A method for positioning and quality re-testing during drainage ditch construction.
By using a simple calibration tool, one-time positioning and real-time re-measurement can be achieved during drainage ditch construction, solving the problems of low efficiency and poor accuracy in traditional construction and improving construction efficiency and quality.
Patent Information
- Application Number
- CN202611084174.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-21
- Publication Date
- 2026-11-17
AI Technical Summary
Traditional drainage ditch construction requires repeated measurement and layout, resulting in low work efficiency, high costs, and difficulty in ensuring construction accuracy.
By using a simple calibration tool, markings are set on the positioning rod and connecting plumb bobs, one-time positioning and real-time re-measurement during construction can be achieved, simplifying the measurement process and improving construction accuracy.
The elimination of repeated point measurement and layout significantly improves construction efficiency, reduces labor and equipment costs, and enhances construction accuracy and quality.
Smart Images

Figure CN123109260A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of drainage ditch construction technology, and specifically to a method for drainage ditch construction positioning and quality re-testing. Background Technology
[0002] To meet drainage requirements, drainage ditches are commonly installed on both sides of roads during construction. After the earthwork excavation of the drainage ditches is completed, the loose soil on both sides and the bottom of the ditch needs to be cleared, and the structural dimensions need to be measured and laid out. The sides and bottom of the ditch are then trimmed to ensure that the cross-sectional dimensions of the drainage ditch meet the design requirements before proceeding to the next construction step. Traditional drainage ditch construction and slope trimming require repeated measurement and layout, which is time-consuming, labor-intensive, repetitive, inefficient, and results in long usage times for measuring instruments and high labor and equipment costs. Summary of the Invention
[0003] This invention discloses a method for positioning and quality retesting during drainage ditch construction. With the help of a simple calibration tool, the accuracy of drainage ditch positioning can be improved without repeated point measurement and line setting.
[0004] To achieve the above objectives, the technical solution adopted by the present invention is as follows: A method for positioning and quality re-testing during the construction of drainage ditches includes the following steps: Step 1): Based on the structural layer dimensions and construction location determined by the drainage ditch design drawings, excavate the construction ground to form a drainage ditch structural layer with an inverted trapezoidal cross-section; Step 2): Set up positioning supports on the construction ground on both sides of the drainage ditch; Step 3): Assemble the calibration tools: 3.1): Mark the edges of the trench at both ends of the positioning rod, and make the distance between the two trench edge marks the same as the distance between the two positioning supports; 3.2) Mark the bottom of the ditch on the positioning rod between the two end marks, and make the distance between the two bottom marks consistent with the bottom width of the drainage ditch after construction in the design drawing; 3.3) Mark the top of the ditch on the positioning rod between the ditch edge mark and the bottom mark on each side. The top mark is located at the intersection of the ditch sidewall and the construction ground after the drainage ditch is completed in the design drawing. 3.4) Tie a bottom position connecting line to each of the two bottom position markings on the positioning rod. The length of the bottom position connecting line is determined according to the height of the construction structure surface. Tie a plumb bob to the other end of each bottom position connecting line and let each plumb bob hang naturally. 3.5) Connect the plumb bob on each side of the positioning rod to the top position mark of the trench with a top position connecting line, and keep the plumb bob on each side in a natural hanging state and the top position connecting line on each side in a taut state. Step 4): After assembling the calibration tool according to Step 3), place the two ends of the positioning rod on the two positioning supports respectively, so that the positioning support at each end corresponds to the position of the ditch edge mark at that end, and let the two plumb bobs hang down naturally into the drainage ditch. Step 5): Begin construction of the drainage ditch or conduct a quality re-inspection after construction; The trench width is constructed according to the landing points of the two plumb bobs, so that the width of the trench bottom after construction is consistent with the distance between the two plumb bobs; the trench sidewall is constructed according to the inclination angle of the connecting line at the top, so that the trench sidewall after construction is parallel to the connecting line at the top and the two coincide in position.
[0005] Furthermore, the positioning rod is a metal cylindrical rod.
[0006] Furthermore, the length of the positioning rod is greater than the top width of the drainage ditch.
[0007] Furthermore, the positioning support is made of mortar and has a right-angled triangle cross-section.
[0008] This invention can effectively solve the problems of inaccurate positioning of the sloping sides of the drainage ditch and poor construction quality. At the same time, it can flexibly adjust the position of the markings on the positioning rod to cope with complex drainage ditches of different shapes. By using calibration tools to check in a timely manner during construction, the construction quality can be further improved. Attached Figure Description
[0009] Figure 1 This is a state diagram of drainage ditch construction using calibration tools in the embodiment; Figure 2 for Figure 1 Enlarged view of point A in the middle; Figure 3 To be according to Figure 1 The diagram shows the state after construction.
[0010] Figure label: 1. Drainage ditch; 2. Positioning rod; 3. Positioning support; 4. Ditch edge marker; 5. Ditch top marker; 6. Ditch bottom marker; 7. Plumb bob; 8. Bottom position connecting line; 9. Top position connecting line; 10. Ditch sidewall; 11. Construction ground. Detailed Implementation
[0011] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
[0012] This embodiment designs a simple calibration tool for the construction of drainage ditch 1 and the subsequent quality re-testing, such as... Figure 1 As shown, the calibration tool in this embodiment includes a positioning rod 2, a connecting wire, and two plumb bobs 7. The positioning rod 2 needs to be marked with multiple points according to the construction dimensions determined in the design drawing of the drainage ditch 1. This embodiment and the accompanying drawings use a drainage ditch 1 with an inverted trapezoidal cross-section as an example. A cylindrical metal rod with a length greater than the maximum width of the drainage ditch 1 is selected as the positioning rod 2. Based on the bottom width of the drainage ditch 1 in the design drawing, the positions of two ditch bottom position marks 6 are determined on the positioning rod 1, and two ditch bottom position marks 6 are marked at the determined positions, with the distance between the two ditch bottom position marks 6 equal to the bottom width of the ditch. Based on the top width of the drainage ditch 1 in the design drawing, the positions of two ditch top position marks 5 are determined on the positioning rod 1, and two ditch top position marks 5 are marked at the determined positions, with the distance between the two ditch top position marks 5 equal to the top width of the ditch. Mark the ditch edge 4 near the ends of the positioning rod 2. Determine the length of the lower opening position connecting line 8 according to the depth of the drainage ditch 1. Tie a lower opening position connecting line 8 to each lower opening position mark 6, and tie a plumb bob 7 to the other end of each lower opening position connecting line 8. Let each plumb bob 7 hang naturally under the action of gravity. Connect each plumb bob 7 to the upper opening position mark 5 on the same side of the ditch with an upper opening position connecting line 9, ensuring that the upper opening position connecting line 9 is taut and does not affect the natural hanging of the plumb bob 7.
[0013] After assembling the calibration tools as described above, the construction positioning and quality re-testing of drainage ditch 1 can be carried out. Figures 1 to 3 As shown, the method includes the following steps: Step 1): Based on the structural layer dimensions and construction location determined by the design drawing of drainage ditch 1, excavate the construction ground 11 at the construction location to form a drainage ditch structural layer with an inverted trapezoidal cross section. Step 2): On the construction ground 11 on both sides of the drainage ditch structural layer, right-angled triangular positioning supports 3 are cast with mortar. Step 3): Set up the assembled calibration tools, that is: place the two ends of the positioning rod 2 on the two positioning supports 3 respectively, so that the positioning support 3 at each end corresponds to the position of the ditch edge mark 4 at the end, and let the two plumb bobs 7 hang naturally in the drainage ditch 1. Step 4): Correct the drainage ditch structure layer according to the calibration tool (such as surface plastering, slope finding, leveling, tiling, etc.), or re-test the quality of the drainage ditch 1 after construction according to the calibration tool.
[0014] Taking the modification construction of drainage ditch 1 as an example, the bottom width of the ditch is constructed according to the drop points of the two plumb bobs 7, so that the width of the bottom of the ditch after construction is consistent with the distance between the two plumb bobs 7; the sidewall of the ditch 10 is constructed according to the inclination angle of the connecting line 9 at the top, so that the sidewall of the ditch 10 after construction is completely parallel to the connecting line 9 at the top and the two coincide in position (e.g., Figure 3 (As shown).
[0015] The calibration tool designed in this invention has a simple structure, and all components used are common and do not require customization. The position of the markings on the positioning rod 2 can be flexibly adjusted according to the shape and size of the drainage ditch 1 being constructed. For a drainage ditch 1 with a rectangular cross-section, the two upper opening position markings 5 and the upper opening position connecting line 9 can be omitted, and the specific selection can be flexibly made according to the shape and size. For a drainage ditch 1 with an inverted trapezoidal cross-section, this invention can determine the construction flatness and positional accuracy of the ditch sidewall 10 of the drainage ditch 1 through the inclined upper opening position connecting line 9, eliminating the need for multiple measurement points and line laying, which can greatly improve construction efficiency.
[0016] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A method for positioning and quality re-testing during the construction of drainage ditches, characterized in that, Includes the following steps: Step 1): Based on the structural layer dimensions and construction location determined by the drainage ditch design drawings, excavate the construction ground to form a drainage ditch structural layer with an inverted trapezoidal cross-section; Step 2): Set up positioning supports on the construction ground on both sides of the drainage ditch; Step 3): Assemble the calibration tools: 3.1): Mark the edges of the trench at both ends of the positioning rod, and make the distance between the two trench edge marks the same as the distance between the two positioning supports; 3.2) Mark the bottom of the ditch on the positioning rod between the two end marks, and make the distance between the two bottom marks consistent with the bottom width of the drainage ditch after construction in the design drawing; 3.3) Mark the top of the ditch on the positioning rod between the ditch edge mark and the bottom mark on each side. The top mark is located at the intersection of the ditch sidewall and the construction ground after the drainage ditch is completed in the design drawing. 3.4) Tie a bottom position connecting line to each of the two bottom position markings on the positioning rod. The length of the bottom position connecting line is determined according to the height of the construction structure surface. Tie a plumb bob to the other end of each bottom position connecting line and let each plumb bob hang naturally. 3.5) Connect the plumb bob on each side of the positioning rod to the top position mark of the trench with a top position connecting line, and keep the plumb bob on each side in a natural hanging state and the top position connecting line on each side in a taut state. Step 4): After assembling the calibration tool according to Step 3), place the two ends of the positioning rod on the two positioning supports respectively, so that the positioning support at each end corresponds to the position of the ditch edge mark at that end, and let the two plumb bobs hang down naturally into the drainage ditch. Step 5): Begin construction of the drainage ditch or conduct a quality re-inspection after construction; The trench width is constructed according to the landing points of the two plumb bobs, so that the width of the trench bottom after construction is consistent with the distance between the two plumb bobs; the trench sidewall is constructed according to the inclination angle of the connecting line at the top, so that the trench sidewall after construction is parallel to the connecting line at the top and the two coincide in position.
2. The method for positioning and quality re-testing of drainage ditch construction according to claim 1, characterized in that: The positioning rod is a metal cylindrical rod.
3. The method for positioning and quality re-testing of drainage ditch construction according to claim 1, characterized in that: The length of the positioning rod is greater than the top width of the drainage ditch.
4. The method for positioning and quality re-testing of drainage ditch construction according to claim 1, characterized in that: The positioning support is made of mortar and has a right-angled triangle cross-section.