Methods and devices for controlling the pouring of precast beam concrete
By establishing a vibrator lattice and a concrete placing machine coordinate system during the precast beam concrete pouring process, and determining the forced and transitional concrete placing zones, the problem of asynchronous concrete placing and vibration response was solved, achieving stable control of the vibrator and improving pouring quality and equipment stability.
Patent Information
- Application Number
- CN202611215085.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-12
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2046-08-12
AI Technical Summary
In the existing technology, the linkage control between the concrete placing machine and the vibrator is only based on the preset vibration position, component position or target vibration area, ignoring the dynamic process during the pouring process. This results in asynchronous responses between concrete placing and vibration, frequent start-stop switching of the vibrator, and affects the stability of the equipment and the quality of the pouring.
By mapping the vibrator array to a dot matrix, a unified coordinate system is established to determine the current position coordinates of the concrete placing machine. Based on the relative positional relationship, the forced concrete placing zone and the transitional concrete placing zone are determined, thereby controlling the working state of the vibrator and reducing frequent start-stop operations.
It improves the matching between the concrete placement position and the start/stop state of the vibrator, reduces the frequent start/stop of the vibrator and local under-vibration, and enhances the coordination and vibration quality of the precast beam concrete pouring process.
Smart Images

Figure CN122732282B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of concrete pouring control technology, and in particular to a method and apparatus for controlling the pouring of precast beam concrete. Background Technology
[0002] In concrete pouring systems for precast component production, placing booms and distributed vibrators are the core actuators. In existing construction methods, placing and vibrating operations are typically independent, heavily reliant on manual experience for timing and start / stop. This traditional control method suffers from low automation, is prone to under-vibration or over-vibration due to blind spots and fatigue, resulting in inconsistent component pouring quality. Furthermore, severe information silos exist between equipment, leading to disjointed processes and low coordination efficiency.
[0003] In the existing technology, there are already solutions that use control units such as PLCs to automatically start and stop multiple vibrators. For example, based on the distribution of the tenons, end tenons, and reinforcing mesh of the component or the preset vibration position, the number and location distribution of vibrators to be started are determined, and supplementary vibration is performed when vibration is abnormal. There are also solutions that configure automatic vibration strategies based on the component position, material placement data, component type, vibration path, and vibration effect feedback.
[0004] However, existing solutions typically control the vibration around preset positions, component locations, or target vibration areas. They haven't yet established a real-time spatial mapping between the vibrator positions and the area affected by the material placement, considering the dynamic discharge position of the concrete placing machine during continuous material placement. Furthermore, they haven't stabilized the operating state of the vibrator near the boundary of the material placement area. Therefore, even with continuous changes in the concrete placing machine position, positioning errors, or short-cycle mechanical disturbances, problems such as asynchronous material placement and vibration responses, frequent vibrator start-stop switching, and localized missed or ineffective vibration may still occur. Summary of the Invention
[0005] This invention provides a method and apparatus for controlling the pouring of precast beam concrete, which solves the problems in the prior art where the linkage between the concrete placing machine and the vibrator is only controlled around the preset vibration position, component position or target vibration area, ignoring the dynamic process during the pouring process, resulting in asynchronous response between the concrete placing and vibration, and frequent start-stop switching of the vibrator leading to damage to the vibrator.
[0006] This invention provides a method for controlling the pouring of precast beam concrete, comprising: mapping a vibrator array to a vibrator dot matrix, determining a first coordinate system based on the vibrator dot matrix, and determining the identifier and corresponding position coordinates of each vibrator dot matrix in the vibrator dot matrix based on the first coordinate system; acquiring the position information of a preset position of a concrete placing machine, and mapping the position information onto the first coordinate system to determine the current position coordinates of the concrete placing machine; determining a placement domain based on the current position coordinates, wherein the placement domain includes a forced placement domain and a transition placement domain surrounding the forced placement domain; determining the working state of each vibrator according to the relative positional relationship between each vibrator dot and the placement domain, and controlling each vibrator to vibrate the concrete according to the corresponding working state.
[0007] The precast beam concrete pouring control method provided by the present invention further includes: establishing a second coordinate system with the current position coordinates of the concrete placing machine as the origin, the trolley travel direction of the concrete placing machine as the first direction, and the trolley travel direction of the concrete placing machine as the second direction; determining the relative position coordinates of each vibrator point in the second coordinate system based on the position coordinates of each vibrator point in the first coordinate system and the current position coordinates of the concrete placing machine; and determining the relative positional relationship between each vibrator point and the concrete placing area based on the relative position coordinates.
[0008] According to the precast beam concrete pouring control method provided by the present invention, the current position coordinates are the center position coordinates of the discharge port of the concrete placing machine; determining the placement zone based on the current position coordinates includes: taking the current position coordinates as the center, determining the starting length of the forced placement zone in the first direction according to the projected length of the discharge port of the concrete placing machine in the first direction, the effective vibration radius of the vibrator, and the spacing between the vibrators; determining the starting width of the forced placement zone in the second direction according to the projected width of the discharge port of the concrete placing machine in the second direction, the effective vibration radius of the vibrator, and the spacing between the vibrators; and determining the forced placement zone based on the starting length and the starting width.
[0009] According to the precast beam concrete pouring control method provided by the present invention, the step of determining the material placement area based on the current position coordinates further includes: determining a first hysteresis increment in the first direction according to the motion state parameters of the material placing machine and the flow characteristic parameters of the concrete; expanding the boundary of the forced material placement area in the first direction based on the first hysteresis increment to obtain the outer boundary of the material placement area; and determining the area between the boundary of the forced material placement area and the outer boundary as the transition material placement area.
[0010] According to the precast beam concrete pouring control method provided by the present invention, determining the first hysteresis increment in the first direction includes: determining the lower limit of the adjustment of the first hysteresis increment based on the running speed of the concrete placing machine in the first direction, the position detection error parameter, and the instruction refresh cycle of the vibrator working state; determining the upper limit of the adjustment of the first hysteresis increment based on the flow characteristic parameters of the concrete; and determining the first hysteresis increment based on the lower limit and the upper limit of the adjustment of the first hysteresis increment.
[0011] According to the precast beam concrete pouring control method provided by the present invention, the step of determining the working state of each vibrator based on the relative positional relationship between each vibrator point and the concrete placement zone, and controlling each vibrator to vibrate the concrete according to the corresponding working state, includes: determining that the corresponding vibrator is in the start state when the relative position coordinates of the vibrator point are within the forced concrete placement zone; determining the current working state of the corresponding vibrator based on the working state of the corresponding vibrator in the previous determination cycle when the relative position coordinates of the vibrator point are within the transition concrete placement zone; and determining that the corresponding vibrator is in the off state when the relative position coordinates of the vibrator point are outside the concrete placement zone.
[0012] According to the precast beam concrete pouring control method provided by the present invention, when the relative position coordinates of the vibrator point are located within the transition material placement area, determining the current working state of the corresponding vibrator based on the working state of the corresponding vibrator in the previous determination cycle includes: keeping the corresponding vibrator in the start state when the corresponding vibrator was in the start state in the previous determination cycle; and keeping the corresponding vibrator in the stop state when the corresponding vibrator was in the stop state in the previous determination cycle.
[0013] The present invention also provides a precast beam concrete pouring control device, comprising: a mapping module, used to map a vibrator array to a vibrator dot matrix, and determine a first coordinate system based on the vibrator dot matrix, and determine the identifier and corresponding position coordinates of each vibrator dot matrix in the vibrator dot matrix based on the first coordinate system; a position confirmation module, used to obtain the position information of a preset position of a concrete placing machine, and map the position information onto the first coordinate system to determine the current position coordinates of the concrete placing machine; a placing area determination module, used to determine the placing area based on the current position coordinates, wherein the placing area includes a forced placing area and a transition placing area set around the forced placing area; and a vibration module, used to determine the working state of each vibrator according to the relative positional relationship between each vibrator dot and the placing area, and control each vibrator to vibrate the concrete according to the corresponding working state.
[0014] The present invention also provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the program to implement the precast beam concrete pouring control method as described above.
[0015] The present invention also provides a computer program product, including a computer program that, when executed by a processor, implements the precast beam concrete pouring control method as described above.
[0016] The precast beam concrete pouring control method and apparatus provided by this invention lattice the vibrator array and establish a unified first coordinate system. The current position coordinates of the concrete placing machine are then mapped to this first coordinate system, thereby enabling the determination of the relative positional relationship between the concrete placing machine and each vibrator point under the same spatial reference. Furthermore, a placement domain, including a forced placement domain and a transition placement domain, is determined based on the current position coordinates of the concrete placing machine. The working state of each vibrator is determined according to the relative positional relationship between each vibrator point and the placement domain, allowing the vibrator array to start and stop in sync with the real-time placement position of the concrete placing machine. Therefore, compared to methods that only rely on preset vibration positions or fixed vibration areas for control, this invention improves the matching between the placement position and the start / stop state of the vibrators. It also stabilizes the vibrator state near the boundary of the placement influence area through the transition placement domain, reducing frequent start / stop of the vibrators, localized missed vibration, or ineffective vibration, thus improving the synergy and vibration quality of the precast beam concrete pouring process. Attached Figure Description
[0017] To more clearly illustrate the technical solutions in this invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of this invention. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.
[0018] Figure 1 The diagram illustrates a scenario of precast beam casting according to an example of the present invention. Figure 2 This is a flowchart of the precast beam concrete pouring control method and device of the present invention; Figure 3 A flowchart illustrating an example of the present invention for determining the relative positional relationship between a vibrator and a concrete placing machine is shown. Figure 4 A flowchart illustrating an example of the present invention for determining a fabric domain based on the current position coordinates is shown. Figure 5 A flowchart illustrating another example of the invention for determining the fabric domain based on the current position coordinates is shown. Figure 6A flowchart illustrating an example of the present invention for determining a first hysteresis increment in a first direction is shown. Figure 7 A structural block diagram of a precast beam concrete pouring control device according to the present invention is shown. Figure 8 This is a schematic diagram of the structure of the electronic device provided by the present invention. Detailed Implementation
[0019] To make the objectives, technical solutions, and advantages of this invention clearer, the technical solutions of this invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this invention. All other embodiments obtained by those skilled in the art based on the embodiments of this invention without creative effort are within the scope of protection of this invention.
[0020] In large-scale precast projects such as smart beam yards, concrete placing booms typically feature large cantilever lengths, high structural inertia, and significant pumping impacts. During their travel, braking, or pumping processes, they may experience low-frequency oscillations, residual vibrations, or short-cycle positional fluctuations. If the start / stop determination of the vibrator is based solely on a single material placing boundary, even small positional fluctuations near the boundary can cause the determination result to repeatedly switch between start and stop states, leading to frequent changes in the vibrator's start / stop commands. For vibratory actuators driven by relays, contactors, or output modules, frequent start / stop operations can increase the impact load on electrical components and contact wear, affecting equipment operational stability and service life.
[0021] In view of this, the present invention provides a method for controlling the concrete pouring of precast beams.
[0022] Figure 1 The diagram illustrates a scenario of precast beam casting according to an example of the present invention.
[0023] like Figure 1 As shown, during the concrete pouring process of the precast beam 110, the concrete placing boom outlet 130 moves along the length and / or width of the precast beam 110 to place concrete, and multiple vibrators 120 are arranged at preset intervals in the corresponding pouring areas of the precast beam 110. As the position of the concrete placing boom outlet 130 changes, the concrete placement area 140 can be dynamically determined based on the current position of the concrete placing boom outlet 130, and the working state of each vibrator 120 can be determined according to the relative positional relationship between each vibrator 120 and the forced concrete placement area 141 and the transitional concrete placement area 142 in the concrete placement area 140.
[0024] Figure 2 This is a flowchart of the precast beam concrete pouring control method and device of the present invention.
[0025] Figure 2 As shown, the method includes operations S210~S240.
[0026] In operation S210, the vibrator array is mapped to a vibrator dot matrix, and a first coordinate system is determined based on the vibrator dot matrix. Based on the first coordinate system, the identifier and corresponding position coordinates of each vibrator dot in the vibrator dot matrix are determined.
[0027] According to an embodiment of the present invention, operation S210 can be executed after the equipment is powered on and initialized, and upon receiving the pouring task information. The pouring task information may include the precast beam template dimensions, vibrator array layout parameters, vibrator installation spacing, and the correspondence between the vibrators and the execution ports. Based on the pouring task information, the installation position and arrangement relationship of each vibrator in the vibrator array can be determined.
[0028] According to an embodiment of the present invention, the center point of the effective vibration area of the vibrator can be determined as the vibrator point corresponding to the vibrator, and multiple vibrator points can be used together as a vibrator point array.
[0029] According to an embodiment of the present invention, a first coordinate system can be determined based on the arrangement direction of the vibrator array and the reference edge of the precast beam formwork. For example, the origin of the coordinate system can be established using a corner point of the precast beam formwork, the center point of the formwork, or a preset reference point in the vibrator array, with the length direction of the precast beam formwork as the first coordinate axis direction and the width direction of the precast beam formwork as the second coordinate axis direction. The first coordinate system is used to uniformly represent the positional relationship between the vibrator points, the concrete placing machine position, and the concrete placing area.
[0030] Furthermore, the coordinate position of each vibrator can be determined based on the origin of the first coordinate system and the relative relationship of each vibrator to the origin of the first coordinate system; and a unique identifier can be assigned to each vibrator position. The identifier can be generated based on the row and column number of the vibrator in the array, the physical port number, or a preset coding rule, or it can be assigned numbers sequentially according to the scanning order of the vibrator array. By establishing a mapping relationship between the identifier and the corresponding position coordinates, the subsequent working status determination results can be accurately associated with the specific vibrator.
[0031] Furthermore, after determining the identifiers and coordinates of the vibrator locations, the correspondence between the vibrator locations and the actual vibrators can be verified. For example, based on the vibrator's physical port information, installation location records, or on-site calibration results, it can be checked whether each identifier corresponds one-to-one with the actual vibrator. After successful verification, the identifiers, coordinates, and associated relationships of each vibrator location are saved for later use when determining the relative positional relationship between each vibrator location and the fabric application area.
[0032] By simplifying the complex mechanical array into a "static dictionary" composed of coordinate points, the digital pre-storage of all execution nodes used for vibration throughout the field can be completed during initialization.
[0033] In operation S220, the position information of the preset position of the concrete placing machine is obtained, and the position information is mapped into the first coordinate system to determine the current position coordinates of the concrete placing machine.
[0034] According to embodiments of the present invention, the preset position of the fabric placing machine can be a reference position used to characterize the current fabric placing position. For example, the preset position may include the center position of the fabric placing machine's discharge port, the center position of the end of the fabric placing tube, the center position of the fabric placing trolley, or an installation reference point with a fixed relative positional relationship to the discharge port. By selecting a preset position, the actual fabric placing position of the fabric placing machine can be abstracted into a reference point that can be located and calculated, so that the fabric placing area can be subsequently determined based on this reference point.
[0035] According to embodiments of the present invention, position information of a preset position can be obtained through a position detection device. The position detection device may include an encoder, a displacement sensor, a distance sensor, a positioning module, or a combination of the above devices. For example, when a concrete placing boom moves along the length and width directions of the precast beam formwork, the displacement of the placing boom in both directions can be collected separately, and the position data of the preset position in the construction space can be determined based on the displacement.
[0036] In some embodiments, the pulse signal of the fabric placing machine in the corresponding moving direction can be acquired by an encoder, and the physical position of the preset position on the fabric placing machine at the current moment can be determined according to the number of pulses, pulse equivalent and initial calibration position of the encoder, and mapped to the first coordinate system to determine it as the current position coordinate of the fabric placing machine.
[0037] Furthermore, to improve the reliability of the current position coordinates of the fabric placing machine, the collected position information can be validated and / or filtered. For example, it can be determined whether the position change within adjacent sampling periods exceeds a preset speed constraint, or whether there are missing, abrupt, or outlier values in the currently collected data; if the position information meets the preset validation conditions, it is used as the valid position information for the current period. Alternatively, moving average, amplitude limiting filtering, or median filtering can be applied to the position information from multiple consecutive sampling periods to reduce the impact of encoder jitter, mechanical backlash, or short-term acquisition errors on the current position coordinates.
[0038] In operation S230, the fabric area is determined based on the current position coordinates. The fabric area includes a forced fabric area and a transitional fabric area set around the forced fabric area.
[0039] According to an embodiment of the present invention, after determining the current position coordinates of the concrete placing machine, the current position coordinates can be used as a reference point for the current placing position to determine the placing area corresponding to the current placing position. The placing area is used to represent the spatial range near the current placing machine position that needs to participate in the vibration state determination. Specifically, the placing area may include a forced placing area and a transitional placing area, wherein the forced placing area is used to represent the main vibration action area corresponding to the current placing position, and the transitional placing area is used to represent the area located outside the forced placing area for transitional determination of the vibrator's working state.
[0040] For example, a predetermined width can be extended outward in at least one direction of the forced fabric area to form a transition fabric area; alternatively, a transition fabric area can be formed around the periphery of the forced fabric area according to a predetermined outward expansion rule. Thus, the outer boundary of the fabric area can be obtained by extending outward from the boundary of the forced fabric area, with the area within the forced fabric area serving as the forced fabric area, and the area between the boundary of the forced fabric area and the outer boundary of the fabric area serving as the transition fabric area.
[0041] According to embodiments of the present invention, the forced placement zone and the transition placement zone can be rectangular, circular, elliptical, or irregular areas that match the influence range of the material output from the concrete placing machine. To facilitate judgment based on the position coordinates of the vibrator points, in some embodiments, a rectangular area can be used to represent the forced placement zone and the transition placement zone. For example, the forced placement zone can be determined with the current position coordinates of the concrete placing machine as the center of the rectangle, based on the length parameter in the first direction and the width parameter in the second direction; then, a transition width is set around the forced placement zone to determine the outer boundary of the placement zone.
[0042] Furthermore, after determining the forced placement zone and the transition placement zone, the boundary information of both zones can be associated and stored with the current position coordinates of the concrete placing machine. Subsequently, when determining the relative positional relationship between each vibrator point and the placement zone, the position coordinates or relative position coordinates of each vibrator point can be compared with the boundaries of the forced placement zone and the transition placement zone, thereby determining whether each vibrator point is within the forced placement zone, the transition placement zone, or outside the placement zone.
[0043] By using the spatial hysteresis constraint formed by the transitional concrete placement zone, the working state switch is only triggered when the change in the position of the vibrator relative to the current position of the concrete placing machine crosses the corresponding boundary. This reduces boundary judgment jumps caused by mechanical rebound, positioning errors, or sensor noise from the concrete placing machine, lowers the risk of electrical shocks and contact wear to relays, contactors, or output modules due to frequent start-stop cycles, and improves the operational stability and service life of the vibratory actuator.
[0044] When operating S240, the working state of each vibrator is determined according to the relative positional relationship between each vibrator point and the concrete placement area, and each vibrator is controlled to vibrate the concrete according to the corresponding working state.
[0045] According to an embodiment of the present invention, after determining the fabric application zone, the position coordinates of each vibrator point can be compared with the boundary of the fabric application zone to determine the relative positional relationship between each vibrator point and the fabric application zone. The relative positional relationship may include: the vibrator point is located within the forced fabric application zone, the vibrator point is located within the transitional fabric application zone, and the vibrator point is located outside the fabric application zone.
[0046] Specifically, for any vibrator point, it can be determined whether the vibrator point falls within the forced concrete placement zone or the transitional concrete placement zone based on its position coordinates in the first coordinate system or its relative position coordinates with respect to the current position coordinates of the concrete placing machine. For example, when the concrete placement zone is represented by a rectangular area, the coordinate values of the vibrator point in the first and second directions can be compared with the boundary values of the concrete placement zone to determine the area where the vibrator point is located.
[0047] According to embodiments of the present invention, the working state of a corresponding vibrator can be determined based on the area where the vibrator point is located. For example, when the vibrator point is located within the forced placement zone, the corresponding vibrator can be determined to be in the activated state, so that the concrete near the current placement position can be vibrated in a timely manner; when the vibrator point is located within the transition placement zone, the corresponding vibrator can be determined to be in the transition state, which can be determined based on the historical working state of the corresponding vibrator, the current direction of the placing boom, or a preset state maintenance rule; when the vibrator point is located outside the placement zone, the corresponding vibrator can be determined to be in the deactivated state, to reduce ineffective or excessive vibration.
[0048] After determining the working status of each vibrator, the working status can be matched with the corresponding actual vibrator based on the identifier of each vibrator location, and control commands can be output to the corresponding vibrator. Control commands may include start commands, hold commands, stop commands, and / or vibration parameter adjustment commands. For example, for a vibrator in the start state, it can be controlled to start and vibrate the concrete according to a preset vibration frequency, vibration time, or vibration intensity; for a vibrator in the stop state, it can be controlled to stop working; for a vibrator in the transition state, it can be controlled to maintain its current working status or delay the switch to a new working status according to preset status maintenance rules.
[0049] According to an embodiment of the present invention, during the continuous movement of the concrete placing boom, the above-mentioned positional relationship judgment and working state determination process can be repeatedly executed according to a preset judgment cycle. Thus, as the current position coordinates of the concrete placing boom change, the placing area is updated accordingly, and the working state of each vibrator can also be dynamically adjusted according to the current placing position, thereby ensuring that the vibrator array and the placing position of the concrete placing boom remain coordinated.
[0050] To address the aforementioned technical problems, this invention establishes a transitional concrete placement zone around the forced concrete placement zone, creating a spatial buffer area between the forced concrete placement zone and its outer boundary. For vibrator locations within the forced concrete placement zone, the corresponding vibrator can be directly identified as being in the active state. For vibrator locations entering the transitional concrete placement zone, the current working state can be determined by combining historical working states or preset state maintenance rules, rather than immediately switching states when crossing the boundary of the forced concrete placement zone. Therefore, the switching of the corresponding vibrator's working state is only triggered when the position of the concrete placing machine or the relative position change of the vibrator location is sufficient to cross the transitional concrete placement zone, thereby reducing the impact of mechanical shaking, positioning errors, or short-cycle position fluctuations on the state determination results.
[0051] Through the above-described configuration, the present invention can provide spatial redundancy for determining the start and stop of the vibrator during the continuous movement and pumping of the concrete placing machine, reduce the frequent switching of the working state of the vibrator near the boundary, improve the coordination stability between the placing position and the vibrator array, and reduce the risk of electrical shock and mechanical wear caused by frequent start and stop of the vibrating actuator.
[0052] Figure 3 A flowchart illustrating an example of the present invention for determining the relative positional relationship between a vibrator and a concrete placing machine is shown.
[0053] like Figure 3 As shown, the process includes operations S310~S330.
[0054] When operating S310, a second coordinate system is established with the current position coordinates of the concrete placing machine as the origin, the direction of travel of the main trolley of the concrete placing machine as the first direction, and the direction of travel of the trolley of the concrete placing machine as the second direction.
[0055] According to an embodiment of the present invention, after determining the current position coordinates of the concrete placing boom, a second coordinate system can be established with the current position coordinates of the concrete placing boom as the origin. Specifically, the direction of travel of the main trolley of the concrete placing boom can be used as the first direction of the second coordinate system, and the direction of travel of the auxiliary trolley of the concrete placing boom can be used as the second direction of the second coordinate system. The second coordinate system is updated as the current position of the concrete placing boom changes, and is used to describe the local spatial relationship of each vibrator point relative to the current concrete placing position.
[0056] When operating S320, the relative position coordinates of each vibrator point in the second coordinate system are determined based on the position coordinates of each vibrator point in the first coordinate system and the current position coordinates of the concrete placing machine.
[0057] For example, for the i-th vibrator point, if its position coordinates in the first coordinate system are... The current position coordinates of the fabric placing machine are: Then, the relative position coordinates of the vibrator point with respect to the current position of the concrete placing machine can be determined based on the coordinate difference between the two. For example, it can be... The relative position coordinates of the i-th vibrator point in the second coordinate system are determined.
[0058] When operating S330, the relative positional relationship between each vibrator point and the fabric application area is determined based on the relative position coordinates.
[0059] After obtaining the relative position coordinates of each vibrator point, these coordinates can be compared with the boundary of the concrete placement zone to determine the relative positional relationship between each vibrator point and the zone. For example, when the relative position coordinates of a vibrator point satisfy the boundary conditions of the forced concrete placement zone, the vibrator point is determined to be within the forced concrete placement zone; when the relative position coordinates do not satisfy the boundary conditions of the forced concrete placement zone but satisfy the outer boundary conditions of the zone, the vibrator point is determined to be within the transitional concrete placement zone; and when the relative position coordinates do not satisfy the outer boundary conditions of the zone, the vibrator point is determined to be outside the zone.
[0060] By converting the global position coordinates of each vibrator point from the first coordinate system to the relative position coordinates in the second coordinate system, the concrete placement zone determination process can be transformed from global spatial matching to local offset comparison. Since relative position coordinates typically only represent the local distance of the vibrator point relative to the current position of the concrete placing machine, their numerical range is smaller than the global coordinate range within the construction area. This reduces the amount of data processing and the risk of numerical overflow during coordinate comparison. In some embodiments, the relative position coordinates can also be represented using fixed-point or integer methods, enabling the field control unit to complete the concrete placement zone boundary determination through integer comparisons, reducing the need for floating-point operations and thus improving the real-time performance of vibrator operating status determination and control command issuance.
[0061] In one illustrative embodiment, the current position coordinates are the center position coordinates of the material feeder's outlet.
[0062] Figure 4 A flowchart illustrating an example of the present invention for determining the fabric domain based on the current position coordinates is shown.
[0063] like Figure 4As shown, the specific process for determining the fabric area based on the current position coordinates includes operations S410~S430.
[0064] In operation S410, with the current position coordinates as the center, the starting length of the forced material distribution area in the first direction is determined based on the projected length of the material distribution machine's outlet in the first direction, the effective vibration radius of the vibrator, and the spacing between each vibrator.
[0065] According to an embodiment of the present invention, the projected length of the concrete placing boom's discharge port in the first direction can be obtained first. The projected length can be determined based on the geometric dimensions of the discharge port, or based on the actual material drop projection range of the discharge port on the precast beam template plane. Then, the effective vibration radius of the vibrator is obtained. The effective vibration radius can be determined based on the vibrator model, vibrator rod diameter, vibration frequency, concrete workability parameters, or on-site calibration results. Further, the arrangement spacing of adjacent vibrator points in the first direction is obtained.
[0066] After determining the above parameters, the foundation starting length in the first direction can be obtained based on the projected length of the discharge port in the first direction and the effective vibration radius of the vibrator. For example, the foundation starting length can be determined based on the projected length and twice the effective vibration radius. That is, an effective vibration radius is extended outwards on both sides of the projected range of the discharge port, so that the forced material distribution area not only covers the material drop area directly below the discharge port but also covers the area at the edge of the drop area that needs to be effectively acted upon by the vibrator.
[0067] Furthermore, the foundation starting length can be modified based on the spacing between each vibrator to obtain the starting length. Since the vibrator array is discretely arranged, if the starting length is determined solely based on the projected length of the discharge port and the effective vibration radius, the boundary of the forced material distribution area may fall exactly between two adjacent vibrator points, leading to unstable triggering of the vibrators near the boundary. Therefore, the foundation starting length can be rounded, expanded, or adjusted with a margin based on the spacing between adjacent vibrator points in the first direction. For example, the starting length can be made no less than the sum of the projected length and twice the effective vibration radius, and the starting length can be matched with the spacing between the vibrator points to ensure that the forced material distribution area can cover at least one vibrator point corresponding to the current material distribution area.
[0068] In operation S420, the starting width of the forced fabric distribution zone in the second direction is determined based on the projected width of the fabric placing machine's outlet in the second direction, the effective vibration radius of the vibrator, and the spacing between each vibrator.
[0069] The projected width of the concrete placing boom outlet in the second direction, the effective vibration radius of the vibrator, and the spacing between adjacent vibrator points in the second direction can be obtained. Then, based on the projected width and the effective vibration radius of the vibrator, the basic starting width in the second direction is determined. For example, the sum of the projected width of the outlet in the second direction and twice the effective vibration radius can be used as the basic starting width.
[0070] Furthermore, the foundation starting width can be modified based on the spacing between adjacent vibrator points in the second direction to obtain the starting width. This modification ensures that the second-direction boundary of the forced concrete placement zone matches the arrangement of the vibrator points, preventing insufficient or excessive coverage of the forced concrete placement zone edge due to the discrete distribution of vibrator points.
[0071] In operation S430, the forced cloth field is determined based on the start length and start width.
[0072] According to an embodiment of the present invention, after determining the starting length and starting width, the boundary of the forced concrete placing zone can be determined with the current position coordinates of the concrete placing machine as the center. For example, in a second coordinate system with the current position coordinates of the concrete placing machine as the origin, the boundary in the first direction can be set to half the starting length, and the boundary in the second direction can be set to half the starting width. That is, when the relative position coordinates of a vibrator point in the second coordinate system satisfy that the absolute value of the relative coordinate in the first direction is not greater than half the starting length, and the absolute value of the relative coordinate in the second direction is not greater than half the starting width, it can be determined that the vibrator point is located within the forced concrete placing zone.
[0073] For example, a forced cloth field can be represented as:
[0074] in, Indicates a forced fabric area. This indicates the relative coordinates of the vibrator position with respect to the current position of the concrete placing boom in the first direction. This indicates the relative coordinates of the vibrator position with respect to the current position of the concrete placing boom in the second direction. Indicates the start-up length. Indicates the startup width.
[0075] The above method allows the boundary of the forced fabric placement zone to be determined by the actual material drop range of the fabric placing machine's outlet, the effective range of the vibrator, and the discrete arrangement of the vibrator array. This enables the forced fabric placement zone to cover the area near the current fabric placement location that needs timely vibration, and allows the vibrators within this area to be triggered promptly, thereby improving the spatial matching between fabric placement and vibration.
[0076] Figure 5 A flowchart illustrating another example of the invention, showing the determination of the fabric domain based on the current position coordinates, is shown.
[0077] like Figure 5 As shown, the process of determining the fabric area based on the current position coordinates also includes operations S510~S530.
[0078] In operation S510, the first hysteresis increment in the first direction is determined based on the motion state parameters of the concrete placing boom and the flow characteristic parameters of the concrete.
[0079] According to an embodiment of the present invention, the motion state parameters of the concrete placing boom are used to characterize the degree of deviation that the current position coordinates of the concrete placing boom may undergo in a short period of time. Since the concrete placing boom may experience mechanical shaking, residual vibration, or positioning errors during travel, braking, reversing, and pumping, if the hysteresis increment is set too small, the buffer range between the forced placement zone and the transition placement zone will be insufficient. Even slight fluctuations in the current position of the concrete placing boom may cause the vibrator near the boundary to frequently switch between the start and stop states. Therefore, it is necessary to determine the hysteresis increment based on the motion state parameters of the concrete placing boom so that the transition placement zone can at least cover the range of position fluctuations that the concrete placing boom may experience within a short period, thereby improving the stability of the vibrator's working state determination.
[0080] The flow characteristics of concrete are used to characterize the requirements of vibration coverage and timeliness. Specifically, when concrete has good flowability, it still has good paving and flowability within a certain range after placement, and the transition placement zone can be appropriately widened to reduce frequent start-stop of the boundary vibrator. However, when the concrete residence time is long, the slump loss is large, or the equivalent flowability is reduced, the concrete is more likely to become viscous or locally accumulate. In this case, if the hysteresis increment is too large, the vibrator may continue to operate in a position deviating from the actual placement influence range, resulting in ineffective vibration, over-vibration, or untimely response to the current placement area. Therefore, it is necessary to constrain the hysteresis increment according to the flow characteristics of concrete to match the range of the transition placement zone with the actual flowable range and vibration requirements of the current concrete.
[0081] In other words, the motion parameters of the concrete placing boom are mainly used to address the issue of insufficient sensitivity in boundary determination, while the flow characteristic parameters of concrete are mainly used to address the issue of excessively large hysteresis ranges or mismatches with the actual placement influence range. By considering both types of parameters simultaneously, the hysteresis increment can provide sufficient spatial redundancy to filter short-cycle position fluctuations of the concrete placing boom without making the transition placement zone too wide, thus reducing the accuracy of the vibration response. Therefore, the setting of the first hysteresis increment can improve the matching between the placement area and the vibration area while ensuring the stability of the vibrator's start and stop.
[0082] In operation S520, based on the first hysteresis increment, the boundary of the forced cloth domain in the first direction is expanded outward to obtain the outer boundary of the cloth domain.
[0083] In some embodiments, a second hysteresis increment in the second direction may also be introduced to expand the boundary of the forced fabric domain in the second direction.
[0084] For example, when introducing the first hysteresis increment Second hysteresis increment Then, the region enclosed by the outer boundary of the fabric domain can be represented as:
[0085] in, This indicates the outer layer of the fabric area. Indicates the first hysteresis increment. This represents the second hysteresis increment. Consequently, the outer boundary of the fabric domain expands outward relative to the boundary of the forced fabric domain in both the first and second directions.
[0086] In operation S530, the area between the boundary of the forced cloth domain and the outer boundary is defined as the transition cloth domain.
[0087] According to an embodiment of the present invention, after determining the outer boundary of the fabric domain, the area located within the outer boundary and outside the forced fabric domain can be defined as a transitional fabric domain. Exemplarily, a transitional fabric domain can be represented as:
[0088] in, This indicates the transition fabric area.
[0089] Figure 6 A flowchart illustrating an example of the present invention for determining a first hysteresis increment in a first direction is shown.
[0090] like Figure 6 As shown, the process of determining the first hysteresis increment in the first direction includes operations S610~S630.
[0091] When operating S610, the lower limit of the adjustment of the first hysteresis increment is determined based on the running speed of the concrete placing boom in the first direction, the position detection error parameters, and the instruction refresh cycle of the vibrator's working status.
[0092] According to an embodiment of the present invention, in order to eliminate edge flickering caused by mechanical resonance, the first hysteresis increment must be able to cover the most unfavorable jitter displacement of the machine, thereby determining the lower limit of the adjustment of the first hysteresis increment.
[0093] For example, the lower limit of the adjustment of the first hysteresis increment can be determined by the following formula:
[0094] in, This is the lower limit for adjusting the first hysteresis increment. This refers to the real-time operating speed of the fabric placing machine in the first direction. For instruction refresh cycle, These are the position detection error parameters for the fabric placing machine.
[0095] By employing the above method, the lower limit of the first hysteresis increment adjustment can at least cover the displacement and position detection error of the concrete placing boom within one instruction refresh cycle. Therefore, when the current position coordinates of the concrete placing boom are close to the boundary of the forced placement domain, even with short-cycle movement, detection errors, or mechanical micro-motion, the vibrator's operating state will not frequently switch due to an excessively narrow transition placement domain, thus improving the stability of boundary determination.
[0096] In operation S620, the upper limit of the adjustment of the first hysteresis increment is determined based on the flow characteristic parameters of the concrete.
[0097] According to embodiments of the present invention, the flow characteristic parameters of concrete may include the initial slump of the current batch of concrete, the residence time of the concrete from its discharge from the mixer to its current placement position, the slump time loss coefficient, the standard slump threshold, the effective vibration radius of the foundation, the flowability mapping coefficient, and / or the engineering safety reduction coefficient. The initial slump characterizes the initial flowability of the concrete upon discharge; the residence time characterizes the time elapsed from discharge to the current placement position; the slump time loss coefficient characterizes the degree to which the flowability of the concrete decreases over time; the standard slump threshold characterizes the reference flowability when the preset vibration coverage requirement is met; and the effective vibration radius of the foundation characterizes the effective vibration range of the concrete under the reference flowability conditions.
[0098] Furthermore, the correction amount for the current allowable effective vibration range of concrete can be determined based on the difference between the equivalent flowability and the standard slump threshold. When the equivalent flowability is higher than the standard slump threshold, it indicates that the concrete still has good flow and paving capacity, and the upper limit of the adjustment of the first hysteresis increment can be appropriately increased to improve the stability of boundary determination. When the equivalent flowability decreases and approaches or falls below the standard slump threshold, it indicates that the flowability of the concrete has decayed. If the transition placement zone still maintains a large outward expansion range, it is easy for the edge area to leave the effective vibration range, resulting in ineffective vibration, over-vibration, or untimely response to the current placement area. Therefore, it is necessary to reduce the upper limit of the adjustment of the first hysteresis increment.
[0099] For example, the upper limit of the adjustment of the first hysteresis increment can be determined according to the following relationship:
[0100] in, This indicates the upper limit of the adjustment for the first hysteresis increment; This represents the engineering safety reduction factor, used to reduce the theoretical upper limit for safety. This represents the effective vibration radius of the foundation under the standard slump threshold. This represents the fluidity mapping coefficient, used to characterize the degree of influence of changes in concrete fluidity on the effective vibration range; Indicates the initial slump of the current batch of concrete; This represents the slump time loss coefficient; This indicates the dwell time of the concrete from its discharge point to its current position at the placement site; This represents the standard slump threshold. In the formula... It can characterize the equivalent fluidity of concrete at the current moment. It can characterize the current equivalent liquidity surplus relative to the standard collapse threshold.
[0101] By employing the above method, the upper limit of the first hysteresis increment can be dynamically adjusted according to changes in the concrete flow state. When the concrete has good fluidity, the transition placement zone can be appropriately widened in the first direction to reduce the possibility of frequent start-stop cycles of the vibrator near the boundary. When the concrete's fluidity decreases, the acceptable range of the first hysteresis increment is narrowed to prevent the vibrator from continuing to operate outside the effective placement area due to an excessively wide transition placement zone. Thus, while ensuring the stability of the state determination, the risks of under-vibration, ineffective vibration, or over-vibration can be reduced.
[0102] In operation S630, the first hysteresis increment is determined based on the lower and upper limits of the adjustment of the first hysteresis increment.
[0103] In some embodiments, when the lower adjustment limit is less than or equal to the upper adjustment limit, the average of the lower adjustment limit and the upper adjustment limit can be determined as the first hysteresis increment.
[0104] In other embodiments, a weighted average value between the lower and upper adjustment limits can be determined as the first hysteresis increment, depending on construction preferences or risk control requirements. For example, when there is a greater emphasis on reducing the risk of frequent start-stop of the vibrator, the first hysteresis increment can be made closer to the upper adjustment limit; when there is a greater emphasis on avoiding the risk of ineffective vibration or over-vibration, the first hysteresis increment can be made closer to the lower adjustment limit.
[0105] In some other embodiments, multiple candidate hysteresis increments can be generated between the lower and upper adjustment limits according to a preset step size, and a first hysteresis increment can be determined from these candidate increments based on preset evaluation rules. The preset evaluation rules may include factors such as a low number of vibrator start-stop cycles, sufficient state holding time, and the transition material placement area not exceeding the effective vibration range. Therefore, while ensuring the first hysteresis increment is within a reasonable range, a more suitable hysteresis increment can be selected based on the current construction status.
[0106] In one illustrative embodiment, the second hysteresis increment is used to limit the outward expansion width of the forced fabric distribution area in the second direction. It can be determined with reference to the method for determining the first hysteresis increment, or it can be determined based on the position detection error parameters of the fabric placing machine in the second direction, the lateral movement speed, the spacing between vibrator points, the lateral positioning accuracy requirements, or a preset empirical value.
[0107] In one illustrative embodiment, the working state of each vibrator is determined based on the relative positional relationship between each vibrator point and the concrete placement area, and each vibrator is controlled to vibrate the concrete according to its corresponding working state, including: If the relative position coordinates of the vibrator point are within the forced material placement area, it is determined that the corresponding vibrator is in the start state.
[0108] According to an embodiment of the present invention, when the relative position coordinates of the vibrator point are within the forced placement zone, it indicates that the vibrator point is within the main vibration range corresponding to the current discharge position of the concrete placing machine. In this case, the vibrator can be set to the start state, and a start command can be output to the vibrator to vibrate the concrete in the current placement area according to a preset vibration frequency, vibration time, and / or vibration intensity. This ensures that the concrete near the current placement position can be vibrated and compacted in a timely manner.
[0109] When the relative position coordinates of the vibrator point are within the transition fabric area, the current working state of the corresponding vibrator is determined based on the working state of the corresponding vibrator in the previous judgment cycle.
[0110] For example, if the corresponding vibrator was in the activated state in the previous determination cycle, the corresponding vibrator is kept in the activated state. If the corresponding vibrator was in the deactivated state in the previous determination cycle, the corresponding vibrator is kept in the deactivated state.
[0111] Therefore, instead of immediately changing the working state based on whether it crosses the boundary of the forced placement zone, the current working state is determined based on the working state of the corresponding vibrator in the previous judgment cycle, so as to reduce frequent start-stops caused by short-cycle shaking or positioning errors of the concrete placing machine.
[0112] If the relative position coordinates of the vibrator point are outside the material distribution area, it is determined that the corresponding vibrator is in the off state.
[0113] The precast beam concrete pouring control device provided by the present invention is described below. The precast beam concrete pouring control device described below can be referred to in correspondence with the precast beam concrete pouring control method described above.
[0114] Figure 7 A structural block diagram of a precast beam concrete pouring control device according to the present invention is shown.
[0115] like Figure 7 As shown, the precast beam concrete pouring control device 700 includes a mapping module 710, a position confirmation module 720, a material placement area determination module 730, and a vibration module 740.
[0116] The mapping module 710 is used to map the vibrator array into a vibrator dot matrix, determine a first coordinate system based on the vibrator dot matrix, and determine the identifier and corresponding position coordinates of each vibrator dot in the vibrator dot matrix based on the first coordinate system. The position confirmation module 720 is used to obtain the position information of the preset position of the concrete placing machine and map the position information into the first coordinate system to determine the current position coordinates of the concrete placing machine; The cloth area determination module 730 is used to determine the cloth area based on the current position coordinates, wherein the cloth area includes a forced cloth area and a transition cloth area set around the forced cloth area; The vibration module 740 is used to determine the working state of each vibrator according to the relative positional relationship between each vibrator point and the concrete placement area, and to control each vibrator to vibrate the concrete according to the corresponding working state.
[0117] Figure 8 An example is a schematic diagram of the physical structure of an electronic device, such as... Figure 8 As shown, the electronic device may include a processor 810, a communications interface 820, a memory 830, and a communication bus 840. The processor 810, communications interface 820, and memory 830 communicate with each other via the communication bus 840. The processor 810 can call logical instructions from the memory 830 to execute a precast beam concrete pouring control method.
[0118] Furthermore, the logical instructions in the aforementioned memory 830 can be implemented as software functional units and, when sold or used as independent products, can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art, or a part of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods described in the various embodiments of the present invention. The aforementioned storage medium includes various media capable of storing program code, such as USB flash drives, portable hard drives, read-only memory (ROM), random access memory (RAM), magnetic disks, or optical disks.
[0119] On the other hand, the present invention also provides a computer program product, which includes a computer program that can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer is able to execute the precast beam concrete pouring control method provided by the above methods.
[0120] The device embodiments described above are merely illustrative. The units described as separate components may or may not be physically separate. The components shown as units may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the modules can be selected to achieve the purpose of this embodiment according to actual needs. Those skilled in the art can understand and implement this without any creative effort.
[0121] Through the above description of the embodiments, those skilled in the art can clearly understand that each embodiment can be implemented by means of software plus necessary general-purpose hardware platforms, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solutions, in essence or the part that contributes to the prior art, can be embodied in the form of a software product. This computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, magnetic disk, optical disk, etc., and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute the methods described in the various embodiments or some parts of the embodiments.
[0122] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for controlling the concrete pouring of precast beams, characterized in that, include: The vibrator array is mapped to a vibrator dot matrix, and a first coordinate system is determined based on the vibrator dot matrix. Based on the first coordinate system, the identifier and corresponding position coordinates of each vibrator dot in the vibrator dot matrix are determined. The position information of the preset position of the fabric placing machine is obtained, and the position information is mapped onto the first coordinate system to determine the current position coordinates of the fabric placing machine; The fabric area is determined based on the current position coordinates, wherein the fabric area includes a forced fabric area and a transition fabric area surrounding the forced fabric area; The working state of each vibrator is determined based on the relative positional relationship between the location of each vibrator and the concrete placement area, and each vibrator is controlled to vibrate the concrete according to the corresponding working state. A second coordinate system is established with the current position coordinates of the placing boom as the origin, the direction of travel of the main trolley of the placing boom as the first direction, and the direction of travel of the auxiliary trolley of the placing boom as the second direction. Based on the position coordinates of each vibrator point in the first coordinate system and the current position coordinates of the concrete placing machine, determine the relative position coordinates of each vibrator point in the second coordinate system. Based on the relative position coordinates of each of the above, the relative positional relationship between each of the vibrator points and the fabric application area is determined; The step of determining the fabric area based on the current position coordinates also includes: The first hysteresis increment in the first direction is determined based on the motion state parameters of the concrete placing boom and the flow characteristic parameters of the concrete. Based on the first hysteresis increment, the boundary of the forced fabric domain in the first direction is expanded outward to obtain the outer boundary of the fabric domain. The area between the boundary of the forced fabric domain and the outer boundary is defined as the transition fabric domain; Determining the first hysteresis increment in the first direction includes: The lower limit for adjusting the first hysteresis increment is determined based on the running speed of the concrete placing machine in the first direction, the position detection error parameters, and the instruction refresh cycle of the vibrator's working status. The adjustment limit of the first hysteresis increment is determined based on the flow characteristic parameters of concrete. The first hysteresis increment is determined based on the lower limit and upper limit of the adjustment of the first hysteresis increment; Determining the working state of each vibrator based on its relative position to the fabric application area includes: If the relative position coordinates of the vibrator point are within the forced material distribution area, the corresponding vibrator is determined to be in the start state. If the relative position coordinates of the vibrator point are within the transition fabric area, the corresponding vibrator remains in the working state of the previous judgment cycle. If the relative position coordinates of the vibrator point are outside the fabric area, it is determined that the corresponding vibrator is in the off state.
2. The method for controlling the concrete pouring of precast beams according to claim 1, characterized in that, The current position coordinates are the center position coordinates of the material outlet of the material placing machine; The step of determining the fabric area based on the current position coordinates includes: Centered on the current position coordinates, the starting length of the forced fabric spreading area in the first direction is determined based on the projected length of the material spreading machine's outlet in the first direction, the effective vibration radius of the vibrator, and the spacing between each vibrator. The starting width of the forced fabric spreading area in the second direction is determined based on the projected width of the outlet of the fabric spreading machine in the second direction, the effective vibration radius of the vibrator, and the spacing between the vibrators. The forced fabric area is determined based on the start length and the start width.
3. A precast beam concrete pouring control device, characterized in that, Used to perform the precast beam concrete pouring control method as described in claim 1 or 2.
4. An electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the processor executes the program, it implements the precast beam concrete pouring control method as described in claim 1 or 2.
5. A computer program product, comprising a computer program, characterized in that, When the computer program is executed by the processor, it implements the precast beam concrete pouring control method as described in claim 1 or 2.
Citation Information
Patent Citations
Vibrating method in pouring process of prefabricated T-beam
CN116100653A
Concrete vibrating robot for raft foundation bottom plate of nuclear power station and control method
CN121931858A