Double-jumper ship power system main network with load screen and control screen spaced and configuration method

By setting up a busbar corresponding to the number of generator sets configured in a single power station on the main distribution board of the ship's power system, and setting up a busbar switch between the busbars. The double jumper lead-out point is located between the busbar switches of the (n/2-1)th to the n/2th busbar from both ends of the main distribution board to the middle, the problem of excessive working current requirements of the main distribution board in the multi-unit configuration of a single power station is solved, and the reduction of resource consumption and the improvement of the system's adaptability is achieved.

CN119696028APending Publication Date: 2025-03-25CHINA SHIP DEV & DESIGN CENT
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411835186.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-13
Publication Date
2025-03-25

AI Technical Summary

Technical Problem

When the existing ship power system is equipped with more than two generator sets in a single power station, the working current requirements of the busbar and protection devices of the main distribution board are greatly improved, resulting in increased development difficulties and excessive resource consumption.

Method used

The main network of the double-bounce ship power system with a spaced distance between the load screen and the control screen, by setting a busbar corresponding to the number of generator sets configured in a single power station on the main distribution board, and setting a busbar switch between the busbars. The double-bounce lead-out point is located between the busbars (n/2-1)th to the n/2th busbar from both ends of the main distribution board to the middle.

Benefits of technology

The working current requirements of busbars and protection devices in the main distribution board are reduced from 2.6Ie to 1.8Ie, alleviating the development pressure and overall resource consumption of the main distribution board.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119696028A_ABST
    Figure CN119696028A_ABST
Patent Text Reader

Abstract

The invention provides a load screen and control screen spaced double-jumper ship power system main network and a configuration method. Main power distribution boards corresponding to power stations in number and busbars corresponding to generator sets configured for a single power station in number are adopted on the main power distribution boards; buscouple switches are arranged between the busbars in the main distribution board; jumper wires are arranged on different main distribution boards, a single power station is configured with n units, leading-out points of the jumper wires are located between buscouple switches of a (n / 2-1) th busbar to a (n / 2) th busbar from the two ends of the main distribution boards to the middle of the main distribution boards, and the configuration function of the ship power system main network structure adaptive to the single power station and the multiple units is achieved. The problems that when three or more generator sets are configured in a single power station of a ship power system, the requirements for busbars and protection devices in a main distribution board are greatly improved, consequently, the development of the main distribution board is difficult, and the consumption of overall resources of a ship is too large are solved, and when the generator capacity of a large ship is large and the configuration number is large, the development cost is low. And the development pressure and the total resource consumption of the main distribution board are well relieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of ship power system architecture, and in particular relates to a main network of a double-jump-wire ship power system with a load panel and a control panel spaced apart, and a configuration method thereof. Background Art

[0002] Based on the vitality requirements in ship design, generally larger ships are equipped with two power stations, each with two (or more) generator sets, and each with a main switchboard, which monitors and controls the generator sets and the main network of the power station, and distributes power to the primary network distribution equipment. The main switchboards of different power stations are connected by jumper cables (single jumper cables).

[0003] The main switchboard consists of a control panel and a load panel. The control panel includes a generator control panel, a busbar panel, and a jumper panel. The generator control panel completes the monitoring and control function of the generator set. The busbar switch in the busbar panel is used to connect the busbars of different generator sets. The jumper switch in the jumper panel is used to connect the jumper cables between different power stations. The load panel completes the function of distributing electricity and is generally set on both sides of the control panel, such as Figure 1 shown. The above network is very suitable for power station configurations with no more than two units in a single power station. However, due to the development of equipment and ship technology, the capacity requirements for ship power systems are getting higher and higher, and there will inevitably be power station configurations with more than two units in a single power station. At this time, if the above traditional network structure is adopted, according to the specification requirements, the main switchboard bus should be "greater than the rated current of a generator set with the largest capacity plus 80% of the total rated current of the remaining generators in this power station." At this time, the working current requirements for the bus and protection devices in the main switchboard are greatly increased, which greatly increases the difficulty and production costs of the main switchboard, and may even exceed the processing technology capabilities of the bus. At the same time, due to the high working current of the bus and protection devices, the size and weight of the main switchboard will increase proportionally, which will inevitably increase the overall resource consumption of the ship. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a main network of a double-jump-wired ship power system with a load panel and a control panel separated and a configuration method for adapting to the configuration of multiple units in a single power station of a ship power system.

[0005] The technical solution adopted by the present invention to solve the above technical problems is: a main network of a double-jump-wire ship power system with a load panel and a control panel separated, including a main distribution board corresponding to the number of power stations, and a bus on the main distribution board corresponding to the number of generator sets configured in a single power station; it also includes a bus tie switch arranged between the bus bars in the main distribution board; assuming that a single power station is configured with n units; it also includes double jumper wires, and the lead-out points of the two jumper wires are respectively located between the bus tie switches of the (n / 2-1)th to n / 2th buses from the two ends of the main distribution board to the middle.

[0006] According to the above scheme, it also includes a generator set switch connecting the busbar and the generator.

[0007] Furthermore, each section of the bus is provided with a generator set switch.

[0008] According to the above scheme, a load switch connecting the bus bar and the load is also included.

[0009] According to the above scheme, a jumper switch connecting the busbar and the jumper wire is also included.

[0010] Furthermore, the generator set switch and the bus tie switch are arranged on both sides of the jumper switch.

[0011] Furthermore, a load switch is provided between each generator set switch, the jumper switch and the bus tie switch.

[0012] A configuration method comprises the following steps: A main switchboard corresponding to the number of power stations is set up, and buses corresponding to the number of generator sets in a single power station are arranged on the main switchboard; A bus tie switch is provided between the busbars in the main switchboard; Assume that a single power station is equipped with n units; set up double jumper wires so that the lead-out points of the two jumper wires are located between the bus tie switches from the (n / 2-1)th to the n / 2th buses in the middle from both ends of the main distribution board.

[0013] Furthermore, the method further comprises the following steps: Set up the generator set switch connecting the busbar and the generator; Set up a load switch connecting the bus and the load; Each bus section is equipped with a generator set switch.

[0014] Furthermore, the method further comprises the following steps: A jumper switch is provided to connect the busbar and the jumper wire; the generator set switch and the bus tie switch are provided on both sides of the jumper switch; and a load switch is provided between each generator set switch, the jumper switch and the bus tie switch.

[0015] The beneficial effects of the present invention are: 1. The present invention discloses a main network and configuration method of a ship power system with double jumper wires separated by a load panel and a control panel. The main network and configuration method adopt a main distribution board corresponding to the number of power stations, and a busbar on the main distribution board corresponding to the number of generator sets configured in a single power station; a busbar is arranged along the length direction of the busbar, and a busbar tie switch is arranged on the busbar; a single power station is configured with n units; jumper wires are arranged so that the lead-out point of the jumper wires is located between the busbar tie switches of the (n / 2-1)th to n / 2th buses from both ends of the main distribution board to the middle, thereby realizing the function of adapting to the configuration of multiple units in a single power station of the ship power system.

[0016] 2. The present invention solves the problem that when a single power station of a ship power system is equipped with 3 or more generator sets, the requirements for the busbars and protection devices in the main switchboard are greatly increased, which makes the development of the main switchboard difficult and consumes too much overall resources of the ship.

[0017] 3. The operating current requirement of the busbar and protective devices in the main switchboard of the present invention is 2.6I e Reduced to 1.8I e For large ships with large generator capacity (i.e. I e It can effectively alleviate the development pressure and overall resource consumption of the main switchboard when the number of configurations is large.

[0018] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0020] Figure 1 It is the main network diagram of the existing power system.

[0021] Figure 2 It is an optimized main network diagram of the power system according to an embodiment of the present invention.

[0022] In the figure: 1. Load panel; 2. Generator set control panel; 3. Bus tie panel; 4. Jumper panel; MBS1: front main distribution board; MBS2: rear main distribution board; G1~G6: Generator sets 1~6; QF1~QF6: Generator set switches; QF7~QF10: Bus tie switches; QF11~QF14: Jumper switches; QF11, QF1xx, QF21, QF2xx: load switches. DETAILED DESCRIPTION

[0023] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0024] Example 1 See also Figure 2 A main network of a ship power system with double jumper wires separated by a load panel and a control panel, comprising a main switchboard corresponding to the number of power stations, and buses on the main switchboard corresponding to the number of generator sets configured in a single power station; also comprising bus-tie switches arranged between the buses in the main switchboard; assuming that a single power station is configured with n generator sets; also comprising double jumper wires, the lead-out points of the two jumper wires are respectively located between the bus-tie switches of the (n / 2-1)th to the n / 2th buses from both ends of the main switchboard to the middle.

[0025] Furthermore, it also includes a generator set switch connecting the busbar and the generator.

[0026] Furthermore, each section of the bus is provided with a generator set switch.

[0027] Also included is a load switch for connecting the busbar and the load.

[0028] Also included is a jumper switch for connecting the busbar and the jumper wire.

[0029] Furthermore, the generator set switch and the bus tie switch are arranged on both sides of the jumper switch.

[0030] Furthermore, a load switch is provided between each generator set switch, the jumper switch and the bus tie switch.

[0031] This embodiment realizes the function of adapting to the configuration of multiple units in a single power station of a ship power system by adopting a main distribution board corresponding to the number of power stations and a busbar on the main distribution board corresponding to the number of generator sets configured in a single power station; arranging a busbar along the length direction of the busbar, and providing a bus tie switch on the busbar; assuming that a single power station is configured with n units; arranging jumper wires so that the lead-out points of the jumper wires are located between the bus tie switches of the (n / 2-1)th to the n / 2th buses from both ends of the main distribution board to the middle, thereby realizing the function of adapting to the configuration of multiple units in a single power station of a ship power system.

[0032] Example 2 The structure and principle of this embodiment are the same as those of Embodiment 1, except that the above structure is applied to a specific example.

[0033] Assume that a ship is equipped with two power stations, each with three diesel generators of equal power and rated current I. e .

[0034] The power station composition and connection method of the prior art are as follows Figure 1 As shown in the figure, the load panels (1) are set on both sides of the control panel and a single jumper is set. According to the specification, the busbar of the main switchboard should be "greater than the rated current of the largest generator set plus 80% of the total rated current of the remaining generators in the power station." At this time, the operating current requirement for the busbar and protection devices in the main switchboard is not less than I e +2I e *80%, which is 2.6I e .

[0035] The power station composition and connection method of the optimized power network structure proposed by the present invention are as follows: Figure 2 As shown. Since each generator set bus is equipped with a load panel, the power is distributed to the primary power grid, effectively decomposing the working current pressure of the main distribution board bus; at the same time, the double jumper configuration and the optimized setting of the access point not only relieve the current pressure on the jumper line, but also provide more combinations for the reconstruction of the entire system, thus improving the vitality of the system. After simulation analysis and calculation, the working current requirement for the bus and protection devices in the main distribution board is not less than 1.8I e .

[0036] From the above scheme, it can be seen that for large ships with large generator capacity (i.e. I e It can effectively alleviate the development pressure and overall resource consumption of the main switchboard when the number of configurations is large.

[0037] Example 3 The present embodiment is used to implement the method for system execution of the above method embodiment, including the following steps: A main switchboard corresponding to the number of power stations is set up, and buses corresponding to the number of generator sets in a single power station are arranged on the main switchboard; A bus tie switch is provided between the busbars in the main switchboard; Assume that a single power station is equipped with n units; set up double jumper wires so that the lead-out points of the two jumper wires are located between the bus tie switches from the (n / 2-1)th to the n / 2th buses in the middle from both ends of the main distribution board.

[0038] Furthermore, the method further comprises the following steps: Set up the generator set switch connecting the busbar and the generator; Set up a load switch connecting the bus and the load; Each bus section is equipped with a generator set switch.

[0039] Furthermore, the method further comprises the following steps: A jumper switch is provided to connect the busbar and the jumper wire; the generator set switch and the bus tie switch are provided on both sides of the jumper switch; and a load switch is provided between each generator set switch, the jumper switch and the bus tie switch.

[0040] It should be pointed out that, according to the needs of implementation, the various steps / components described in this application can be split into more steps / components, and two or more steps / components or partial operations of steps / components can be combined into new steps / components to achieve the purpose of the present invention.

[0041] This embodiment also includes a processor, a communication interface, a memory and a communication bus; wherein the processor, the communication interface and the memory communicate with each other via the communication bus; a computer program is stored in the memory, and when the program is executed by the processor, the processor executes the steps of a configuration method.

[0042] This embodiment also provides a computer-readable storage medium on which executable instructions are stored. When the instructions are executed by a processor, the processor implements a configuration method.

[0043] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware.

[0044] Moreover, the present application may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.

[0045] The present application is described with reference to the block diagram of the device (system) according to Embodiment 1 of the present application and the flowchart of the method and computer program product according to Embodiment 2. It should be understood that each process or box in the flowchart or block diagram, as well as the combination of processes or boxes in the flowchart or block diagram, can be implemented by computer program instructions.

[0046] These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the process Figure 1 A process or multiple processes or boxes Figure 1 A double-jump-wired ship power system main network that separates the load panel and the control panel with functions specified in one box or multiple boxes.

[0047] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes or boxes Figure 1 A function specified in one or more boxes.

[0048] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes or boxes Figure 1 The steps of a configuration method are specified in one or more boxes.

[0049] The above embodiments are only used to illustrate the design ideas and features of the present invention, and their purpose is to enable those skilled in the art to understand the content of the present invention and implement it accordingly. The protection scope of the present invention is not limited to the above embodiments. Therefore, any equivalent changes or modifications made based on the principles and design ideas disclosed by the present invention are within the protection scope of the present invention.

Claims

1. A main network of a double-jump connection ship power system with a load panel and a control panel separated, characterized in that: It includes a main switchboard corresponding to the number of power stations, and a busbar on the main switchboard corresponding to the number of generator sets configured in a single power station; Also included is a bus tie switch disposed between the bus bars in the main switchboard; Assume that a single power station is equipped with n units; it also includes double jumper wires, and the lead-out points of the two jumper wires are located between the bus tie switches from the two ends of the main distribution board to the middle of the (n / 2-1)th to the n / 2th busbars.

2. According to claim 1, a double-jump connection ship power system main network with load panel and control panel separated is characterized in that: It also includes a generator set switch that connects the busbar to the generator.

3. According to claim 2, a double-jump connection ship power system main network with a load panel and a control panel separated is characterized in that: Each bus section is equipped with a generator set switch.

4. According to claim 1, a double-jump connection ship power system main network with a load panel and a control panel separated is characterized by: Also included is a load switch for connecting the busbar and the load.

5. According to claim 1, a double-jump connection ship power system main network with load panel and control panel separated is characterized in that: Also included is a jumper switch for connecting the busbar and the jumper wire.

6. A double-jump connection ship power system main network with load panel and control panel separated according to claim 2 or 5, characterized in that: The generator set switch and the bus tie switch are arranged on both sides of the jumper switch.

7. A double-jump connection ship power system main network with load panel and control panel separated according to claim 6, characterized in that: A load switch is provided between each generator set switch, jumper switch and bus tie switch.

8. A configuration method, characterized in that: The following steps are involved: A main switchboard corresponding to the number of power stations is set up, and buses corresponding to the number of generator sets in a single power station are arranged on the main switchboard; A bus tie switch is provided between the busbars in the main switchboard; Assume that a single power station is equipped with n units; Double jumper wires are set up so that the lead-out points of the two jumper wires are located between the bus tie switches of the (n / 2-1)th to n / 2th buses from both ends of the main distribution board to the middle.

9. A configuration method according to claim 8, characterized in that: The following steps are also included: Set up the generator set switch connecting the busbar and the generator; Set up a load switch connecting the bus and the load; Each bus section is equipped with a generator set switch.

10. A configuration method according to claim 9, characterized in that: The following steps are also included: A jumper switch is provided to connect the busbar and the jumper wire; the generator set switch and the bus tie switch are provided on both sides of the jumper switch; and a load switch is provided between each generator set switch, the jumper switch and the bus tie switch.