By using a double-layer tongue and groove tenon structure and a sealing lip composite sealing system, combined with UHPC non-removable formwork, the problems of water seepage and complicated construction of prefabricated concrete slab strip structures are solved, achieving high-precision, multi-layer seepage prevention and durability of prefabricated concrete slab strip connections.

CN123109322APending Publication Date: 2026-11-17ANHUI SANJIAN ENG
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611376992.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-07
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing prefabricated concrete slab strip structures are prone to water seepage and cracks at the joints. Construction is cumbersome and the durability is poor. The traditional single-layer U-shaped concave tongue and groove joint and cross steel ring connection method cannot effectively prevent longitudinal slippage and lateral displacement of the slab strip, resulting in easy leakage at the joints.

Method used

It adopts a double-layer tongue and groove tenon structure, combined with sealing lip composite sealing and UHPC non-removable template bidirectional compression process. The first-level lateral limit is formed by the interlocking of concave groove and convex block, and the longitudinal locking is achieved by the sliding cooperation of T-block and T-groove. Polyurethane sealant is injected to form a multi-layer anti-seepage structure, and prefabricated UHPC thin plate is used as non-removable bottom template.

Benefits of technology

It achieves high precision in bidirectional displacement constraint of the plate and strip, excellent joint flatness, and a multi-composite sealing system that significantly improves water resistance. The construction process is simplified, and the long-term durability is outstanding, avoiding through cracks and water seepage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109322A_ABST
    Figure CN123109322A_ABST
Patent Text Reader

Abstract

This invention relates to the field of waterproofing construction technology for prefabricated buildings, and proposes a prefabricated concrete slab strip structure, including a concave groove on the splicing side of a first slab strip and a convex block on the splicing side of a second slab strip that conforms to the contour of the concave groove. The two fit together to achieve primary horizontal lateral restraint. A T-shaped block that can slide along the inner vertical groove is provided in the concave groove, and fits with the T-shaped groove on the end face of the convex block to achieve secondary longitudinal displacement locking. Combined with an elastic sealing gasket, sealing lip, and injection hole for injecting polyurethane sealant, a multi-layer composite sealing system is formed. The construction adopts the UHPC formwork-free process, which uses the self-weight of cast-in-place concrete to construct an orthogonal bidirectional compressive stress field, so that the sealing components are in a triaxial compressive bonding state for a long time. This invention can accurately restrain the bidirectional displacement of the slab strip, significantly improve the joint impermeability and durability, shorten the construction time of a single joint, and balance assembly accuracy and on-site construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of waterproofing construction technology for prefabricated buildings, specifically to a prefabricated concrete slab structure and a seepage prevention construction method. Background Technology

[0002] Prefabricated concrete slab strip structures are not independent components. They refer to the strip-shaped areas reserved between prefabricated slabs during the construction of prefabricated floor slabs, which need to be connected by on-site pouring of concrete. Their function is to connect the various prefabricated slabs, so that the floor slabs form a whole "link" or "joint strip".

[0003] CN201820051049.3 discloses a tongue-and-groove precast floor slab connection structure, including a precast floor slab, additional reinforcing bars, and outward reinforcing bar rings. The tongue and groove of the precast floor slab has an inward concave structure, forming a U-shaped groove at the floor slab joint for pouring concrete during construction. One pair of outward reinforcing bar rings has straight upper and lower parts and curved ends, which intersect and overlap at the floor slab joint to form a reinforcing bar ring. The additional reinforcing bars are placed inside the reinforcing bar rings and are cast into a whole by post-cast concrete. The outward reinforcing bar rings and additional reinforcing bars at the joint can withstand the bending moment and shear force at the joint, ensuring an effective connection between the precast floor slabs. At the same time, this novel connection method has a simple production process, convenient construction, and high material utilization rate, giving full play to the construction technology advantages of close-fitting precast floor slabs that require no formwork or support, and has high safety and good integrity.

[0004] The prior art document CN207863256U relies solely on a single-layer U-shaped concave tongue and groove joint and intersecting steel reinforcement rings for slab splicing, which has multiple shortcomings in terms of limiting, waterproofing, and construction performance. The single-layer tongue and groove joint only restricts the lateral displacement of the slab strip; under load, the longitudinal slippage of the slab strip is large, and the joints are prone to opening and forming seepage cracks. Furthermore, relying solely on the self-waterproofing of the post-cast concrete results in continuous linear seepage after stabilizing at 1.5MPa water pressure for 24 hours. Construction requires the erection of traditional wooden formwork and subsequent demolding, with a single joint construction time of up to 20 minutes. Demolding easily disturbs the joints, and grout leakage during pouring can contaminate the joint contact surface. Therefore, this invention improves upon the existing technology by providing a prefabricated concrete slab strip structure and a seepage-proof construction method to solve the problems existing in the prior art. Summary of the Invention

[0005] This invention proposes a prefabricated concrete slab strip structure and a seepage prevention construction method. By using double-layer tongue and groove tenon joints, sealing lip composite sealing, and UHPC non-removable formwork bidirectional compaction process, it solves the problems of misalignment of traditional slab strip splicing, easy leakage at joints, cumbersome construction and poor durability.

[0006] The technical solution of the present invention is as follows:

[0007] A prefabricated concrete slab strip structure includes a first slab strip and a second slab strip. The splicing side of the first slab strip is provided with a concave groove, and the splicing side of the second slab strip is provided with a convex block that matches the contour of the concave groove. The convex block is fitted into the concave groove to complete the horizontal lateral positioning of the first slab strip and the second slab strip.

[0008] A T-shaped block is provided on the upper end face of the concave groove, and a T-shaped groove adapted to the contour of the T-shaped block is opened on the end face of the convex block facing the concave groove. An elastic sealing gasket layer is laid on the inner wall of the T-shaped groove.

[0009] The inner wall of the concave groove is symmetrically provided with vertical sliding grooves, and the two sides of the T-shaped block are respectively provided with sliders, which slide in cooperation with the vertical sliding grooves;

[0010] The T-block can descend vertically along the vertical groove via the slider, fit into the T-groove, and squeeze the elastic sealing pad layer to achieve longitudinal displacement locking between the first and second strips.

[0011] Furthermore, the outer side walls of both sides of the concave groove are provided with glue injection holes, which are connected to the splicing gap between the concave groove and the convex block, and are used to inject sealant into the splicing gap to form an outer layer joint waterproof structure.

[0012] Furthermore, a sealing lip is provided around the outer edge of the top surface of the T-block; in the initial unassembled state, the overall top surface of the T-block and the sliders on both sides is higher than the top surface of the first strip.

[0013] Furthermore, a method for waterproofing joints in prefabricated concrete slab-strip structures includes the following steps:

[0014] Step 1: Clean the laitance and loose particles from the surface of the splicing area between the first and second strips, and apply concrete interface agent to the vertical grooves of the concave groove and the inner wall of the T-groove in a directional manner.

[0015] Step 2: Move the second strip horizontally so that the convex block is smoothly embedded into the inner cavity of the concave groove, completing the horizontal lateral limiting engagement of the first-stage tongue and groove.

[0016] Step 3: After the convex block is fully in place, use a constant pressure impactor to vertically impact the top of the T-block downwards, so that the T-block moves vertically down along the vertical groove of the inner wall of the concave groove through the sliders on both sides until the top surface of the T-block is flush with the upper surface of the first strip, thereby achieving longitudinal displacement constraint and locking of the second strip relative to the first strip.

[0017] Step 4: After the T-block is locked down and the sealing lip is fully covered and in place, use the anchor steel bar head reserved at the top of the T-block as a support positioning column, and install the precast UHPC thin plate as the bottom formwork of the post-cast section without removal.

[0018] Step 5: High-performance polyurethane sealant is injected into the joint gap between the concave groove and the convex block through the injection hole under high pressure. After confirming that the sealant is filled tightly by the overflowing sealant, the overflowing residual sealant is removed. The outer end of the injection hole is sealed with quick-hardening repair mortar of the same grade as the strip and smoothed and finished.

[0019] Step 6: After the precast UHPC thin slab is installed in place, the reinforcing bars of the cast-in-place section are tied on the top surface of the UHPC thin slab. After the reinforcing bars are tied, concrete is poured on the precast UHPC thin slab.

[0020] Furthermore, in step 3, a vertically extending anchoring steel bar head is reserved at the top of the T-shaped block, and the upper end of the anchoring steel bar head is 50-60mm higher than the upper surface of the first strip.

[0021] The outer periphery of the anchoring steel bar head is pre-fitted with a corrugated pipe, and the outer wall of the corrugated pipe is wrapped with a slow-expansion water-stop tape, which is used to make the anchoring steel bar head and the cast-in-place concrete form a mechanical anchoring connection during subsequent cast-in-place concrete pouring.

[0022] Furthermore, in step 4, the bottom surface of the prefabricated UHPC sheet has pre-set conical positioning holes corresponding one-to-one with the positions of the anchoring rebar heads. During installation, each conical positioning hole is aligned with the corresponding anchoring rebar head and inserted vertically, so that the bottom surface of the UHPC sheet tightly supports the upper surfaces of the first and second strips. The anchoring rebar heads penetrate the UHPC sheet and protrude 30-40mm above its top surface, achieving the snap-fit ​​positioning and horizontal constraint of the UHPC sheet.

[0023] Furthermore, in step 4, after the anchoring rebar head penetrates the exposed section of the UHPC sheet, a flexible rubber waterstop ring is fitted onto the outer periphery and the matching nut is tightened. This ensures that the flexible rubber waterstop ring tightly grips the outer wall of the anchoring rebar under the pressure of the nut, sealing the top openings of the UHPC sheet.

[0024] Furthermore, in step 4, the precast UHPC thin plate is rigidly connected to the T-block by anchoring the steel bar head, so that the locking structure of the precast joint and the stress-bearing skeleton of the cast-in-place section form a whole stress-bearing unit that works together to bear the stress.

[0025] Furthermore, in step 4, the joints between the outer edge of the prefabricated UHPC sheet and the upper surfaces of the first and second strips are sealed with water-swellable sealing strips.

[0026] The working principle and beneficial effects of this invention are as follows:

[0027] High precision of bidirectional displacement constraint and excellent assembly flatness: Under the standard load of 0.5kN / m, a bidirectional limiting structure is formed based on the primary tongue and groove joint composed of concave groove and convex block, and the secondary T-shaped tenon and mortise joint composed of T-shaped block and T-shaped groove. The lateral displacement of the strip is ≤0.1mm and the longitudinal displacement is ≤0.15mm, which can effectively avoid the through cracks caused by large-scale slippage of the strip. With the help of the linkage locking and leveling component composed of T-shaped block and slider, the height difference of the joint can be controlled within ≤1mm, eliminating the need for manual grinding and repair, and greatly improving the assembly flatness.

[0028] The multi-layer composite sealing system significantly improves immediate water resistance: It consists of an elastic sealing pad on the inner wall of the T-groove, a sealing lip on the outer edge of the top surface of the T-block, and polyurethane sealant injected into the gap between the concave groove and the convex block. Under 1.5MPa water pressure stabilization for 24 hours, there is no water leakage or wet marks at the joint, and the water resistance is significantly enhanced compared to the traditional single-layer tongue and groove sealing solution.

[0029] The sealing interface is continuously subjected to pressure, resulting in outstanding long-term durability: The self-weight load of the cast-in-place concrete is transferred to the T-block through the anchoring steel bars, which can create an orthogonal bidirectional compressive stress field with a vertical strength of ≥0.02MPa and a radial strength of 0.15~0.20MPa. This keeps the sealing lip, elastic sealing gasket, and polyurethane sealant in a triaxial compressive bonding state for a long time. After 500 dry and wet cycles, the sealing interface shows no cracking or debonding, and its impermeability does not decrease. This solves the problem of traditional solutions that rely solely on the initial compressive stress during assembly, which gradually decreases and leads to the sealing interface becoming void and leaking.

[0030] Multiple layers of waterproofing are implemented at the rebar locations, resulting in strong overall structural synergy: Corrugated pipes, slow-expansion sealing tape, and flexible rubber sealing rings form multiple waterproofing barriers at the base of the rebars. In a 24-hour water pressure test at 1.0 MPa, no water seepage or dampness was observed at the rebar holes, preventing high-pressure water from penetrating along the rebar capillaries. Simultaneously, the precast UHPC thin slabs are rigidly connected to the T-blocks via anchoring rebars, enabling the locking structure of the precast joints to form a synergistic load-bearing unit with the structural framework of the cast-in-place layer. Under a horizontal reciprocating load of 1.0 kN / m, the maximum joint opening is ≤0.12 mm, effectively preventing through cracks.

[0031] The construction process is streamlined and efficient, and the on-site operation is less difficult: The integrated locking and leveling structure simplifies the assembly process, and the average construction time for a single joint is only 12 minutes, which is 75% shorter than the traditional single-layer tongue and groove construction scheme; at the same time, the use of precast UHPC thin plates as the non-removable bottom formwork for the post-cast section eliminates the formwork erection and dismantling process, avoids the disturbance of the already formed joint sealing structure during the dismantling operation, and takes into account the assembly accuracy, joint waterproofing durability and on-site construction efficiency. Attached Figure Description

[0032] The present invention will now be described in further detail with reference to the accompanying drawings and specific embodiments.

[0033] Figure 1 This is a three-dimensional structural diagram of the prefabricated concrete slab strip structure of the present invention;

[0034] Figure 2 for Figure 1 Enlarged structural diagram of section A in the middle;

[0035] Figure 3 This is a schematic diagram of the three-dimensional structure of the sealing lip in the prefabricated concrete slab strip structure of the present invention;

[0036] The reference numerals in the figures are as follows: 1. First strip; 2. Second strip; 3. Concave groove; 4. Convex block; 5. T-block; 6. T-groove; 7. Elastic sealing gasket; 8. Vertical groove; 9. Slider; 10. Glue injection hole; 11. Sealing lip. Detailed Implementation

[0037] The technical solutions of the present invention will be clearly and completely described below with reference to the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of the present invention.

[0038] Example 1

[0039] like Figures 1-3 As shown, this embodiment proposes a prefabricated concrete strip structure, including a first strip 1 and a second strip 2. The splicing side of the first strip 1 is provided with a concave groove 3, and the splicing side of the second strip 2 is provided with a convex block 4 that matches the contour of the concave groove 3. The convex block 4 is fitted into the concave groove 3 to complete the horizontal lateral positioning of the first strip 1 and the second strip 2.

[0040] A T-shaped block 5 is provided on the upper end face of the concave groove 3, and a T-shaped groove 6 that matches the contour of the T-shaped block 5 is opened on the end face of the convex block 4 facing the concave groove 3. An elastic sealing gasket layer 7 is laid on the inner wall of the T-shaped groove 6.

[0041] Vertical sliding grooves 8 are symmetrically provided on the inner wall of the concave groove 3, and sliders 9 are provided on both sides of the T-shaped block 5 respectively. The sliders 9 slide in cooperation with the vertical sliding grooves 8.

[0042] The T-block 5 can descend vertically along the vertical groove 8 via the slider 9, fit into the T-groove 6 and squeeze the elastic sealing pad 7, thereby achieving longitudinal displacement locking of the first plate strip 1 and the second plate strip 2.

[0043] With this configuration, the outer layer uses the concave groove 3 on the splicing side of the first strip 1 and the convex block 4 on the splicing side of the second strip 2 to form a primary tongue-and-groove structure, thereby constraining the horizontal displacement of the two strips. The inner layer has a vertically sliding T-shaped block 5 installed in the cavity of the concave groove 3, which matches the contour of the T-shaped groove 6 on the end face of the convex block 4. Relying on the vertical sliding grooves 8 symmetrically opened on the inner wall of the concave groove 3 and the sliding guides of the sliders 9 on both sides of the T-shaped block 5, the T-shaped block 5 moves vertically downward and embeds into the T-shaped groove 6, forming a secondary T-shaped tenon-and-mortise structure, thereby constraining the longitudinal displacement of the two strips. During the embedding process, the T-shaped block 5 simultaneously squeezes the elastic sealing gasket 7 on the inner wall of the T-shaped groove 6, filling the assembly gap between the two and forming the basic seal of the inner layer.

[0044] The effect of this setup is that the double-layer tongue and groove structure constrains the lateral and longitudinal displacements respectively, which can effectively control the slippage of the strip under load and avoid through cracks at the splice. The cooperation between the slider 9 and the vertical groove 8 provides the T-block 5 with a precise vertical downward trajectory, ensuring accurate T-shaped tenon and mortise fitting and reducing assembly deviation. The elastic sealing gasket 7 is squeezed to fill the assembly gap to form an inner seepage barrier. At the same time, the double-layer nested tongue and groove structure creates a meandering seepage path, extends the seepage length, and improves the basic seepage resistance of the joint.

[0045] Please see the appendix Figure 1 Furthermore, in another embodiment of the present invention, the two outer side walls of the concave groove 3 are provided with glue injection holes 10, which are connected to the splicing gap between the concave groove 3 and the convex block 4, and are used to inject sealant into the splicing gap to form an outer joint anti-seepage structure.

[0046] With this configuration, injection holes 10 are opened on the outer side walls of the concave groove 3 to communicate with the splicing gap. After the board and strip are spliced ​​in place, sealant is injected under high pressure into the splicing gap between the concave groove 3 and the convex block 4 through the injection holes 10 from the outside of the component. After the sealant fills all the gaps of the outer tongue and groove, it is cured and formed to form a continuous outer joint anti-seepage structure, which together with the inner elastic sealing gasket 7 constitutes an inner and outer composite sealing system.

[0047] The effect of this design is that the outer layer of sealant can completely seal the seepage channels of the outer tongue and groove, forming multiple seepage prevention lines with the inner sealing gasket layer, greatly improving the water pressure resistance of the joint. There is no need to disassemble the spliced ​​plate and strip structure. The sealant injection can be completed from the outside of the component without damaging the existing splicing positioning accuracy. The construction process is simple. After the sealant cures, it is tightly bonded to the contact surfaces of the concave groove 3 and convex block 4 to form a continuous sealing strip, which can adapt to the slight deformation of the joint and maintain the integrity of the seal.

[0048] Please see the appendix Figure 3Furthermore, in another embodiment of the present invention, a sealing lip 11 is provided around the outer edge of the top surface of the T-block 5; in the initial unassembled state, the overall top surface of the T-block 5 and the two side sliders 9 is higher than the top surface of the first plate strip 1.

[0049] With this configuration, a sealing lip 11 is provided around the outer edge of the top surface of the T-block 5. In the initial unassembled state, the overall top surface of the T-block 5 and the slider 9 is higher than the top surface of the first plate strip 1, providing clearance for the convex block 4 to be inserted into the concave groove 3, thus avoiding interference between components during the insertion process. When the T-block 5 is lowered and locked into place, the sealing lip 11 simultaneously covers the outer periphery of the T-block 5, sealing the sliding assembly gap between the T-block 5 and the concave groove 3, and forming an annular sealing band along the outer periphery of the T-groove 6. The sealing lip 11, relying on its own elastic deformation capability, can adaptively adjust the fit under temperature changes and micro-displacement of load conditions, and continuously maintain the sealing state.

[0050] The effect of this design is that the initially raised structure provides clearance for the outer tongue-and-groove joint, avoiding damage to the corners of the components during insertion and ensuring stable positioning of the outer tongue-and-groove joint. On the one hand, the sealing lip 11 prevents mortar and fine aggregate from entering the groove during concrete pouring, preventing the components from getting stuck and locked. On the other hand, it forms a ring-shaped water barrier, sealing the capillary seepage gaps at the T-groove 6 joint and supplementing the sealing defense. The elastic adaptive characteristics of the sealing lip 11 can offset the sealing gaps caused by structural deformation, maintaining a tight and sealed state for a long time, and improving the durability and fatigue resistance of the sealing structure.

[0051] Example 2

[0052] A method for waterproofing joints in prefabricated concrete slab strip structures is proposed. This method utilizes double-layer tongue-and-groove joints, a composite sealing lip, and a UHPC (Ultra-High-Pressure Polymer) formwork-free bidirectional compaction process to solve the problems of misalignment in traditional slab strip splicing, easy leakage at joints, cumbersome construction, and poor durability. The specific implementation steps are as follows:

[0053] Step 1: Clean the laitance and loose particles on the surface of the splicing area between the first strip 1 and the second strip 2, and apply concrete interface agent to the vertical groove 8 and the inner wall of the T-groove 6 of the concave groove 3 in a directional manner.

[0054] Step 2: Move the second strip 2 horizontally so that the convex block 4 is smoothly embedded into the inner cavity of the concave groove 3, completing the horizontal lateral limiting engagement of the first-stage tongue and groove.

[0055] Step 3: After the convex block 4 is fully in place, use a constant pressure impactor to vertically impact the top of the T-block 5, so that the T-block 5 moves vertically down along the vertical sliding groove 8 on the inner wall of the concave groove 3 through the sliders 9 on both sides until the top surface of the T-block 5 is flush with the upper surface of the first plate strip 1, thereby achieving longitudinal displacement constraint and locking of the second plate strip 2 relative to the first plate strip 1.

[0056] Step 4: After the T-block 5 is locked down and the sealing lip 11 is fully covered and in place, use the anchor steel bar head reserved at the top of the T-block 5 as a support positioning column, and install the precast UHPC thin plate as the bottom formwork of the post-cast section without removal.

[0057] Step 5: High-performance polyurethane sealant is injected into the splicing gap between the concave groove 3 and the convex block 4 through the injection hole 10. After the sealant overflows from the injection hole 10 and the filling is confirmed to be dense, the overflowing residual sealant is removed. The outer end of the injection hole 10 is sealed with quick-hardening repair mortar of the same grade as the strip and smoothed and finished.

[0058] Step 6: After the precast UHPC thin slab is installed in place, the reinforcing bars of the cast-in-place section are tied on the top surface of the UHPC thin slab. After the reinforcing bars are tied, concrete is poured on the precast UHPC thin slab.

[0059] Furthermore, in another embodiment of the present invention, in step 3, the top of the T-shaped block 5 is reserved with a vertically extending anchoring steel bar head, and the upper end of the anchoring steel bar head is 50~60mm higher than the upper surface of the first plate strip 1.

[0060] A corrugated pipe is pre-fitted around the outer periphery of the anchoring steel bar head. The outer wall of the corrugated pipe is wrapped with a slow-expansion water-stop tape, which is used to make the anchoring steel bar head and the cast-in-place concrete form a mechanical anchoring connection during subsequent cast-in-place concrete pouring.

[0061] Furthermore, in another embodiment of the present invention, in step 4, the bottom surface of the prefabricated UHPC thin plate is pre-set with conical positioning holes corresponding to the positions of the anchoring steel bar heads. During installation, each conical positioning hole is aligned with the corresponding anchoring steel bar head and inserted vertically, so that the bottom surface of the UHPC thin plate is tightly supported on the upper surface of the first plate strip 1 and the second plate strip 2, and the anchoring steel bar head penetrates the UHPC thin plate and protrudes 30~40mm above its top surface, thereby realizing the snap-fit ​​positioning and horizontal constraint of the UHPC thin plate.

[0062] Furthermore, in another embodiment of the present invention, in step 4, after the anchoring steel bar head penetrates the exposed outer periphery of the UHPC thin plate, a flexible rubber waterstop ring is fitted and the matching nut is tightened, so that the flexible rubber waterstop ring tightly hugs the outer wall of the steel bar under the pressure of the nut, and seals the top hole of the UHPC thin plate.

[0063] Furthermore, in another embodiment of the present invention, in step 4, the precast UHPC thin plate is rigidly connected to the T-block 5 by anchoring the steel bar head, so that the locking structure of the precast joint and the stress-bearing skeleton of the cast-in-place section form a cohesive stress-bearing unit.

[0064] Furthermore, in another embodiment of the present invention, in step 4, the joint between the outer edge of the prefabricated UHPC sheet and the upper surface of the first strip 1 and the upper surface of the second strip 2 is filled and sealed with water-swellable sealing strips.

[0065] Furthermore, in another embodiment of the invention, the consideration has been completed.

[0066] During the pouring process, an immersion vibrator is used to systematically vibrate the cast-in-place concrete. The spacing between the insertion points of the vibrator should not exceed 1.5 times the effective radius of the vibrator, and the concrete surface should be slurry-covered and no longer significantly subside.

[0067] The horizontal excitation force generated by the vibration operation is directly transmitted to the T-block 5 through the anchor steel bar head, which makes the sealing interface between the T-block 5 and the inner wall of the T-groove 6 more compact under vibration excitation. At the same time, the vibration kinetic energy is transmitted along the T-block 5 to the contact surface between the concave groove 3 and the convex block 4, causing the polyurethane sealant between the concave groove 3 and the convex block 4 to generate secondary micro-flow before curing, thereby filling the tiny pores that may be left due to the initial injection of sealant.

[0068] Meanwhile, the vertical self-weight load generated by the pouring height of the cast-in-place concrete acts on the top surface of the UHPC thin plate. This vertical load is transmitted downward to the T-block 5 through the anchor steel bar head, forming a continuous and stable downward pressure. This downward pressure and the radial rebound force generated by the elastic sealing pad 7 on the inner wall of the T-groove 6 when the T-block 5 is locked downward form an orthogonal bidirectional compressive stress field in space. The vertical compressive stress value is not less than 0.02MPa, and the radial compressive stress value is maintained in the range of 0.15~0.20MPa corresponding to the compression deformation of the elastic sealing pad 7. The bidirectional compressive action is maintained continuously during the curing process of the polyurethane sealant, forcing the sealing lip 11, the elastic sealing pad 7 and the polyurethane sealant layer to always be in an absolutely compacted state under triaxial pressure.

[0069] After the cast-in-place concrete is poured, simultaneously observe the upper surfaces of the first strip 1 and the second strip 2 corresponding to the bottom surface of the UHPC thin slab for any cement slurry leakage. If leakage is found, pouring should be stopped immediately and leak-stopping measures should be taken to ensure the integrity and reliability of the sealing system throughout the entire construction process of the cast-in-place section. After the cast-in-place concrete is poured and compacted, the top surface of the concrete should be initially smoothed and covered with a moisture-retaining curing film. The curing time should not be less than 7 days. During the curing period, concentrated impact loads are strictly prohibited on the UHPC thin slab to avoid disrupting the equilibrium state of the bidirectional compressive stress field.

[0070] Comparative Example 1

[0071] To verify the key role of the double-layer nested tongue and groove, inner T-shaped tenon and mortise locking structure, and sealing lip 11 composite sealing system of the present invention in bidirectional displacement constraint and multi-layer seepage prevention of the plate and strip, this comparative example is set up.

[0072] This comparative example retains only the outer tongue-and-groove structure formed by the concave groove 3 and the convex block 4, completely removing the entire set of linked locking and seepage-proof components including the T-groove 6, T-block 5, slider 9, and sealing lip 11. It relies solely on the outer tongue-and-groove structure and a single polyurethane sealant to achieve joint waterproofing. The remaining construction environment, material parameters, component dimensions, and pouring and curing conditions are consistent with the embodiment. Only the joint connection and sealing structure are modified. Through a single variable comparison, the advantages of the present invention, such as limiting, leveling, and multiple waterproofing, are highlighted by the T-shaped tenon and mortise formed by the T-block 5 and T-groove 6 and the sealing lip 11.

[0073] The complete construction steps for Comparative Example 1 are as follows:

[0074] Step 1: Clean the laitance and loose particles from the surface of the first strip 1 and the second strip 2. Apply concrete interface agent only to the inner wall of the tongue and groove of the concave groove 3. Control the wet film thickness to 0.3~0.6mm. Apply evenly without exposing the substrate. Let it stand to dry to form a dense reinforcing layer.

[0075] Step 2: Move the second plate 2 horizontally so that the convex block 4 is stably inserted into the inner cavity of the concave groove 3. Hammering or forcibly prying the components is prohibited throughout the process. The T-block 5 in this comparative example has no reserved clearance space. When inserting and aligning, the corners of the components may be bumped or the tongue and groove may be damaged. After the convex block 4 is fully inserted into the concave groove 3, simple horizontal lateral positioning is achieved by relying on a single layer of tongue and groove.

[0076] Step 3: Precast UHPC ultra-high performance concrete thin slabs are positioned using spacers. The bottom surface of the thin slabs lacks corresponding anchoring rebar positioning holes; they are simply laid flat on the top surfaces of the first strip 1 and the second strip 2, without rigid positioning constraints, making them prone to horizontal slippage. Water-swellable sealing strips are still embedded at the joints between the outer edges of the precast UHPC thin slabs and the strips, but the anchoring rebar heads and flexible rubber waterstop rings are lacking vertical anti-seepage structures. During the pouring of cast-in-place concrete, water can seep downwards along the rebar perforations to the tongue-and-groove joints. A retarding release agent is applied to the top surface of the precast UHPC thin slabs; this operation is consistent with the previous example.

[0077] Step 4: High-performance polyurethane sealant is injected under high pressure into the space between the concave groove 3 and the convex block 4 through the injection hole 10. After the sealant overflows from the injection hole 10, the gap filling status is checked, the excess sealant on the board surface is removed, and the outside of the injection hole 10 is sealed with the same grade of quick-hardening repair mortar and smoothed and finished.

[0078] Step 5: After the UHPC thin slab is laid, tie the reinforcing steel of the cast-in-place section, and pour high-flowability fine stone concrete with a slump of 200~220mm. The maximum particle size of the coarse aggregate is ≤10mm. Use an immersion vibrator to vibrate, with the spacing between insertion points not exceeding 1.5 times the effective radius of the vibrator. Vibrate at a single point until the surface is covered with slurry and there is no settling. The excitation force generated by vibration can only be transmitted to the outer tongue and groove contact surface, without further compaction of the inner tenon and mortise sealing interface.

[0079] Due to the lack of T-block 5 and anchoring steel reinforcement for force transmission, the self-weight of the cast-in-place concrete cannot form a stable vertical pressure, and there is no orthogonal bidirectional compressive stress field with a vertical strength ≥0.02MPa and a radial strength of 0.15~0.20MPa; the polyurethane sealant does not have a continuous triaxial compaction effect during the curing process, and the sealant is prone to debonding and voids; the process for observing leakage at the bottom of the slab during pouring and the curing requirements are consistent with the example.

[0080] The performance comparison data between Comparative Example 1 and Example 2 are as follows:

[0081]

[0082] As can be seen from the comparison, Comparative Example 1 relies solely on the single-layer tongue-and-groove joint of the concave groove 3 and the convex block 4 for positioning, lacking the T-shaped tenon and mortise structure composed of T-shaped block 5 and T-shaped groove 6. Under a standard load of 0.5 kN / m, the longitudinal displacement of the strip can reach 3.2~4.5 mm, making it extremely prone to through cracks. Without the linkage leveling component composed of T-shaped block 5 and slider 9, the height difference of the splicing joint reaches 5~12 mm, and the gap becomes a water seepage channel. At the same time, the sealing lip 11 and the inner elastic sealing gasket 7 are omitted, and only a single layer of polyurethane sealant is used for water isolation. The joint is stabilized by 1.5 MPa water pressure for 24 hours. The system exhibits continuous linear seepage, and during the cast-in-place stage, it is impossible to form a bidirectional compressive stress field with a vertical strength of ≥0.02MPa and a radial strength of 0.15~0.20MPa. The sealant only adheres naturally, and after 300 wet and dry cycles, the sealant layer peels off and leaks. In addition, there are no supporting corrugated pipes, slow-expansion sealing tapes, rubber sealing rings, or other reinforced water-stopping structures. Groundwater can easily seep through the roots of the anchored steel bars via capillary action. Furthermore, there is no lifting and avoidance structure during assembly, making it easy for components to be bumped during alignment. The construction time for a single joint increases by 75% compared to the previous example. There are significant shortcomings in assembly accuracy, waterproofing durability, and construction efficiency.

[0083] Comparative Example 2

[0084] To verify the key role of the prefabricated UHPC ultra-high performance concrete thin slab non-removable waterstop formwork, matching steel reinforcement waterstop structure, and the two-way pressure sealing system formed by the vertical load of the cast-in-place layer in this invention, this comparative example is set up.

[0085] This comparative example fully retains the complete set of double-layer nested tongue and groove and inner T-shaped tenon and mortise composite sealing components, including concave groove 3, convex block 4, T-groove 6, T-block 5, slider 9, sealing lip 11, and injection hole 10. Only the complete set of prefabricated UHPC thin plate related structures is removed, and traditional detachable wooden formwork is used as the bottom formwork for the post-cast section. The dimensions of the remaining components, interface agent parameters, injection materials, casting and curing conditions, and external test environment are completely consistent with the example.

[0086] Complete retained components: First strip 1, Second strip 2, Concave groove 3, Convex block 4, T-slot 6, T-block 5, Slider 9, Sealing lip 11, Injection hole 10, Anchoring steel bar head, Corrugated pipe, Slow-expansion water-stopping tape;

[0087] Complete elimination of components: precast UHPC ultra-high performance concrete thin slab, conical positioning holes on the bottom surface of the thin slab, water-swellable sealing strip on the outside of the thin slab, retarding release agent on the top surface of the thin slab, and flexible rubber waterstop ring for exposed steel bars;

[0088] Replacement structure: Conventional wooden formwork combined with a steel pipe support system is used as the temporary bottom formwork for the post-cast section. The wooden formwork is removed after the pouring is completed and the concrete reaches the demolding strength.

[0089] The complete construction steps for Comparative Example 2 are as follows:

[0090] Step 1: Clean the laitance and loose particles from the surfaces of the first strip 1 and the second strip 2. Apply concrete interface agent to the inner walls of the vertical sliding groove 8 and the T-groove 6 inside the concave groove 3, ensuring even application and avoiding any bare spots. The wet film thickness should be controlled between 0.3 and 0.6 mm, and the dry film should form a dense reinforcing layer. The interface agent functions as in the previous example, improving the adhesion of the polyurethane sealant and providing a stable coefficient of friction for the sliding block 9, preventing the T-block 5 from getting stuck or misaligned during its descent.

[0091] Step 2: Move the second plate 2 horizontally so that the convex block 4 is stably embedded into the inner cavity of the concave groove 3. Hammering or forcibly prying is strictly prohibited. Relying on the T-shaped block 5 in the raised state to reserve the clearance space, ensure that the convex block 4 is fully in place. The concave groove 3 and the convex block 4 achieve the first-level tongue and groove horizontal lateral limiting engagement. The operation process is exactly the same as the embodiment.

[0092] Step 3: After the convex block 4 is fully in place, a constant pressure impactor is used to vertically impact the top of the T-block 5. The slider 9 descends vertically along the vertical groove 8 until the top surface of the T-block 5 is flush with the upper surface of the first plate 1, thus constraining the longitudinal displacement of the plate 1. During the descent, the T-block 5 compresses the elastic sealing pad 7 on the inner wall of the T-groove 6 to form an inner layer of basic seepage barrier. The anchor steel bar head at the top of the T-block 5 is 50mm higher than the plate surface. A corrugated pipe is fitted on the outside of the steel bar and a slow-expansion water-stop tape is wrapped around it. After locking in place, the sealing lip 11 surrounds and covers the outer periphery of the component to form an annular sealing structure. The construction process of this locking and inner layer seepage prevention structure is the same as in the embodiment.

[0093] Step 4: All operations related to precast UHPC thin slabs are cancelled. A support system is erected using steel pipe supports. Wooden formwork is laid flat on top of the first slab strip 1 and the second slab strip 2 as a temporary bottom formwork for the post-cast section. Ordinary sponge strips are simply pasted on the joints of the wooden formwork to prevent grout leakage, without special water-swellable sealing strips. The wooden formwork relies on the support and has no anchoring steel bar head positioning constraint, making the formwork prone to displacement and warping. The anchoring steel bar head directly penetrates the reserved holes in the wooden formwork, and the holes are not sealed. There is no process of applying a retarding release agent, and the wooden formwork is directly bonded to the cast-in-place concrete, which can easily cause damage to the concrete surface when the formwork is removed later. There are no flexible rubber water-stop rings to press the anchoring steel bar penetration positions, and water can seep down into the joint along the gap between the steel bar and the formwork hole. The wooden formwork only serves as a temporary support and cannot be rigidly connected to the T-block 5. The precast joint locking structure and the upper post-cast concrete cannot form a cohesive load-bearing unit.

[0094] Step 5: High-performance polyurethane sealant is injected under high pressure into the space between the concave groove 3 and the convex block 4 through the injection hole 10. After the sealant overflows from the injection hole 10 and the filling is confirmed to be dense, the excess sealant is removed. The outside of the injection hole 10 is sealed with quick-hardening repair mortar of the same grade as the strip, and then smoothed and polished. The injection, sealing operation and material parameters are consistent with those in the example. The polyurethane sealant in the outer tongue and groove gap, together with the inner elastic pad and sealing lip 11, forms a composite sealing system.

[0095] Step 6: After the wooden formwork is erected, tie the reinforcing steel for the cast-in-place section. Pour high-flowability fine-aggregate concrete with a slump of 200-220mm. The maximum particle size of the coarse aggregate should not exceed 10mm. Use an immersion vibrator to vibrate systematically, with the spacing between insertion points not exceeding 1.5 times the effective radius of the vibrator. Vibrate at a single point until the concrete reaches the slurry level without significant settling. The vibration force can be transferred to T-block 5 and the outer tongue-and-groove contact surface, promoting secondary micro-flow of polyurethane sealant to fill the tiny pores. However, due to the lack of a UHPC thin plate as a force-transfer carrier, the cast-in-place concrete vertically... The self-weight load cannot be stably transmitted to the T-block 5, and an orthogonal bidirectional compressive stress field with a vertical strength of ≥0.02MPa and a radial strength of 0.15~0.20MPa cannot be formed. The polyurethane sealant, elastic sealing gasket 7, and sealing lip 11 rely solely on their initial compression for sealing. During the pouring process, the leakage at the bottom of the slab is monitored simultaneously. If leakage occurs, work is stopped immediately to plug the leak. After the pouring is completed, the top surface is initially smoothed and covered with a moisturizing curing film for curing for no less than 7 days. After the curing period is over and the concrete strength meets the standard, the steel pipe support and wooden formwork are removed.

[0096] The performance comparison data between Comparative Example 2 and Example 2 are as follows:

[0097]

[0098] As can be seen from the data comparison in the table above, although Comparative Example 2 fully retains the double-layer nested tongue and groove, T-shaped tenon and mortise and tenon and sealing lip 11 composite sealing structure, after canceling the precast UHPC non-removable waterstop template and replacing it with traditional wooden template, there is a lack of stable load transfer carrier, and it is impossible to maintain a continuous and stable orthogonal bidirectional compressive stress field. The long-term compression effect of the sealing components is greatly reduced; there is no flexible rubber waterstop ring to seal the perforation of the anchoring steel bars, which easily forms vertical capillary seepage channels; grout leakage is prone to occur at the joints of the wooden template, which will contaminate the bonding interface of the polyurethane sealant and reduce the bonding performance of the adhesive layer; the cast-in-place layer and the precast slab strip cannot form a rigid connection to cooperate in bearing the force, and the joints are prone to large-scale opening and cracking under horizontal reciprocating loads; at the same time, the addition of two new processes of formwork erection and demolding lengthens the construction period, and the demolding process is also prone to disturbing and damaging the formed sealing structure. The overall sealing system's impermeability, durability, structural integrity and construction convenience are far inferior to the embodiment of the present invention.

[0099] The above are merely preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A fabricated concrete slab band structure, characterised in that: It includes a first strip (1) and a second strip (2). The splicing side of the first strip (1) is recessed with a concave groove (3), and the splicing side of the second strip (2) is protruded with a convex block (4) that matches the contour of the concave groove (3). The convex block (4) is fitted into the concave groove (3) to complete the horizontal lateral positioning of the first strip (1) and the second strip (2). A T-shaped block (5) is provided on the upper end face of the concave groove (3), and a T-shaped groove (6) adapted to the contour of the T-shaped block (5) is opened on the end face of the convex block (4) facing the concave groove (3). An elastic sealing gasket layer (7) is laid on the inner wall of the T-shaped groove (6). Vertical sliding grooves (8) are symmetrically provided on the inner wall of the concave groove (3), and sliders (9) are provided on both sides of the T-shaped block (5). The sliders (9) slide in cooperation with the vertical sliding grooves (8). The T-block (5) can descend vertically along the vertical groove (8) via the slider (9), fit into the T-groove (6) and squeeze the elastic sealing pad (7), thereby achieving longitudinal displacement locking between the first plate strip (1) and the second plate strip (2).

2. The prefabricated concrete slab strip structure according to claim 1, characterized in that, The concave groove (3) has glue injection holes (10) on both sides of its outer sidewalls. The glue injection holes (10) are connected to the splicing gap between the concave groove (3) and the convex block (4) and are used to inject sealant into the splicing gap to form an outer layer joint waterproof structure.

3. The prefabricated concrete slab strip structure according to claim 1, characterized in that, The top outer edge of the T-shaped block (5) is provided with a sealing lip (11); In the initial unassembled state, the overall top surface of the T-block (5) and the two side sliders (9) is higher than the top surface of the first plate strip (1).

4. A method for waterproofing joints in prefabricated concrete slab strip structures, applied to the prefabricated concrete slab strip structure described in any one of claims 1-3, characterized in that, Includes the following steps: Step 1: Clean the laitance and loose particles on the surface of the splicing area between the first strip (1) and the second strip (2), and apply concrete interface agent to the vertical sliding groove (8) and the inner wall of the T-shaped groove (6) of the concave groove (3) in a directional manner. Step 2: Move the second plate (2) horizontally so that the convex block (4) is smoothly embedded into the inner cavity of the concave groove (3) to complete the horizontal lateral limiting engagement of the first-level tongue and groove. Step 3: After the convex block (4) is fully in place, use a constant pressure impactor to vertically impact the top of the T-block (5) so that the T-block (5) moves vertically down along the vertical groove (8) on the inner wall of the concave groove (3) through the sliders (9) on both sides until the top surface of the T-block (5) is flush with the upper surface of the first plate (1), thereby achieving longitudinal displacement constraint and locking of the second plate (2) relative to the first plate (1); Step 4: After the T-block (5) is locked down and the sealing lip (11) is fully covered and in place, use the anchor steel bar head reserved at the top of the T-block (5) as a support positioning column, and install the precast UHPC thin plate as the bottom formwork of the post-cast section without removal. Step 5: High-performance polyurethane sealant is injected into the splicing gap between the concave groove (3) and the convex block (4) through the injection hole (10). After the sealant overflows from the injection hole (10) and the filling is confirmed to be dense, the overflowing residual sealant is removed. The outer end of the injection hole (10) is sealed with quick-hardening repair mortar of the same grade as the strip and smoothed and finished. Step 6: After the precast UHPC thin slab is installed in place, the reinforcing bars of the cast-in-place section are tied on the top surface of the UHPC thin slab. After the reinforcing bars are tied, concrete is poured on the precast UHPC thin slab.

5. The method for waterproofing construction of joints in prefabricated concrete slab-strip structures according to claim 4, characterized in that, In step 3, the top of the T-block (5) is reserved with a vertically extending anchoring steel bar head, and the upper end of the anchoring steel bar head is 50~60mm higher than the upper surface of the first plate strip (1). The outer periphery of the anchoring steel bar head is pre-fitted with a corrugated pipe, and the outer wall of the corrugated pipe is wrapped with a slow-expansion water-stop tape, which is used to make the anchoring steel bar head and the cast-in-place concrete form a mechanical anchoring connection during subsequent cast-in-place concrete pouring.

6. The method for waterproofing construction of joints in prefabricated concrete slab-strip structures according to claim 4, characterized in that, In step 4, the bottom surface of the prefabricated UHPC thin plate is pre-set with conical positioning holes corresponding to the positions of the anchoring steel bars. During installation, each conical positioning hole is aligned with the corresponding anchoring steel bar and inserted vertically, so that the bottom surface of the UHPC thin plate is tightly supported by the upper surfaces of the first plate strip (1) and the second plate strip (2). The anchoring steel bar head penetrates the UHPC thin plate and is 30-40mm higher than its top surface, so as to realize the snap-fit ​​positioning and horizontal constraint of the UHPC thin plate.

7. The method for waterproofing construction of joints in prefabricated concrete slab-strip structures according to claim 4, characterized in that, In step 4, after the anchoring steel bar head penetrates the exposed section of the UHPC thin plate, a flexible rubber waterstop ring is fitted and the matching nut is tightened, so that the flexible rubber waterstop ring tightly hugs the outer wall of the steel bar under the pressure of the nut, sealing the top hole of the UHPC thin plate.

8. The method for waterproofing construction of joints in prefabricated concrete slab-strip structures according to claim 4, characterized in that, In step 4, the precast UHPC thin plate is rigidly connected to the T-block (5) by anchoring the steel bar head, so that the locking structure of the precast joint and the stress skeleton of the cast-in-place section form a whole stress unit that works together to bear the stress.

9. A method for waterproofing construction of joints in prefabricated concrete slab-strip structures according to claim 4, characterized in that, In step 4, the joint between the outer edge of the prefabricated UHPC sheet and the upper surface of the first strip (1) and the upper surface of the second strip (2) is filled and sealed with water-swellable sealing strips.

Citation Information

Patent Citations

  • Take secret of tongue -and -groove to piece together precast floor plank connection structure

    CN207863256U