A rotary lifting cantilever for scaffolding

By designing a rotary lifting cantilever, using a combination of curved pipe support rods and lifting cantilever, and combining it with a limit device to achieve mechanical self-locking, the problems of limited operating range, significant safety hazards, and short service life of existing lifting cantilevers are solved, improving construction efficiency and safety, and adapting to changing construction sites.

CN123105481APending Publication Date: 2026-11-17CHUZHOU JINCHENG METAL PROD CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611418800.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-14
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing scaffolding lifting cantilever structures cannot be flexibly rotated and adjusted, limiting the working range, requiring frequent disassembly and relocation, posing significant safety hazards, and having a short service life, poor versatility, and unable to adapt to the needs of construction sites with different specifications and heights.

Method used

A rotary lifting cantilever was designed, which combines a bent pipe support rod with the lifting cantilever. Mechanical self-locking is achieved through a limiting device. The bent pipe support rod and the lifting cantilever rotate around the vertical axis. Combined with the spring-driven limiting bent rod and positioning plate, multi-position angle locking is achieved. The whole device has a compact structure, is easy to assemble and disassemble, and is suitable for different scaffolding specifications and heights.

Benefits of technology

It enables the hook's working position to be changed without disassembly or relocation, improving the efficiency of high-altitude material transfer, reducing safety risks, extending equipment lifespan, reducing maintenance costs, and adapting to the needs of complex construction sites.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123105481A_ABST
    Figure CN123105481A_ABST
Patent Text Reader

Abstract

This invention relates to the field of scaffolding accessories technology, and discloses a rotary lifting cantilever for scaffolding, including scaffolding and a vertically arranged connecting plate. A U-shaped bracket I is fixedly installed at the bottom end of the connecting plate, and a U-shaped bracket II is fixedly installed at the top end of the connecting plate. It also includes a bent pipe support rod, one end of which is movably mounted on the U-shaped bracket I via bolts, and the other end of which is fixedly mounted on the lifting cantilever. One end of the lifting cantilever is movably connected to the U-shaped bracket II via bolts. With the rotatable bent pipe support rod working in conjunction with the lifting cantilever, the entire device uses a vertically coincident axis as its rotation center. The bent pipe support rod and the lifting cantilever can rotate horizontally around the axis, breaking the limitations of the fixed lifting range of traditional fixed cantilever systems. During high-altitude material lifting operations on scaffolding, there is no need to disassemble or relocate the entire equipment; only the locking state of the limiting device needs to be released.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of building scaffolding accessories technology, specifically a rotary lifting cantilever for scaffolding. Background Technology

[0002] On construction sites, scaffolding is the core basic carrier for high-altitude operations, material storage, and construction operations, and is widely used in various engineering scenarios such as building construction, exterior wall decoration, and electromechanical installation. During construction, various lightweight materials such as bricks, pipes, insulation materials, and small construction tools need to be frequently transferred to the high-altitude working surface of the scaffolding. The efficiency and safety of material transfer directly affect the overall construction progress and the level of on-site construction safety management. Currently, high-altitude material transfer on scaffolding mainly relies on manual handling, fixed crane booms, or integral cantilever cranes to complete the operation.

[0003] Traditional manual material handling is labor-intensive and inefficient. Workers carrying materials back and forth on scaffolding are prone to trampling and falling accidents, posing significant safety hazards and failing to meet the demands of modern, efficient construction. Existing scaffolding lifting jib structures are mostly fixed welded structures or simple telescopic structures. After installation, the jib angle and working range are fixed, and flexible rotation adjustment is not possible. The working coverage area is limited, and materials can only be hoisted to a local area of ​​the scaffolding. Frequent disassembly, relocation, and re-fixing of equipment are required. After each relocation, stability must be re-checked and safety acceptance must be completed. The operation process is cumbersome, seriously delaying the construction period and increasing construction manpower and time costs.

[0004] In addition, conventional scaffolding lifting cantilever jibs on the market have a single load-bearing structure, poor stress uniformity, and are prone to problems such as cantilever bending and loosening of connectors after long-term hoisting operations. This results in short equipment lifespan and high maintenance costs. Furthermore, most cantilever jibs have poor adaptability, unable to accommodate scaffolding of different specifications and erection heights, lacking versatility and failing to meet the complex and ever-changing operational needs of construction sites. Therefore, there is an urgent need for a compact, easy-to-assemble, flexible, highly stable, and versatile rotary lifting cantilever jib for scaffolding. Summary of the Invention

[0005] This invention provides a rotary lifting cantilever for scaffolding, which has the advantages of compact structure, convenient assembly and disassembly, flexible rotation, high stability and strong versatility, and solves the problems in the background art mentioned above.

[0006] This invention provides the following technical solution: a rotary lifting cantilever for scaffolding, comprising scaffolding and a vertically arranged connecting plate. A U-shaped bracket I is fixedly installed at the bottom end of the connecting plate, and a U-shaped bracket II is fixedly installed at the top end of the connecting plate. It further comprises: a bent pipe support rod, one end of which is movably mounted on the U-shaped bracket I via bolts, and the other end of which is fixedly mounted with a lifting cantilever. One end of the lifting cantilever is movably connected to the U-shaped bracket II via bolts. A half-pipe clamp is fixedly installed on one side of the U-shaped bracket II and the U-shaped bracket I, and the half-pipe clamp can be locked onto the scaffolding. A positioning plate is fixedly installed at one end of the bent pipe support rod, and the positioning plate is also sleeved with bolts on the U-shaped bracket I. A hook is provided at the other end of the lifting cantilever for suspending items. A limiting device is installed on the U-shaped bracket I to limit the positioning plate, thereby limiting the rotation angle of the bent pipe support rod.

[0007] Preferably, the limiting device includes a fixing plate, which is L-shaped. One end of the fixing plate is fixedly connected to one side of the connecting plate, and the other end is fixedly connected to the upper surface of the U-shaped bracket I, for structural reinforcement of the connecting plate and the U-shaped bracket I. A fixing sleeve is fixedly installed on the fixing plate, and a limiting bent rod is movably installed on the fixing sleeve. A connecting hole is opened on the U-shaped bracket I, and limiting holes are evenly opened on the positioning plate. One end of the limiting bent rod passes through the connecting hole and is inserted into the limiting hole of the positioning plate, for limiting the positioning plate and preventing the U-shaped bracket II from rotating.

[0008] Preferably, the connecting plate has a limiting hole, and the other end of the limiting bent rod is movably engaged with the limiting hole. A locking pin spring is movably arranged on the limiting bent rod and located inside the fixed plate, and a pin is also provided on the limiting bent rod to limit the locking pin spring so that the locking pin spring always presses against the limiting bent rod. When the connecting hole corresponds to the limiting hole of the positioning plate, the limiting bent rod automatically inserts into the limiting hole to achieve mechanical self-locking of the rotation angle.

[0009] Preferably, a reinforcing sleeve is fixedly installed on the lifting cantilever to increase the structural strength of the lifting cantilever.

[0010] Preferably, the bolt holes at one end of the lifting cantilever, the bolt holes at one end of the bent pipe support rod, and the center hole of the positioning plate are aligned vertically and have their central axes coincide.

[0011] Preferably, the limiting hole is Z-shaped and is used to limit the limiting bent rod to prevent the limiting bent rod from disengaging from the limiting hole due to misoperation.

[0012] Preferably, the hook is equipped with an elastic buckle and a pulley is fastened to the hook for winding the wire rope, guiding it, reducing friction, and completing the material lifting.

[0013] Preferably, the bent pipe support rod is L-shaped with a bending angle of 121.2 degrees, used to support the lifting cantilever and enhance the load-bearing capacity of the hook.

[0014] The present invention has the following beneficial effects:

[0015] 1. This invention features a rotatable curved pipe support rod in conjunction with a lifting cantilever. The entire device uses a vertically aligned axis as its rotation center. The curved pipe support rod and the lifting cantilever can rotate horizontally around this axis, breaking the limitations of traditional fixed cantilever lifting ranges. During high-altitude material lifting operations on scaffolding, there is no need to disassemble or relocate the entire equipment. Simply releasing the locking state of the limiting device allows the lifting cantilever to be rotated directly, changing the horizontal working position of the hook and covering a larger working area outside the scaffolding. This reduces the procedures for disassembly, reassembly, and acceptance, significantly reducing the workload of on-site workers, shortening the auxiliary time for material transfer, and improving the efficiency of high-altitude material transfer at construction sites. After rotation adjustment, the limiting device achieves mechanical self-locking, locking the curved pipe support rod and positioning plate to prevent the cantilever from rotating autonomously due to material disturbance during lifting operations. This eliminates the safety risks of material swaying, object impact with scaffolding components, and object falling caused by accidental cantilever rotation, balancing operational flexibility and safety.

[0016] 2. This invention adopts a dual-component collaborative load-bearing structure of a bent pipe support rod and a lifting cantilever. The bending angle of the bent pipe support rod is set to 121.2°, forming a triangular force support system. The lifting load is transferred from the lifting cantilever to the bent pipe support rod, and then distributed to the upper and lower U-shaped supports and the half-pipe clamps. This changes the drawback of the traditional single cantilever beam bearing a single point of force, distributing the concentrated load to multiple connection points, reducing the bending moment borne by a single component, effectively suppressing the deformation of the lifting cantilever under load, increasing the rated load limit of the entire equipment, reducing component bending, weld cracking, bolt loosening and other failures under long-term heavy load conditions, extending the overall service life of the equipment, and reducing the maintenance cost of on-site equipment inspection and replacement.

[0017] 3. The limiting device of this invention uses a spring-driven limiting rod in conjunction with multiple sets of limiting holes on the positioning plate to achieve multi-position angle locking. The positioning plate rotates synchronously with the curved support rod. When it rotates to the preset angle position, the locking pin spring automatically pushes the limiting rod into the limiting hole of the positioning plate to complete mechanical self-locking. No additional pins or ropes are required for auxiliary fixation. The connecting plate is provided with Z-shaped limiting holes, which can lock and position the tail of the limiting rod. There are two positions: unlocking and locking. Workers can maintain the "unlocked" and "locked" working states by moving the tail of the limiting rod to different positions of the Z-shaped limiting holes. The operator can complete the entire unlocking-rotation-self-locking operation with one hand on the scaffolding platform. The operation is simple and convenient, does not require multiple people to cooperate, reduces the difficulty of high-altitude operation, and avoids the risk of personnel falling due to complex high-altitude operations. The entire limit mechanism adopts a purely mechanical structure and does not rely on electrical or hydraulic components. Harsh working conditions such as dust, rain, and vibration at the construction site will not affect the reliability of the mechanism. The equipment has a low failure rate and is more suitable for open-air high-altitude operation environments on construction sites.

[0018] 4. The end of the lifting jib is equipped with a hook with an elastic buckle and a detachable pulley. The pulley can be directly fastened to the hook position and can be quickly disassembled and assembled on site according to actual operation needs. The hook can be used to directly lift material containers, or wire rope can be threaded through it to complete the lifting and hoisting operation with the winch. The hook has an elastic buckle to prevent the lifting rope and sling from accidentally slipping out of the hook groove, further improving the safety redundancy of the hoisting operation. Attached Figure Description

[0019] Figure 1 This is a schematic diagram of the overall structure of the present invention;

[0020] Figure 2 This is a partially enlarged schematic diagram of the structure of the present invention;

[0021] Figure 3 This is a schematic diagram of the pulley installation in the present invention.

[0022] Figure 4 This is a front view schematic diagram of the structure of the present invention;

[0023] Figure 5 This is a schematic diagram of the installation of the half-pipe clamp of the present invention;

[0024] Figure 6 This is a side view of the limiting hole of the present invention;

[0025] Figure 7 This is a schematic diagram of the installation of the bent pipe support rod, lifting cantilever and positioning plate of the present invention;

[0026] Figure 8 This is a schematic diagram of the semi-tube clamp structure of the present invention;

[0027] Figure 9 This is a schematic diagram of the positioning disk of the present invention;

[0028] Figure 10 This is a schematic diagram of the U-shaped support structure of the present invention.

[0029] In the diagram: 1. Connecting plate; 2. U-shaped bracket I; 3. U-shaped bracket II; 4. Bent pipe support rod; 5. Lifting cantilever; 6. Half-pipe clamp; 7. Positioning plate; 8. Limiting device; 81. Fixing plate; 82. Fixing sleeve; 83. Limiting bent rod; 84. Locking pin spring; 9. Limiting hole; 10. Hook; 11. Pulley; 12. Reinforcing sleeve; 13. Connecting hole; 14. Scaffolding. Detailed Implementation

[0030] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0031] Please see Figure 1-10A rotary lifting cantilever for scaffolding includes a scaffold 14 and a vertically arranged connecting plate 1. The connecting plate 1 is made of high-strength steel plate of sufficient thickness, cut and processed into a long, vertical strip. A U-shaped bracket I2 is fixedly installed at the bottom end of the connecting plate 1, and a U-shaped bracket II3 is fixedly installed at the top end of the connecting plate 1. Assembly through holes are opened on the plate for hinged assembly. The welding positions between the U-shaped bracket I2, U-shaped bracket II3 and the connecting plate 1 are fully welded. After welding, the weld seams are ground and inspected to eliminate welding defects. To ensure the structural strength of the connection points, the system also includes: a bent pipe support rod 4, one end of which is movably mounted on a U-shaped bracket I2 via bolts, and the other end is fixedly mounted with a lifting cantilever 5. One end of the lifting cantilever 5 is movably connected to a U-shaped bracket II3 via bolts. A half-pipe clamp 6 is fixedly mounted on one side of both the U-shaped bracket II3 and the U-shaped bracket I2, and the half-pipe clamp 6 can be locked onto the scaffold 14. The half-pipe clamp 6 is a split-type pipe clamp structure, and the curvature of the inner arc surface of the clamp matches the outer diameter of the standard steel pipe upright of the scaffold 14. The clamp 6 can be locked onto the outside of the uprights of the scaffold 14, and is fixed by tightening with high-strength bolts. The entire device is positioned between itself and the scaffold uprights by friction. After the half-pipe clamp 6 is fixed, the connecting plate 1, U-shaped bracket I 2, and U-shaped bracket II 3 are confined to the side of the scaffold uprights, serving as the mounting base for the entire slewing mechanism. One end of the bent pipe support rod 4 is fixedly equipped with a positioning plate 7, which is also connected to the bolts on the U-shaped bracket I 2. The other end of the lifting cantilever 5 is equipped with a hook. 10, which can be used to suspend items; the limiting device 8, which is set on the U-shaped bracket I2, is used to limit the positioning plate 7, thereby limiting the rotation angle of the bent pipe support rod 4. The limiting device 8 is arranged inside the connecting plate 1. The limiting device 8 is used to insert and limit the positioning plate 7, thereby locking the rotational freedom of the positioning plate, indirectly limiting the rotation angle of the bent pipe support rod 4 and the lifting arm 5, so that the lifting arm 5 can be fixed in position after rotating to the target angle, preventing the arm from rotating freely during the hoisting operation;

[0032] By incorporating a rotatable curved support rod 4 and a lifting cantilever 5, the entire system uses a vertically aligned axis as its rotation center. The curved support rod 4 and the lifting cantilever 5 can rotate horizontally around this axis, breaking the limitations of traditional fixed cantilever lifting ranges. During high-altitude material handling operations on scaffolding, there is no need to disassemble or relocate the entire system. Simply releasing the locking mechanism allows direct rotation of the lifting cantilever 5, changing the horizontal working position of the hook 10 and covering a wider area outside the scaffolding. The area reduces the procedures for disassembly, re-inspection, and acceptance of equipment, significantly reduces the workload of on-site workers, shortens the auxiliary time for material transfer, and improves the efficiency of high-altitude material transfer at construction sites. After the rotation adjustment is completed, the limit device 8 achieves mechanical self-locking, locking the bend support rod 4 and the positioning plate 7, preventing the cantilever from rotating autonomously due to material disturbance during hoisting operations, eliminating the safety risks of material swaying, load hitting scaffolding components, and load falling caused by accidental rotation of the cantilever, and balancing operational flexibility and operational safety.

[0033] The limiting device 8 includes a fixing plate 81, which is L-shaped. One end of the fixing plate 81 is fixedly connected to one side of the connecting plate 1, and the other end is fixedly connected to the upper surface of the U-shaped bracket I2. This serves to strengthen the structure of the connecting plate 1 and the U-shaped bracket I2. Besides acting as the mounting base for the limiting component, the fixing plate 81 also functions as a structural reinforcement, reinforcing the connection between the connecting plate 1 and the U-shaped bracket I2, distributing the load at the hinge point, and preventing deformation and cracking of the U-shaped bracket I2 under load. A fixing sleeve 82 is fixedly installed on the fixing plate 81. A limiting bent rod 83 is installed on the upper part of the U-shaped bracket I2. A connecting hole 13 is opened on the U-shaped bracket I2, and limiting holes are evenly opened on the positioning plate 7. One end of the limiting bent rod 83 passes through the connecting hole 13 and is inserted into the limiting hole of the positioning plate 7 to limit the positioning plate 7 and prevent the U-shaped bracket II3 from rotating. When the limiting bent rod 83 is inserted into the limiting hole of the positioning plate 7, the rotational movement of the positioning plate 7 is locked, and the bent pipe support rod 4 and the lifting cantilever 5 can no longer continue to rotate horizontally, thus achieving angle locking and preventing the boom from rotating uncontrollably during the hoisting operation.

[0034] A limiting hole 9 is provided on the connecting plate 1. The limiting hole 9 is Z-shaped. The tail end of the limiting bent rod 83 can be inserted into different slots of the Z-shaped limiting hole 9 to maintain two working positions. This limits the limiting bent rod 83 and prevents it from disengaging from the limiting hole due to misoperation. The other end of the limiting bent rod 83 is movably engaged with the limiting hole 9. A locking pin spring 84 is movably installed on the limiting bent rod 83 and located inside the fixed plate 81. A pin is also provided on 83 to limit the locking spring 84, so that the locking spring 84 always presses against the limiting bent rod 83. When the connecting hole 13 corresponds to the limiting hole of the positioning plate 7, the limiting bent rod 83 automatically inserts into the limiting hole, realizing mechanical self-locking of the rotation angle. When it is necessary to release the lock for rotation adjustment, the operator only needs to pull the tail of the limiting bent rod 83 backward to overcome the elastic force of the locking spring 84 and release the head of the limiting bent rod 83 from the limiting hole of the positioning plate 7. Pull the limiting rod 83 out of the hole, then insert the tail of the limiting rod 83 into the upper clearance groove of the Z-shaped limiting hole 9. The Z-shaped limiting hole 9 can then hold the tail of the limiting rod 83, keeping the limiting rod 83 in the pulled-out and unlocked state. At this time, the positioning plate 7 is no longer constrained by the limiting, and the bent pipe support rod 4 and the lifting arm 5 can rotate freely horizontally around the vertical hinge axis. Rotating the lifting arm will drive the bent pipe support rod 4 and the positioning plate 7 to rotate synchronously. Adjust the horizontal position of the hook 10. After adjusting to the target working position, move the tail of the limiting rod 83 to disengage it from the clearance groove of the Z-shaped limiting hole 9. The locking pin spring 84 will push the limiting rod 83 forward again. When the limiting hole of the positioning plate 7 is aligned with the reinforcing sleeve 13, the limiting rod 83 will automatically insert into the hole to complete the locking. The Z-shaped limiting hole 9 can effectively prevent the limiting rod 83 from accidentally coming out due to vibration or collision during high-altitude operations, avoid the mechanism from unlocking itself, and further ensure the safety of equipment operation.

[0035] A reinforcing sleeve 12 is fixedly installed on the lifting boom 5 to increase the structural strength of the lifting boom 5.

[0036] The bolt holes at one end of the lifting boom 5, the bolt holes at one end of the bent pipe support rod 4, and the center hole of the positioning plate 7 are all aligned vertically, with their central axes coinciding. The entire slewing mechanism has a unified vertical slewing axis. The bent pipe support rod 4 and the lifting boom 5 complete horizontal slewing around the same vertical axis. During the slewing motion, there will be no jamming or binding, and the rotation will be smooth. At the same time, all the lifting loads can be evenly distributed to the hinge bolts and the upper and lower U-shaped supports, avoiding eccentric loads that could cause the bolts to be damaged by lateral shear force.

[0037] The hook 10 is equipped with an elastic buckle, which is engaged by a spring. Under normal conditions, the buckle is closed, sealing the hook opening of the hook 10 and preventing the sling or rope from slipping off the hook opening. The hook 10 is detachably fitted with a pulley 11, which can be freely disassembled and assembled. The pulley 11 is equipped with a bearing inside, and the wire rope is wound inside the groove of the pulley 11. The pulley plays a guiding role and reduces the frictional resistance of the wire rope during movement. During on-site operations, the pulley can be removed and the hook can be used to lift materials directly, or it can be used in conjunction with the wire rope of the winch to lift and transport materials with the help of the pulley, adapting to different lifting operation conditions on the construction site.

[0038] The bent pipe support rod 4 is L-shaped with a bending angle of 121.2 degrees. It is used to support the lifting cantilever 5 and enhance the load-bearing capacity of the hook 10. One end of the bent pipe support rod 4 is hinged to the U-shaped bracket I2, and the other end is welded to the lifting cantilever 5. The bent pipe support rod 4 and the lifting cantilever 5 form a triangular support structure. When the hook 10 bears the downward lifting load, the load is transferred to the hinge point of the U-shaped bracket II3 and the bent pipe support rod 4 through the lifting cantilever 5. The bent pipe support rod 4 can bear most of the pressure load, greatly reducing the bending moment borne by the lifting cantilever 5, avoiding the lifting cantilever 5 from deflecting under load, and significantly improving the load-bearing capacity of the entire cantilever mechanism, allowing the equipment to obtain a greater safe lifting weight under the same pipe specifications.

[0039] Installation process: First, pre-assemble the connecting plate 1, U-shaped bracket I 2, U-shaped bracket II 3, and limiting device 8 into a single unit; pre-install the semi-pipe clamps 6 on the sides of U-shaped bracket I 2 and U-shaped bracket II 3 respectively; then move the device to the installation position of the scaffolding upright 14, fasten the two semi-pipe clamps 6 to wrap around the outside of the scaffolding upright, tighten the fastening bolts of the semi-pipe clamps 6, and rely on the semi-pipe clamps 6 to hold the scaffolding upright to complete the fixed assembly of the entire base; then assemble the lower end of the bent pipe support rod 4 and the positioning plate 7 together onto the hinge bolts of U-shaped bracket I 2, then align the hinge hole at the end of the lifting cantilever 5 with U-shaped bracket II 3, insert the hinge bolt to complete the hinge assembly, ensuring that the three holes are vertical and coaxial. After assembly, assemble the hook 10 and pulley 11 to the end of the lifting cantilever 5. The entire installation relies on bolt assembly, without welding, making the high-altitude on-site assembly process simple and the installation speed fast.

[0040] Working principle: After the equipment is installed and fixed, the entire device is held and fixed to the scaffolding uprights by two sets of upper and lower half-pipe clamps 6. The connecting plate, U-shaped bracket I, and U-shaped bracket II form a fixed base. When high-altitude material hoisting operations are required and the horizontal working position of the hook needs to be changed, the operator operates the limiting bent rod 83 on the scaffolding working platform, pulling the tail of the limiting bent rod 83 backward to overcome the elastic force of the locking pin spring 84, pulling the head of the limiting bent rod 83 out of the limiting hole of the positioning plate 7, and then locking the tail of the limiting bent rod 83 into the unlocking slot of the Z-shaped limiting hole 9 to maintain the unlocked state. At this time, the bent pipe support rod 4, the positioning plate 7, and the lifting cantilever 5 are released from the angle lock and can rotate horizontally around the vertical hinge axis. The operator directly pushes the lifting cantilever 5 to drive the hook 10 to rotate and adjust the hook 10 to the position corresponding to the material lifting or unloading. After adjustment, move the tail of the limiting rod 83 out of the unlocking slot of the Z-shaped limiting hole 9. The locking pin spring 84 continues to push the limiting rod 83 forward. When the positioning plate 7 rotates with the rotation until the limiting hole aligns with the connecting hole 13, the limiting rod 83 will automatically insert into the limiting hole of the positioning plate 7, completing the mechanical self-locking. At this time, the lifting boom cannot continue to rotate, and then the material lifting operation can be carried out. The material lifting device is hung on the hook 10, and the lifting equipment completes the lifting and transfer of materials by relying on the pulley 11 and the wire rope. After the lifting operation is completed, if the orientation needs to be adjusted, the above unlocking-rotation-self-locking process can be repeated.

[0041] The entire set of equipment relies on the 121.2° bend of the bent pipe support rod 4 to form a triangular force support, which disperses and transmits the hoisting load, resulting in high load-bearing capacity. The limit mechanism is entirely mechanical, with spring-driven automatic locking and Z-shaped limit holes 9 to maintain the position, making operation simple and safe. The equipment is modular, easy to assemble and disassemble, and flexible to rotate. The hoisting position can be adjusted without disassembling the entire machine, making it compatible with various standard scaffolding. It effectively solves the engineering pain points of existing scaffolding booms, such as limited working range, cumbersome assembly and disassembly, and poor load-bearing performance. When not in use, the hook and pulley can be disassembled, and the entire cantilever can be directly removed from the scaffolding uprights for transportation, facilitating on-site turnover.

[0042] When using this device for hoisting operations, the on-site hoisting safety regulations must be strictly followed. Overloading is strictly prohibited. Before operation, check the condition of all components, including the half-pipe clamp, hinge bolts, hook, pulley, and limit device, and confirm that the locking mechanism is effective before commencing hoisting operations.

[0043] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A rotary lifting cantilever for scaffolding, comprising a scaffold (14) and a vertically arranged connecting plate (1), a U-shaped support I (2) being fixedly arranged at the bottom end of the connecting plate (1), and a U-shaped support II (3) being fixedly arranged at the top end of the connecting plate (1), characterized in that, Also includes: The curved pipe support rod (4) has one end movably mounted on the U-shaped bracket I (2) by bolts, and the other end is fixedly mounted with a lifting cantilever (5). One end of the lifting cantilever (5) is movably connected to the U-shaped bracket II (3) by bolts. A half-pipe clamp (6) is fixedly mounted on one side of the U-shaped bracket II (3) and the U-shaped bracket I (2), and the half-pipe clamp (6) can be locked onto the scaffold (14). One end of the curved pipe support rod (4) is fixedly mounted with a positioning plate (7), and the positioning plate (7) is also sleeved with bolts on the U-shaped bracket I (2). The other end of the lifting cantilever (5) is equipped with a hook (10), which can be used to hang items. The limiting device (8) is set on the U-shaped bracket I (2) to limit the positioning plate (7) and thus limit the rotation angle of the bent pipe support rod (4).

2. The rotary lifting cantilever for scaffolding according to claim 1, characterized in that: The limiting device (8) includes a fixing plate (81), which is L-shaped. One end is fixedly connected to one side of the connecting plate (1), and the other end is fixedly connected to the upper surface of the U-shaped bracket I (2). It is used to strengthen the structure of the connecting plate (1) and the U-shaped bracket I (2). A fixing sleeve (82) is fixedly provided on the fixing plate (81), and a limiting bent rod (83) is movably provided on the fixing sleeve (82). A connecting hole (13) is provided on the U-shaped bracket I (2), and limiting holes are evenly provided on the positioning plate (7). One end of the limiting bent rod (83) passes through the connecting hole (13) and is inserted into the limiting hole of the positioning plate (7) to limit the positioning plate (7) and prevent the U-shaped bracket II (3) from rotating.

3. A rotary lifting cantilever for scaffolding according to claim 2, characterized in that: The connecting plate (1) has a limiting hole (9), and the other end of the limiting bent rod (83) is movably engaged with the limiting hole (9). A locking pin spring (84) is movably provided on the limiting bent rod (83) and located inside the fixing plate (81). A pin is also provided on the limiting bent rod (83) to limit the locking pin spring (84) so ​​that the locking pin spring (84) always presses against the limiting bent rod (83). When the connecting hole (13) corresponds to the limiting hole of the positioning plate (7), the limiting bent rod (83) automatically inserts into the limiting hole to realize mechanical self-locking of the rotation angle.

4. A rotary cantilever crane for scaffolding according to claim 1, characterized in that: A reinforcing sleeve (12) is fixedly installed on the lifting boom (5) to increase the structural strength of the lifting boom (5).

5. A rotary cantilever crane for scaffolding according to claim 1, characterized in that: The bolt holes at one end of the lifting cantilever (5), the bolt holes at one end of the bent pipe support rod (4), and the center hole of the positioning plate (7) are all aligned and vertically arranged.

6. A rotary cantilever crane for scaffolding according to claim 3, characterized in that: The limiting hole (9) is Z-shaped and is used to limit the limiting rod (83) to prevent the limiting rod (83) from separating from the limiting hole due to misoperation.

7. A rotary cantilever crane for scaffolding according to claim 1, characterized in that: The hook (10) is equipped with an elastic buckle and a pulley (11) is fastened to the hook (10) for winding the wire rope, guiding it, reducing friction, and completing the material lifting.

8. A rotary cantilever crane for scaffolding according to claim 1, characterized in that: The bent pipe support rod (4) is L-shaped and has a bending angle of 121.2 degrees. It is used to support the lifting cantilever (5) and strengthen the load-bearing capacity of the hook (10).