Industrial boiler waste heat utilization structure
By designing the waste heat utilization structure of industrial boiler automatic dust cleaning, flue gas filtration and hot water automatic discharge, the problems of dust adhesion, manual cleaning and lack of filtration functions in the prior art are solved, and efficient waste heat utilization and heat transfer effects are achieved.
Patent Information
- Application Number
- CN202411932311.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-26
- Publication Date
- 2025-03-14
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When the existing waste heat utilization structure utilizes boiler flue gas, dust will cause dust to adhere to the equipment, and the waste heat cannot be effectively utilized. It requires manual cleaning, which affects the heat transfer effect, and lacks flue gas filtration and hot water regulation functions, which increases the labor burden.
An industrial boiler waste heat utilization structure is designed, including dust cleaning components, splicing filter components and waste heat utilization components. The dust cleaning component automatically cleans up the dust in the equipment through a screw rod and a rotating connecting plate and a brush arc plate driven by a motor; the splicing filter component realizes splicing between the equipment and the boiler and flue gas filtration through the mount structure and filter ring; the waste heat utilization component realizes automatic discharge of hot water through the heating box and drainage pipe.
By automatically cleaning up dust, the effective utilization of waste heat and the heat transfer effect of the boiler are ensured, and the burden of manual cleaning is reduced; flue gas filtration and hot water are automatically discharged, the efficiency of the equipment and the effect of waste heat utilization are improved.
Smart Images

Figure CN119617944A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of boiler waste heat utilization, and in particular to an industrial boiler waste heat utilization structure. Background Art
[0002] Waste heat boilers are widely used in various industrial fields, such as steel, chemical industry, ceramics, etc. In these fields, waste heat boilers can effectively utilize industrial waste heat, reduce energy waste, and improve energy utilization efficiency. For example, in the steel production process, high-temperature steel slag can be recycled by waste heat boilers, and its heat can be converted into steam or hot water for use in other processes. In the chemical industry, waste heat boilers can be used to recover and utilize the heat of chemical waste gas to reduce environmental pollution. When the boiler needs to utilize the waste heat, a waste heat utilization structure is required for auxiliary utilization. However, when the existing waste heat utilization structure utilizes the flue gas of the boiler, the dust in the flue gas will adhere to the inside of the equipment, resulting in inadequate utilization of waste heat. The boiler needs to be cleaned manually, and the heat transfer effect of the boiler cannot be ensured, which reduces the use effect of the equipment. In addition, the equipment is generally spliced and fixed by bolt structures, and the flue gas cannot be filtered, which increases the filtering effect and reduces the splicing filtering effect. In addition, when the waste heat is utilized, the hot water cannot be adjusted and discharged, and it needs to be discharged manually, which increases the labor burden and reduces the waste heat utilization effect of the equipment. Summary of the invention
[0003] The problem solved by the present invention is to provide an industrial boiler waste heat utilization structure, which can be used to utilize the flue gas of the boiler. The dust attached to the equipment can be cleaned through the cleaning structure to ensure the utilization effect of the waste heat, and there is no need to manually clean the boiler, thereby ensuring the heat transfer effect of the boiler and improving the use effect of the equipment. The equipment and the boiler can be spliced through a snap-fit structure, and the flue gas can be filtered to reduce the filtering effect and improve the splicing filtering effect. Moreover, when the waste heat is utilized, the hot water can be discharged to a designated location without the need for manual auxiliary discharge, thereby reducing the manual burden and improving the waste heat utilization effect of the equipment.
[0004] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: an industrial boiler waste heat utilization structure, comprising a waste heat utilization tank body, a dust cleaning component, a ventilation pipe, a splicing filter component and a waste heat utilization component, wherein the dust cleaning component is installed in the waste heat utilization tank body, ventilation pipes are connected through the outer walls of both sides of the waste heat utilization tank body, the splicing filter component is installed on the ventilation pipe, and the waste heat utilization component is installed on the top of the waste heat utilization tank body; The dust cleaning assembly includes a spiral rod, a first motor, a first screw rod, a rotating connecting disk, a spiral hole, a first connecting ring, a first filter screen, an annular slide groove, a brush arc plate, a first moving block, a first threaded hole and a slip ring. The spiral rods are fixedly connected to the inner walls on both sides of the waste heat utilization tank protective body, and a rotating connecting disk is installed on the middle inner wall of the waste heat utilization tank protective body. A spiral hole is provided in the middle of the rotating connecting disk at the position of the spiral rod. The first connecting ring is fixedly connected to the outer walls on both sides of the rotating connecting disk. The first filter screen is symmetrically fixedly connected between the first connecting ring and the rotating connecting disk. The brush arc plate is fixedly connected to the first connecting ring. The first connecting ring is provided with an annular slide groove, and a slip ring is slidably connected in the annular slide groove.
[0005] Preferably, a first moving block is symmetrically fixedly connected to the slip ring, a first motor is symmetrically inlaid and installed on the inner wall of one side of the waste heat utilization tank protective body, one end of the output shaft of the first motor is fixedly connected to a first screw rod, and the other end of the first screw rod is rotatably connected to the inner wall of the waste heat utilization tank protective body, and a first threaded hole is opened on the first moving block corresponding to the position of the first screw rod.
[0006] Preferably, the spliced filter assembly includes a second screw rod, a rotating handle, a sleeve, a movable plate, a second threaded hole, a slot, a sealing gasket, a second connecting ring, a first spring, a filter ring and a second filter screen; the ventilation pipe is installed with a sleeve, slots are provided at both ends of the sleeve corresponding to the positions of the ventilation pipe, a sealing gasket is installed between the slot and the ventilation pipe, the movable plate is symmetrically fixedly connected to the sleeve, second screw rods are distributed and rotatably connected on the outer walls of both sides of the waste heat utilization tank protective body, a rotating handle is fixedly connected on the outer wall of one end of the second screw rod, a second threaded hole is provided on the movable plate corresponding to the position of the second screw rod, a second connecting ring is fixedly connected in the sleeve, a first spring is fittedly connected on one side of the second connecting ring, a filter ring is fixedly connected on the outer wall of the other end of the first spring, and a second filter screen is fixedly connected in the filter ring.
[0007] Preferably, the waste heat utilization component includes a heating box, a drain pipe, a piston column, a fixed plate, a connecting arc block, a second spring, a second motor, a third screw rod, a guide rod, a second moving block, a third threaded hole, a guide hole, a connecting frame, an extrusion arc block and a heat conducting plate. A heat conducting plate is embedded and installed on the top inner wall of the waste heat utilization tank protective body, a heating box is fixedly connected to the top outer wall of the waste heat utilization tank protective body, drain pipes are distributed and connected to the outer walls of both sides of the heating box, a piston column is sleeved in the drain pipe, a fixing plate is fixedly connected to the outer wall of one end of the piston column, and the top outer wall of the fixing plate A connecting arc block is fixedly connected to the upper part, a second spring is fixedly connected to an outer wall of one side of the fixed plate, and the other end of the second spring is fixedly connected to the inner wall of the heating box, a second motor is inlaid and installed on one side of the heating box, a third screw rod is fixedly connected to one end of the output shaft of the second motor, and the other end of the third screw rod is rotatably connected to the inner wall of the heating box, a second moving block is installed in the heating box, a third threaded hole is opened on the second moving block corresponding to the position of the third screw rod, guide rods are fixedly connected to the inner walls of both sides of the heating box, and guide holes are opened on the second moving block corresponding to the position of the guide rods.
[0008] Preferably, a connecting frame is fixedly connected to the top outer wall of the second movable block, and an extrusion arc block is symmetrically fixedly connected to the bottom outer wall of the connecting frame at a position corresponding to the connecting arc block.
[0009] Preferably, positioning plates are fixedly connected to both side outer walls of the waste heat utilization tank protective body, and connecting holes are symmetrically opened on the positioning plates, and screws are sleeved in the connecting holes.
[0010] Preferably, a water supply pipe is connected through the top outer wall of the heating box, and a valve is installed on the water supply pipe.
[0011] Preferably, the number of the brush arc plates is four, and the brush side of the brush arc plate is closely connected to the inner wall of the waste heat utilization tank protective body.
[0012] Preferably, the second spring is internally sleeved on the outer wall of the piston column, and the number of the second springs is fourteen.
[0013] The beneficial effects of the present invention are: the dust cleaning component is adopted, and when the smoke of the boiler is utilized, the dust attached to the equipment can be cleaned through the cleaning structure, thereby ensuring the utilization effect of the waste heat, and there is no need to manually clean the boiler, thereby ensuring the heat transfer effect of the boiler and improving the use effect of the equipment; The splicing filter assembly is adopted, and the equipment and the boiler can be spliced through the snap-fit structure, and the flue gas can be filtered, which reduces the filtering effect and improves the splicing filtering effect; The waste heat utilization component is adopted. When the waste heat is utilized, the hot water can be discharged to the designated location without the need for manual auxiliary discharge, which reduces the labor burden and improves the waste heat utilization effect of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is the overall three-dimensional structure diagram of the present invention; Figure 2 It is a front view cutaway structural diagram of the present invention; Figure 3 It is a top view cutaway structural diagram of the present invention; Figure 4 For the present invention Figure 3 A magnified view of the structure in the middle A area; Figure 5 It is the internal three-dimensional structure diagram of the present invention; Figure 6 It is a three-dimensional structural diagram of the spliced filter assembly of the present invention; Figure 7 It is a top view cutaway structural diagram of the spliced filter assembly of the present invention; Figure 8 This is a diagram of the internal structure of the waste heat utilization component of the present invention; Fig. 9 For the present invention Figure 8 A magnified view of the structure in the middle B area; Fig.10 It is a top view cutaway structural diagram of the waste heat utilization component of the present invention.
[0015] Legend: 1. Waste heat utilization tank body; 2. Dust cleaning assembly; 3. Ventilation pipe; 4. Splicing filter assembly; 5. Waste heat utilization assembly; 6. Positioning plate; 7. Connection hole; 8. Screw; 9. Water supply pipe; 10. Valve; 201. Screw rod; 202. First motor; 203. First screw rod; 204. Rotating connecting plate; 205. Screw hole; 206. First connecting ring; 207. First filter screen; 208. Annular slide; 209. Brush arc plate; 2010. First moving block; 2011. First threaded hole; 2012. Slip ring; 401. Second screw rod; 402. Rotating handle; 403. Casing ; 404, movable plate; 405, second threaded hole; 406, slot; 407, sealing gasket; 408, second connecting ring; 409, first spring; 4010, filter ring; 4011, second filter; 501, heating box; 502, drain pipe; 503, piston column; 504, fixed plate; 505, connecting arc block; 506, second spring; 507, second motor; 508, third screw rod; 509, guide rod; 5010, second movable block; 5011, third threaded hole; 5012, guide hole; 5013, connecting frame; 5014, extrusion arc block; 5015, heat conduction plate. DETAILED DESCRIPTION
[0016] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0017] Embodiment 1 See also Figure 1~Figure 5 , an industrial boiler waste heat utilization structure, comprising a waste heat utilization tank body 1, a dust cleaning component 2, a ventilation pipe 3, a splicing filter component 4 and a waste heat utilization component 5, the dust cleaning component 2 is installed in the waste heat utilization tank body 1, the outer walls on both sides of the waste heat utilization tank body 1 are connected through the ventilation pipe 3, the splicing filter component 4 is installed on the ventilation pipe 3, and the waste heat utilization component 5 is installed on the top of the waste heat utilization tank body 1; the outer walls on both sides of the waste heat utilization tank body 1 are fixedly connected with positioning plates 6, the positioning plates 6 are symmetrically provided with connecting holes 7, and screws 8 are sleeved in the connecting holes 7, so that the positioning plates 6 are inserted into the interior of the equipment, and then the screws 8 are inserted into the interior of the connecting holes 7, so as to facilitate the position fixing of the waste heat utilization tank body 1; a water supply pipe 9 is connected through the outer wall of the top of the heating box 501, and a valve 10 is installed on the water supply pipe 9. When there is less clean water in the heating box 501, the valve 10 is opened, and then water is replenished into the heating box 501 through the water supply pipe 9; The dust cleaning assembly 2 includes a spiral rod 201, a first motor 202, a first screw rod 203, a rotating connection disk 204, a spiral hole 205, a first connection ring 206, a first filter 207, an annular groove 208, a brush arc plate 209, a first moving block 2010, a first threaded hole 2011 and a slip ring 2012. The spiral rod 201 is fixedly connected to the inner walls of both sides of the waste heat utilization tank protection body 1, and a rotating connection disk 204 is installed on the middle inner wall of the waste heat utilization tank protection body 1. A spiral hole 205 is provided in the middle of the rotating connection disk 204 at a position corresponding to the spiral rod 201. The first connection ring 206 is fixedly connected to the outer walls of both sides of the rotating connection disk 204. The first filter 207 is symmetrically fixedly connected between the first connection ring 206 and the rotating connection disk 204. The brush arc plate 209 is fixedly connected to the first connection ring 206. The first connection ring 206 is provided with an annular groove 208. The sliding ring 208 A slip ring 2012 is connected; a first moving block 2010 is symmetrically fixedly connected to the slip ring 2012, a first motor 202 is symmetrically inlaid and installed on the inner wall of one side of the waste heat utilization tank protective body 1, one end of the output shaft of the first motor 202 is fixedly connected to the first screw rod 203, and the other end of the first screw rod 203 is rotatably connected to the inner wall of the waste heat utilization tank protective body 1, a first threaded hole 2011 is opened on the first moving block 2010 corresponding to the position of the first screw rod 203, the first motor 202 is started to rotate the first screw rod 203, and then under the action of the first threaded hole 2011, the slip ring 2012 on the first moving block 2010 is conveniently moved; there are four brush arc plates 209, and one side of the brush of the brush arc plate 209 is fitted and connected to the inner wall of the waste heat utilization tank protective body 1, and the dust on the inner wall of the waste heat utilization tank protective body 1 is cleaned by the brush arc plate 209 to prevent the dust from blocking the thermal conductivity of the equipment.
[0018] Working principle: When the waste heat utilization tank protective body 1 is in use, the first motor 202 is started to rotate the first screw rod 203, and then the slip ring 2012 on the first moving block 2010 is moved under the action of the first threaded hole 2011. At this time, the rotating connecting plate 204 is rotated and moved along the screw rod 201 under the action of the spiral hole 205, so that the annular groove 208 on the first connecting ring 206 rotates along the slip ring 2012, and then the dust on the inner wall of the waste heat utilization tank protective body 1 is cleaned by the brush arc plate 209 to prevent the dust from blocking the thermal conductivity of the equipment. When in use, the flue gas can also be filtered for the second time through the first filter net 207 to ensure that the flue gas can reduce environmental pollution when it is discharged. When the flue gas of the boiler can be utilized, the dust attached to the equipment can be cleaned through the cleaning structure to ensure the utilization effect of the waste heat, and there is no need to manually clean the boiler to ensure the heat transfer effect of the boiler, thereby improving the use effect of the equipment.
[0019] Embodiment 2 See also Figure 6~Figure 7 The splicing filter assembly 4 includes a second screw rod 401, a rotating handle 402, a sleeve 403, a movable plate 404, a second threaded hole 405, a slot 406, a sealing gasket 407, a second connecting ring 408, a first spring 409, a filter ring 4010 and a second filter screen 4011. The sleeve 403 is installed on the ventilation pipe 3. Slots 406 are provided at both ends of the sleeve 403 corresponding to the positions of the ventilation pipe 3. A sealing gasket 407 is installed between the slot 406 and the ventilation pipe 3. The movable plate 404 is symmetrically fixedly connected to the sleeve 403. A second screw rod 401 is rotatably connected to the outer walls of both sides of the waste heat utilization tank protective body 1, a rotating handle 402 is fixedly connected to the outer wall of one end of the second screw rod 401, a second threaded hole 405 is opened on the movable plate 404 corresponding to the position of the second screw rod 401, a second connecting ring 408 is fixedly connected in the sleeve 403, a first spring 409 is fittedly connected to one side of the second connecting ring 408, a filter ring 4010 is fixedly connected to the outer wall of the other end of the first spring 409, and a second filter net 4011 is fixedly connected in the filter ring 4010.
[0020] First, place the waste heat utilization tank body 1 at the designated position, then insert the positioning plate 6 into the equipment, then insert the screw 8 into the connecting hole 7 to fix the position of the waste heat utilization tank body 1, then turn the rotating handle 402 to rotate the second screw rod 401, then move the movable plate 404 on the sleeve 403 under the action of the second threaded hole 405, insert the slot 406 on the sleeve 403 into the outside of the smoke exhaust pipe on the boiler, and squeeze the filter ring 4010 to squeeze the first spring 409 onto the second connecting ring 408, and then inject the hot flue gas into the waste heat utilization tank body 1 through the ventilation pipe 3, and at this time, the flue gas is preliminarily filtered through the second filter net 4011, When the filtering effect of the second filter 4011 is not good, turn the rotating handle 402 to reset the second screw rod 401, and then reset the movable plate 404 on the sleeve 403 under the action of the second threaded hole 405, so that the sleeve 403 is separated from the smoke exhaust pipe on the boiler. At this time, under the action of the first spring 409, the second filter 4011 on the filter ring 4010 is ejected from the sleeve 403, and then the new second filter 4011 is reinstalled into the sleeve 403, so as to ensure the filtering effect of the second filter 4011. The equipment and the boiler can be spliced by the snap-fit structure, and the smoke can be filtered, which reduces the filtering effect and improves the splicing filtering effect.
[0021] Embodiment 3 See also Figure 2 , Figure 8 , Fig. 9 and Fig.10The waste heat utilization component 5 includes a heating box 501, a drain pipe 502, a piston column 503, a fixing plate 504, a connecting arc block 505, a second spring 506, a second motor 507, a third screw rod 508, a guide rod 509, a second moving block 5010, a third threaded hole 5011, a guide hole 5012, a connecting frame 5013, an extrusion arc block 5014 and a heat conducting plate 5015. The heat conducting plate 5015 is embedded and installed on the top inner wall of the waste heat utilization tank body 1, and the heating box 501 is fixedly connected to the top outer wall of the waste heat utilization tank body 1. The heating box 5 Drain pipes 502 are distributed and connected on the outer walls of both sides of 01, and piston rods 503 are sleeved in the drain pipes 502. A fixing plate 504 is fixedly connected to the outer wall of one end of the piston rod 503, and a connecting arc block 505 is fixedly connected to the outer wall of the top of the fixing plate 504. A second spring 506 is fixedly connected to the outer wall of one side of the fixing plate 504, and the other end of the second spring 506 is fixedly connected to the inner wall of the heating box 501. A second motor 507 is embedded and installed on one side of the heating box 501, and a third screw rod 508 is fixedly connected to one end of the output shaft of the second motor 507, and The other end of the third screw rod 508 is rotatably connected to the inner wall of the heating box 501. A second moving block 5010 is installed in the heating box 501. A third threaded hole 5011 is provided on the second moving block 5010 at a position corresponding to the third screw rod 508. Guide rods 509 are fixedly connected to the inner walls of both sides of the heating box 501. Guide holes 5012 are provided on the second moving block 5010 at positions corresponding to the guide rods 509. A connecting frame 5013 is fixedly connected to the outer wall at the top end of the second moving block 5010. The outer wall at the bottom end of the connecting frame 5013 is connected to the arc block 505 The extrusion arc block 5014 is symmetrically fixedly connected, so that the extrusion arc block 5014 on the connecting frame 5013 squeezes the connecting arc block 505 at the designated position, so as to facilitate the removal of the piston column 503 on the fixed plate 504 from the drain pipe 502; the second spring 506 is internally sleeved on the outer wall of the piston column 503, and the number of the second springs 506 is fourteen. When the extrusion arc block 5014 separates the connecting arc block 505 at the designated position, the piston column 503 is reinserted into the drain pipe 502 under the action of the second spring 506.
[0022] When the flue gas with hot gas enters the waste heat utilization tank body 1, the hot gas is first transferred to the inside of the heating box 501 through the heat conducting plate 5015, so as to heat the clean water in the heating box 501. When the clean water reaches the specified temperature, the second motor 507 is started to rotate the third screw rod 508. Then, under the action of the third threaded hole 5011, the guide hole 5012 on the second moving block 5010 moves along the guide rod 509, so that the extrusion arc block 5014 on the connecting frame 5013 squeezes the connecting arc block 505 at the specified position, so that the piston column 503 on the fixing plate 504 is moved out of the drain pipe 502, and then the hot water passes through the drain pipe 5 02 is discharged to the designated position. When the water supply is sufficient, the second motor 507 is started to rotate the third screw rod 508, and then under the action of the third threaded hole 5011, the guide hole 5012 on the second moving block 5010 continues to move along the guide rod 509, so that the extrusion arc block 5014 separates the connecting arc block 505 at the designated position, and then under the action of the second spring 506, the piston column 503 is reinserted into the drain pipe 502, thereby blocking the drain pipe 502. When utilizing the waste heat, the hot water can be discharged to the designated position without manual auxiliary discharge, which reduces the labor burden and improves the waste heat utilization effect of the equipment.
[0023] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. An industrial boiler waste heat utilization structure, characterized in that: The invention comprises a waste heat utilization tank protective body (1), a dust cleaning component (2), a ventilation pipe (3), a spliced filter component (4) and a waste heat utilization component (5), wherein the dust cleaning component (2) is installed in the waste heat utilization tank protective body (1), the ventilation pipe (3) is connected to both sides of the outer wall of the waste heat utilization tank protective body (1), the spliced filter component (4) is installed on the ventilation pipe (3), and the waste heat utilization component (5) is installed on the top of the waste heat utilization tank protective body (1); The dust cleaning assembly (2) comprises a spiral rod (201), a first motor (202), a first screw rod (203), a rotating connection disk (204), a spiral hole (205), a first connection ring (206), a first filter screen (207), an annular slide groove (208), a brush arc plate (209), a first moving block (2010), a first threaded hole (2011) and a slip ring (2012). The spiral rod (201) is fixedly connected to the inner walls of both sides of the waste heat utilization tank protective body (1), and the rotating connection disk (204) is installed on the inner wall of the middle part of the waste heat utilization tank protective body (1). 04), a spiral hole (205) is provided in the middle of the rotating connecting disk (204) at a position corresponding to the spiral rod (201), a first connecting ring (206) is fixedly connected to the outer walls on both sides of the rotating connecting disk (204), a first filter screen (207) is symmetrically fixedly connected between the first connecting ring (206) and the rotating connecting disk (204), a brush arc plate (209) is fixedly connected to the first connecting ring (206), an annular slide groove (208) is provided on the first connecting ring (206), and a slip ring (212) is slidably connected in the annular slide groove (208).
2. The industrial boiler waste heat utilization structure according to claim 1 is characterized in that: A first moving block (2010) is symmetrically fixedly connected to the slip ring (212); a first motor (202) is symmetrically inlaid and installed on an inner wall of one side of the waste heat utilization tank protective body (1); a first screw rod (203) is fixedly connected to one end of an output shaft of the first motor (202); and the other end of the first screw rod (203) is rotatably connected to the inner wall of the waste heat utilization tank protective body (1); and a first threaded hole (211) is provided on the first moving block (2010) at a position corresponding to the first screw rod (203).
3. The industrial boiler waste heat utilization structure according to claim 1, characterized in that: The spliced filter assembly (4) comprises a second screw rod (401), a rotating handle (402), a sleeve (403), a movable plate (404), a second threaded hole (405), a slot (406), a sealing gasket (407), a second connecting ring (408), a first spring (409), a filter ring (4010) and a second filter screen (4011); the sleeve (403) is installed on the ventilation pipe (3); slots (406) are provided at both ends of the sleeve (403) at positions corresponding to the ventilation pipe (3); a sealing gasket (407) is installed between the slot (406) and the ventilation pipe (3); the movable plate (404) is symmetrically fixedly connected to the sleeve (403); 04), second screw rods (401) are rotatably connected to the outer walls of both sides of the waste heat utilization tank protective body (1), a rotating handle (402) is fixedly connected to the outer wall of one end of the second screw rod (401), a second threaded hole (405) is opened on the movable plate (404) at a position corresponding to the second screw rod (401), a second connecting ring (408) is fixedly connected inside the sleeve (403), a first spring (409) is fittedly connected to one side of the second connecting ring (408), a filter ring (4010) is fixedly connected to the outer wall of the other end of the first spring (409), and a second filter net (4011) is fixedly connected inside the filter ring (4010).
4. The industrial boiler waste heat utilization structure according to claim 1, characterized in that: The waste heat utilization component (5) comprises a heating box (501), a drain pipe (502), a piston column (503), a fixing plate (504), a connecting arc block (505), a second spring (506), a second motor (507), a third screw rod (508), a guide rod (509), a second moving block (5010), a third threaded hole (5011), a guide hole (5012), a connecting frame (5013), an extrusion arc block (5014) and a heat conducting plate ( 5015), a heat conducting plate (5015) is embedded and installed on the top inner wall of the waste heat utilization tank protective body (1), a heating box (501) is fixedly connected to the top outer wall of the waste heat utilization tank protective body (1), drainage pipes (502) are distributed and connected to the outer walls of both sides of the heating box (501), a piston column (503) is sleeved in the drainage pipe (502), and a fixing plate (504) is fixedly connected to the outer wall of one end of the piston column (503), and the fixing plate (504) is fixedly connected to the outer wall of one end of the piston column (503). A connecting arc block (505) is fixedly connected to the outer wall at the top end of the plate (504); a second spring (506) is fixedly connected to the outer wall on one side of the fixed plate (504), and the other end of the second spring (506) is fixedly connected to the inner wall of the heating box (501); a second motor (507) is embedded and installed on one side of the heating box (501); a third screw rod (508) is fixedly connected to one end of the output shaft of the second motor (507), and the other end of the third screw rod (508) is rotatably connected to the inner wall of the heating box (501); a second moving block (5010) is installed in the heating box (501); a third threaded hole (5011) is provided on the second moving block (5010) at a position corresponding to the third screw rod (508); guide rods (509) are fixedly connected to the inner walls on both sides of the heating box (501); and guide holes (5012) are provided on the second moving block (5010) at a position corresponding to the guide rod (509).
5. The industrial boiler waste heat utilization structure according to claim 4 is characterized in that: A connecting frame (5013) is fixedly connected to the top outer wall of the second moving block (5010), and an extrusion arc block (5014) is symmetrically fixedly connected to the bottom outer wall of the connecting frame (5013) at a position corresponding to the connecting arc block (505).
6. The industrial boiler waste heat utilization structure according to claim 1, characterized in that: Positioning plates (6) are fixedly connected to both side outer walls of the waste heat utilization tank protective body (1), and connecting holes (7) are symmetrically provided on the positioning plates (6), and screws (8) are sleeved in the connecting holes (7).
7. The industrial boiler waste heat utilization structure according to claim 3 is characterized in that: A water supply pipe (9) is connected through the outer wall of the top end of the heating box (501), and a valve (10) is installed on the water supply pipe (9).
8. The industrial boiler waste heat utilization structure according to claim 1, characterized in that: The number of the brush arc plates (209) is four, and the brush side of the brush arc plates (209) is fitted and connected to the inner wall of the waste heat utilization tank protective body (1).
9. The industrial boiler waste heat utilization structure according to claim 3, characterized in that: The second spring (506) is internally sleeved on the outer wall of the piston column (503), and the number of the second springs (506) is fourteen.