Regional power grid flexible interconnection planning method giving consideration to global consumption capability and investment income of new energy
By establishing a two-layer planning model and an improved multi-objective particle swarm algorithm, the installation capacity and site selection location of the flexible interconnection device are optimized, and the problem of difficulty in effectively planning the DC connection line between regions in the existing technology is solved, and the flexible consumption of new energy and mutual resource assistance between regional power grids is achieved, taking into account investment returns.
Patent Information
- Application Number
- CN202411462042.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-18
- Publication Date
- 2025-03-18
AI Technical Summary
It is difficult for the existing technology to effectively plan DC connection lines between regions and select appropriate DC connection nodes and line capacity while maintaining investment returns, so as to maximize the flexible consumption of new energy and mutual resource assistance between regional power grids, and reduce wind and light abandonment.
A flexible interconnection planning method for regional power grids is proposed. By establishing a double-layer planning model and combining with an improved multi-objective particle swarm algorithm, the installation capacity and location of the flexible interconnection device are optimized to ensure both the benefits of new energy consumption and investment returns.
On the basis of ensuring investment returns, it has improved the new energy consumption capacity and power supply reliability of regional power grids, reduced the boost/download transmission of electricity, and alleviated the problem of congestion in the main grid transmission trend.