Method for overhauling power line of hydraulic power plant
By designing an automatic maintenance process in the computer monitoring system of the hydropower plant, the problems of low operating efficiency and high risk of misoperation in the existing technology of hydropower plant 500kV line are solved, and the automatic switching of the line is realized, improving operation efficiency and safety.
Patent Information
- Application Number
- CN202411777718.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-05
- Publication Date
- 2025-03-18
AI Technical Summary
The existing hydropower plants have low operating efficiency and high risk of misoperation, making it difficult to meet the requirements of efficient scheduling and operation management.
A method for power line maintenance of hydropower plants is designed, and the automatic judgment of line status and process control is realized through a computer monitoring system, including responding to power outage dispatch commands, issuing disconnection instructions one by one, changing line switch status, and automatically performing maintenance actions when preset conditions are met.
The automatic switching and maintenance status of the 500kV line of the hydropower plant has been realized, which reduces the risk of omissions in manual supervision, improves operation efficiency and safety, and reduces the risk of instability of the power system caused by misoperation.