Fixing device and fixing method for vertical drilling machine machined part
By designing the fixing device for vertical drilling machine machining parts, the cylinder drives the movement of rectangular fixing plates and clamps to adapt to the fixing of different shapes of machining parts, the poor practicality problem caused by different shapes of vertical drilling machine machining parts is solved, and a stable and convenient fixing effect is achieved.
Patent Information
- Application Number
- CN202510492304.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-18
- Publication Date
- 2025-07-04
AI Technical Summary
When processing parts of different shapes, vertical drilling machines require different clamping tools, resulting in poor practicality.
A fixing device for vertical drilling machine machining parts is designed, including fixed installation components, which drives the movement of rectangular fixing plates and fixed clamps through cylinders, adapts to the fixing of different shapes of machining parts, and is fixed by point-fixing.
It improves the practicality and stability of the fixing device of vertical drilling machine machining parts, simplifies the installation and disassembly process of the installation base, and ensures the stable fixation of machining parts of different shapes.
Smart Images

Figure CN120244667A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of fixing devices, and specifically to a fixing device and a fixing method for workpieces processed by a vertical drilling machine. Background Art
[0002] Vertical drilling machines are commonly used in machinery manufacturing and repair factories for processing holes in medium and small workpieces, and can also be used for drilling metal materials, wood boards and other materials. In addition, as a type of drilling machine, vertical drilling machines are also common metal cutting machines, which have the characteristics of wide application and high precision and are suitable for batch processing.
[0003] When a vertical drilling machine is working, the workpiece needs to be fixed. However, because the workpieces have different shapes according to their uses, during the processing, the workpieces have various shapes, and different workpieces require different clamping tools for clamping. Therefore, many tools are needed to fix the materials, and the practicability is poor. Therefore, a fixing device and a fixing method for workpieces processed by a vertical drilling machine are needed. Summary of the Invention
[0004] (I) Technical Problems to be Solved
[0005] Aiming at the deficiencies of the prior art, the present invention provides a fixing device and a fixing method for workpieces processed by a vertical drilling machine, which solve the problem that because the workpieces have different shapes according to their uses, during the processing, the workpieces have various shapes, and different workpieces require different clamping tools for clamping. Therefore, many tools are needed to fix the materials, and the practicability is poor.
[0006] (II) Technical Solutions
[0007] To achieve the above object, the present invention provides the following technical solutions: A fixing device for workpieces processed by a vertical drilling machine includes a mounting base of the vertical drilling machine, on which a vertical drilling machine body is fixedly installed. An installation base is provided on the mounting base of the vertical drilling machine. Two second rectangular installation grooves are formed on the upper surface of the installation base, and both of the two second rectangular installation grooves penetrate through the lower surface of the installation base;
[0008] A fixed installation component, which is arranged on the mounting base of the vertical drilling machine;
[0009] A fixing component, which is arranged on the installation base. The fixing component includes a support plate, and the support plate is fixedly connected to the upper surface of the installation base;
[0010] Among them, a plurality of cylinder installation grooves are formed on both the left and right sides of the support plate, and a third cylinder is fixedly installed inside each of the plurality of cylinder installation grooves. The telescopic ends of the plurality of third cylinders are fixedly connected to a rectangular fixing plate;
[0011] Among them, rectangular grooves are provided on the upper surfaces of multiple rectangular fixing plates, and moving plates are slidably connected to the inner walls of the multiple rectangular grooves;
[0012] Among them, on one side of the multiple rectangular fixing plates away from the output end of the third cylinder, mounting bottom plates are fixedly connected, and first cylinders are fixedly installed on the upper surfaces of the multiple mounting bottom plates.
[0013] Preferably, the telescopic ends of the multiple first cylinders are fixedly connected with connecting plates, and the multiple connecting plates are respectively fixedly connected with the corresponding moving plates;
[0014] Among them, a workpiece placement plate is fixedly connected to the upper surface of the support plate, and a plurality of guide grooves are provided on both the left and right sides of the workpiece placement plate, and guide plates are slidably connected to the inner walls of the multiple guide grooves.
[0015] Preferably, one ends of the multiple guide plates located outside the guide grooves are respectively fixedly connected with the corresponding rectangular fixing plates, and fixing rods are provided on the upper surfaces of the multiple guide plates.
[0016] Preferably, the multiple fixing rods are fixedly connected to the corresponding moving plates together, and fixing clamping plates are fixedly connected to one ends of the multiple fixing rods away from the moving plates.
[0017] Preferably, the fixed installation component includes a mounting plate, and the mounting plate is fixedly connected to the left side of the vertical drilling machine mounting base;
[0018] Among them, a positioning plate is fixedly connected to the upper surface of the mounting plate, and the upper end of the positioning plate slidably penetrates through the inner wall of the second rectangular installation groove.
[0019] Preferably, a support sleeve is fixedly sleeved on the outer wall of the positioning plate, and the upper surface of the support sleeve is in contact with the lower surface of the mounting base.
[0020] Preferably, three second cylinders are fixedly installed on the lower surface of the mounting plate, the telescopic ends of the three second cylinders are fixedly connected with a push plate, and two clamping plates are fixedly connected to the left side of the push plate.
[0021] Preferably, a fixing plate is provided on the left side of the two clamping plates, and the upper surface of the fixing plate is fixedly connected to the lower surface of the mounting base together;
[0022] Among them, two first rectangular installation grooves are provided on the left side of the fixing plate, and both of the two first rectangular installation grooves penetrate through the right side of the fixing plate.
[0023] Preferably, the left sides of the two clamping plates respectively slide through the inner walls of the corresponding first rectangular installation grooves;
[0024] Among them, the number of the fixed installation components is two, and the structures of the two fixed installation components are arranged in a left-right mirror image.
[0025] A fixing method for a vertical drilling machine workpiece has the following steps:
[0026] S1: First, place the workpiece to be processed on the upper surface of the workpiece placement plate. Then, start the third cylinder, and the telescopic end of the third cylinder drives the rectangular fixing plate connected to it to move towards the workpiece.
[0027] Among them, when the rectangular fixing plate moves, it will drive the guiding plate to slide along the inner wall of the guiding groove. The guiding plate cooperates with the guiding groove to assist the movement of the rectangular fixing plate.
[0028] Among them, the rectangular fixing plate drives the fixing clamping plate to move towards the workpiece through the moving plate and the fixing rod. After the fixing clamping plate approaches the fixed position, start the first cylinder.
[0029] S2: The telescopic end of the first cylinder pushes the connecting plate to move. The connecting plate drives the moving plate to move up and down along the inner wall of the rectangular groove. The moving plate drives the fixing clamping plate to move up and down through the fixing rod, thereby adjusting the up and down fixing position of the fixing clamping plate to adapt to different up and down fixing positions of the workpiece.
[0030] S3: After the up and down fixing position of the fixing clamping plate is adjusted, stop the first cylinder, and start the third cylinder again to push the fixing clamping plate to move and fix the workpiece.
[0031] Among them, the movement modes of multiple other third cylinders are the same as that of the first cylinder, and multiple third cylinders and the first cylinder are all independently controlled.
[0032] Among them, by setting the fixing components, the moving distance and up and down position of multiple fixing clamping plates can be adjusted according to the specific shape of the workpiece to adapt to the fixing of workpieces with different shapes. And the fixing is carried out by using a point-fixing method to fix the specific fixing position of the specific shape of the workpiece, and the fixing is firm.
[0033] S4: When installing the entire mounting base, first, the staff can use welding or other methods to fixedly connect the two mounting plates to the left and right sides of the vertical drilling machine mounting base as a whole, and then take out the entire mounting base.
[0034] S5: Place the entire mounting base above the vertical drilling machine mounting base, and then move the entire mounting base downward so that the upper ends of the two positioning plates respectively slide through the inner walls of the corresponding second rectangular mounting grooves. When the upper surfaces of the two support sleeves are both in contact with the lower surface of the mounting base, the installation of the entire mounting base is completed.
[0035] Among them, then start multiple second cylinders.
[0036] S6: The telescoping of multiple second cylinders pushes the two push plates to move away from each other, thereby pushing the four clamping plates to respectively engage with the inner walls of the corresponding first rectangular mounting grooves. When the opposite surfaces of the two push plates are respectively in contact with the corresponding fixed plates, the overall installation of the mounting base is completed.
[0037] Among them, the working principle of the overall disassembly and installation of the mounting base is the same, but the movement direction is opposite.
[0038] (III) Beneficial effects
[0039] Compared with the prior art, the present invention provides a fixing device and a fixing method for a vertical drilling machine workpiece, having the following beneficial effects:
[0040] 1. For the fixing device of the vertical drilling machine workpiece, by setting the fixing component, the moving distance and the vertical position of multiple fixing clamping plates can be adjusted according to the specific shape of the workpiece, so as to adapt to the fixing of workpieces with different shapes, and improve the practicability of the fixing device of the vertical drilling machine workpiece.
[0041] 2. For the fixing device of the vertical drilling machine workpiece, when installing or disassembling the overall mounting base by setting the fixing and mounting component, only need to start multiple second cylinders and reset multiple second cylinders, then the overall mounting base can be installed or removed from the mounting base of the vertical drilling machine, thereby improving the convenience of the overall installation and disassembly of the mounting base.
[0042] 3. For the fixing device of the vertical drilling machine workpiece, by setting two second rectangular mounting grooves, two support sleeves and two positioning plates, it not only plays an auxiliary role in the installation of the overall mounting base, but also plays a positioning role in the installation of the clamping plate and the first rectangular mounting groove, improving the accuracy of the installation of the clamping plate and the first rectangular mounting groove.
[0043] 4. For the fixing device of the vertical drilling machine workpiece, when the rectangular fixing plate moves, it will drive the guide plate to slide along the inner wall of the guide groove. The guide plate cooperates with the guide groove to play an auxiliary role in the movement of the rectangular fixing plate, thereby improving the stability of the overall movement of the rectangular fixing plate.
[0044] 5. For the fixing method of the vertical drilling machine workpiece, it adopts a point-based fixing method to fix the specific fixing position of the specific shape of the workpiece, with firm fixing, thereby improving the stability of fixing workpieces with different shapes and also improving the stability of different-shaped workpieces during processing. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1 is a schematic structural diagram of the whole of the present invention;
[0046] Figure 2 is a schematic diagram of the lower surface of the mounting base of the vertical drilling machine of the present invention;
[0047] Figure 3 Schematic diagram of the left side of the support plate of the present invention;
[0048] Figure 4 Schematic diagram of the connection between the connecting plate and the moving plate of the present invention;
[0049] Figure 5 Schematic diagram of the left side of the installation base of the vertical drilling machine of the present invention;
[0050] Figure 6 is Figure 5 Enlarged schematic diagram at position A in
[0051] In the figure: 1. Vertical drilling machine body; 2. First cylinder; 3. Moving plate; 4. Installation base of vertical drilling machine; 5. Fixed rod; 6. Workpiece placement plate; 7. Fixed clamping plate; 8. Support plate; 9. Second cylinder; 10. Guide plate; 11. Installation base; 12. Fixed plate; 13. First rectangular installation groove; 14. Second rectangular installation groove; 15. Third cylinder; 16. Guide groove; 17. Cylinder installation groove; 18. Installation bottom plate; 19. Rectangular groove; 20. Rectangular fixed plate; 21. Connecting plate; 22. Installation plate; 23. Support sleeve; 24. Positioning plate; 25. Clamping plate; 26. Pushing plate. Detailed implementation manners
[0052] Next, the technical solutions in the embodiments of the present invention will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
[0053] Please refer to Figures 1-6 , the present invention provides a new technical solution: a fixing device and a fixing method for workpieces of a vertical drilling machine, including an installation base 4 of a vertical drilling machine, a vertical drilling machine body 1 is fixedly installed on the installation base 4 of the vertical drilling machine, an installation base 11 is provided on the installation base 4 of the vertical drilling machine, two second rectangular installation grooves 14 are opened on the upper surface of the installation base 11, both of the two second rectangular installation grooves 14 penetrate through the lower surface of the installation base 11, a fixed installation component, and the fixed installation component is arranged on the installation base 4 of the vertical drilling machine;
[0054] A fixing component, the fixing component is arranged on the installation base 11, and the fixing component includes a support plate 8, and the support plate 8 is fixedly connected to the upper surface of the installation base 11;
[0055] Among them, a plurality of cylinder mounting grooves 17 are formed on both the left and right sides of the support plate 8, and a third cylinder 15 is fixedly installed inside each of the plurality of cylinder mounting grooves 17. The telescopic ends of the plurality of third cylinders 15 are fixedly connected to a rectangular fixing plate 20;
[0056] Among them, a rectangular groove 19 is formed on the upper surface of each of the plurality of rectangular fixing plates 20, and a moving plate 3 is slidably connected to the inner wall of each of the plurality of rectangular grooves 19;
[0057] Among them, one side of each of the plurality of rectangular fixing plates 20 away from the output end of the third cylinder 15 is fixedly connected to a mounting bottom plate 18, and a first cylinder 2 is fixedly installed on the upper surface of each of the plurality of mounting bottom plates 18.
[0058] Further, the telescopic ends of the plurality of first cylinders 2 are fixedly connected to a connecting plate 21, and the plurality of connecting plates 21 are respectively fixedly connected to the corresponding moving plates 3;
[0059] Among them, the upper surface of the support plate 8 is fixedly connected to a workpiece placement plate 6. A plurality of guide grooves 16 are formed on both the left and right sides of the workpiece placement plate 6, and a guide plate 10 is slidably connected to the inner wall of each of the plurality of guide grooves 16.
[0060] Further, one ends of the plurality of guide plates 10 located outside the guide grooves 16 are respectively fixedly connected to the corresponding rectangular fixing plates 20, and fixing rods 5 are arranged on the upper surfaces of the plurality of guide plates 10.
[0061] Further, the plurality of fixing rods 5 are fixedly connected to the corresponding moving plates 3 together, and fixing clamps 7 are fixedly connected to one ends of the plurality of fixing rods 5 away from the moving plates 3.
[0062] Further, the fixed installation component includes a mounting plate 22, and the mounting plate 22 is fixedly connected to the left side of the vertical drill press mounting base 4;
[0063] Among them, the upper surface of the mounting plate 22 is fixedly connected to a positioning plate 24, and the upper end of the positioning plate 24 slidably penetrates through the inner wall of the second rectangular mounting groove 14.
[0064] Further, a support sleeve 23 is fixedly sleeved on the outer wall of the positioning plate 24, and the upper surface of the support sleeve 23 is attached to the lower surface of the mounting base 11.
[0065] Further, three second cylinders 9 are fixedly installed on the lower surface of the mounting plate 22. The telescopic ends of the three second cylinders 9 are fixedly connected to a push plate 26, and two clamping plates 25 are fixedly connected to the left side of the push plate 26.
[0066] Further, a fixing plate 12 is arranged on the left side of the two clamping plates 25, and the upper surface of the fixing plate 12 is fixedly connected to the lower surface of the mounting base 11 together;
[0067] Among them, two first rectangular mounting grooves 13 are formed on the left side of the fixing plate 12, and both of the two first rectangular mounting grooves 13 penetrate through the right side of the fixing plate 12.
[0068] Furthermore, the left sides of the two clamping plates 25 respectively slide through the inner walls of the corresponding first rectangular mounting grooves 13;
[0069] Among them, the number of the fixed mounting components is two, and the structures of the two fixed mounting components are arranged in a left-right mirror image.
[0070] A fixing method for a vertical drilling machine workpiece has the following steps:
[0071] S1: First, place the workpiece to be processed on the upper surface of the workpiece placement plate 6, and then start the third cylinder 15. The telescopic end of the third cylinder 15 drives the rectangular fixing plate 20 connected thereto to move towards the position close to the workpiece.
[0072] Among them, when the rectangular fixing plate 20 moves, it will drive the guide plate 10 to slide along the inner wall of the guide groove 16. The guide plate 10 cooperates with the guide groove 16 to assist the movement of the rectangular fixing plate 20, thereby improving the stability of the overall movement of the rectangular fixing plate 20.
[0073] Among them, the rectangular fixing plate 20 drives the fixed clamping plate 7 to move towards the position close to the workpiece through the moving plate 3 and the fixed rod 5. After the fixed clamping plate 7 approaches the fixed position, start the first cylinder 2.
[0074] S2: The telescopic end of the first cylinder 2 pushes the connecting plate 21 to move. The connecting plate 21 drives the moving plate 3 to move up and down along the inner wall of the rectangular groove 19. The moving plate 3 drives the fixed clamping plate 7 to move up and down through the fixed rod 5, thereby adjusting the up and down fixing position of the fixed clamping plate 7 to adapt to different up and down fixing positions of the workpiece.
[0075] S3: After the up and down fixing position of the fixed clamping plate 7 is adjusted, stop the first cylinder 2, and start the third cylinder 15 again to push the fixed clamping plate 7 to move and fix the workpiece.
[0076] Among them, the movement modes of the other multiple third cylinders 15 and the first cylinder 2 are the same, and the multiple third cylinders 15 and the first cylinder 2 are all independently controlled.
[0077] Among them, by setting the fixing components, the moving distance and the up-and-down position of the multiple fixing clamping plates 7 can be adjusted according to the specific shape of the workpiece to be processed, so as to adapt to the fixing of workpieces with different shapes, improve the practicability of the fixing device for workpieces of the vertical drilling machine, and adopt the point-based fixing method to fix the specific fixing positions of the specific shapes of the workpieces, with firm fixing, thereby improving the stability of fixing workpieces with different shapes and also improving the stability of workpieces with different shapes during processing;
[0078] S4: When installing the whole mounting base 11, first, the staff can use welding or other methods to fixedly connect the two mounting plates 22 as a whole to the left and right sides of the vertical drilling machine mounting base 4, and then take out the whole mounting base 11;
[0079] S5: Place the whole mounting base 11 above the vertical drilling machine mounting base 4, and then move the whole mounting base 11 downward so that the upper ends of the two positioning plates 24 respectively slide through the inner walls of the corresponding second rectangular mounting grooves 14. Wait until the upper surfaces of the two support sleeves 23 are both in contact with the lower surface of the mounting base 11, thus completing the installation of the whole mounting base 11;
[0080] Among them, by setting the two second rectangular mounting grooves 14, the two support sleeves 23 and the two positioning plates 24, it not only plays an auxiliary role in the installation of the whole mounting base 11, but also plays a positioning role in the installation of the clamping plate 25 and the first rectangular mounting groove 13, improving the accuracy of the installation of the clamping plate 25 and the first rectangular mounting groove 13;
[0081] Among them, then start multiple second cylinders 9;
[0082] S6: The telescopic movement of the multiple second cylinders 9 pushes the two push plates 26 to move in opposite directions, and then pushes the four clamping plates 25 to be respectively clamped into the inner walls of the corresponding first rectangular mounting grooves 13. Wait until the opposite surfaces of the two push plates 26 are respectively in contact with the corresponding fixing plates 12, thus completing the installation of the whole mounting base 11;
[0083] Among them, the working principle of disassembling and installing the whole mounting base 11 is the same, but the movement direction is opposite;
[0084] Among them, by setting the fixed installation components, when installing or disassembling the whole mounting base 11, only need to start the multiple second cylinders 9 and reset the multiple second cylinders 9, then the whole mounting base 11 can be installed or removed from the vertical drilling machine mounting base 4, thereby improving the convenience of installing and disassembling the whole mounting base 11.
[0085] Structure description:
[0086] Vertical drilling machine body 1: The vertical drilling machine body 1 is of an existing structure, and its working principle is explained in detail as follows:
[0087] I. Main components and functions
[0088] Base: Provides stable support to ensure that the drilling machine does not shake during drilling.
[0089] Column: Connects the base and the main machine part, providing support and guidance.
[0090] Main machine: Includes a motor and a transmission system. The power of the motor is transmitted to the main shaft gearbox through a belt, and then transmitted to the main shaft after speed change by the main shaft, so that the main shaft drives the drill bit to rotate.
[0091] Main shaft and drill bit: The main shaft is fixed on the column and can rotate, driven by the motor, and the speed can be adjusted. The drill bit is the core component of the drilling machine, responsible for the actual drilling operation. The rotation of the main shaft creates the rotational kinetic energy for drilling, and at the same time, the main shaft drives the drill bit into the workpiece and starts drilling.
[0092] Feeding device: Controls the depth and speed of the contact between the drill bit and the workpiece. Vertical drilling machines usually have a rapid feeding device, enabling the workpiece to be quickly moved to the correct position. At the same time, the axial feeding movement of the main shaft can be automatically or manually controlled by the feed box.
[0093] II. Working process
[0094] Position the workpiece: Place the workpiece to be machined on the workbench and fix it with a fixture to ensure that the workpiece does not move during drilling.
[0095] Select the drill bit: Select a suitable drill bit according to the requirements of different materials and hole diameters. The type and diameter of the drill bit will affect the depth and accuracy of the hole.
[0096] Start the drilling machine: Turn on the power, the motor starts to run, driving the drill bit to rotate. The speed of the drill bit can usually be adjusted to meet the drilling requirements of different materials.
[0097] Feeding: Make the main shaft move downward through the feeding device, driving the drill bit to slowly contact the workpiece. During this process, the drill bit cuts the material while rotating, gradually forming a hole.
[0098] Removing cutting substances: The rotation of the drill bit and the downward movement of the main shaft create a cutting force, which removes the cutting substances on the workpiece to complete drilling.
[0099] Coolant supply: During the drilling process, vertical drilling machines usually supply coolant to cool and lubricate the drill bit and the workpiece, preventing overheating and extending the tool life.
[0100] Complete drilling: Once the drilling reaches the predetermined depth, the main shaft stops rotating and can be moved upward through manual or automatic control, and the worker can take out the drilled workpiece.
[0101] Vertical drilling machine mounting base 4: The vertical drilling machine mounting base 4 is used to mount the vertical drilling machine body 1.
[0102] Cylinder mounting groove 17: The cylinder mounting groove 17 is used for the installation of the third cylinder 15.
[0103] Guide groove 16: The guide groove 16 is used for the installation of the guide plate 10.
[0104] Guide plate 10: The guide plate 10 cooperates with the guide groove 16 to assist in the movement of the rectangular fixing plate 20.
[0105] Fixed rod 5: The fixed rod 5 is used to fix and drive the fixed clamping plate 7 to move.
[0106] Rectangular groove 19: The rectangular groove 19 is used for the installation of the moving plate 3.
[0107] First cylinder 2: The first cylinder 2 drives the moving plate 3 to move up and down through the connecting plate 21.
[0108] Mounting bottom plate 18: The mounting bottom plate 18 is used for the installation of the first cylinder 2.
[0109] Third cylinder 15: The third cylinder 15 is used to drive the rectangular fixing plate 20 to move left and right.
[0110] Second rectangular mounting groove 14: The second rectangular mounting groove 14 is used for the installation of the positioning plate 24.
[0111] First rectangular mounting groove 13: The first rectangular mounting groove 13 is used for the installation of the clamping plate 25.
[0112] Pushing plate 26: The pushing plate 26 is used to fix and drive the clamping plate 25 to move.
[0113] Second cylinder 9: The second cylinder 9 is used to push the pushing plate 26 to move.
[0114] Although the embodiments of the present invention have been shown and described, for those of ordinary skill in the art, it can be understood that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A fixing device for a vertical drilling machine workpiece, characterized in that, Including: A vertical drilling machine mounting base (4), on which a vertical drilling machine body (1) is fixedly installed. An installation base (11) is provided on the vertical drilling machine mounting base (4). Two second rectangular installation grooves (14) are formed on the upper surface of the installation base (11), and both of the two second rectangular installation grooves (14) penetrate through the lower surface of the installation base (11). A fixed installation component, which is arranged on the vertical drilling machine mounting base (4); A fixing component, which is arranged on the installation base (11). The fixing component includes a support plate (8), and the support plate (8) is fixedly connected to the upper surface of the installation base (11); Wherein, a plurality of cylinder installation grooves (17) are formed on both the left and right sides of the support plate (8). A third cylinder (15) is fixedly installed inside each of the plurality of cylinder installation grooves (17), and the telescopic ends of the plurality of third cylinders (15) are fixedly connected to a rectangular fixing plate (20); Wherein, a rectangular groove (19) is formed on the upper surface of each of the plurality of rectangular fixing plates (20), and a moving plate (3) is slidably connected to the inner wall of each of the plurality of rectangular grooves (19); Wherein, on one side of each of the plurality of rectangular fixing plates (20) away from the output end of the third cylinder (15), an installation bottom plate (18) is fixedly connected, and a first cylinder (2) is fixedly installed on the upper surface of each of the plurality of installation bottom plates (18).
2. The fixing device for a vertical drilling machine workpiece according to claim 1, characterized in that: The telescopic ends of the plurality of first cylinders (2) are fixedly connected to a connecting plate (21), and the plurality of connecting plates (21) are respectively fixedly connected to the corresponding moving plates (3); Wherein, a workpiece placement plate (6) is fixedly connected to the upper surface of the support plate (8). A plurality of guide grooves (16) are formed on both the left and right sides of the workpiece placement plate (6), and a guide plate (10) is slidably connected to the inner wall of each of the plurality of guide grooves (16).
3. The fixing device for a vertical drilling machine workpiece according to claim 2, characterized in that: One ends of the plurality of guide plates (10) located outside the guide grooves (16) are respectively fixedly connected to the corresponding rectangular fixing plates (20), and a fixing rod (5) is arranged on the upper surface of each of the plurality of guide plates (10).
4. The fixing device for a vertical drilling machine workpiece according to claim 3, characterized in that: The plurality of fixing rods (5) are respectively fixedly connected to the corresponding moving plates (3), and fixing clamps (7) are fixedly connected to one ends of the plurality of fixing rods (5) away from the moving plates (3).
5. The fixing device for a vertical drilling machine workpiece according to claim 1, characterized in that: The fixed installation component includes an installation plate (22), and the installation plate (22) is fixedly connected to the left side of the vertical drilling machine mounting base (4); Wherein, a positioning plate (24) is fixedly connected to the upper surface of the installation plate (22), and the upper end of the positioning plate (24) slidably penetrates through the inner wall of the second rectangular installation groove (14).
6. The fixing device for a vertical drilling machine workpiece according to claim 5, characterized in that: A support sleeve (23) is fixedly sleeved on the outer wall of the positioning plate (24), and the upper surface of the support sleeve (23) is attached to the lower surface of the installation base (11).
7. The fixing device for a vertical drilling machine workpiece according to claim 5, characterized in that: Three second cylinders (9) are fixedly installed on the lower surface of the installation plate (22). The telescopic ends of the three second cylinders (9) are fixedly connected to a push plate (26), and two clamping plates (25) are fixedly connected to the left side of the push plate (26).
8. The fixing device for a vertical drilling machine workpiece according to claim 7, characterized in that: On the left side of the two clamping plates (25), there is a fixing plate (12), and the upper surface of the fixing plate (12) is fixedly connected to the lower surface of the installation base (11); Among them, two first rectangular mounting grooves (13) are formed on the left side of the fixing plate (12), and both of the two first rectangular mounting grooves (13) penetrate through the right side of the fixing plate (12).
9. The fixing device for a vertical drilling machine workpiece according to claim 7, characterized in that: The left sides of the two clamping plates (25) respectively slide through the inner walls of the corresponding first rectangular mounting grooves (13); Among them, the number of the fixed mounting components is two, and the structures of the two fixed mounting components are arranged in left-right mirror symmetry.
10. A fixing method for a vertical drilling machine workpiece, comprising the following steps: S1: First, place the workpiece to be processed on the upper surface of the workpiece placement plate (6), and then start the third cylinder (15). The telescopic end of the third cylinder (15) drives the rectangular fixing plate (20) connected thereto to move towards the workpiece. Among them, When the rectangular fixing plate (20) moves, it will drive the guide plate (10) to slide along the inner wall of the guide groove (16). The guide plate (10) cooperates with the guide groove (16) to assist the movement of the rectangular fixing plate (20). Among them, the rectangular fixing plate (20) drives the fixed clamping plate (7) to move towards the workpiece through the moving plate (3) and the fixed rod (5). After the fixed clamping plate (7) approaches the fixed position, start the first cylinder (2). S2: The telescopic end of the first cylinder (2) pushes the connecting plate (21) to move. The connecting plate (21) drives the moving plate (3) to move up and down along the inner wall of the rectangular groove (19). The moving plate (3) drives the fixed clamping plate (7) to move up and down through the fixed rod (5), so as to adjust the up and down fixed position of the fixed clamping plate (7) to adapt to different up and down fixed positions of the workpiece. S3: After the up and down fixed position of the fixed clamping plate (7) is adjusted, stop the first cylinder (2), and start the third cylinder (15) again to push the fixed clamping plate (7) to move to fix the workpiece. Among them, the movement modes of the other multiple third cylinders (15) and the first cylinder (2) are the same, and the multiple third cylinders (15) and the first cylinder (2) are all independently controlled. Among them, by setting the fixing components, the moving distance and up and down position of the multiple fixed clamping plates (7) can be adjusted according to the specific shape of the workpiece to adapt to the fixing of workpieces with different shapes. And the fixing method uses a point-fixing method to fix the specific fixing position of the specific shape of the workpiece, and the fixing is firm. S4: When installing the entire mounting base (11), first, the staff can use welding or other methods to fixedly connect the two mounting plates (22) to the left and right sides of the vertical drilling machine mounting base (4) as a whole, and then take out the entire mounting base (11). S5: Place the entire mounting base (11) above the vertical drilling machine mounting base (4), and then move the entire mounting base (11) downward so that the upper ends of the two positioning plates (24) respectively slide through the inner walls of the corresponding second rectangular mounting grooves (14). When the upper surfaces of the two support sleeves (23) are both in contact with the lower surface of the mounting base (11), the installation of the entire mounting base (11) is completed. Among them, then start multiple second cylinders (9); S6: The expansion and contraction of multiple second cylinders (9) push two push plates (26) to move towards opposite positions, thereby pushing four clamping plates (25) to be respectively clamped against the inner walls of the corresponding first rectangular mounting grooves (13). When the opposite surfaces of the two push plates (26) are respectively in contact with the corresponding fixed plates (12), the overall installation of the mounting base (11) is completed. Among them, the working principle of the overall disassembly and installation of the mounting base (11) is the same, but the movement direction is opposite.