Pile foundation construction reinforcement cage lowering positioning pile casing and construction method

By setting a combination of force transmission frame and arc-shaped positioning plate inside the steel casing, the problems of low accuracy and deviation during the lowering of the steel cage are solved, achieving efficient and accurate positioning of the steel cage and improving the quality and efficiency of pile foundation construction.

CN123109158APending Publication Date: 2026-11-17JINAN URBAN CONSTR GRP CONSTR ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611141628.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-30
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing pile foundation construction, the positioning accuracy of the steel cage during lowering is low, especially the deviation in the middle and lower parts is difficult to control, which leads to problems such as uneven thickness of concrete protective layer in pile body and structural eccentricity, affecting the bearing capacity and durability of pile foundation.

Method used

The structure adopts a steel casing with a hinged force transmission frame and an arc-shaped positioning plate on the inside. Through the rotation of the force transmission frame and the contact of the arc-shaped positioning plate, the multi-point limiting and correction of the steel cage is achieved. Combined with the limiting and anti-deviation of the lifting bar crossbar, it ensures that the steel cage remains centered and vertical during the lowering process.

Benefits of technology

It improves the accuracy and efficiency of steel cage placement, ensures uniform thickness of the protective layer of the pile body, enhances the construction quality and structural durability of the pile foundation, simplifies the construction process, and reduces operational complexity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109158A_ABST
    Figure CN123109158A_ABST
Patent Text Reader

Abstract

This invention belongs to the field of pile foundation construction in building engineering, and specifically relates to a positioning casing and construction method for lowering a reinforcing cage in pile foundation construction. The positioning casing has symmetrically hinged force transmission frames on its inner side. Multiple sets of arc-shaped positioning plates adapted to the curvature of the reinforcing cage are installed on the force transmission frames. A fixed bracket with a limiting gap is installed at the top of the steel casing. The force transmission frames and the fixed brackets are locked together by pins, and linked by a lifting crossbar. During construction, as the reinforcing cage is lowered, the lifting crossbar drives the force transmission frames to swing downwards, causing the arc-shaped positioning plates to fit against the outer wall of the reinforcing cage, achieving centering and limiting the reinforcing cage throughout its movement. This invention solves the problems of traditional positioning methods, which can only correct the borehole position, are prone to deviation and tilting in the lower part of the reinforcing cage, have low accuracy with manual calibration, and require cumbersome tooling assembly and disassembly. It can achieve multi-point correction in the depth direction of the reinforcing cage, has high positioning accuracy, simple construction procedures, and high work efficiency, effectively ensuring the quality of pile foundation formation, and is suitable for various drilled and grouted pile construction scenarios.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of pile foundation construction in building construction, and specifically relates to a method for positioning and constructing a steel reinforcement cage for pile foundation construction. Background Technology

[0002] Drilled piles are the core foundation structure of infrastructure projects. The reinforcing cage, as the core load-bearing skeleton of the pile foundation, directly determines the thickness of the concrete cover, the structural stress performance, and the overall construction quality after its lowering. Pile foundation construction specifications impose strict limits on the center deviation and verticality of the reinforcing cage. If the reinforcing cage deviates or tilts during lowering, it will lead to uneven thickness of the concrete cover, resulting in problems such as exposed reinforcement, concrete cracking, and eccentric load distribution on the pile. This significantly reduces the pile foundation's bearing capacity, pull-out resistance, and durability, and in severe cases, can lead to pile foundation scrapping, rework, and reconstruction, causing huge economic losses and construction delays. Therefore, accurate centering of the reinforcing cage throughout the lowering process is a crucial and core procedure for pile foundation construction quality control.

[0003] Currently, in pile foundation construction, the mainstream positioning methods for lowering and positioning the rebar cage mainly include three types: manual centering and calibration with the help of spacer blocks for limiting, fixed suspension rods for positioning, and simple positioning frame for auxiliary positioning. All of these traditional positioning methods have inherent technical shortcomings and are difficult to meet the requirements of refined construction. Among them, the spacer block limiting method mainly achieves gap limiting by binding concrete spacers and plastic clips to the outside of the rebar cage. The spacers support the pile hole wall to complete the initial centering limiting. This method is only a single-point passive support and cannot adapt to the small deviation of the hole diameter and the dynamic swaying of the rebar cage. It lacks the ability to correct deviation throughout the process and is very likely to cause problems such as insufficient local protective layer thickness and excessive deviation. Manual centering calibration relies on the construction personnel to use a tape measure, measuring rope and cross line layout method. The steel casing benchmark is used as a reference to visually observe and adjust the center position of the rebar cage. The whole process depends on human experience judgment, the calibration accuracy is low and the error is large. Moreover, it can only complete the instantaneous centering at the hole opening and cannot control the deviation of the middle and lower parts of the hole depth in real time. At the same time, the manual calibration and adjustment process is cumbersome and the work efficiency is low. The lifting bar positioning method uses a fixed length of lifting bar welded to fix the top of the rebar cage to limit the vertical and horizontal displacement of the rebar cage and achieve simple positioning and fixation after lowering. This method can only constrain the position of the top of the rebar cage and has no limiting and correcting effect on the middle and lower parts of the rebar cage. In addition, the few existing improved positioning devices on the market generally suffer from problems such as complex structure, cumbersome disassembly and assembly, redundant parts, and numerous assembly and debugging procedures. These issues place high demands on construction personnel, result in long construction times, and low overall efficiency. Among them, most integrated positioning devices have numerous parts, redundant overall assembly structures, high processing and manufacturing costs, and require a significant amount of time for assembly, debugging, and fixing before the rebar cage is lowered. The complex construction procedures greatly reduce the overall efficiency of the rebar cage lowering construction.

[0004] Furthermore, and more importantly, existing rebar cage lowering and positioning devices generally only achieve localized correction of the pile foundation opening position, failing to effectively control the misalignment of the lower rebar cage within the pile hole. Specifically, the opening positioning device only acts on the pile hole opening position, ensuring only the initial centered position of the upper part of the rebar cage during lowering. Given the long overall length of the rebar cage, during crane lifting and lowering, it is affected by multiple factors such as lifting sway and hoisting wire rope swing. This causes continuous horizontal shifts, tilting, and eccentric twisting of the lower rebar cage within the pile hole. The opening positioning structure cannot constrain or correct the lower rebar cage within the hole, ultimately resulting in a misaligned state where the upper part is centered and the lower part is tilted. Existing technologies mostly focus on opening positioning and correction, lacking devices for positioning and correction along the depth direction of the rebar cage. This fails to solve the problem of misalignment in the lower part of the pile hole, making it difficult to achieve the required accuracy for centering the rebar cage during pile foundation construction, resulting in poor stability of pile body forming quality and severely hindering the development of standardized, refined, and high-quality construction in pile foundation engineering. Given the numerous shortcomings of the existing technologies, there is an urgent need to develop a positioning device and method that can solve the problem of misalignment in the lower part of the reinforcing cage. Summary of the Invention

[0005] The problem to be solved by the present invention is to overcome the shortcomings of the prior art and to provide a method for lowering and positioning the reinforcing cage and protective casing in pile foundation construction.

[0006] This invention is achieved through the following technical solution: A positioning casing for lowering a reinforcing cage during pile foundation construction includes a steel casing. Two force transmission frames are symmetrically hinged to the inner wall of the steel casing. Several arc-shaped positioning plates are fixed from top to bottom on the two force transmission frames. The curvature of the arc-shaped positioning plates matches the curvature of the reinforcing cage. The upper part of the force transmission frames is provided with positioning holes A and through holes. Fixed supports are symmetrically fixed on the top edge of the steel casing. The upper part of the fixed supports is provided with positioning holes B corresponding to positioning holes A. A pin is inserted between positioning holes B and positioning holes A to connect the force transmission frames and the fixed supports. The fixed supports below positioning holes B are provided with downwardly penetrating limiting gaps. The width of the limiting gaps is equal to the width of the lifting bar crossbar. The lifting bar crossbar can pass through the lifting ring at the upper end of the reinforcing cage lifting bar and the through holes on the force transmission frames. When the force transmission frames are rotated to the lowest end, the circular diameter of the corresponding arc-shaped positioning plates on both sides is equal to the outer diameter of the reinforcing cage, and the inner surface of the arc-shaped positioning plates abuts against the reinforcing cage.

[0007] Preferably, when the force transmission frame rotates to its lowest point, the reinforcing cage is lowered to the design elevation, and the lifting crossbar is erected on the top surface of the steel casing.

[0008] Preferably, several rotating plates are hinged to each other from top to bottom on both sides of the force transmission frame, the other end of the rotating plate is hinged to one end of the fixed plate, and the other end of the fixed plate is fixed to the inner wall of the steel casing.

[0009] Preferably, the force transmission frame is provided with an arc-shaped positioning plate at its lower middle part and bottom.

[0010] Preferably, the size of the perforation matches the size of the crossbar of the suspension rod.

[0011] Preferably, the pin is an L-shaped plug.

[0012] This invention also includes a method for lowering and positioning a steel reinforcement cage in pile foundation construction, comprising the following steps: S1: Fix the lifting bars symmetrically on both sides of the steel cage, fix the lifting rings at the upper end of the lifting bars, connect the crane lifting rope to the lifting rings, lift the steel cage, and transport the vertical steel cage to the top of the steel casing. Slowly lower the steel cage into the inside of the steel casing.

[0013] S2: When the lifting ring is aligned with the through hole of the force transmission frame, a horizontal lifting bar is inserted into the lifting ring and the through hole. At the same time, the horizontal lifting bar passes through the limiting gap of the fixed bracket, the pin is removed, and the steel cage is lowered.

[0014] S3: During the lowering of the steel cage, the force transmission frame rotates downward. When the force transmission frame rotates to the lowest end, the arc-shaped positioning plates on both sides abut against the outer surface of the steel cage. S4: When lowering the steel cage to the design elevation, the horizontal bars of the suspension rods are erected on both sides of the top surface of the steel casing.

[0015] This invention effectively solves the industry pain points of traditional pile foundation reinforcement cage lowering, such as low positioning accuracy, easy deviation in the middle and lower parts, cumbersome device assembly and disassembly, and low construction efficiency. This device relies on a force transmission frame and a hinged rotating plate structure, combined with multi-point arc-shaped positioning plates, to limit and correct deviation along the depth direction of the reinforcement cage. It overcomes the limitations of traditional local positioning at the borehole opening, completely improving the problems of the reinforcement cage being upright at the top and deviating downwards, as well as tilting and twisting. This ensures uniform thickness of the protective layer of the pile body, significantly improves the centering accuracy of the reinforcement cage, and guarantees the construction quality and structural durability of the pile foundation. The limiting gap designed on the fixed support of this invention prevents the reinforcement cage from twisting during lowering, further enhancing its limiting function. The structure designed in this invention can automatically complete positioning and correction as the reinforcement cage is lowered, eliminating the need for repeated manual calibration, simplifying the construction process. At the same time, the overall structure is simple, with low processing and usage costs, effectively improving construction efficiency. Attached Figure Description

[0016] Figure 1 This is a schematic diagram of the construction state structure in this embodiment; Figure 2 This is a schematic diagram of the upper partial structure of this embodiment; Figure 3 This is a schematic diagram of the structure after the reinforcing cage is lowered and the horizontal bars of the lifting bars are inserted in this embodiment; Figure 4 This is a top view of the structure in this embodiment; Figure 5This is a schematic diagram of the internal cross-sectional structure of this embodiment; Figure 6 This is a schematic diagram of the force transmission frame structure in this embodiment.

[0017] In the diagram, 1. Rebar cage; 2. Steel casing; 3. Force transmission frame; 4. Arc-shaped positioning plate; 5. Positioning hole A; 6. Through hole; 7. Fixed bracket; 8. Positioning hole B; 9. Pin; 10. Limiting gap; 11. Hanging rod; 12. Hanging rod crossbar; 13. Lifting ring; 14. Rotating plate; 15. Fixed plate. Detailed Implementation

[0018] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are some embodiments of the present invention, but not all embodiments.

[0019] This embodiment includes a steel casing 2. Two force transmission frames 3 are symmetrically hinged to the inner wall of the conventional steel casing 2, and the force transmission frames 3 are symmetrically arranged along the central axis of the steel casing 2. The force transmission frames 3 can rotate and swing inward or outward at the hinge points, so that the force transmission frames 3 can be close to or away from the inner wall of the steel casing 2. The force transmission frame 3 is a rectangular steel frame as a whole. Preferably, the force transmission frame 3 is a hollow rectangular steel frame. The vertical long strip hollow steel frame structure can reduce its own weight while ensuring structural rigidity. Preferably, several rotating plates 14 are hinged to the left and right sides of the force transmission frame 3 from top to bottom along its vertical length. The other end of the rotating plate 14 is hinged to one end of a fixed plate 15. The other end of the fixed plate 15 is fixedly installed on the inner wall of the steel casing 2 by full welding, bolt fastening, or other methods. The rotating plate 14 is hinged to the force transmission frame 3 and the fixed plate 15 with a pin, and a small rotation gap is reserved at the hinge to allow the rotating plate 14 to rotate freely synchronously with the swing of the force transmission frame 3. The force transmission frame 3, the multi-layer rotating plates 14, the fixed plate 15 and the inner wall of the steel casing 2 cooperate to form a multi-linkage mechanism. When the force transmission frame 3 retracts upward and approaches the inner wall of the steel casing 2, the rotating plate 14 folds and narrows synchronously, fitting the inner wall of the steel casing 2 as a whole, without encroaching on the central lowering channel of the steel casing 2, and without obstructing the hoisting of the reinforcing cage 1 into the steel casing 2; when the force transmission frame 3 rotates downward and retracts towards the center of the steel casing 2 and approaches the reinforcing cage 1, the rotating plates 14 of each layer synchronously expand outward, forming an oblique traction support for the force transmission frame 3, sharing the radial lateral pressure of the reinforcing cage 1 borne by the force transmission frame 3, avoiding bending and deformation of the force transmission frame 3 due to relying only on a single hinge to receive the force, and greatly improving the overall structural rigidity and load-bearing stability of the force transmission frame 3.

[0020] Several arc-shaped positioning plates 4 are fixed from top to bottom on two force transmission frames 3. The arc-shaped positioning plates 4 on the left and right force transmission frames 3 correspond one-to-one, and the curvature of the arc-shaped positioning plates 4 matches the curvature of the reinforcing cage 1 to be lowered, that is, the arc-shaped positioning plates 4 can be attached to the outer surface of the reinforcing cage 1. When the force transmission frame 3 rotates downward to its lowest position, the inner diameter of the circle containing the arc-shaped positioning plates 4 on the left and right sides is exactly equal to the outer diameter of the reinforcing cage 1. The inner surface of the arc-shaped positioning plates 4 can abut against the outer wall of the reinforcing cage 1, realizing the centering and limiting of the reinforcing cage 1 and preventing the reinforcing cage 1 from deviating during the lowering process. In this embodiment, one arc-shaped positioning plate 4 is provided in the lower middle part and the bottom of the force transmission frame 3. Several more arc-shaped positioning plates 4 can also be provided in other positions on the force transmission frame 3 as needed to realize the centering and limiting of the reinforcing cage 1 at multiple points above and below.

[0021] Positioning holes A5 and through holes 6 are respectively made from top to bottom on the upper part of the force transmission frame 3. Two fixed brackets 7 are symmetrically fixed on the left and right sides of the top surface of the steel casing 2, and the two fixed brackets 7 correspond to the two force transmission frames 3 respectively. A positioning hole B8 corresponding to the positioning hole A5 is provided on the upper part of the fixed bracket 7. A pin 9 is inserted between the positioning hole B8 and the positioning hole A5 to connect the force transmission frame 3 and the fixed bracket 7 together. In this embodiment, the pin 9 is an L-shaped plug. When the force transmission frame 3 rotates upward until the positioning hole A5 and the positioning hole B8 are aligned, the pin 9 is inserted through the positioning hole A5 and the positioning hole B8 to pull the force transmission frame 3 upward and lock it. At this time, the force transmission frame 3 is close to or against the inner wall of the steel casing 2, and there is a certain distance between the arc-shaped positioning plates 4 on both sides and the reinforcing cage 1.

[0022] The through hole 6 on the aforementioned force transmission frame 3 is used to pass through the lifting bar crossbar 12. Preferably, the size of the through hole 6 matches the size of the lifting bar crossbar 12. The lifting bar crossbar 12 can pass through the lifting ring 13 at the upper end of the lifting bar 11 of the reinforcing cage 1. The reinforcing cage 1 and the force transmission frame 3 can be connected together through the lifting bar crossbar 12. Thus, during the lowering process of the reinforcing cage 1, the weight of the reinforcing cage 1 can be transferred to the force transmission frame 3, causing the force transmission frame 3 to rotate so that the arc-shaped positioning plate 4 can approach and limit the position of the reinforcing cage 1.

[0023] A vertically downward limiting gap 10 is provided on the fixed bracket 7 below the positioning hole B8. The width of the limiting gap 10 is equal to the width of the lifting rod 12, allowing the lifting rod 12 to pass horizontally. After the lifting rod 12 passes horizontally through the through hole 6 of the lifting ring 13 and the force transmission frame 3, and simultaneously passes through the limiting gap 10 of the fixed brackets 7 on both sides, the lifting rod 12 can slide up and down along the limiting gap 10. The side walls of the limiting gap 10 can form a lateral clamping constraint on the lifting rod 12, which can restrict the circumferential rotation of the lifting rod 12 and effectively prevent the steel cage 1 from twisting or radially shifting during the continued lowering process, thus playing a reliable lateral limiting and anti-deviation role. The aforementioned lifting rod 12 can also be a circular rod, and the corresponding through hole 6 on the force transmission frame 3 is a circular hole that matches the circular rod, while the limiting gap 10 matches the size of the lifting rod 12.

[0024] As described above, when the force transmission frame 3 rotates downward to its lowest point, the circular diameter of the corresponding arc-shaped positioning plates 4 on both sides is equal to the outer diameter of the reinforcing cage 1. The inner surface of the arc-shaped positioning plate 4 just abuts against the outer wall of the reinforcing cage 1, achieving radial centering constraint on the reinforcing cage 1. When the inner surface of the arc-shaped positioning plate 4 just abuts against the outer wall of the reinforcing cage 1, the reinforcing cage 1 can continue to be lowered under the constraint of the arc-shaped positioning plate 4 until the design elevation, and the outer wall of the reinforcing cage 1 can slide down along the arc-shaped positioning plate 4. Alternatively, it can be further preferred that when the force transmission frame 3 rotates to its lowest point, the reinforcing cage 1 is just lowered to the design elevation, and at the same time, the horizontal bar 12 of the suspension rod just falls and is erected on the top surface of the steel casing 2. Precise dimensional matching calculations can be performed based on the preset lowering elevation of the reinforcing cage 1, the vertical height of the hinged support point of the force transmission frame 3, and the maximum displacement stroke of the entire force transmission frame 3 that can rotate and swing. This ensures that the vertical displacement of the force transmission frame 3 and the lowering height of the reinforcing cage 1 are precisely matched, allowing the force transmission frame 3 to swing to its lowest position, the arc-shaped positioning plate 4 to hold the reinforcing cage 1 in the center, the reinforcing cage 1 to reach the design elevation, and the lifting bar 12 to fall on the top surface of the steel casing 2 to bear the load. These four processes are achieved simultaneously.

[0025] This embodiment describes a method for positioning and lowering a reinforcing cage in pile foundation construction, based on the aforementioned reinforcing cage positioning casing. The method includes the following steps: S1: The reinforcing cage 1 is assembled and bound in the processing yard. Symmetrical lifting rods 11 are fixed to the left and right sides of the top of the reinforcing cage 1. A closed lifting ring 13 is welded to the upper end of each lifting rod 11. The crane lifting rope is connected to the lifting ring 13, and the reinforcing cage 1 is vertically lifted. The vertical reinforcing cage 1 is then transported directly above the steel casing 2 and slowly lowered, allowing it to slowly extend into the steel casing 2. The lifting rods 11, lifting rings 13, and the subsequent lifting rod crossbars 12 are all conventional designs in existing construction methods and will not be described in detail in this embodiment.

[0026] S2: Continue to lower the steel cage 1 until the lifting ring 13 is horizontally aligned with the through hole 6 of the force transmission frame 3. At this time, a horizontal lifting rod 12 is inserted horizontally into the lifting ring 13 and the through hole 6. At the same time, the horizontal lifting rod 12 passes through the limiting gap 10 of the fixed bracket 7. The worker pulls out the pin 9 inserted into the positioning hole A5 and the positioning hole B8, releasing the locking constraint between the force transmission frame 3 and the fixed bracket 7. Due to the pressure of the weight of the steel cage 1, the force transmission frame 3 has the power to rotate and swing downward. The horizontal lifting rod 12 can slide slightly horizontally in the through hole 6 to compensate for the lateral displacement generated during the rotation of the force transmission frame 3, avoid the components from jamming each other, and ensure that the downward swing of the force transmission frame 3 is smooth and without interference.

[0027] S3: During the lowering process of the steel cage 1, the force transmission frame 3 is driven to rotate downward. When the force transmission frame 3 rotates to the lowest end, the arc-shaped positioning plates 4 on both sides abut against the outer surface of the steel cage 1, and the arc-shaped positioning plates 4 on both sides realize the automatic centering of the steel cage 1.

[0028] S4: If the reinforcing cage 1 has not yet reached the design elevation, and the horizontal support rod 12 has not yet landed on the top surface of the steel casing 2, and there is still a distance between them, the reinforcing cage 1 can continue to be lowered slowly. The outer wall of the reinforcing cage 1, which is attached to the arc-shaped positioning plates 4 on both sides, continues to move downward. Due to the limitation of the arc-shaped positioning plates 4, the reinforcing cage 1 remains in a centered state. When the reinforcing cage 1 is lowered to the design elevation, the horizontal support rod 12 will be positioned on both sides of the top surface of the steel casing 2. At this point, the lowering and centering of the reinforcing cage 1 is completed.

[0029] The above steps S3 and S4 can be further optimized. Preferably, when the force transmission frame 3 is rotated to the lowest end, the arc-shaped positioning plates 4 on both sides abut against the outer surface of the steel cage 1. At the same time, the steel cage 1 is lowered to the design elevation, and the two sides of the lifting bar crossbar 12 just fall and are erected on the top surface of the steel casing 2. It can also be further optimized that the arc-shaped positioning plates 4 on both sides have a small clamping force on the steel cage 1.

[0030] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and not to limit them; those skilled in the art should understand that modifications can still be made to the technical solutions described in the above embodiments, or equivalent substitutions can be made to some of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the various embodiments of the present invention.

Claims

1. A positioning casing for lowering a reinforcing cage during pile foundation construction, comprising a steel casing (2), characterized in that: Two force transmission frames (3) are symmetrically hinged on the inner wall of the steel casing (2). Several arc-shaped positioning plates (4) are fixed on the two force transmission frames (3) from top to bottom. The arc of the arc-shaped positioning plates (4) matches the arc of the steel cage (1). The upper part of the force transmission frame (3) is provided with positioning holes A (5) and through holes (6). A fixing bracket (7) is symmetrically fixed on the top edge of the steel casing (2). The upper part of the fixing bracket (7) is provided with positioning holes B (8) corresponding to positioning holes A (5). A pin (9) is inserted between positioning holes B (8) and positioning holes A (5) to connect the force transmission frame. (3) Connected to the fixed bracket (7), the fixed bracket (7) below the positioning hole B (8) is provided with a downward through-limit gap (10), the width of the limit gap (10) is equal to the width of the lifting bar (12), the lifting bar (12) can pass through the lifting ring (13) at the upper end of the lifting bar (11) of the steel cage (1) and the through hole (6) on the force transmission frame (3); when the force transmission frame (3) rotates to the lowest end, the circular diameter of the corresponding arc positioning plates (4) on both sides is equal to the outer diameter of the steel cage (1), and the inner surface of the arc positioning plate (4) abuts against the steel cage (1).

2. The positioning casing for lowering the reinforcing cage during pile foundation construction according to claim 1, characterized in that: When the force transmission frame (3) rotates to the lowest end, the steel cage (1) is lowered to the design elevation, and the suspension bar (12) is erected on the top surface of the steel casing (2).

3. The positioning casing for lowering the reinforcing cage during pile foundation construction according to claim 1, characterized in that: The force transmission frame (3) has several rotating plates (14) hinged from top to bottom on both sides. The other end of the rotating plate (14) is hinged to one end of the fixed plate (15), and the other end of the fixed plate (15) is fixed to the inner wall of the steel casing (2).

4. The positioning casing for lowering the reinforcing cage during pile foundation construction according to claim 1, characterized in that: The force transmission frame (3) is provided with an arc-shaped positioning plate (4) at its lower middle part and bottom.

5. The positioning casing for lowering the reinforcing cage during pile foundation construction according to claim 1, characterized in that: The size of the perforation (6) matches the size of the suspension rod crossbar (12).

6. The positioning casing for lowering the reinforcing cage during pile foundation construction according to claim 1, characterized in that: The pin (9) is an L-shaped plug.

7. A method for positioning and lowering a reinforcing cage in pile foundation construction, based on the positioning casing for lowering a reinforcing cage according to any one of claims 1-5, comprising the following steps: S1: Fix the lifting bars (11) symmetrically on both sides of the steel cage (1), fix the lifting ring (13) at the upper end of the lifting bar (11), connect the crane lifting rope to the lifting ring (13), lift the steel cage (1), lift the vertical steel cage (1) to the top of the steel casing (2), and slowly lower the steel cage (1) into the steel casing (2). S2: When the lifting ring (13) is aligned with the through hole (6) of the force transmission frame (3), a horizontal lifting rod (12) is inserted horizontally in the lifting ring (13) and through hole (6). At the same time, the horizontal lifting rod (12) passes through the limiting gap (10) of the fixed bracket (7), the pin (9) is removed, and the steel cage (1) is lowered. S3: During the lowering process of the steel cage (1), the force transmission frame (3) is driven to rotate downward. When the force transmission frame (3) rotates to the lowest end, the arc-shaped positioning plates (4) on both sides abut against the outer surface of the steel cage (1). S4: When the steel cage (1) is lowered to the design elevation, the horizontal bars (12) of the suspension rods are erected on both sides of the top surface of the steel casing (2).

8. The method for lowering and positioning the reinforcing cage in pile foundation construction according to claim 7, characterized in that: When the force transmission frame (3) rotates to the lowest end, the steel cage (1) is lowered to the design elevation.