the second fixing hoop plate 10 made of concrete building material, and for the connection structure between the bottom of the connecting section 1002 and the second support seat 4, it is preferred that a transversely extending boss is provided at the bottom of the connecting section 1002, and the boss is provided with a connecting hole, and the connecting section 1002 is pre-embedded with a metal reinforcing member at the boss position, and the metal reinforcing member forms a reinforcement structure of the boss and the connecting section 1002.

[0046] The structural arrangement of the second fixing hoop plate 10 is not limited to the form of the concrete structural component shown in the figure. In an optional embodiment, a metal second fixing hoop plate 10 or an engineering plastic second fixing hoop plate 10 can also be selected.

[0047] In a preferred embodiment, for the structure of the present invention, regarding the connection between the first support seat 3 and the pipe body 1, to be more specific, the construction structure further includes a first fixing hoop plate 15, which can be connected to the first support seat 3 and clamped and fixed to the pipe body 1. As shown in the figure, by providing the first fixing hoop plate 15, the connection between the first support seat 3 and the concrete pipe at the corresponding position can be achieved. This further improves the connection stability after the first support seat 3 and the flared section 2 at the corresponding position are matched.

[0048] In the illustrated embodiment, the specific structure of the connection method between the first fixing hoop plate 15 and the first supporting seat 3 is consistent with the connection structure between the second fixing hoop plate and the second supporting seat 4, and will not be further described here.

[0049] The connection method between the first support seat 3 and the concrete pipe body 1 is not limited to the form shown in the figure. In an optional embodiment, other forms can also be used, such as the first support seat 3 is fixed by bonding.

[0050] The present invention also provides a construction method of an outward-flared concrete pipe. Based on the outward-flared concrete pipe construction structure as described above, the construction method comprises: S1, placing a first support seat 3 and a second support seat 4 in the area where the externally expanded concrete pipe is to be placed, the first support seat 3 corresponds to the position of the expanded section 2, and the second support seat 4 corresponds to the position of the pipe body 1; S2, placing the externally expanded concrete pipe, and inserting the pipe body 1 newly placed in the externally expanded concrete pipe into the expanded section 2 already placed in the externally expanded concrete pipe; S3, move the first support seat 3 and the second support seat 4, the newly placed second support seat 4 can be connected to the first support seat 3 that has been placed in the position of the externally expanded concrete pipe, the newly placed first support seat 3 can cooperate with the expanded section 2 at the corresponding position, and the newly placed first support seat 3 and the second support seat 4 are connected to the newly placed externally expanded concrete pipe.

[0051] It should be noted that in order to better display the structure, Figure 3 Zhongjin shows a cross section of the left part.

[0052] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0053] The above is only an embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of the claims of the present application.

Claims

1. An externally expanded concrete pipe construction structure, used for installing an externally expanded concrete pipe, the externally expanded concrete pipe comprising a cylindrical pipe body and an expanded section formed at one end of the pipe body, the end of the pipe body away from the expanded section can be inserted into the inner side of the expanded section of another externally expanded concrete pipe, characterized in that: It comprises a first supporting seat and a second supporting seat, wherein the top surface of the first supporting seat is provided with a first arc-shaped groove, and the top surface of the second supporting seat is provided with a second arc-shaped groove; The first support seat has a first connection portion, and the second support seat has a second connection portion. When the adjacent tube body and the flared section are inserted, the outer flared concrete pipe where the flared section is located can be placed in the first arc groove, and the outer flared concrete pipe where the tube body is located can be placed in the second arc groove, and the first connection portion of the first support seat can be connected to the second connection portion of the second support seat; The first support seat and the second support seat can be connected to the externally expanded concrete pipe.

2. The externally expanded concrete pipe construction structure according to claim 1 is characterized in that: The first supporting seat protrudes from the flared section to form the first connecting portion; The second supporting seat is formed with a second connecting portion which can be plug-fitted with the first connecting portion.

3. The externally expanded concrete pipe construction structure according to claim 2, characterized in that: The first support seat is provided with a first connecting hole, and the second support seat is provided with a second connecting hole; the construction structure also includes a first bolt, which can pass through the first connecting hole and the second connecting hole and fix the first support seat and the second support seat.

4. An externally expanded concrete pipe construction structure according to any one of claims 1 to 3, characterized in that: The first arc-shaped groove includes a cylindrical section capable of cooperating with the side surface of the tube body and a deformation section capable of cooperating with the side surface of the expansion section.

5. The externally expanded concrete pipe construction structure according to claim 1, characterized in that: The construction structure also includes a second fixing hoop plate, which can be connected to the second support seat and clamped and fixed on the pipe body.

6. The externally expanded concrete pipe construction structure according to claim 5, characterized in that: The second fixing hoop plate includes an arc segment that can cooperate with the side surface of the tube body and connecting segments respectively connected to both sides of the arc segment, and the connecting segment can be connected to the second support seat so that the arc segment and the inner surface of the second arc groove can clamp and fix the tube body.

7. The externally expanded concrete pipe construction structure according to claim 6, characterized in that: The second support seat is provided with a slot for the connecting section to be inserted, the connecting section is provided with a connecting hole, the second support seat is provided with a threaded hole in the slot, and the construction structure also includes a second bolt, which can pass through the connecting hole and be fixed in the threaded hole.

8. The externally expanded concrete pipe construction structure according to claim 6, characterized in that: The inner surface of the first arc-shaped groove and / or the inner surface of the second arc-shaped groove is provided with a rubber strip groove, and the construction structure further includes a rubber strip arranged in the rubber strip groove.

9. The externally expanded concrete pipe construction structure according to claim 5, characterized in that: The construction structure also includes a first fixing hoop plate, which can be connected to the first supporting seat and clamped and fixed on the pipe body.

10. A construction method for an externally expanded concrete pipe, characterized in that: Based on the externally expanded concrete pipe construction structure according to any one of claims 1 to 9, the construction method comprises: S1. Place a first support seat and a second support seat in the area where the externally expanded concrete pipe is to be placed, the first support seat corresponds to the expanded section position, and the second support seat corresponds to the pipe body position; S2, placing the externally expanded concrete pipe, and inserting the pipe body of the newly placed externally expanded concrete pipe into the expanded section of the already placed externally expanded concrete pipe; S3, move the first support seat and the second support seat, the newly placed second support seat can be connected to the first support seat that has been placed in the position of the externally expanded concrete pipe, the newly placed first support seat can cooperate with the expanding section at the corresponding position, and the newly placed first support seat and the second support seat are connected to the newly placed externally expanded concrete pipe.

Citation Information