A method and structure for assembling a generator base plate and a wedge plate.

By using a combination of T-shaped tooling and leveling screw assembly, the problems of flatness and displacement during the installation of the wedge plate and the base plate were solved, improving installation efficiency and accuracy, and ensuring a stable connection between the generator base plate and the wedge plate.

CN123109199APending Publication Date: 2026-11-17DONGFANG ELECTRIC MACHINERY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611425947.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-15
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In the existing technology, it is difficult to ensure that the wedge plate surface is flush during the installation of the generator base plate and the wedge plate, which poses a risk of displacement between the wedge plate and the base plate. In addition, high-precision cutting of the stud part is time-consuming and labor-intensive, affecting the contact area and installation accuracy.

Method used

The base plate and part of the wedge plate are first assembled into one piece using a T-shaped fixture. The elevation of the base plate is adjusted by the leveling and adjusting screw assembly pre-embedded in the factory foundation, which reduces the workload of wedge plate adjustment and the risk of unqualified contact surface. After the wedge plate is grouted with cement, the T-shaped fixture part is cut off to achieve stable fixation of the base plate and the wedge plate.

Benefits of technology

It significantly reduces the workload of wedge adjustment, lowers the risk of substandard contact surfaces between the wedge and the base plate, improves installation accuracy and efficiency, ensures a stable connection between the wedge and the base plate, and reduces high-precision cutting work.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109199A_ABST
    Figure CN123109199A_ABST
Patent Text Reader

Abstract

This invention discloses a method and structure for the combined installation of a generator base plate and wedge plates, relating to the field of large-scale power equipment installation. The method includes: lapping all mating contact surfaces between the wedge plates and the base plate; then dividing the wedge plates into two categories, using a T-shaped fixture with locking nuts to fasten one type of wedge plate to the base plate through the anchor bolt holes; next, hoisting the base plate pre-installed with one type of wedge plate onto the foundation and leveling it; after hoisting the base plate away, installing the second type of wedge plates to the corresponding positions on the foundation and adjusting their height, then hoisting the base plate back in for verification; performing cement grouting on all wedge plate installation areas, and after the grout reaches the required compressive strength, loosening the locking nuts and hoisting the base plate away, cutting off the exposed sections of the vertical and horizontal bars of the T-shaped fixture; finally, lowering the base plate back to its original position along its original trajectory and verifying the installation accuracy. This invention classifies the wedge plates distributed on the base plate and assembles them in different ways, ensuring installation accuracy and construction efficiency for large base plates under complex foundation conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of installation technology for large nuclear power generators, and more specifically to a method for the combined installation of a generator base plate and a wedge plate. Background Technology

[0002] Nuclear generators employ two excitation methods: brushless excitation and static excitation. At the generator excitation end, both the brushless exciter's base and the static excitation brush holder, serving as rotating support components, need to be connected to the wedge plate and the powerhouse foundation via a base plate. Therefore, to prevent vibration, the base plate and wedge plate must be reliably connected to the powerhouse foundation. To achieve reliable contact, the wedge plate is typically small in size to facilitate mating with the base plate. Furthermore, to ensure overall rigidity, the wedge plate on the underside of the base plate and the powerhouse foundation must be filled together with cement grout to form a single unit.

[0003] Currently, the installation schemes for the base plate and wedge plate are as follows: Figures 2-4 As shown, the installation process is roughly as follows: First, check the contact between the wedge plate and the base plate, and ensure the contact area between the wedge plate and the base plate is qualified through methods such as lap jointing; then remove the base plate, and arrange the wedge plates on the surface of the factory foundation according to the dimensions in the design drawings, and pre-embed anchor bolts for fastening; next, adjust the elevation of each wedge plate by adjusting the screws, and test install the base plate back and forth on the wedge plate to ensure that the elevation of the base plate meets the design requirements; after the elevation adjustment is completed, fix the wedge plate to the foundation using studs, washers, nuts, and pre-embedded anchor bolts in the factory foundation, and then grout with cement. After the concrete has cured, cut off the protruding part of the studs (including washers and nuts) to ensure that the studs do not protrude above the surface of the wedge plate; finally, reinstall the base plate and adjust the lateral and axial positions of the base plate according to the drawings until it is qualified.

[0004] The above installation method usually has the following problems and defects: (1) There is more than one wedge plate under each base plate. When adjusting the wedge plate elevation by adjusting the screw, it is difficult to ensure that all wedge plate surfaces are flush. Even if the wedge plate and the base plate are pre-lapped and qualified, the contact area between them will be worse due to the unevenness of the wedge plate surface; (2) During the process of installing each wedge plate on the factory foundation, there is a possibility of displacement between the wedge plate and the base plate. The contact surface between the wedge plate and the base plate that was initially lapped and qualified also has the risk of not meeting the standard; (3) When cutting off the protruding stud part on the surface of the wedge plate, there is a possibility that the cutting is not in place and a local high point remains, which affects the contact area between the wedge plate and the base plate; (4) Repeated disassembly and assembly between the base plate and the wedge plate and the high-precision cutting of the protruding stud part on the surface of the wedge plate are time-consuming and labor-intensive. Summary of the Invention

[0005] To address the problems existing in the prior art, this invention provides a method for the combined installation of a generator base plate and a wedge plate. The base plate and a portion of the wedge plate are first assembled into one unit using a T-shaped tooling. Then, the elevation of the base plate is adjusted using a leveling and adjusting screw assembly pre-embedded in the factory foundation. This method can reduce the workload of wedge plate adjustment and the risk of non-compliance of the contact surface between the wedge plate and the base plate. It can also reduce the high-precision cutting work of the protruding stud portion on the wedge plate surface.

[0006] This invention is achieved through the following technical solution: On one hand, the present invention discloses a method for combining and installing a generator base plate and a wedge plate, the method comprising the following steps: Step S1. Grind all the mating contact surfaces between the wedge plates and the base plate until the contact area and clearance between the wedge plates and the base plate meet the design requirements; Step S2. Divide the wedges into two categories according to their distribution location. The wedges distributed on both sides of the anchor bolt holes on the base plate are classified as Category I wedges, and the wedges distributed in areas other than the anchor bolt holes are classified as Category II wedges. Place the Category I wedges in the corresponding installation positions on the base plate. Use a T-shaped tool with a locking nut to pass through the anchor bolt holes and fasten the two Category I wedges on both sides of the anchor bolt holes to the base plate through the crossbar of the T-shaped tool. Step S3. Hoist the base plate pre-installed with a type of wedge plate onto the factory foundation. Adjust the levelness, elevation and lift of the base plate using the leveling screw assembly pre-arranged on the foundation, in conjunction with a level instrument, until the requirements are met. Step S4. Lift the base plate with the pre-installed Type I wedge plate off the work station as a whole, then install the Type II wedge plate to the corresponding position on the factory foundation. Adjust its installation height using the adjusting screws on the Type II wedge plate. Then lift the base plate back in and lower it into place. Check the mating contact surface between the Type II wedge plate and the base plate. Repeat the adjustment until the contact area and mating clearance between the Type II wedge plate and the base plate meet the design requirements. Step S5. Perform cement grouting on all wedge plate installation areas. When the compressive strength of the grout reaches 65% to 75% of the design strength, loosen the locking nut on the T-shaped tool screw, lift the base plate off the work position as a whole, and then cut off the vertical part of the T-shaped tool, while cutting off the exposed section of its horizontal bar that extends beyond the foundation embedded surface. Step S6. Slowly lower the base plate along the original installation trajectory to ensure that the base plate and the already cured wedge plate mating surface are precisely aligned. After positioning, check the levelness, elevation, and lift of the base plate to confirm that the deviation from the initial installation accuracy meets the requirements. The final repositioning of the base plate is then completed.

[0007] Preferably, the design requirements in steps S1 and S4 are that the effective contact area between the wedge plate and the base plate accounts for no less than 75% of the total contact area, the contact points are evenly distributed, and a 0.04mm feeler gauge must not be inserted into the core stress-bearing area of ​​both.

[0008] Preferably, the T-shaped fixture consists of an integrally formed vertical rod and a horizontal rod. The vertical rod is provided with an external thread adapted to a locking nut, and the length of the horizontal rod is greater than the diameter of the anchor bolt hole and less than the outer distance between the two Class I wedge plates.

[0009] Preferably, in step S3, after the installation accuracy index of the base plate meets the requirements, a pair of positioning concave points are processed on the side of the base plate and the corresponding factory foundation surface to form a secondary resetting alignment reference.

[0010] Preferably, colored marking pigment is applied to the positioning recesses.

[0011] Preferably, before the cement grouting operation, a sealing strip is bonded to the outer periphery of the joint between the base plate and various wedge plates; and during the cement grouting process, the grouting pressure is controlled to be 0.1 to 0.3 MPa.

[0012] Preferably, in step S6, during the process of resetting and lowering the base plate, the hoisting and lowering speed is controlled to be no more than 0.2 m / s, and the horizontal displacement deviation of the base plate is monitored in real time using a dial indicator.

[0013] Preferably, in step S6, the levelness, elevation, and lift of the base plate after it is lowered and reset should not deviate from the initial installation accuracy by more than 0.02 mm / m.

[0014] Based on the same inventive concept, in another aspect, the present invention also discloses a combined installation structure of a generator base plate and a wedge plate, which is obtained by the above-mentioned combined installation method of the generator base plate and the wedge plate.

[0015] The beneficial effects of this invention are mainly reflected in the following aspects: 1. For installation of adjacent wedge plates with anchor bolt holes on the base plate, the present invention uses a T-shaped tool to assemble the wedge plates located on both sides of the anchor bolt holes on the base plate into a whole, and then hoist them together to the foundation of the factory building. The overall elevation and lift of the base plate are adjusted by the foundation leveling and adjusting screw assembly embedded in the foundation of the factory building, which can significantly reduce the workload of wedge plate adjustment and the risk of unqualified contact surface between the wedge plates and the base plate.

[0016] 2. In this invention, the base plate and wedge plate are first positioned as a whole. After the cement grouting of the wedge plate reaches 65% to 75% of the design strength, the base plate is lifted away. Then, the part of the T-shaped fixture that affects the installation of the anchor bolts is cut off. Finally, the base plate is reinstalled to ensure good contact between the installed base plate and the wedge plate.

[0017] 3. In this invention, the base plate is removed after the grouting strength of the wedge plate reaches 65% to 75% of the design value. This strength value does not affect the compressive strength of the cement or the construction. If the strength is too high, the waiting time is long, affecting the construction; if the strength is too low, the wedge plate and the base plate may shift, ultimately affecting the contact area between the wedge plate and the base plate.

[0018] 4. The T-shaped tooling of this invention adopts a standardized interface design (compatible with wedge plates of different specifications from φ16 to φ100), and combined with the anchor bolt holes of the base plate, it realizes modular and universal installation of the exciter base plate and the brush holder base plate. When replacing different types of base plates, the tool reuse rate is high.

[0019] 5. In the T-shaped fixture used in this invention, the part affecting the installation of the anchor bolts is located between the two wedge plates, which is easy to cut. Since it is in contact with the wedge plates, the machining accuracy is not high, and it has high operability. Attached Figure Description

[0020] The present invention will now be further described in detail with reference to the accompanying drawings and specific embodiments: Figure 1 This is a schematic diagram of the assembly layout of the base plate and wedge plate of the present invention; Figure 2 This is a schematic diagram of the existing base plate and wedge plate assembly installation; Figure 3 for Figure 2 Sectional view of AA in the middle; Figure 4 for Figure 2 Cross-sectional view of the middle section (BB).

[0021] In the attached image: 1. Base plate; 2. Wedge plate; 3. T-shaped fixture; 4. Anchor bolt hole; 21. Type I wedge plate; 22. Type II wedge plate. Detailed Implementation

[0022] To enable those skilled in the art to better understand the technical solutions of this invention, several specific embodiments will be used to further illustrate the technical solutions for achieving the objectives of this invention. It should be noted that the technical solutions claimed by this invention include, but are not limited to, the following embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of this invention without inventive effort should fall within the scope of protection of this invention.

[0023] The current traditional method of combining generator base plate 1 and wedge plate 2 usually has problems such as difficulty in ensuring that all wedge plate 2 surfaces are flush, easy displacement between wedge plate 2 and base plate 1, and local high point rubbing residue when cutting protruding studs. These problems affect the contact area between the pre-fitted wedge plate 2 and base plate 1, and reduce the contact quality.

[0024] When there is insufficient contact between wedge plate 2 and base plate 1, or when the local gap exceeds the tolerance, the load on base plate 1 is concentrated at a few contact points. After long-term operation, local crushing and deformation occur, and the levelness and elevation deviation of base plate 1 quickly exceed the allowable range, ultimately leading to uneven stress that seriously affects the safe operation of the unit.

[0025] Furthermore, if the contact area between the wedge plate 2 and the base plate 1 is insufficient, it will also affect the secondary reset effect. Specifically, the secondary hoisting and reset after grouting cannot accurately replicate the initial fit state, and the elevation and height deviation of the base plate 1 directly exceed the standard, damaging the original alignment accuracy of the generator shaft system.

[0026] Based on this, the present invention proposes a method for combining and installing a generator base plate 1 and a wedge plate 2, which significantly reduces the risk of non-compliance of the contact surface between the wedge plate 2 and the base plate 1, and reduces the workload of adjusting the wedge plate 2 and the high-precision cutting of the protruding stud portion on the surface of the wedge plate 2.

[0027] Figure 1 This is a schematic diagram of the assembly layout of the base plate 1 and the wedge plate 2 of the present invention, as shown below. Figure 1 As shown, after the wedge plate 2 and the base plate 1 are installed in place, the wedge plate 2 has two possible positions and layouts on the base plate 1: one is symmetrically distributed on both sides of the anchor bolt holes 4 on the base plate 1, and the other is located in the area outside the anchor bolt holes 4 on the base plate 1. Furthermore, most of the wedge plates 2 are symmetrically distributed on both sides of the anchor bolt holes 4, with a small portion located in the area outside the anchor bolt holes 4. Therefore, if all the wedge plates 2 are installed using the traditional method, the workload for adjusting the wedge plates 2 and the high-precision removal of the protruding studs on the surface of the wedge plates 2 would undoubtedly be enormous.

[0028] Therefore, based on the position and layout of the wedge plates 2 on the base plate 1, the present invention installs the wedge plates 2 at different positions in the optimal manner and grinds their contact surfaces with the base plate 1. Specifically, according to the installation distribution of the wedge plates 2, the wedge plates 2 are divided into the following two categories: wedge plates 21 distributed on both sides of the anchor bolt holes 4 on the base plate 1 are classified as category one wedge plates 21, and wedge plates 22 distributed in the area of ​​the base plate 1 other than the anchor bolt holes 4 are classified as category two wedge plates 22.

[0029] The aforementioned type I wedge 21, type II wedge 22, and base plate 1 are assembled and installed in the following manner until base plate 1 and wedge 2 are stably and reliably fixed to the factory foundation, and the contact area between wedge 2 and base plate 1, as well as the installation accuracy of base plate 1, all meet the requirements. The specific assembly and installation process is as follows: Step S1. First, flip the base plate 1 over and level it. Then, grind all the mating contact surfaces of the wedge plates 2 to be installed with the base plate 1 until the contact area and mating clearance between the wedge plates 2 and the base plate 1 meet the design requirements.

[0030] Step S2. Based on the aforementioned classification of the installation positions of the wedge plates 2, firstly, a type I wedge plate 21 is pre-placed in the corresponding installation position on the base plate 1. A T-shaped fixture 3 with a locking nut is used to fix the two type I wedge plates 21 on both sides of the anchor bolt hole 4 onto the base plate 1. The specific fastening method is as follows: the vertical rod of the T-shaped fixture 3 passes through the anchor bolt hole 4 on the base plate 1 from below, and then the locking nut is tightened on the vertical rod to fasten the entire T-shaped fixture 3 onto the base plate 1. The horizontal rod of the T-shaped fixture 3 holds the two type I wedge plates 21 on both sides of the anchor bolt hole 4 from below and then fastens them onto the base plate 1.

[0031] Step S3. Hoist the base plate 1, which is pre-installed with a type of wedge plate 21, onto the foundation of the factory building. Adjust the levelness, elevation, and lift (center deviation) of the base plate 1 using the leveling and adjusting screw assembly pre-arranged on the foundation, in conjunction with a high-precision level, until the installation accuracy of the base plate 1 is accepted.

[0032] In the embodiments described in this invention, in order to quickly verify and refer to the subsequent secondary repositioning of the base plate 1, after the installation accuracy index of the base plate 1 is accepted in step S3, positioning recesses are machined and punched on the side of the base plate 1 and the surface of the corresponding foundation using positioning marking tools such as a center punch to form a pair of positioning recesses. Then, a colorable marking pigment such as red lead oil is applied to the positioning recesses to form a conspicuous alignment reference for the secondary repositioning of the base plate 1.

[0033] Step S4. Lift the base plate 1 with the pre-installed type I wedges off the work station as a whole, and then install the type II wedge plate 22 to the corresponding position on the factory foundation. Adjust its installation height using the adjusting screws on the type II wedge plate 22. Then, lift the base plate 1 back in along the above alignment reference and lower it into place. Use the red lead powder coloring method to check the mating contact surface between the type II wedge plate 22 and the base plate 1. Repeat the adjustment until the contact area and mating clearance between the type II wedge plate 22 and the base plate 1 also meet the design requirements. Step S5. Perform cement grouting on all installation areas of wedge plates 2. When the compressive strength of the grout reaches 65% to 75% of the design strength (the horizontal bar of the T-shaped fixture 3 is poured into the cement grout together with the wedge plate 2), loosen the locking nut on the T-shaped fixture 3 and lift the base plate 1 as a whole away from the work position (after loosening the locking nut, lift the base plate 1, and the vertical bar of the T-shaped fixture 3 gradually exits from the anchor bolt hole 4 of the base plate 1). Then, use tools such as an angle grinder to completely cut off all the vertical bar parts of the T-shaped fixture 3 on the wedge plate 2, and at the same time cut off the exposed section of its horizontal bar that exceeds the foundation pre-embedded surface and hinders the subsequent installation of anchor bolts. The remaining horizontal bar part of the T-shaped fixture 3 is permanently embedded in the foundation. Step S6. Clean the debris from the contact surface of the factory foundation. Using the alignment benchmark set before grouting as the alignment reference, slowly lower the base plate 1 along the original installation trajectory so that the base plate 1 and the mating surface of the already cured wedge plate 2 below are precisely fitted. After positioning, check the levelness, elevation and lift (center deviation) of the base plate 1. Confirm that the deviation from the initial installation accuracy does not exceed 0.02mm / m, and complete the final repositioning of the base plate 1.

[0034] During the secondary lowering of the base plate 1, the hoisting and lowering speed is controlled to be no more than 0.2m / s, ensuring that the vertical offset of the base plate 1 when it is lowered along the original installation trajectory does not exceed 0.05mm. At the same time, the horizontal displacement deviation of the base plate 1 is monitored in real time using a dial indicator to ensure that the horizontal position deviation does not exceed the preset requirements.

[0035] Furthermore, in steps S1 and S4, the contact area and fitting clearance between the wedge plate 2 and the base plate 1 meet the design requirements, which means that the effective contact area between the wedge plate 2 and the base plate 1 accounts for no less than 75% of the total contact area, the contact points are evenly distributed, and a 0.04mm feeler gauge must not be inserted into the core stress-bearing area of ​​both.

[0036] It should be noted that the T-shaped tooling 3 used in this invention consists of an integrally formed vertical rod and a horizontal rod. The vertical rod has an external thread adapted to a locking nut, and the length of the horizontal rod is greater than the diameter of the anchor bolt hole 4 and less than the distance between the outer edges of the two Class I wedge plates 21 located on both sides of the anchor bolt hole 4. The T-shaped tooling 3 of this invention adopts a standardized interface design, which can be adapted to wedge plates 2 of different specifications from φ16 to φ100. Therefore, the tool reuse rate when replacing different types of base plates 1 reaches 100%, and modular universal installation of the exciter base plate 1 and the brush holder base plate 1 can be realized.

[0037] Furthermore, in order to prevent the alignment reference marks set on the base plate 1 and the foundation from being covered by mortar or worn by bumps during subsequent grouting and hoisting operations, the depth of the paired positioning indentations set in step S3 is 1 to 2 mm, and after applying the marking pigment, a layer of varnish is applied to the surface of the marking pigment to form a wear-resistant protective layer.

[0038] Furthermore, before performing cement grouting, the present invention also adheres a sealing strip to the outer periphery of the joint between the base plate 1 and the wedge plate 2. At the same time, during the grouting process, the grouting pressure is controlled at 0.1 to 0.3 MPa to ensure that the grout completely fills the cavity between the bottom of the wedge plate 2 and the foundation, and that the grout does not overflow into the mating surfaces between the wedge plate 2 and the base plate 1.

[0039] Based on the same inventive concept, another aspect of the present invention discloses a combined installation structure of a generator base plate and a wedge plate, which is obtained by the above-mentioned combined installation method of the generator base plate and the wedge plate.

[0040] The above description is merely a specific embodiment of the present invention. Any feature disclosed in this specification may be replaced by other equivalent or similar features unless otherwise specified. All features or steps in the disclosed methods or processes may be combined in any way, except for mutually exclusive features and / or steps.

Claims

1. A method for assembling and installing a generator base plate and a wedge plate, characterized in that, Includes the following steps: Step S1. Grind all the mating contact surfaces between the wedge plates and the base plate until the contact area and clearance between the wedge plates and the base plate meet the design requirements; Step S2. Divide the wedges into two categories according to their distribution location: the wedges distributed on both sides of the anchor bolt holes on the base plate are the first type, and the wedges distributed in the non-anchor bolt hole area are the second type. Place the first type wedges in the corresponding installation position on the base plate, and use a T-shaped tool with a locking nut to pass through the anchor bolt holes. Use the crossbar of the T-shaped tool to fasten the two first type wedges on both sides of the anchor bolt holes to the base plate. Step S3. Hoist the base plate pre-installed with a type of wedge plate onto the factory foundation. Adjust the levelness, elevation and lift of the base plate using the leveling screw assembly pre-arranged on the foundation, in conjunction with a level instrument, until the requirements are met. Step S4. Lift the base plate with the pre-installed Type I wedge plate off the work station as a whole, then install the Type II wedge plate to the corresponding position on the factory foundation. Adjust its installation height using the adjusting screws on the Type II wedge plate. Then lift the base plate back in and lower it into place. Check the mating contact surface between the Type II wedge plate and the base plate. Repeat the adjustment until the contact area and mating clearance between the Type II wedge plate and the base plate meet the design requirements. Step S5. Perform cement grouting on all wedge plate installation areas. When the compressive strength of the grout reaches 65% to 75% of the design strength, loosen the locking nut on the T-shaped tool screw, lift the base plate off the work position as a whole, and then cut off the vertical part of the T-shaped tool, while cutting off the exposed section of its horizontal bar that extends beyond the foundation embedded surface. Step S6. Slowly lower the base plate along the original installation trajectory to ensure that the base plate and the already cured wedge plate mating surface are precisely aligned. After positioning, check the levelness, elevation, and lift of the base plate to confirm that the deviation from the initial installation accuracy meets the requirements. The final repositioning of the base plate is then completed.

2. The method for combining and installing a generator base plate and a wedge plate according to claim 1, characterized in that, The design requirements in steps S1 and S4 are that the effective contact area between the wedge plate and the base plate accounts for no less than 75% of the total contact area, the contact points are evenly distributed, and a 0.04mm feeler gauge must not be inserted into the core stress-bearing area of ​​both.

3. The method for combining and installing a generator base plate and a wedge plate according to claim 1, characterized in that, The T-shaped fixture consists of an integrally formed vertical rod and a horizontal rod. The vertical rod is provided with an external thread adapted to a locking nut, and the length of the horizontal rod is greater than the diameter of the anchor bolt hole and less than the outer distance between the two Class I wedge plates.

4. The method for combining and installing a generator base plate and a wedge plate according to claim 1, characterized in that, In step S3, after the installation accuracy of the base plate meets the requirements, a pair of positioning recesses are processed on the side of the base plate and the corresponding factory foundation surface to form a secondary resetting alignment reference.

5. The method for combining and installing a generator base plate and a wedge plate according to claim 4, characterized in that, Apply colored marker pigment to the positioning indentation.

6. The method for combining and installing a generator base plate and a wedge plate according to claim 1, characterized in that, Before cement grouting, a sealing strip is bonded to the outer perimeter of the joint between the base plate and various wedge plates.

7. The method for combining and installing a generator base plate and a wedge plate according to claim 1, characterized in that, During cement grouting, the grouting pressure should be controlled at 0.1–0.3 MPa.

8. The method for combining and installing a generator base plate and a wedge plate according to claim 1, characterized in that, In step S6, during the resetting and lowering of the base plate, the hoisting and lowering speed is controlled to be no more than 0.2 m / s, and the horizontal displacement deviation of the base plate is monitored in real time using a dial indicator.

9. The method for combining and installing a generator base plate and a wedge plate according to claim 1, characterized in that, In step S6, the levelness, elevation, and height of the base plate after it is lowered and reset shall not deviate from the initial installation accuracy by more than 0.02 mm / m.

10. A combined mounting structure of a generator base plate and a wedge plate, characterized in that, The combined installation structure is obtained by the combined installation method of generator base plate and wedge plate as described in any one of claims 1-9.