Environment-friendly and energy-saving design optimization method for constructional engineering

By monitoring and allocating the power usage of construction projects, combined with photovoltaic energy stations and sewage power stations, the problem of the increase in the number of energy stations when the demand for electricity increases significantly, and efficient and environmentally friendly power utilization is achieved.

CN119726951APending Publication Date: 2025-03-28LIAONING INST OF SCI & ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411796110.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-09
Publication Date
2025-03-28

AI Technical Summary

Technical Problem

The existing green energy-saving design optimization method for construction projects needs to be added when power demand increases significantly, resulting in increased costs and increased building area, causing inconvenience.

Method used

By monitoring the use of electricity and adjusting the power allocation, photovoltaic energy stations and sewage power stations can be used to avoid power shortage and improve energy utilization efficiency.

Benefits of technology

It effectively avoids power shortage, reduces energy costs, improves energy utilization efficiency, and makes construction projects more green and environmentally friendly.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119726951A_ABST
    Figure CN119726951A_ABST
Patent Text Reader

Abstract

The invention discloses a building engineering green energy-saving design optimization method, which comprises the following steps: S1, regional planning: carrying out regional planning on a whole building engineering region, dividing the whole building engineering region into a plurality of regions, and carrying out construction planning on the plurality of regions; s2, after planning is completed, a plurality of energy stations and sewage power stations are arranged in a specific area, and the power use condition in the area is monitored; s3, optimizing electric power, deploying the electric power according to the electric power use condition, and continuously monitoring the electric power use condition; and S4, when supply shortage is caused by increase of the power demand, the sewage power station and the energy station jointly provide power for the building engineering area, the problem of power shortage is avoided by monitoring the power use condition and adjusting power allocation, and the photovoltaic energy station and the sewage power station are used, so that the building engineering area is more environmentally friendly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of green energy-saving design optimization for construction projects, and in particular to a green energy-saving design optimization method for construction projects. Background Art

[0002] Green energy-saving design optimization of construction projects refers to the application of green energy-saving concepts and technologies in the building design stage, reducing the building's energy consumption and environmental impact by selecting energy-saving materials, optimizing building structure and system design, and improving energy efficiency. Through green energy-saving design optimization, buildings can become more environmentally friendly and energy-saving, while also reducing operating costs and improving user comfort.

[0003] The existing green energy-saving design optimization method for construction projects avoids the problem of power shortage by allocating electricity. However, when this method is used, when the demand for electricity increases on a large scale, more energy stations need to be added, which leads to increased costs and an increase in the required building area, causing many inconveniences. Summary of the invention

[0004] The purpose of the present invention is to solve at least one of the technical problems existing in the prior art, and to provide a green energy-saving design optimization method for construction projects, which monitors the use of electricity and adjusts the allocation of electricity to avoid the problem of power shortage, and uses photovoltaic energy stations and sewage power stations to achieve a greener and more environmentally friendly approach.

[0005] The present invention also provides a green energy-saving design optimization method for a construction project, comprising the following steps:

[0006] S1. Regional planning: regional planning for the entire construction project area, dividing the entire construction project area into multiple areas, and carrying out construction planning for multiple areas;

[0007] S2. After the planning is completed, multiple energy stations and sewage power plants will be set up in a specific area, and the power usage in the area will be monitored;

[0008] S3, power optimization, allocate power according to power usage, adjust power output ratio, and continuously monitor power usage;

[0009] S4. During normal use, the energy station provides electricity to the construction area. When the increase in electricity demand leads to supply shortage, the sewage power station and the energy station jointly provide electricity to the construction area.

[0010] According to a green energy-saving design optimization method for construction projects provided by the present invention, the regional planning of the entire construction project area in S1 is specifically to divide the entire construction project into a residential area, an energy area, a domestic sewage treatment area, and an industrial area.

[0011] According to a green energy-saving design optimization method for a construction project provided by the present invention, the energy station in S2 is specifically a photovoltaic energy station.

[0012] According to a green energy-saving design optimization method for a construction project provided by the present invention, the sewage power station is specifically a water conservancy generator placed at the outlet of the sewage treatment plant.

[0013] According to a green energy-saving design optimization method for construction projects provided by the present invention, the monitoring of power usage in S2 is specifically carried out by detecting the current size of the output port of the substation, thereby determining the power distribution situation.

[0014] According to a green energy-saving design optimization method for construction projects provided by the present invention, the continuous monitoring of power usage in S3 specifically involves detecting power usage every 30-60 minutes.

[0015] According to a green energy-saving design optimization method for construction projects provided by the present invention, when S4 is normally used, the sewage power station does not generate electricity.

[0016] According to a green energy-saving design optimization method for construction projects provided by the present invention, the construction planning in S1 specifically designs and plans the construction of the area.

[0017] Compared with existing technologies, the green energy-saving design optimization method of the construction project monitors the use of electricity and adjusts the power allocation to avoid the problem of power shortage. It is more green and environmentally friendly by using photovoltaic energy stations and sewage power stations. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The present invention is further described below in conjunction with the accompanying drawings and embodiments;

[0019] Figure 1 A flow chart of the green energy-saving design optimization method for building engineering of the present invention; DETAILED DESCRIPTION

[0020] This section will describe in detail the specific embodiments of the present invention. The preferred embodiments of the present invention are shown in the accompanying drawings. The purpose of the accompanying drawings is to supplement the description of the text part of the specification with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the present invention, but it cannot be understood as a limitation on the scope of protection of the present invention.

[0021] Reference Figure 1The embodiment of the present invention provides a green energy-saving design optimization method for a construction project, which comprises the following steps:

[0022] S1. Regional planning: regional planning for the entire construction project area, dividing the entire construction project area into multiple areas, and carrying out construction planning for multiple areas. The regional planning for the entire construction project area specifically involves dividing the entire construction project into residential areas, energy areas, domestic sewage treatment areas, and industrial areas. The construction planning specifically involves designing and planning the construction of the area;

[0023] S2. After the planning is completed, multiple energy stations and sewage power stations are set up in a specific area, and the power usage in the area is monitored. The energy station is a photovoltaic energy station, and the sewage power station is a hydroelectric generator placed at the outlet of the sewage treatment plant. The power usage is monitored by detecting the current size of the output port of the substation, and then determining the power distribution;

[0024] S3. Power optimization: according to the power usage, the power is allocated, the power output ratio is adjusted, and the power usage is continuously monitored. The specific monitoring of power usage is to detect the power usage every 30-60 minutes;

[0025] S4. During normal use, the energy station provides electricity to the construction area. When the demand for electricity increases and the supply is tight, the sewage power station and the energy station jointly provide electricity to the construction area. During normal use, the sewage power station does not generate electricity.

[0026] The embodiments of the present invention are described in detail above with reference to the accompanying drawings. However, the present invention is not limited to the above embodiments. Various changes can be made within the knowledge scope of ordinary technicians in the technical field without departing from the purpose of the present invention.

Claims

1. A green energy-saving design optimization method for construction engineering, characterized in that: The following steps are involved: S1. Regional planning: regional planning for the entire construction project area, dividing the entire construction project area into multiple areas, and carrying out construction planning for multiple areas; S2. After the planning is completed, multiple energy stations and sewage power plants will be set up in a specific area, and the power usage in the area will be monitored; S3, power optimization, allocate power according to power usage, adjust power output ratio, and continuously monitor power usage; S4. During normal use, the energy station provides electricity to the construction area. When the increase in electricity demand leads to supply shortage, the sewage power station and the energy station jointly provide electricity to the construction area.

2. A green energy-saving design optimization method for construction engineering according to claim 1, characterized in that: The regional planning of the entire construction project area in S1 is specifically to divide the entire construction project into a residential area, an energy area, a domestic sewage treatment area, and an industrial area.

3. A green energy-saving design optimization method for construction engineering according to claim 1, characterized in that: The energy station in S2 is specifically a photovoltaic energy station.

4. A green energy-saving design optimization method for construction engineering according to claim 1, characterized in that: The sewage power station specifically places a hydroelectric generator at the outlet of the sewage treatment plant.

5. A green energy-saving design optimization method for construction engineering according to claim 1, characterized in that: The monitoring of the power usage in S2 is specifically performed by detecting the current size of the output port of the substation, thereby determining the power distribution situation.

6. A green energy-saving design optimization method for construction engineering according to claim 1, characterized in that: The continuous monitoring of the power usage in S3 specifically includes detecting the power usage every 30-60 minutes.

7. A green energy-saving design optimization method for construction engineering according to claim 1, characterized in that: When S4 is used normally, the sewage power plant does not generate electricity.

8. A green energy-saving design optimization method for construction engineering according to claim 1, characterized in that: The construction planning in S1 specifically involves designing and planning the construction of the area.