By designing an intelligent construction platform, using Beret frames and multiple components to achieve automated lifting and transportation of materials, the problem of low material transportation efficiency in prefabricated residential projects is solved, and construction efficiency and safety performance are improved.
Patent Information
- Application Number
- CN202411944059.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-27
- Publication Date
- 2025-04-22
AI Technical Summary
During the construction of prefabricated residential projects, the transportation of materials and prefabricated components mainly relies on manual labor, resulting in slow speed and low efficiency, which cannot meet the needs of lifting multiple working faces at the same time.
A prefabricated residential engineering construction intelligent construction platform was designed, using a combination of beret frames and positioning components, transportation components, loading components and monitoring components to realize the automatic lifting and transportation of materials through motor-driven slide rails and movable blocks.
It improves construction efficiency, improves the safety performance and operating environment of the operating layer, realizes fast and accurate transportation of materials, and solves the problems of slow and low efficiency of manual transportation.
Smart Images

Figure CN119860100A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of building construction, and in particular to an intelligent construction platform and a construction method for an assembled residential project. Background Art
[0002] Prefabricated buildings refer to buildings where the main components are prefabricated in factories and assembled to form a whole after being transported to the site. Therefore, this type of structure has a high degree of industrialized production, fast construction speed, can effectively guarantee the quality of components, and is not affected by the environment. It is particularly suitable for housing buildings with large construction workloads and relatively consistent component quality requirements.
[0003] For prefabricated residential projects, when lifting and transporting prefabricated components in multiple buildings at the same time, the tower crane operation cannot meet the problem of simultaneous lifting operations on multiple working surfaces. In addition, during the construction process, the aluminum membrane panels, auxiliary materials, and prefabricated components on the floors need to be transported to various construction sites. Currently, the transportation of materials on the operating floor is mainly done manually, which is slow and inefficient. For this reason, we proposed an intelligent construction platform and construction method for prefabricated residential engineering construction to solve the above problems. Summary of the invention
[0004] The purpose of the present invention is to provide an intelligent construction platform and construction method for prefabricated residential engineering construction, so as to solve the problem that prefabricated components need to be transported to various construction sites during the construction process proposed in the above background technology. At present, the transportation of materials within the operating layer is mainly completed manually, which has the problems of slow speed and low efficiency.
[0005] To achieve the above-mentioned objectives, the present invention provides the following technical solutions: an intelligent construction platform and construction method for assembled residential engineering, including Bailey frames, four groups of Bailey frames are connected with reinforcement plates, a positioning assembly is arranged in the Bailey frames, the positioning assembly includes a first fixed frame, a first slide rail, a first movable block, a first mounting plate, a first motor, a first walking wheel and a hook, a first fixed frame is arranged between the Bailey frames, two groups of first slide rails are opened on the inner side of the first fixed frame, a first movable block is arranged at the bottom of the first fixed frame, two groups of first mounting plates are installed on the outer side of the upper end of the first movable block, a first motor is installed on the outer side of the first mounting plate, an output end of the first motor is connected with a first walking wheel, the first walking wheel is located in the first slide rail and its diameter is adapted to the first slide rail, and a hook is connected to the bottom of the first movable block.
[0006] Preferably, two groups of transport components are symmetrically arranged on both sides of the Bailey frame, and the transport components include a second fixed frame, a third slide rail, a second movable block, a second mounting plate, a second motor and a second walking wheel. A second fixed frame is connected between the front and rear groups of Bailey frames, two groups of third slide rails are opened on the inner side of the third slide rail, the bottom of the second fixed frame is movably connected to the second movable block, two groups of second mounting plates are connected to the left and right sides of the second movable block, a second motor is installed on the outer side of the second mounting plate, the inner output end of the second motor is fixedly connected to the second walking wheel, and the lower end of the second movable block is connected to the surface of the first fixed frame.
[0007] Preferably, a loading assembly is provided at the bottom of the Bailey frame, and the loading assembly includes a first support frame, a guardrail, a second support frame, a third push rod, a first connecting frame, a push rod and a guide rod. The outer surface of a rear end group of the Bailey frames is connected to the first support frame, a discharge place is provided in the first support frame, the right side of the first support frame is fixedly connected to the guardrail, the bottom of the first support frame is fixedly connected to the second support frame, the third push rod is fixedly installed in the second support frame, the output of the third push rod is fixedly connected to the first connecting frame, the left side of the first connecting frame is located on the upper surface of the first support frame and is fixedly connected to the push rod, and the push rod is located between the guardrails.
[0008] Preferably, monitoring components are provided on the left and right sides of the first movable block, and the monitoring components include a first fixed plate, a first push rod, a second slide rail, a slider and a first detection probe. The left side of the first movable block is fixedly connected to the first fixed plate, a first push rod is installed between the first fixed plate and the first movable block, the inner side of the first fixed plate is fixedly connected to the second slide rail, the outer surface of the second slide rail is movably connected to the slider, the right side of the slider is fixedly connected to the output end of the first push rod, and the first detection probe is installed on the inner side of the slider.
[0009] Preferably, a second fixed plate is fixedly connected to the right side of the first movable block, a micro motor is installed between the second fixed plate and the first movable block, a fixed block is fixedly connected to the inner side of the second fixed plate, a second detection probe is rotatably connected to the fixed block via a connecting piece, and the connecting piece at the second detection probe is connected to the output end of the micro motor.
[0010] Preferably, a fourth push rod is fixedly installed on the left bottom of the first support frame, the upper end of the fourth push rod is fixedly connected to the second connecting frame, the upper end of the second connecting frame is fixedly connected to a push plate, and the push plate is located on the surface of the first support frame.
[0011] Preferably, two groups of fixed components are provided on both sides of the first movable block, and the fixed components include a fifth push rod, a third connecting frame and a suction cup. Four groups of fifth push rods are installed at the four corners of the first movable block. The lower end of the fifth push rod is fixedly connected to the third connecting frame, and a suction cup is installed in the third connecting frame.
[0012] Preferably, two groups of second push rods are installed in the second movable block, the first fixed frame and the second movable block are connected through the second push rods, and the four groups of second push rods are respectively located at the four corners of the surface of the first fixed frame.
[0013] Preferably, a limiting rod is threadedly connected to the other side of the suction cup in the third connecting frame.
[0014] Compared with the prior art, the present invention has the following beneficial effects: 1. The present invention can lift materials and prefabricated components from the material discharge location to the designated location for stacking through the setting of positioning components. The materials and prefabricated components can be hoisted to the construction site along the first slide rail. The aluminum film panels, auxiliary materials, prefabricated components and other materials can also be transported to various locations of the operating layer through the fixing components, thereby improving the construction efficiency, the safety performance of the operating layer and the working environment.
[0015] 2. The present invention can scan materials moved to designated positions and detect the spacing between them by setting up monitoring components, thereby improving the accuracy of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0017] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a schematic side cross-sectional view of the structure of the present invention; Figure 3 It is a front cross-sectional schematic diagram of the structure of the present invention; Figure 4 It is a structural schematic diagram of the positioning component of the present invention; Figure 5 It is a structural schematic diagram of the fixing assembly of the present invention; Figure 6 It is a structural schematic diagram of the feeding assembly of the present invention; Figure 7 For the present invention Figure 2 A is a partial enlarged schematic diagram; Figure 8 For the present invention Figure 3 A partial enlarged schematic diagram of B in the middle; Fig. 9 For the present invention Figure 4 A partial enlarged schematic diagram of C in the middle; Fig.10 For the present invention Figure 4 A partial enlarged schematic diagram of D in the middle.
[0018] In the figure: 1, Bailey frame; 2, reinforcement plate; 3, positioning assembly; 31, first fixed frame; 32, first slide rail; 33, first movable block; 34, first mounting plate; 35, first motor; 36, first walking wheel; 37, hook; 4, monitoring assembly; 41, first fixed plate; 42, first push rod; 43, second slide rail; 44, slider; 45, first detection probe; 46, second fixed plate; 47, micro motor; 48, fixed block; 49, second detection probe; 5, transportation assembly; 51, second fixed frame; 52, third slide Rail; 53, second movable block; 54, second mounting plate; 55, second motor; 56, second walking wheel; 57, second push rod; 6, loading assembly; 601, first support frame; 602, guardrail; 603, second support frame; 604, third push rod; 605, first connecting frame; 606, push rod; 607, guide rod; 608, fourth push rod; 609, second connecting frame; 610, push plate; 7, discharge place; 8, fixing assembly; 81, fifth push rod; 82, third connecting frame; 83, suction cup; 84, limit rod. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0020] See also Figure 1-10An embodiment of the present invention is as follows: an intelligent construction platform and a construction method for assembled residential engineering, comprising a Bailey frame 1, a reinforcement plate 2 is connected between four groups of Bailey frames 1, a positioning assembly 3 is arranged in the Bailey frame 1, the positioning assembly 3 comprises a first fixed frame 31, a first slide rail 32, a first movable block 33, a first mounting plate 34, a first motor 35, a first walking wheel 36 and a hook 37, a first fixed frame 31 is arranged between the Bailey frames 1, two groups of first slide rails 32 are opened on the inner side of the first fixed frame 31, a first movable block 33 is arranged at the bottom of the first fixed frame 31, and a first movable block 33 is arranged at the bottom of the first fixed frame 31. Two groups of first mounting plates 34 are installed on the outer side of the upper end of the movable block 33, and a first motor 35 is installed on the outer side of the first mounting plate 34. The output end of the first motor 35 is connected to a first travel wheel 36. The first travel wheel 36 is located in the first slide rail 32 and has a diameter that matches the first slide rail 32. A hook 37 is connected to the bottom of the first movable block 33. By starting the two groups of first motors 35, the first travel wheel 36 drives the first movable block 33 to move along the first slide rail 32 to adjust the left and right positions. After the first movable block 33 is moved to the specified position, the material is hoisted by the hook 37.
[0021] This device solves the problem of transporting prefabricated components to various construction sites during the construction process by setting up positioning components 3, monitoring components 4, transportation components 5 and loading components 6. Currently, the transportation of materials within the operating layer is mainly completed manually, which has the problems of slow speed and low efficiency.
[0022] Furthermore, two groups of transport components 5 are symmetrically arranged on both sides of the Bailey frame 1. The transport components 5 include a second fixed frame 51, a third slide rail 52, a second movable block 53, a second mounting plate 54, a second motor 55 and a second running wheel 56. The second fixed frame 51 is connected between the front and rear groups of Bailey frames 1. Two groups of third slide rails 52 are provided on the inner side of the third slide rail 52. The second movable block 53 is movably connected to the bottom of the second fixed frame 51. Two groups of second mounting plates 54 are connected to the left and right sides of the second movable block 53. A second motor 55 is installed on the outer side of the second mounting plate 54. The inner output end of the second motor 55 is fixedly connected to the second running wheel 56. The lower end of the second movable block 53 is connected to the surface of the first fixed frame 31. Figure 8 As shown, the structure is used to start two sets of second motors 55 so that the second walking wheel 56 drives the second movable block 53 and the first fixed frame 31 to adjust the front and rear positions along the third slide rail 52, thereby increasing the range of motion of the first movable block 33 and facilitating the movement of materials to the specified position.
[0023] Furthermore, a loading assembly 6 is provided at the bottom of the Bailey frame 1, and the loading assembly 6 includes a first support frame 601, a guardrail 602, a second support frame 603, a third push rod 604, a first connecting frame 605, a push rod 606 and a guide rod 607. The outer surface of a rear end group of Bailey frames 1 is connected to the first support frame 601, and a material discharge place 7 is provided in the first support frame 601. The right side of the first support frame 601 is fixedly connected to the guardrail 602, the bottom of the first support frame 601 is fixedly connected to the second support frame 603, and the third push rod 604 is fixedly installed in the second support frame 603. The output of the third push rod 604 is fixedly connected to the first connecting frame 605, and the left side of the first connecting frame 605 is located on the upper surface of the first support frame 601 and is fixedly connected to the push rod 606, and the push rod 606 is located between the guardrails 602. Figure 6 As shown, the structure is used to stack the materials at the discharge point 7, and then start the second support frame 603, driving the first connecting frame 605 and the push rod 606 to push the materials to the left along the guide rod 607, so that the materials fit the left inner wall of the push plate 610.
[0024] Further, monitoring components 4 are arranged on the left and right sides of the first movable block 33, and the monitoring components 4 include a first fixed plate 41, a first push rod 42, a second slide rail 43, a slider 44 and a first detection probe 45. The left side of the first movable block 33 is fixedly connected with the first fixed plate 41, the first push rod 42 is installed between the first fixed plate 41 and the first movable block 33, the inner side of the first fixed plate 41 is fixedly connected with the second slide rail 43, the outer surface of the second slide rail 43 is movably connected with the slider 44, the right side of the slider 44 is fixedly connected with the output end of the first push rod 42, and the inner side of the slider 44 is installed with the first detection probe 45. Fig. 9 As shown, the structure is used to start the first push rod 42 to push the slider 44 to adjust horizontally along the second slide rail 43, thereby expanding the detection range of the first detection probe 45 and avoiding material obstruction that affects the detection effect.
[0025] Furthermore, a second fixed plate 46 is fixedly connected to the right side of the first movable block 33, a micro motor 47 is installed between the second fixed plate 46 and the first movable block 33, a fixed block 48 is fixedly connected to the inner side of the second fixed plate 46, a second detection probe 49 is rotatably connected to the fixed block 48 through a connecting piece, and the connecting piece at the second detection probe 49 is connected to the output end of the micro motor 47. Fig.10 As shown, the structure is used to start the micro motor 47 to drive the fixed block 48 to rotate, adjust the irradiation angle of the second detection probe 49, avoid the angle deviation of the placement position, and improve the accuracy of the device.
[0026] Furthermore, a fourth push rod 608 is fixedly installed at the bottom of the left side of the first support frame 601, and the upper end of the fourth push rod 608 is fixedly connected to the second connecting frame 609, and the upper end of the second connecting frame 609 is fixedly connected to the push plate 610, which is located on the surface of the first support frame 601. Figure 6 As shown, the structure is used to drive the second connecting frame 609 and the push plate 610 to move upward by starting the fourth push rod 608, so as to push the material on the surface end of the push plate 610 upward, so as to facilitate material removal.
[0027] Furthermore, two sets of fixing components 8 are arranged on both sides of the first movable block 33, and the fixing components 8 include a fifth push rod 81, a third connecting frame 82 and a suction cup 83. Four sets of fifth push rods 81 are installed at the four corners of the first movable block 33, and the lower end of the fifth push rod 81 is fixedly connected to the third connecting frame 82, and the suction cup 83 is installed in the third connecting frame 82. Figure 5 As shown, the structure is used to start four groups of fifth push rods 81 to drive the third connecting frame 82 to lower the suction cup 83 to fit the surface of materials such as plate glass, thereby improving the stability of the device.
[0028] Furthermore, two sets of second push rods 57 are installed in the second movable block 53, and the first fixed frame 31 and the second movable block 53 are connected by the second push rods 57. The four sets of second push rods 57 are respectively located at the four corners of the surface of the first fixed frame 31. Figure 8 As shown, the structure is used to start the second push rod 57 so that the first fixing frame 31 can be raised and lowered under the action of the second push rod 57 .
[0029] Furthermore, a limiting rod 84 is threadedly connected to the other side of the suction cup 83 in the third connecting frame 82. Figure 5 As shown, the structure is used to limit the limiting rod 84 through threaded connection, so that the plate is in contact with the suction cup 83 and the hook 37 at the same time, causing wear to the plate. Example
[0030] A method for constructing an assembled residential project comprises the following steps: Step S1: assembling, building the Bailey frame 1 and the reinforcement plate 2 according to the construction site, and then assembling the equipment; Step S2: preparing materials, and neatly stacking the assembled prefabricated components at the material placement location 7; Step S3: stacking and unloading the material, starting the second support frame 603, driving the first connecting frame 605 and the push rod 606 to push the material to move to the left along the guide rod 607, so that the material fits the left inner wall of the push plate 610. During the whole process, the material will automatically move to the left for loading as the material-taking platform clamps each time, without the need for redundant operations by the operator, thereby improving the overall automation efficiency; To load the material, the fourth push rod 608 is started to drive the second connecting frame 609 and the push plate 610 to move upward, and the material on the surface of the push plate 610 is pushed upward to facilitate material removal.
[0031] Step S4: Take the material, start the two sets of second motors 55, so that the second walking wheel 56 drives the second movable block 53 and the first fixed frame 31 to adjust the front and rear positions along the third slide rail 52, start the second push rod 57, and make the first fixed frame 31 rise and fall under the action of the second push rod 57. At the same time, start the two sets of first motors 35, so that the first walking wheel 36 drives the first movable block 33 to move along the first slide rail 32 to adjust the left and right positions. After the first movable block 33 is moved to the specified position, the material is hoisted through the hook 37.
[0032] Step S5: Fix the material with a steel wire rope and then hoist it on the hook 37. When taking materials such as plates or glass, the fifth push rod 81 can be started while hoisting, and the suction cup 83 at the third connecting frame 82 can be attached to the surface of the plate for adsorption to fix the material, and then the material is transported to the designated location according to step S3.
[0033] Step S6: Positioning, after moving the material to the specified position, start the first push rod 42, push the slider 44 to adjust horizontally along the second slide rail 43, expand the detection range of the first detection probe 45, avoid material obstruction and affect the detection effect, start the micro motor 47, drive the fixed block 48 to rotate, adjust the irradiation angle of the second detection probe 49, avoid the angle deviation of the placement position, and improve the accuracy of the device.
[0034] The electrical components mentioned in this article are all connected to an external main controller and 220V mains electricity, and the main controller can be a conventional known device for controlling a computer or the like.
[0035] Working principle: When used, Figure 1 As shown, Bailey frame 1 and reinforcement plate 2 are built according to the construction site, and then the equipment is assembled; Figure 6 As shown, the assembled prefabricated components are stacked and placed at the material discharge location 7, the second support frame 603 is started, and the first connecting frame 605 and the push rod 606 are driven to push the material to the left along the guide rod 607, so that the material fits the left inner wall of the push plate 610, and then the fourth push rod 608 is started to drive the second connecting frame 609 and the push plate 610 to move upward, and the material on the surface end of the push plate 610 is pushed up to facilitate material removal, as shown in FIG. Figure 8As shown, by starting the two sets of second motors 55, the second walking wheel 56 drives the second movable block 53 and the first fixed frame 31 along the third slide rail 52 to adjust the front and rear positions, thereby increasing the range of motion of the first movable block 33 and facilitating the movement of the material to the specified position. The second push rod 57 is started, and the first fixed frame 31 is raised and lowered under the action of the second push rod 57, as shown in FIG. Figure 7 As shown, the two sets of first motors 35 are started, so that the first travel wheel 36 drives the first movable block 33 to move along the first slide rail 32 to adjust the left and right positions. After the first movable block 33 is moved to the specified position, the material is hoisted by the hook 37, as shown in FIG. Figure 5 As shown, when transporting sheet materials, the four groups of fifth push rods 81 are started to drive the third connecting frame 82 to make the suction cup 83 descend and fit with the surface of sheet materials such as glass to improve the stability of the device. Fig. 9 and 10 As shown, the first push rod 42 is started to push the slider 44 to adjust horizontally along the second slide rail 43, thereby expanding the detection range of the first detection probe 45 to avoid material obstruction and affecting the detection effect. At the same time, the micro motor 47 is started to drive the fixed block 48 to rotate, adjust the irradiation angle of the second detection probe 49, avoid angular deviation of the placement position, and improve the accuracy of the device. The above is the entire working principle of the present invention.
[0036] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
Claims
1. An intelligent construction platform for prefabricated residential engineering construction, comprising a Bailey frame (1), characterized in that: A reinforcement plate (2) is connected between the four groups of Bailey frames (1). A positioning assembly (3) is arranged inside the Bailey frames (1). The positioning assembly (3) comprises a first fixed frame (31), a first slide rail (32), a first movable block (33), a first mounting plate (34), a first motor (35), a first walking wheel (36) and a hook (37). A first fixed frame (31) is arranged between the Bailey frames (1). Two groups of first slide rails (32) are provided on the inner side of the first fixed frame (31). A first movable block (33) is arranged at the bottom of the first fixed frame (31). Two groups of first mounting plates (34) are installed on the outer side of the upper end of the first movable block (33). A first motor (35) is installed on the outer side of the first mounting plate (34). The output end of the first motor (35) is connected to the first walking wheel (36). The first walking wheel (36) is located inside the first slide rail (32) and has a diameter that matches the first slide rail (32). A hook (37) is connected to the bottom of the first movable block (33).
2. According to claim 1, the intelligent construction platform for prefabricated residential engineering construction is characterized by: Two groups of transport components (5) are symmetrically arranged on both sides of the Bailey frame (1), and the transport components (5) include a second fixed frame (51), a third slide rail (52), a second movable block (53), a second mounting plate (54), a second motor (55) and a second walking wheel (56). The second fixed frame (51) is connected between the front and rear groups of the Bailey frames (1), two groups of third slide rails (52) are provided on the inner side of the third slide rail (52), the bottom of the second fixed frame (51) is movably connected to the second movable block (53), the left and right sides of the second movable block (53) are connected to two groups of second mounting plates (54), the outer side of the second mounting plate (54) is installed with a second motor (55), the inner output end of the second motor (55) is fixedly connected to the second walking wheel (56), and the lower end of the second movable block (53) is connected to the surface of the first fixed frame (31).
3. The intelligent construction platform for prefabricated residential construction according to claim 1, characterized in that: A loading assembly (6) is provided at the bottom of the Bailey frame (1), and the loading assembly (6) comprises a first support frame (601), a guardrail (602), a second support frame (603), a third push rod (604), a first connecting frame (605), a push rod (606) and a guide rod (607). The outer surface of a rear end group of the Bailey frame (1) is connected to the first support frame (601), and a discharge position (7) is provided in the first support frame (601). The right side of the first support frame (601) A guardrail (602) is fixedly connected to the first support frame (601); a second support frame (603) is fixedly connected to the bottom of the first support frame (601); a third push rod (604) is fixedly installed inside the second support frame (603); an output of the third push rod (604) is fixedly connected to the first connecting frame (605); a push rod (606) is fixedly connected to the left side of the first connecting frame (605) on the upper surface of the first support frame (601); and the push rod (606) is located between the guardrails (602).
4. The intelligent construction platform for prefabricated residential construction according to claim 1, characterized in that: Monitoring components (4) are arranged on the left and right sides of the first movable block (33). The monitoring components (4) include a first fixed plate (41), a first push rod (42), a second slide rail (43), a slider (44) and a first detection probe (45). The left side of the first movable block (33) is fixedly connected to the first fixed plate (41), the first push rod (42) is installed between the first fixed plate (41) and the first movable block (33), the inner side of the first fixed plate (41) is fixedly connected to the second slide rail (43), the outer surface of the second slide rail (43) is movably connected to the slider (44), the right side of the slider (44) is fixedly connected to the output end of the first push rod (42), and the inner side of the slider (44) is installed with the first detection probe (45).
5. The intelligent construction platform for prefabricated residential construction according to claim 1, characterized in that: A second fixed plate (46) is fixedly connected to the right side of the first movable block (33); a micro motor (47) is installed between the second fixed plate (46) and the first movable block (33); a fixed block (48) is fixedly connected to the inner side of the second fixed plate (46); a second detection probe (49) is rotatably connected to the inside of the fixed block (48) via a connecting piece; and the connecting piece at the second detection probe (49) is connected to the output end of the micro motor (47).
6. The intelligent construction platform for prefabricated residential construction according to claim 3 is characterized by: A fourth push rod (608) is fixedly mounted on the left bottom of the first support frame (601); the upper end of the fourth push rod (608) is fixedly connected to a second connecting frame (609); the upper end of the second connecting frame (609) is fixedly connected to a push plate (610); and the push plate (610) is located on the surface of the first support frame (601).
7. The intelligent construction platform for prefabricated residential construction according to claim 1, characterized in that: Two groups of fixing components (8) are arranged on both sides of the first movable block (33), and the fixing components (8) include a fifth push rod (81), a third connecting frame (82) and a suction cup (83). Four groups of fifth push rods (81) are installed at the four corners of the first movable block (33), and the lower ends of the fifth push rods (81) are fixedly connected to the third connecting frame (82), and the suction cup (83) is installed in the third connecting frame (82).
8. The intelligent construction platform for prefabricated residential construction according to claim 2, characterized in that: Two groups of second push rods (57) are installed in the second movable block (53); the first fixed frame (31) and the second movable block (53) are connected via the second push rods (57); and the four groups of second push rods (57) are respectively located at the four corners of the surface of the first fixed frame (31).
9. The intelligent construction platform for prefabricated residential construction according to claim 7, characterized in that: A limiting rod (84) is threadedly connected to the other side of the suction cup (83) in the third connecting frame (82).
10. A method for constructing a prefabricated residential project, characterized in that: The method comprises any one of claims 1 to 9 of the intelligent construction platform for prefabricated residential engineering construction, and further comprises the following steps: Step S1: assembling, building a Bailey frame (1) and a reinforcement plate (2) according to the construction site, and then assembling each device; Step S2: preparing materials, stacking and placing the assembled prefabricated components at the material placement area (7); Step S3: loading the material, starting the second support frame (603), causing the first connecting frame (605) and the push rod (606) to push the material to the left along the guide rod (607) and fit it to the left inner wall of the first support frame (601), and then starting the fourth push rod (608), driving the push plate (610) to move upward through the second connecting frame (609), and moving the material to the designated position; Step S4: taking the material, starting the second motor (55), driving the first fixed frame (31) to move along the third slide rail (52) through the second running wheel (56), moving the first fixed frame (31) to the material discharge position (7), and then starting the second push rod (57) to lower the first fixed frame (31), and at the same time starting the first motor (35) to move along the first slide rail (32) through the first running wheel (36), moving the hook (37) at the first movable block (33) to the top of the material; Step S5: Fix the material with a steel wire rope and then hoist it on the hook (37). When taking materials such as plates or glass, the fifth push rod (81) can be activated while hoisting to make the suction cup (83) at the third connecting frame (82) fit the surface of the plate for adsorption, and then transport the material to the designated location according to step S3; Step S6: Positioning: After the material is moved to the designated position, the first detection probe (45) and the second detection probe (49) on both sides are used to scan and detect the position of the rear end of the movement to determine whether the distance is offset.