House building safety construction hanging basket
By introducing an adjustable suspension mechanism and a buffer structure into the building construction hanging basket, the adaptability problem of construction workers of different heights is solved, safety and comfort are improved, and steel is saved.
Patent Information
- Application Number
- CN202511107231.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-08-08
- Publication Date
- 2025-09-12
AI Technical Summary
The support handles of existing safety hanging baskets used in building construction projects are fixed in height and cannot adapt to construction workers of different heights, resulting in insufficient construction comfort and safety performance.
A safe construction hanging basket for building construction is designed, which adopts an adjustable suspension mechanism and buffer structure, including a suspension system consisting of a suspension beam, vertical connecting rods, T-bars, pulleys and ropes. Buffer baffles, guardrails and anti-slip mats are set in the hanging basket to improve safety and comfort.
The safety performance of the hanging basket is improved, the risk of construction workers slipping is reduced, the construction comfort is improved, and the components are reusable, saving steel.
Smart Images

Figure CN120625855A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of building construction, in particular to a hanging basket for safe building construction. Background Art
[0002] A hanging basket is a construction tool used for aerial work in construction projects. It is used for curtain wall installation and exterior wall cleaning. The cantilever mechanism is erected on a building or structure. The lifting mechanism is used to drive the suspended platform, which is moved up and down along the facade of the building or structure via steel cables. It is also a working platform for operators.
[0003] However, the existing safety hanging baskets for building construction projects still have some drawbacks. Although the traditional safety hanging baskets for building construction projects are provided with support handles, the heights of the handles are fixed. When construction workers of different heights go up, the support handles cannot adapt to construction workers of various heights, and the construction comfort and safety performance cannot be guaranteed. Summary of the Invention
[0004] In view of the above-mentioned deficiencies in the prior art, the present invention provides a building construction safety hanging basket, which has a high structural safety index, is easy to install and disassemble, and the dismantled parts can be reused, saving steel.
[0005] In order to achieve the above-mentioned object of the invention, the technical solution adopted by the present invention is: A building construction safety hanging basket, comprising: a hanging mechanism and a construction hanging basket; The suspension mechanism includes: two suspension beams, one located above each side of the construction hanging basket, one end of the suspension beam is fixedly connected to a vertical connecting rod, the bottom end of the vertical connecting rod is fixedly connected to a counterweight, the other end of the suspension beam is fixedly connected to a T-shaped rod placed above the suspension beam, the top end of the T-shaped rod is provided with a pulley and a rope, the rope passes through the other end of the suspension beam, and the bottom end hangs the construction hanging basket; The construction hanging basket is installed with a hoist connected to a control pulley and a rope, and the hoist is electrically connected to an electrical control box. The construction hanging basket includes: a bottom frame at the bottom end, the bottom ends of both sides of the bottom frame are connected to semicircular connecting plates by bolts, one side of the bottom frame is vertically threadedly connected to an outer baffle, and both sides of the bottom frame are vertically threadedly connected to an inner baffle close to the construction building, and the top two sides of the outer baffle are respectively hinged with an inclined baffle and a V-shaped baffle, and the upper part of the inclined baffle and the upper part of the V-shaped baffle are connected by a horizontally placed rubber column, and a spring is wound around the outside of the rubber column, and both sides of the top of the outer baffle are fixedly connected to the baffle, and the guardrail net is fixedly connected between the baffle and the bottom frame, and the upper part of the inner baffle is fixedly connected to the safety belt hanging rod.
[0006] As an improvement, the starting end of the rope is located at one end of the suspension beam.
[0007] As an improvement, a transverse protective barrier bar is fixedly connected to the upper portion between the two inner barrier bars.
[0008] As an improvement, the bolt passes through the bottom frame from above, the bottom end of the bolt is threadedly connected to a nut, and a gasket is provided between the bottom end of the bolt and the bottom frame.
[0009] As an improvement, both the outer blocking rod and the inner blocking rod pass through the gasket.
[0010] As an improvement, an anti-slip pad is fixedly connected above the bottom frame.
[0011] As an improvement, the V-shaped baffle is away from the construction building.
[0012] As an improvement, one end of the spring is fixedly connected to the V-shaped baffle, and the other end is fixedly connected to the inclined baffle.
[0013] As an improvement, the baffle is located below the inclined baffle and the V-shaped baffle.
[0014] The advantages of the present invention compared with the prior art are: it is blocked by the outer V-shaped baffle, and a spring and a rubber column are provided between the V-shaped baffle and the inclined baffle, which has a buffering effect; guardrail nets are provided on both sides of the outer baffle to increase safety performance; the anti-slip pad has a friction effect to reduce the phenomenon of construction workers slipping and falling; the safety protection index is high; it is easy to install and disassemble; the dismantled parts can be reused, and steel is saved. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a structural schematic diagram of the present invention; Figure 2 It is a structural schematic diagram of a construction hanging basket of the present invention. DETAILED DESCRIPTION
[0016] The specific embodiments of the present invention are further described below with reference to the accompanying drawings, wherein the same parts are represented by the same reference numerals.
[0017] It should be noted that the words "front", "rear", "left", "right", "up" and "down" used in the following description refer to directions in the accompanying drawings, and the words "inside" and "outside" refer to directions toward or away from the geometric center of a specific component, respectively.
[0018] In order to make the contents of the present invention more clearly understood, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
[0019] like Figure 1 、 Figure 2 As shown, a building construction safety hanging basket is characterized by comprising: a hanging mechanism and a construction hanging basket; The suspension mechanism includes: two suspension beams 21, which are respectively located above the two sides of the construction hanging basket. The lower end of one end of the suspension beam 21 is fixedly connected to a vertical connecting rod 25, and the lower end of the vertical connecting rod 25 is fixedly connected to a counterweight 22. The other end of the suspension beam 21 is fixedly connected to a T-shaped rod 24 placed above the suspension beam 21. The top of the T-shaped rod 24 is provided with a pulley and a rope. The rope passes through the other end of the suspension beam 21, and the construction hanging basket is suspended at the bottom end. A hoist 20 connected to a control pulley and a rope is installed on the construction hanging basket, and the hoist 20 is electrically connected to an electrical control system 23. The construction hanging basket includes: a bottom frame 1 at the bottom, the bottom ends of both sides of the bottom frame 1 are connected to a semicircular connecting piece 4 by bolts 7, one side of the bottom frame 1 is vertically threadedly connected to an outer baffle 3, and both sides of the bottom frame 1 are vertically threadedly connected to an inner baffle 2 close to the construction building, and the top sides of the outer baffle 3 are respectively hinged to an inclined baffle 9 and a V-shaped baffle 10, and the upper part of the inclined baffle 9 is connected to the upper part of the V-shaped baffle 10 by a horizontally placed rubber column 11, and a spring 12 is wound around the outside of the rubber column 11, and both sides of the top of the outer baffle 3 are fixedly connected to a baffle 18, and a guardrail net 5 is fixedly connected between the baffle 18 and the bottom frame 1, and the upper part of the inner baffle 2 is fixedly connected to a safety belt hanging rod 13.
[0020] The starting end of the rope is located at one end of the suspension beam 21. A transverse protective baffle 19 is fixedly connected to the upper portion between the two inner baffles. A bolt 7 passes through the bottom frame 1 from above, and the bottom end of the bolt 7 is threadedly connected to a nut. A gasket 6 is provided between the bottom end of the bolt 7 and the bottom frame 1. Both the outer baffle 3 and the inner baffle 2 pass through the gasket 6. An anti-slip pad 8 is fixedly connected to the top of the bottom frame 1. The V-shaped baffle 10 is away from the construction building. One end of the spring 12 is fixedly connected to the V-shaped baffle 10, and the other end is fixedly connected to the inclined baffle 9. The baffle 18 is located below the inclined baffle 9 and the V-shaped baffle 10.
[0021] Working principle of the present invention: During the use of this device, it is blocked by the outer V-shaped baffle, and springs and rubber columns are provided between the V-shaped baffle and the inclined baffle to have a buffering effect. Guardrail nets are provided on both sides of the outer baffle to increase safety performance. The anti-slip pad has a friction effect to reduce the construction workers' slipping and falling phenomenon, and the safety protection index is high.
[0022] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention shall be included in the scope of protection of the present invention.
Claims
1. A building construction safety hanging basket, characterized in that: include: Suspension mechanism and construction hanging basket; The suspension mechanism comprises: two suspension beams (21), which are respectively located above both sides of the construction hanging basket; a vertical connecting rod (25) is fixedly connected to the bottom of one end of the suspension beam (21); a counterweight (22) is fixedly connected to the bottom of the vertical connecting rod (25); the other end of the suspension beam (21) is fixedly connected to a T-shaped rod (24) located above the suspension beam (21); a pulley and a rope are provided at the top of the T-shaped rod (24); the rope passes through the other end of the suspension beam (21), and the construction hanging basket is suspended at the bottom; The construction hanging basket is provided with a hoist (20) connected to a control pulley and a rope, and the hoist (20) is electrically connected to an electrical control system (23). The construction hanging basket comprises: a bottom frame (1) at the bottom end, the bottom ends of both sides of the bottom frame (1) are connected to a semicircular connecting piece (4) by bolts (7), one side of the bottom frame (1) is vertically threadedly connected to an outer baffle (3), both sides of the bottom frame (1) are vertically threadedly connected to an inner baffle (2) close to the construction building, the top ends of the outer baffle (3) are respectively hinged to an inclined baffle (9) and a V-shaped baffle (10), the upper part of the inclined baffle (9) is connected to the upper part of the V-shaped baffle (10) by a horizontally placed rubber column (11), and a spring (12) is wound around the outer side of the rubber column (11), both sides of the top end of the outer baffle (3) are fixedly connected to a baffle (18), a guardrail net (5) is fixedly connected between the baffle (18) and the bottom frame (1), and the upper part of the inner baffle (2) is fixedly connected to a safety belt hanging rod (13).
2. A building construction safety hanging basket according to claim 1, characterized in that: The starting end of the rope is located at one end of the suspension beam (21).
3. The building construction safety hanging basket according to claim 1, characterized in that: A transverse protection barrier rod (19) is fixedly connected to the upper portion between the two inner barrier rods.
4. The building construction safety hanging basket according to claim 1, characterized in that: The bolt (7) passes through the bottom frame (1) from above, the bottom end of the bolt (7) is threadedly connected to a nut, and a gasket (6) is provided between the bottom end of the bolt (7) and the bottom frame (1).
5. The building construction safety hanging basket according to claim 1, characterized in that: The outer blocking rod (3) and the inner blocking rod (2) both pass through the gasket (6).
6. A building construction safety hanging basket according to claim 1, characterized in that: An anti-slip pad (8) is fixedly connected to the top of the bottom frame (1).
7. A building construction safety hanging basket according to claim 1, characterized in that: The V-shaped baffle (10) is away from the construction building.
8. The building construction safety hanging basket according to claim 1, characterized in that: One end of the spring (12) is fixedly connected to the V-shaped baffle (10), and the other end is fixedly connected to the inclined baffle (9).
9. The building construction safety hanging basket according to claim 1, characterized in that: The baffle (18) is located below the inclined baffle (9) and the V-shaped baffle (10).