Using partial hollow plastering to treat indoor leakage problems in the exterior walls of underground engineering projects

By using a partial hollow plastering method, combined with a special drainage board and expansion pipe for fixing, the problem of leakage in the exterior walls of underground projects was solved, achieving permanent waterproofing and cost control.

CN123109269APending Publication Date: 2026-11-17SHANGHAI SANCAI TECH DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611455576.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-08
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing technologies for dealing with leakage in the exterior walls of underground engineering projects involve high costs for applying a hollow plaster to the entire surface, while simply sealing cracks with waterproof materials can lead to aging and failure, making it impossible to achieve permanent waterproofing.

Method used

The method of partial hollow plastering is adopted. First, the cracks are sealed and then a special drainage board is pasted and fixed with expansion tubes. A wire mesh is hung to form a hollow layer and the junction is sealed to ensure the flatness and waterproof effect of the hollow plastering and the dense plastering layer.

Benefits of technology

It achieves permanent waterproofing, reduces project costs, and provides a smooth wall surface, avoiding the risk of water seeping into the dense plaster layer and plaster cracks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109269A_ABST
    Figure CN123109269A_ABST
Patent Text Reader

Abstract

This invention discloses a method for treating interior leakage in exterior walls of underground engineering projects using partial hollow plastering, belonging to the field of building waterproofing technology. First, waterproof materials are used to seal cracks in the wall. A special drainage board is then glued to the leaking area and reinforced with expansion tubes. Wire mesh is then applied, forming a partially hollow drainage channel. The height of the drainage board's support points is less than the plaster thickness, ensuring the hollow plaster layer is the same thickness as the surrounding plaster surface. The drainage board uses combined support points to increase the bonding area. Adhesive strips are used to seal the junctions, preventing water seepage into the dense plaster layer and preventing cracking at the junctions. This invention eliminates the need for full-wall hollow plastering, targeting only the leaking area while providing permanent drainage and seepage prevention, significantly reducing project costs. It is suitable for both new construction and renovation of underground engineering projects.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of building waterproofing technology, and in particular to the treatment technology for water seepage cracks in the interior of the exterior walls of underground engineering projects under new construction and renovation conditions. Background Technology

[0002] There are various methods for dealing with leaks in the exterior walls of underground engineering projects. These include completely repainting the interior of the entire exterior wall with hollow plaster, or sealing the seepage cracks with waterproof materials before repainting. In engineering practice, balancing permanent waterproofing quality with a lower project cost is the ideal technical solution. Therefore, it is necessary to provide a method for localized treatment of wall seepage cracks, suitable for both new construction and renovation projects.

[0003] Existing hollow plastering solutions are expensive; simply sealing cracks with waterproof materials will lead to leakage again after the materials age, failing to achieve permanent waterproofing. Summary of the Invention

[0004] A method for treating indoor leakage in the exterior walls of underground engineering projects using partial hollow plastering involves first sealing the cracks in the exterior walls, then attaching a localized low-support drainage board to achieve partial hollow plastering. The thickness of the hollow plastering is consistent with the thickness of the surrounding actual plaster layer, realizing a combined process of "blocking-draining-filtration-uniform plaster thickness" to achieve permanent quality and control the overall cost. The method includes the following steps:

[0005] S1. Seal the cracks in the wall with waterproof material;

[0006] S2. Glue the special drainage board to the wall, and then use expansion tubes to further secure it;

[0007] S3. Install wire mesh and carry out painting work; form a hollow layer on the wall, and set up a drainage channel at the bottom of the hollow layer.

[0008] The height of the support point of the special drainage board is lower than the thickness of the plaster layer, ensuring that the hollow plaster surface layer has the same thickness as the surrounding ordinary plaster surface layer; the drainage board adopts a combination structure of general support point with full-length groove, or general support point with larger support point; the bottom of the support point forms a larger adhesive contact area with the wall, while ensuring that the interlocking between the support point and the plaster layer is not affected.

[0009] At the junction of the hollow plastering area and the dense plastering area, the side of the drainage board is sealed with adhesive strips to prevent water seepage into the dense plastering layer and to prevent plastering cracks from forming at the junction of the hollow plastering and the dense plastering.

[0010] The beneficial effects of this invention: Underground engineering projects have large overall wall areas, and many leaks only occur in a few localized cracks. Simply relying on waterproofing materials for sealing is risky due to the aging and failure of these materials, and cannot achieve a permanent leak-free solution. This invention employs a localized hollow plastering drainage scheme, placing dedicated drainage boards only in the leaking areas, eliminating the need for hollow plastering the entire wall. The optimized structure of the dedicated drainage board increases the bonding area between the support base plate and the wall, ensuring the drainage board is firmly and smoothly adhered to the wall. The hollow plastering has the same thickness as the surrounding dense plastering, resulting in a smooth wall appearance. Sealing strips at the junctions prevent water seepage into the dense plaster layer, while also avoiding the risk of cracking at the junctions of different plastering areas. This invention can significantly save on project costs, achieve excavation-free interior treatment, and permanently control interior water seepage from exterior walls. Attached Figure Description

[0011] Figure 1 This is a plan view of the general combination of support points and grooves of the special drainage board of the present invention;

[0012] Figure 2 This is a plan view of the combination of general support points and larger support points for the special drainage board of this invention:

[0013] Figure 3 This is a cross-sectional schematic diagram of the hollow paintbrush of the present invention with the same thickness as ordinary paintbrush.

[0014] Figure label:

[0015] 1-General support point, 2-Groove, 3-Larger support point, 4-Expansion tube, 5-Wire mesh, 6-Full plaster layer, 7-Adhesive strip, 8-Dense plaster surface, 9-Structural wall surface Detailed Implementation

[0017] The present invention will now be described in further detail with reference to the accompanying drawings.

[0018] like Figure 1 The special drainage board is equipped with a general support point 1 and a groove 2. The groove increases the bonding contact area between the drainage board and the wall.

[0019] like Figure 2 The special drainage board is equipped with general support point 1 and larger support points 3 distributed in a dispersed manner to increase the bonding area with the wall and improve the bonding firmness.

[0020] like Figure 3 A special drainage board with support points 1 and 3 is pasted on the structural wall 9; expansion tubes 4 are used to reinforce and fix it again; wire mesh 5 is hung, and the wire mesh needs to be extended to the surface of the dense plaster 8; adhesive strips 7 are used to seal the sides of the drainage board to prevent water seepage into the dense plaster layer, and at the same time to prevent plaster cracks from forming at the junction of hollow plaster and dense plaster; finally, the entire plastering 6 is carried out.

[0021] After construction, a hollow drainage channel is formed behind the drainage board. Water seeping from the exterior wall enters the hollow channel and flows downward to drain out. The seepage is confined to the hollow area and will not seep into the surrounding dense plaster layer. The overall wall plaster layer has a uniform thickness, and the wall surface is flat and beautiful.

Claims

1. A method for treating indoor leakage in the exterior walls of underground engineering projects using partial hollow plastering, characterized in that, First, waterproof material is used to seal the cracks in the wall; then, a special drainage board is glued to the wall and reinforced with expansion tubes; after hanging wire mesh, plastering is carried out, and a hollow drainage channel extending from the top to the bottom is formed on the wall.

2. The method for treating indoor leakage of exterior walls in underground engineering projects using partial hollow plastering according to claim 1, characterized in that, The support height of the special drainage board is less than the thickness of the plaster layer, so that the surface layer thickness of the hollow plaster area is consistent with that of the surrounding dense plaster area; the special drainage board is composed of a general support and a full-length groove, or a general support and a larger support; the bottom of the support has a larger adhesive contact area with the wall, while not damaging the interlocking bond between the support and the plaster layer.

3. The method for treating indoor leakage of exterior walls in underground engineering projects using partial hollow plastering according to claim 1, characterized in that, At the junction of the hollow plastering area and the dense plastering area, the sides of the special drainage board are sealed with adhesive strips to prevent water seepage into the dense plastering layer; at the same time, plastering cracks are avoided at the junction of the hollow plastering and the dense plastering.