A connection structure between a contact rail and a concrete sleeper and its construction method.
By pre-embedding steel channels and T-bolts in the concrete sleepers, the problems of small adjustment range and precision in the traditional contact rail installation method are solved, realizing an efficient and stable connection between the contact rail and the concrete sleepers, which is suitable for the construction needs of existing lines and new lines.
Patent Information
- Application Number
- CN202611365627.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-04
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2046-09-04
AI Technical Summary
The traditional connection method between the contact rail and the concrete sleeper has problems such as small vertical line adjustment range, high difficulty in installation accuracy correction and low construction efficiency in track structure upgrading and renovation. It is especially difficult to meet the requirements of accuracy control and rapid construction in the renovation of existing lines and the construction of new lines.
The system employs a connection structure of steel channels and T-bolts. The steel channels are pre-embedded in concrete sleepers, and the T-shaped ends of the T-bolts engage with the steel channels. Combined with a pre-tightening mechanism, this provides a wider adjustment range and greater stability. The modular design simplifies the construction process.
It improves the installation accuracy and stability of the contact rail and concrete sleepers, shortens the construction period, reduces maintenance frequency and cost, adapts to complex alignments and sections with small curve radii, and enhances construction efficiency and durability.
Smart Images

Figure CN122852370B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of rail transit technology, and in particular to a connection structure between a contact rail and a concrete sleeper and its construction method. Background Technology
[0002] The traction network is a core component of the rail transit traction power supply system, among which the contact rail power supply system is widely used in urban rail transit depots and main lines. The main methods for installing the contact rail on the outside of the track are as follows: 1. Sleeper-fixed installation: Holes are drilled or pre-drilled in the sleepers, and the contact rail is installed and fixed to the sleepers using insulating brackets and bolts; 2. Direct track bed installation: Holes are drilled in the concrete track bed, and the contact rail is installed and fixed to the track bed using insulating brackets and bolts; 3. Independent pier installation: Independent concrete support piers are set up beside the track, holes are drilled or pre-drilled in the concrete support piers, and the contact rail is installed and fixed to the support piers using insulating brackets and bolts.
[0003] In subway projects built before 2010, wooden sleepers were commonly used in the tracks. After years of operation, problems such as sleeper decay, track misalignment, and reduced load-bearing capacity have become apparent. Currently, the industry is undertaking large-scale upgrade projects to replace wooden sleepers with reinforced concrete sleepers in confined spaces within the tracks. Under the conditions of existing line renovation, the traditional connection and installation method between the contact rail and concrete sleepers presents significant problems in terms of both installation accuracy control and construction efficiency. First, the vertical adjustment range is small, making it unable to adapt to existing alignment deviations in the upgraded lines. Traditional contact rail installation on concrete sleepers involves two methods: pre-drilled fixing bolt holes on the sleepers and on-site drilling. Both are fixed-point structures with limited lateral adjustment margins for the vertical alignment. Existing upgraded lines are affected by years of operational settlement, deviations in the placement of wooden sleepers, and the complex alignment of turnouts and small-radius curves, resulting in cumulative deviations in the line centerline and the lateral reference of the sleepers. When wooden sleepers are upgraded to concrete sleepers, the traditional fixing hole positions cannot be adapted to the existing contact rail installation references. To meet the required precision, it is necessary to re-drill holes on-site, adjust the sleeper positions extensively, and repeatedly correct indicators such as horizontality, verticality, and clearance, significantly increasing the difficulty of precision control.
[0004] Secondly, construction efficiency is low. The construction space for track renovation is narrow, the work surface is limited, and track renovation can only be carried out during short nighttime maintenance windows. These maintenance windows are short, track closure costs are high, and the tolerance for errors in the work procedures is extremely low. Traditional installation processes are lengthy and inefficient: if concrete sleepers with prefabricated fixing holes are used, the prefabricated holes become unusable if the track reference is misaligned; if on-site drilling and anchoring is used, multiple procedures such as on-site layout and positioning, concrete drilling, pre-embedding of plastic sleeves, and cleaning and protection of the hole must be completed in sequence. The work on a single sleeper is time-consuming and requires a large amount of manpower. The total renovation period cannot be effectively controlled, and it is very easy for the planned amount of work to not be completed within the maintenance window, forcing the extension of multiple nighttime maintenance windows, which will further increase track operation interference and construction costs.
[0005] Similarly, the traditional method of installing contact rails and concrete sleepers also has inherent defects in the scenario of new rail transit lines: the concrete sleepers of new lines are prefabricated in batches, and production size errors and positioning deviations are inevitable during the on-site laying process. The traditional structure has a limited range of adjustment in the vertical direction of the line, and even a small hole deviation will cause the contact rail installation accuracy to exceed the limit, requiring rework and correction, which increases construction time and labor costs.
[0006] Therefore, given that traditional contact rail installation methods have problems such as small vertical track adjustment range, high difficulty in installation accuracy correction, low overall operation efficiency, and insufficient effective construction output during track maintenance windows in track structure upgrade and renovation projects, and also cannot meet the requirements of precision control and rapid construction of new lines, this invention proposes a connection structure between contact rail and concrete sleeper and its construction method, which is applicable to both renovation and new lines, improving construction accuracy and efficiency. Summary of the Invention
[0007] To address the challenges of limited vertical track adjustment during sleeper and contact rail installation and maintenance, particularly when upgrading wooden sleeper lines powered by contact rails to concrete sleeper lines, which presents difficulties in contact rail installation and precision adjustment, resulting in low construction efficiency, this invention provides a connection structure between the contact rail and concrete sleepers, along with its construction method.
[0008] The technical solution adopted by this invention to solve its technical problem is: a connection structure between a contact rail and a concrete sleeper and its construction method, including a steel channel, a T-bolt, and a pre-tightening mechanism. The steel channel is embedded in the concrete sleeper. The T-shaped end of the T-bolt is adapted to be installed in the steel channel. The steel channel is a toothed C-shaped steel channel with the opening facing upward. The teeth of the toothed C-shaped steel channel are located at the inner top of the steel channel. The T-bolt is a toothed T-bolt. The T-shaped end of the T-bolt is provided with teeth that can mesh with the teeth of the steel channel. The pre-tightening mechanism is set below the T-bolt to support the T-bolt.
[0009] Preferably, the bottom of the steel channel is also fixed with an I-beam anchor rod.
[0010] Preferably, a drainage hole is provided at the center of the bottom of the steel channel, and a sleeper through hole is provided on the concrete sleeper at the position corresponding to the drainage hole.
[0011] Preferably, the bottom of the steel channel is also provided with a water guide channel that connects to the drainage hole.
[0012] Preferably, the pre-tightening mechanism includes a spring plate, which is fixed to the lower bottom of the T-bolt, and the lower end of the spring plate slides against the inner bottom of the steel channel.
[0013] Preferably, locking blocks are fixed on both sides of the bottom of the T-bolt, and a wedge block is slidably installed vertically at the center of the locking block. A horizontal guide hole is opened at the lower end of the locking block, and locking pins are slidably installed at both ends of the horizontal guide hole. The lower end of the wedge block is inserted between the two locking pins and slidably connected to one end of the locking pin. The other end of the locking pin can abut against the side wall of the steel channel.
[0014] Preferably, disposable covers are detachably installed at both ends of the steel channel, and clamping plates are fixed on both sides of the disposable covers. The clamping plates abut against the inner wall of the steel channel, and a clamping strip is fixed between the two clamping plates.
[0015] A construction method for a connection structure between a contact rail and a concrete sleeper includes the connection structure described above, and further includes the following steps: S1, preparing a steel channel, and opening circular drainage holes at the bottom of the toothed C-shaped steel channel; S2, welding and reinforcing the steel channel with I-beams, welding I-beam anchor rods to the bottom of the steel channel, with the I-beam anchor rods located on both sides of the drainage holes; S3, pre-embedding and positioning the steel channel, fixing the processed toothed C-shaped steel channel in the sleeper mold before pouring the concrete sleeper, based on the stress requirements of the concrete sleeper and the installation position of the contact rail insulation support, ensuring that the orientation of the steel channel is consistent with the installation direction of the insulation support, and that the axis of the steel channel is parallel to the length direction of the sleeper; S4, penetrating... S5. Opening and protection of through holes: A circular drainage hole is opened at the center of the bottom of the steel channel. At the same time, a through hole with the same diameter as the drainage hole is reserved on the concrete sleeper corresponding to the drainage hole of the steel channel, ensuring that the axis of the drainage hole and the through hole of the sleeper coincide; S6. Pour concrete and cure it to form an integral structure of the channel and the concrete sleeper; S7. Adapting and installing toothed T-bolts to the steel channel: According to the installation hole size of the contact rail insulation bracket, select toothed T-bolts that are compatible with the steel channel, connect the T-bolts to the steel channel, and install and fix the contact rail insulation bracket after determining the position to complete the fixing of the contact rail insulation bracket.
[0016] Preferably, in step S1, the steel channel is a toothed C-shaped steel channel formed by one-time hot rolling, using Q345B or other low-carbon alloy steel or stainless steel with better comprehensive performance than Q345B, and the elongation after fracture of the steel channel material is not less than 14%; in step S2, the H-beam anchor rod is made of the same material as the steel channel, and is double-sided welded or hot-riveted, and is subjected to flaw detection after welding to ensure that there are no false welds or slag inclusions, and the surface of the anchor rod is derusted after welding; in step S3, the elevation of the top surface of the steel channel is checked with a level to ensure that the top surface of the steel channel is flush with the top surface of the concrete sleeper, with an unevenness error of no more than 1mm and a positioning deviation of no more than 1mm; in step S3, flame-retardant material is used to fill the interior of the steel channel to ensure that the entire cross-section is densely filled, and the filling material is polyethylene filler strip with an overall combustion rating of B2 or other environmentally friendly flame-retardant materials.
[0017] Preferably, in step S6, the filling material in the channel must be removed first, and then the toothed T-bolts are installed. In step S6, the T-shaped end of the toothed T-bolt is inserted into the channel opening, and the bolt is slid back and forth in the vertical direction of the track until it reaches the preset position, so that the teeth of the T-bolt are fully engaged with the teeth on the inside of the steel channel. After pulling the T-bolt by hand to confirm that the T-bolt is not loose, flat washers and spring washers are sequentially placed on the T-bolt. Then, the mounting hole of the contact rail insulation bracket is aligned with the T-bolt and inserted. The horizontal position and verticality of the insulation bracket are adjusted so that the verticality deviation is ≤1°, ensuring that the contact rail insulation bracket is parallel to the axis of the concrete sleeper. The nut is tightened with a torque wrench. After tightening, the fit between the contact rail insulation bracket and the surface of the concrete sleeper is checked with a feeler gauge. The fit gap is ≤0.5mm. At the same time, the engagement state between the head of the toothed T-bolt and the steel channel is checked to ensure that there is no tooth slippage.
[0018] The beneficial effects of this invention are as follows: Firstly, by pre-embedding toothed C-shaped steel channels in concrete sleepers, a highly adaptable installation reference surface is constructed. Its core advantage lies in breaking through the limitations of traditional fixed installation. Compared with conventional installation methods, this design can provide a larger adjustment range in the vertical direction of the track, systematically solving the industry pain points of small adjustment range in traditional connection methods, especially insufficient adjustment margin and difficulty in ensuring accuracy of contact rail in existing line renovation projects. It effectively solves the common technical problems when replacing wooden sleepers with concrete sleepers, and can effectively compensate for the deviation of the centerline of existing lines. It is especially suitable for sections with small curve radii, turnout areas, and complex alignments. It also breaks through the adjustment limitations of traditional supports, providing a larger range of adjustment space. Secondly, it improves the stability of the connection between the contact rail and the concrete sleeper. Traditionally, the contact rail is installed on the concrete sleeper by drilling holes or pre-drilling bolt holes on-site. This method relies on the compression and friction between the bolts and the hole walls for fixation, which can easily lead to bolt loosening over time. This invention first uses toothed C-shaped steel channels to form a tight interlock with the concrete through I-beams, establishing a stable foundation connection. Secondly, it employs a combination of toothed C-shaped steel channels and toothed T-bolts, where precise tooth engagement, combined with a pre-tightening mechanism, ensures the installation accuracy and connection stability of the contact rail insulation support. This double reinforcement enhances the overall rigidity of the contact rail support-concrete sleeper connection, creating a connection system that effectively resists train vibration, significantly reducing vibration impact and minimizing loosening issues during long-term use. Thirdly, it ensures efficient and convenient construction. The modular design and standardized construction procedures simplify on-site operations, enabling rapid positioning and adjustment of the contact rail support, making operation simple and flexible. In existing line renovation projects, it can significantly improve construction efficiency during track maintenance windows, greatly shorten the sleeper renovation period, and provide an efficient solution for track upgrade and renovation projects. Fourthly, regarding durability design, this invention incorporates circular drainage holes at the bottom of the pre-embedded toothed C-shaped steel channel, forming a bidirectional drainage channel with the pre-reserved through holes in the sleepers. This effectively removes accumulated water and debris, preventing rainwater from accumulating in the channel for extended periods, thus avoiding corrosion and reducing the lifespan of the channel and bolts. This design avoids corrosion problems caused by prolonged immersion in water for the contact rail supports and connectors, extending their service life while significantly reducing maintenance frequency and costs, resulting in outstanding long-term economic benefits. Attached Figure Description
[0019] To more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are merely exemplary, and those skilled in the art can derive other embodiments based on the provided drawings without creative effort.
[0020] Figure 1 This is a schematic diagram of the optimal embodiment of the connection structure between the contact rail and the concrete sleeper of the present invention; Figure 2 This is a schematic diagram of the concrete sleeper structure of the connection structure between the contact rail and the concrete sleeper according to the present invention. Figure 3 This is a schematic diagram of the structure of an I-beam anchor rod for connecting a contact rail and a concrete sleeper according to the present invention. Figure 4 This is a schematic diagram of a one-time covering structure for the connection structure between the contact rail and the concrete sleeper according to the present invention. Figure 5This is a schematic diagram of the spring sheet in the connection structure between the contact rail and the concrete sleeper according to the present invention. Figure 6 This is a cross-sectional view of a contact rail insulation bracket, which is a connection structure between a contact rail and a concrete sleeper according to the present invention.
[0021] Reference numerals: 1. Steel channel; 2. T-bolt; 3. Concrete sleeper; 4. Tooth; 5. I-beam anchor; 6. Drainage hole; 7. Water guide channel; 8. Spring plate; 9. Locking block; 10. Wedge block; 11. Locking post; 12. One-time cover; 13. Clamping plate; 14. Abutment strip; 15. Contact rail insulation bracket. Detailed Implementation
[0022] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0023] The concepts involved in this application will first be described with reference to the accompanying drawings. It should be noted that the following descriptions of various concepts are only for the purpose of making the content of this application easier to understand and do not constitute a limitation on the scope of protection of this application; furthermore, the embodiments and features in the embodiments of this application can be combined with each other unless otherwise specified. This application will now be described in detail with reference to the accompanying drawings and embodiments.
[0024] like Figures 1 to 6 As shown, this invention provides an embodiment of a connection structure and construction method for a contact rail and a concrete sleeper, including a steel channel 1, T-bolts 2, and a pre-tightening mechanism. The steel channel 1 is embedded in the concrete sleeper 3. The T-shaped end of the T-bolt 2 is adapted to be installed in the steel channel 1. The steel channel 1 is a toothed C-shaped steel channel with the opening facing upward. The teeth 4 of the toothed C-shaped steel channel are located at the inner top of the steel channel 1. The T-bolt 2 is a toothed T-bolt. The T-shaped end of the T-bolt 2 is provided with teeth that can mesh with the teeth 4 of the steel channel 1 to enhance the mechanical interlocking force, prevent the connecting parts from loosening during use, and ensure the stability of the connection.
[0025] The bottom of the steel channel 1 is also fixed with an I-beam anchor rod 5. The rigid support of the I-beam enhances the connection strength between the steel channel 1 and the concrete sleeper 3, offsets the vibration and impact force generated by the train operation, and prevents the steel channel 1 from shifting or falling off during use.
[0026] A drainage hole 6 is provided at the center of the bottom of the steel channel 1. A sleeper through hole is provided on the concrete sleeper 3 at the position corresponding to the drainage hole 6. A water guide trough 7 is also provided at the bottom of the inner side of the steel channel 1 to connect the drainage hole 6, which can ensure that the water and debris in the channel can be discharged smoothly and avoid corrosion or blockage inside the channel.
[0027] The pre-tightening mechanism is located below the T-bolt 2 to support it. The pre-tightening mechanism includes a spring plate 8, which is welded and fixed to the bottom of the T-bolt 2. The lower end of the spring plate 8 slides against the inner bottom of the steel channel 1. When adjusting the position of the T-bolt 2, the T-bolt 2 is first pressed down to separate the teeth at the bottom of the T-bolt 2 from the teeth 4 of the steel channel 1. After moving the T-bolt 2 to the predetermined position, the T-bolt 2 is released. The spring plate 8 can then initially lift the T-bolt 2, so that the teeth engage with the teeth 4, ensuring that the T-bolt 2 does not shift during installation and making it easier to adjust the position of the T-bolt 2.
[0028] Locking blocks 9 are fixed on both sides of the bottom of the T-bolt 2. The locking blocks 9 are inserted and fixed to the T-bolt 2 with an interference fit to prevent the locking blocks 9 from falling off, so as to ensure the connection stability between the locking blocks 9 and the T-bolt 2. A wedge block 10 is vertically slidably installed in the center of the locking block 9. A horizontal guide hole is opened at the lower end of the locking block 9. Locking pins 11 are slidably installed at both ends of the horizontal guide hole. The lower end of the wedge block 10 is inserted between the two locking pins 11 and slidably connected to one end of the locking pin 11. The other end of the locking pin 11 can abut against the side wall of the steel channel 1.
[0029] When the nut locks the contact rail insulation bracket 15 onto the concrete sleeper 3, the bottom of the contact rail insulation bracket 15 presses down on the wedge block 10 until the bottom surface of the contact rail insulation bracket 15 is in contact with the top surface of the steel channel 1. The wedge block 10 moves down and pushes the locking pin 11 to move along the horizontal guide hole until it is pressed against the side wall of the steel channel 1 to reduce the shaking of the T-bolt 2. The size of the wedge block 10 can ensure that it pushes the locking pin 11 against the steel channel 1, and can also prevent the top of the wedge block 10 from blocking the contact rail insulation bracket 15. In addition, after the locking pin 11 is pressed against the side wall of the steel channel 1, the wedge block 10 continues to move down and can also press the locking pin 11, so that the front end of the locking pin 11 is slightly deformed, so as to ensure that the top of the wedge block 10 can move down smoothly to be flush with the top surface of the steel channel 1, so as to avoid the wedge block 10 from hindering the assembly of the contact rail insulation bracket 15, and to allow the T-bolt 2 to adapt to steel channels 1 of different sizes.
[0030] A construction method for a connection structure between a contact rail and a concrete sleeper, comprising the connection structure between the contact rail and the concrete sleeper as described above, and further comprising the following steps: S1. Prepare steel channel 1. Open circular drainage holes 6 at the bottom of the toothed C-shaped steel channel. The steel channel 1 is a toothed C-shaped steel channel formed by one-time hot rolling. The one-time hot rolling process can ensure the overall mechanical properties of the steel channel 1, reduce stress concentration and performance defects caused by welding and other processes, and ensure that the steel channel 1 has high strength and stability. Q345B or other low carbon alloy steel or stainless steel with better comprehensive performance than Q345B is selected. The elongation after fracture of the steel channel 1 material is not less than 14%. S2. Welding reinforcement of the I-beam and the steel channel 1: Weld I-beam anchor rods 5 to the bottom of the steel channel 1. The I-beam anchor rods 5 are located on both sides of the drainage hole 6. The material of the I-beam anchor rods 5 is the same as that of the steel channel 1, so as to ensure the material compatibility of the I-beam anchor rods 5 and the toothed C-shaped steel channel, avoid electrochemical corrosion due to different materials, and ensure that the two have similar mechanical properties and can work together under stress. Double-sided welding or hot riveting is adopted. After welding, flaw detection is performed to ensure that there is no false welding and slag inclusion. After welding, the surface of the anchor rod is derusted. S3. Pre-embedded positioning of steel channel 1: In view of the stress requirements of concrete sleeper 3 and the installation position of contact rail insulation bracket 15, before the concrete sleeper 3 is poured, the processed toothed C-shaped steel channel is fixed in the sleeper mold, and it is ensured that the orientation of steel channel 1 is consistent with the installation direction of insulation bracket, and the axis of steel channel 1 is parallel to the length direction of sleeper, so as to keep steel channel 1 in the correct position during concrete pouring, avoid displacement of steel channel 1 due to impact force and other factors during pouring, and ensure the accuracy of subsequent installation of contact rail insulation bracket 15. In step S3, a level is used to check the elevation of the top surface of the steel channel 1 to ensure that the top surface of the steel channel 1 is flush with the top surface of the concrete sleeper 3, with an unevenness error of no more than 1mm and a positioning deviation of no more than 1mm, so as to avoid affecting the installation of the contact rail insulation bracket 15 due to deviation. Flame-retardant materials are used to fill the interior of the steel channel 1 to ensure that the entire cross-section is densely filled. The filling material is polyethylene filler strips or other environmentally friendly flame-retardant materials with an overall combustion rating of B2. The purpose is to prevent concrete from entering the interior of the steel channel 1 and to avoid concrete from corroding the steel inside the steel channel 1 and its surface layer. Disposable covers 12 are detachably installed at both ends of the steel channel 1. Clamping plates 13 are fixed on both sides of the disposable covers 12. The clamping plates 13 abut against the inner wall of the steel channel 1. A retaining strip 14 is fixed between the two clamping plates 13. The retaining strip 14 applies a supporting force to the clamping plates 13, so that the disposable covers 12 are clamped at both ends of the steel channel 1. The disposable covers 12 prevent concrete from entering the steel channel 1 from both ends. After the concrete is poured, the disposable covers 12 can be removed or left in place to ensure that the concrete end faces at both ends of the steel channel 1 are flat. The disposable covers 12 can be made of plastic or metal. When metal disposable covers 12 are used, they can be directly welded to the steel channel 1 to improve the sealing effect of the disposable covers.
[0031] S4. Opening and protection of through holes: At the bottom center of the steel channel 1, a circular drainage hole 6 is opened. At the same time, on the concrete sleeper 3, corresponding to the position of the drainage hole 6 in the steel channel 1, a through hole of the same diameter as the drainage hole 6 is reserved on the concrete sleeper 3 at the position corresponding to the drainage hole 6 in the steel channel 1, to ensure that the axis of the drainage hole 6 and the through hole of the sleeper coincide. S5. Pour concrete and cure it to form an integrated structure with the trough and concrete sleeper 3, tightly combining the toothed C-shaped steel trough with the concrete sleeper 3, and improving the load-bearing capacity and stability of the entire structure. S6. Adapting and installing the toothed T-bolts to the steel channel 1: Based on the mounting hole size of the contact rail insulation bracket 15, select the toothed T-bolts that are compatible with the steel channel 1, connect the T-bolts 2 to the steel channel 1, and install and fix the contact rail insulation bracket 15 after determining the position to complete the fixing of the contact rail insulation bracket 15. In step S6, the filling material inside the steel channel 1 must be removed first, and then the toothed T-bolts are installed. The T-shaped end of the toothed T-bolt is inserted into the opening of the steel channel 1, and then the T-bolt 2 is rotated so that the T-shaped end of the T-bolt can engage with the teeth 4 inside the steel channel 1. Then, the two locking blocks 9 are inserted into the opening of the steel channel 1 and fixed to both ends of the T-bolt 2. The bolt is slid back and forth in the vertical direction until the preset position is reached, so that the teeth of the T-bolt 2 are fully engaged with the teeth 4 inside the steel channel 1. The T-bolt 2 is pulled by hand to confirm that it is not loose. Then, the T-bolt is... Flat washers and spring washers are sequentially fitted onto the T-bolt 2. Then, the mounting holes of the contact rail insulation bracket 15 are aligned with the T-bolt 2 and fitted in. The horizontal position and verticality of the contact rail insulation bracket 15 are adjusted so that the verticality deviation is ≤1°, ensuring that the contact rail insulation bracket 15 is parallel to the axis of the concrete sleeper 3. The nut is tightened with a torque wrench. After tightening, the fit between the contact rail insulation bracket 15 and the surface of the concrete sleeper 3 is checked with a feeler gauge. The fit gap is ≤0.5mm. At the same time, the engagement state of the toothed T-bolt head and the steel channel 1 is checked to ensure that there is no tooth slippage.
[0032] This document uses specific examples to illustrate the principles and implementation methods of this application. The descriptions of the above embodiments are only for the purpose of helping to understand the methods and core ideas of this application. The above are only preferred embodiments of this application. It should be noted that due to the limitations of textual expression, while there are objectively infinite specific structures, those skilled in the art can make several improvements, modifications, or changes without departing from the principles of this application, and can also combine the above technical features in an appropriate manner. These improvements, modifications, changes, or combinations, or the direct application of the inventive concept and technical solution to other situations without modification, should all be considered within the scope of protection of this application.
Claims
1. A contact rail and concrete sleeper joint structure, characterized by: The system includes a steel channel (1), a T-bolt (2), and a pre-tightening mechanism. The steel channel (1) is embedded in a concrete sleeper (3). The T-shaped end of the T-bolt (2) is fitted into the steel channel (1). The steel channel (1) is a toothed C-shaped steel channel with the opening facing upward. The teeth (4) of the toothed C-shaped steel channel are located at the inner top of the steel channel (1). The T-bolt (2) is a toothed T-bolt. The T-shaped end of the T-bolt (2) is provided with teeth that can mesh with the teeth (4) of the steel channel (1). The pre-tightening mechanism is set below the T-bolt (2) to support the T-bolt (2). The pre-tightening mechanism includes a spring plate (8), which is fixed to the lower bottom of the T-bolt (2), and the lower end of the spring plate (8) slides against the inner bottom of the steel channel (1). Locking blocks (9) are fixed on both sides of the bottom of the T-bolt (2). A wedge block (10) is vertically slidably installed in the center of the locking block (9). A horizontal guide hole is opened at the lower end of the locking block (9). Locking pins (11) are slidably installed at both ends of the horizontal guide hole. The lower end of the wedge block (10) is inserted between the two locking pins (11) and slidably connected to one end of the locking pin (11). The other end of the locking pin (11) can abut against the side wall of the steel channel (1).
2. A contact rail and concrete sleeper joint as claimed in claim 1, c h a r a c t e r i s e d in that: The bottom of the steel channel (1) is also fixed with an I-beam anchor rod (5).
3. The connection structure between the contact rail and the concrete sleeper as described in claim 1, characterized in that: The bottom center of the steel channel (1) is provided with a drainage hole (6), and the concrete sleeper (3) is provided with a sleeper through hole at the position corresponding to the drainage hole (6).
4. The connection structure between the contact rail and the concrete sleeper as described in claim 3, characterized in that: The bottom of the steel channel (1) is also provided with a water guide channel (7) that connects to the drainage hole (6).
5. The connection structure between the contact rail and the concrete sleeper as described in claim 1, characterized in that: The steel channel (1) is detachably fitted with disposable covers (12) at both ends. The disposable covers (12) are also fixed with clamping plates (13) on both sides. The clamping plates (13) abut against the inner wall of the steel channel (1). A clamping strip (14) is also fixed between the two clamping plates (13).
6. A construction method for a connection structure between a contact rail and a concrete sleeper, characterized in that, The connection structure between the contact rail and the concrete sleeper as described in any one of claims 1 to 5 further includes the following steps: S1. Prepare steel channel (1), and open a circular drainage hole (6) at the bottom of the toothed C-shaped steel channel. S2. Welding reinforcement of I-beams and steel channel (1): Weld I-beam anchor rods (5) at the bottom of steel channel (1). The I-beam anchor rods (5) are located on both sides of the drainage hole (6). S3. Pre-embedded positioning of steel channel (1): In view of the stress requirements of concrete sleeper (3) and the installation position of contact rail insulation bracket (15), before the concrete sleeper (3) is poured, the processed toothed C-shaped steel channel is fixed in the sleeper mold, and it is ensured that the orientation of steel channel (1) is consistent with the installation direction of contact rail insulation bracket (15), and the axis of steel channel (1) is parallel to the length direction of sleeper. S4. Opening and protection of the through hole; At the bottom center of the steel channel (1), a circular drainage hole (6) is opened. At the same time, on the concrete sleeper (3), corresponding to the position of the drainage hole (6) of the steel channel (1), a sleeper through hole with the same diameter as the drainage hole (6) is reserved at the position of the concrete sleeper (3) corresponding to the drainage hole (6) of the steel channel (1), so as to ensure that the axis of the drainage hole (6) coincides with the axis of the sleeper through hole. S5. Pour concrete and cure it to form an integral structure between the channel and the concrete sleeper (3); S6. The toothed T-bolt is adapted to the steel channel (1). According to the mounting hole size of the contact rail insulation bracket (15), the toothed T-bolt is selected to match the steel channel (1). The T-bolt (2) is matched and connected with the steel channel (1). After determining the position, the contact rail insulation bracket (15) is installed and fixed to complete the fixing of the contact rail insulation bracket (15).
7. The construction method for the connection structure between the contact rail and the concrete sleeper as described in claim 6, characterized in that: In step S1, the steel channel (1) is a toothed C-shaped steel channel formed by one-time hot rolling, and Q345B or other low carbon alloy steel or stainless steel with better comprehensive performance than Q345B is selected. The elongation after fracture of the steel channel (1) material is not less than 14%. In step S2, the material of the I-beam anchor rod (5) is the same as that of the steel channel (1), and double-sided welding or hot riveting is adopted. After welding, flaw detection is carried out to ensure that there is no false welding and slag inclusion. After welding, the surface of the anchor rod is derusted. In step S3, a level is used to check the elevation of the top surface of the steel channel (1) to ensure that the top surface of the steel channel (1) is flush with the top surface of the concrete sleeper (3), with an unevenness error not exceeding 1mm and a positioning deviation not exceeding 1mm. In step S3, flame-retardant material is used to fill the inside of the steel channel (1) to ensure that the entire cross-section is densely filled. The filling material is polyethylene filler strip with an overall combustion rating of B2 or other environmentally friendly flame-retardant materials.
8. The construction method for the connection structure between the contact rail and the concrete sleeper as described in claim 7, characterized in that: In step S6, the filling material in the channel must be removed before installing the toothed T-bolts; In step S6, the T-shaped end of the toothed T-bolt is inserted into the groove opening. The bolt is slid back and forth in the direction perpendicular to the track until the preset position is reached so that the teeth of the T-bolt (2) are fully engaged with the teeth (4) on the inner side of the steel groove (1). The T-bolt (2) is pulled by hand to confirm that it is not loose. Flat washers and spring washers are then placed on the T-bolt (2) in sequence. The mounting hole of the contact rail insulation bracket (15) is aligned with the T-bolt (2) and then placed on it. The horizontal position and verticality of the insulation bracket are adjusted so that the verticality deviation is ≤1°, ensuring that the contact rail insulation bracket (15) is parallel to the axis of the concrete sleeper (3). The nut is tightened with a torque wrench. After tightening, the contact rail insulation bracket (15) is checked with a feeler gauge to check the fit between the surface of the contact rail insulation bracket (15) and the concrete sleeper (3). The fit gap is ≤0.5mm. At the same time, the engagement state of the head of the toothed T-bolt and the steel groove (1) is checked to ensure that there is no tooth slippage.