Construction method of an electric formwork lifting system

By adopting a combination structure of sliding steel template and fixed steel template in the electric lifting device, combined with guide rail groove and pin hole structure, the convenience and continuity of lifting and jacking operations are achieved, solving the problems of cumbersome operation and insufficient fine adjustment in the existing technology, and ensuring the stable and high-precision operation of the platform.

CN123109387APending Publication Date: 2026-11-17河南省第二建设集团有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611509920.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-28
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In the existing construction methods of electric formwork lifting systems, the alternating operation of lifting and jacking is inconvenient, lacks a systematic operation process and precise control methods, and the lifting system lacks independent fine-tuning function, making it difficult to guarantee the levelness of the platform.

Method used

The system employs a combination of sliding steel formwork and shaped steel formwork. The lifting frame and operating frame are lifted alternately through guide rail grooves and pin holes. Combined with the screw system and the cooperation of rollers and channel steel rails, an independent sub-control system is set up for fine-tuning to ensure the platform's levelness.

Benefits of technology

It enables convenient and continuous lifting and jacking operations, reduces frictional resistance, and ensures stable platform operation and high-precision level control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109387A_ABST
    Figure CN123109387A_ABST
Patent Text Reader

Abstract

This invention discloses a construction method for an electric formwork lifting system, relating to the field of electric formwork lifting in building construction. It aims to solve the problem of cumbersome construction processes in existing lifting systems. The technical solution involves installing a sliding formwork with a track on the outer side of the concrete cylinder wall, below the radial beam. The operating frame and lifting frame of the lifting system establish a limiting relationship with the sliding formwork through a limiting mechanism, and lift alternately; the lifting frame lifts along the track of the sliding formwork. This invention features precise matching between the rollers and the channel steel track, ensuring smooth and reliable operation; alternating lifting and jacking operations ensure continuous and efficient construction; the lifting frame and operating frame serve as tracks for each other, resulting in a simple and reliable structure; and an independent fine-tuning function ensures the platform is level.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of electric formwork lifting technology in building construction, specifically to a construction method for an electric formwork lifting device lifting system. Background Technology

[0002] Reinforced concrete chimneys are tall structures, and their outer casing construction has long employed a scaffold-less hydraulic sliding formwork process (commonly known as slipform process). In recent years, electric lifting formwork construction technology has emerged. Electric lifting formwork uses an electric reducer as power and the formed concrete casing wall as the fulcrum, transforming the system load-bearing structure from compression members to tension members.

[0003] The existing electric formwork lifting system construction method still has the following shortcomings: First, the alternating operation of lifting and jacking is not convenient enough. In the existing technology, the alternating raising operation of the operating frame and the lifting frame is relatively cumbersome, lacking a systematic operation procedure and precise control method.

[0004] Secondly, the lifting system lacks independent fine-tuning capabilities. The existing lifting system lacks independent fine-tuning devices between its units, making it difficult to adjust individually when a unit experiences asynchronous lifting, thus affecting the overall levelness of the platform.

[0005] Therefore, developing a construction method for an electric formwork lifting system that is simple in structure, runs smoothly, has low frictional resistance, and is easy to operate has significant practical engineering value. Summary of the Invention

[0006] The technical problem to be solved by the present invention is to overcome the existing defects and provide a construction method for an electric lifting device lifting system, which can effectively solve the problems in the background art.

[0007] To achieve the above objectives, this invention discloses a construction method for an electric formwork lifting system. The technical solution involves installing sliding steel formwork and fixed steel formwork on the outer and inner sides of the concrete cylinder wall. A lifting system supports a radial beam, which connects to the top of the lifting system's operating frame on the outer side of the concrete cylinder wall. The operating frame and lifting frame of the lifting system establish a limiting relationship with the sliding formwork through a limiting mechanism, allowing for staggered lifting. The lifting frame is lifted along the track of the sliding formwork. The sliding formwork includes a sliding steel formwork panel made of 6mm thick steel plate. Reinforcing members are connected to the panel, and two symmetrically arranged guide rails with guide rail grooves are connected to the reinforcing members. The lifting frame is lifted along the guide rail grooves. Using steel formwork significantly improves the stability of the formwork system, while the guide rail grooves on the sliding steel formwork guide the lifting frame, enhancing its movement stability.

[0008] As a preferred embodiment of the present invention, a through pin hole is provided in the guide rail groove, and the pin holes of the two guide rails are correspondingly positioned. A pin body is inserted into the pin hole (the pin body and the pin hole constitute the limiting mechanism). The operating frame and the lifting frame are alternately seated on the pin body to achieve staggered lifting. The pin body inserted into the pin hole can provide a more convenient switching method for alternating lifting and jacking operations.

[0009] As a preferred embodiment of the present invention, the sliding track steel formwork is further provided with bolt holes, through which tie bolts can be passed to connect with the fixed steel formwork inside the concrete cylinder wall; the two sides of the panel are connected with side ribs, and the side ribs have plates perpendicular to the panel, with connecting holes on the plate surface; the upper end of the panel of the sliding track steel formwork is higher than the side ribs, and the lower end of the side ribs is lower than the panel; the axis of the bolt holes and the axis of the connecting holes are located on different horizontal planes, and the staggered opening method can effectively eliminate stress concentration; by using connecting bolts to pass through the connecting holes, the sliding track steel formwork is connected to the fixed steel formwork on the side, and the connection structure is more stable.

[0010] As a preferred embodiment of the present invention, the operating frame of the lifting system includes an outer operating frame, and a screw system is provided between the outer operating frame and the lifting frame. When the lifting frame is lifted, a pin is inserted into the slotted hole of the guide rail groove opposite to the lower part of the outer operating frame; when the outer operating frame is jacked up, a pin is inserted into the slotted hole of the guide rail groove opposite to the lower part of the lifting frame.

[0011] As a preferred embodiment of the present invention, a support roller is provided on the outer operating frame, and a track is provided. The support roller is supported on the outside of the concrete cylinder wall. A first roller and a second roller are provided on the lifting frame. The first roller is connected to the track of the outer operating frame, and the track of the outer operating frame constrains the movement trajectory of the first roller. The second roller is located in the guide groove of the slide rail steel template, and the guide groove constrains the movement trajectory of the second roller.

[0012] In a preferred embodiment of the present invention, there are multiple lifting systems and sliding steel formwork, corresponding to the positions of the radial beams. These multiple lifting systems are electrically connected to a central control device, and each lifting system is also electrically connected to an independent sub-control device. The central control device can control the overall lifting or jacking of all lifting systems, while the sub-control devices can perform fine-tuning on each lifting system.

[0013] As a preferred technical solution of the present invention, the following steps are included: Step 1: Assemble the outer operating frame, inner operating frame, and lifting frame of the lifting system, and assemble the lower-level formwork system, connecting the slide rail steel formwork to the lower-level formwork system; Step 2: Insert the pin into the pin hole below the contact position between the outer operating frame and the slide rail steel template, so that the outer operating frame sits on the pin. Step 3: Operate the main control device to make the lead screw system run in the forward direction, causing the lifting frame to climb upwards. After all lifting frames have passed the design position, stop the lead screw system. Insert the pin into the pin hole corresponding to the design position. Operate the main control device to control the lead screw system to run in the reverse direction, causing the lifting frame to land on the pin. Then check all lifting frames. If any lifting frame has not landed on the pin, operate the corresponding independent sub-control device to control the independent operation of a single lifting frame until all lifting frames land on the pin. Before or after the lifting starts, remove the pin at the position where the lifting frame was before the lifting starts to avoid interference with the subsequent lifting operation of the external operating frame. Step 4: Operate the main control device to reverse the screw system, lift the outer operating frames upwards, and thus push the entire platform system upwards. After all the outer operating frames have passed the design position, stop the screw system. Insert the pin into the pin hole corresponding to the design position. Operate the main control device to control the screw system to run in the forward direction, so that the outer operating frames fall on the pins. Then check all the outer operating frames. If any are not on the pins, operate the corresponding independent sub-control device to control the individual outer operating frame to run independently until all the outer operating frames fall on the pins. Step 5: Install the formwork system and slide rail steel formwork for the new floor; Step 6: Repeat steps 3 to 5 to achieve alternating lifting or jacking of the lifting frame and the external operating frame. Each time the lifting frame is lifted and the external operating frame is jacked, the lifting system raises the platform system to the height of one template layer, and then the template system of the corresponding layer is installed until the chimney construction is completed. Step 7: Dismantle the lifting system. First, dismantle the lifting frame, then the outer operating frame and the inner operating frame.

[0014] In a preferred embodiment of the present invention, in step 1, a sliding steel formwork is installed below the radial beam, and the adjacent sliding steel formworks are filled with the standardized steel formwork of the formwork system. The sliding steel formworks and the standardized steel formworks are connected by connecting bolts. The inner standardized steel formworks are connected by connecting bolts. A sleeve is installed between the inner formwork of the formwork system, the outer formwork of the formwork system, and the sliding steel formwork of the lifting system. The first tie bolt and the second tie bolt are passed through the formwork and the sleeve and locked. The sliding steel formworks and the standardized steel formworks are tightened with walers to complete the assembly of the formwork system and the connection between the sliding steel formworks and the formwork system.

[0015] As a preferred embodiment of the present invention, in step 5, when installing a new layer of sliding steel formwork, in the non-slope section of the concrete cylinder wall, the straightness error of the guide rail groove of the newly installed sliding steel formwork and the guide rail groove of all the sliding steel formwork below it along the cylinder wall direction shall not exceed 5mm; the fitting clearance between the second roller of the lifting frame and the guide rail groove of the newly installed sliding steel formwork shall not exceed 3mm; and the height difference of all sliding steel formwork in the same layer shall not exceed 25mm.

[0016] In the non-slope section of the concrete cylinder wall, if the straightness exceeds 5mm, local bulges or depressions are prone to appear at the joint. When the second roller passes through the joint, it is prone to impact and jumping, which may result in unstable lifting or even jamming or derailment of the second roller. However, in the slope section of the concrete cylinder wall, due to the change in the slope of the concrete cylinder wall itself, the straightness error of the guide rail groove is no longer subject to the 5mm constraint.

[0017] The fit clearance between the second roller and the guide rail groove ensures a stable fit between them. If the clearance exceeds 3mm, there is a risk that the second roller will be suspended in the air, which is not conducive to the smooth operation of the lifting system.

[0018] Because it is difficult to ensure that the construction ground is absolutely level, and the product dimensions of different sliding track steel formwork are difficult to guarantee with absolute precision, in order to prevent harmful deformation of the platform system, ensure the installation accuracy of the formwork, improve accuracy and avoid errors that are difficult to completely avoid, the height difference of all sliding track steel formwork on the same floor is limited to within 25mm. This allows for fluctuations to proceed smoothly while ensuring the quality of the project.

[0019] Compared with the prior art, the beneficial effects of the present invention are that the construction method of the electric formwork lifting device lifting system of the present invention has the following advantages: (1) The rollers and the channel steel rails are precisely matched, ensuring smooth and reliable operation: Rollers are installed on both sides of the lifting frame, and the rollers are embedded in the channel steel rails on both sides of the operating frame, with the two being precisely matched. During the lifting process, the rollers roll and climb in the channel steel rails, replacing sliding friction with rolling friction, which significantly reduces frictional resistance and makes the operation more stable and reliable. The lifting frame and the operating frame are connected by the rollers and the channel steel rails, which serve as each other's tracks, and rise alternately.

[0020] (2) Alternating lifting and jacking operations ensure continuous and efficient construction: The lifting frame and the operating frame are alternately raised by the forward and reverse rotation of the electric reducer. The lifting frame is first secured to the slide template at a high position, and the operating frame is lifted by the electric reducer. After the operating frame is lifted into position, it is immediately secured. At this time, the lifting frame itself is relatively low, and it is jacked up by the reverse motor to a high position again. This reciprocating lifting (jacking) process constitutes a continuous and efficient lifting construction process.

[0021] (3) Mutual support and simple and reliable structure: The lifting frame and the operating frame are mutual support – the lifting frame rises with the channel steel rail of the operating frame as the guide rail, and the operating frame rises with the rollers of the lifting frame as the guide rail. The two rely on each other and rise alternately, without the need to set up an additional guide rail system, and the structure is simple and reliable.

[0022] (4) Independent fine-tuning function to ensure platform level: An independent sub-control system is set up at each lifting frame, which can realize independent fine-tuning and emergency braking of each unit operating frame. When a certain unit is not in sync with the lifting, it can be adjusted separately through the sub-control box to ensure the overall levelness of the platform.

[0023] (5) High precision of lifting and jacking operations: By setting up sliding steel templates with pin holes and pin structures, each jacking or lifting operation ends with the lifting frame or external operating frame sitting on the pin, ensuring high precision of lifting and jacking operations. The platform system will not tilt or twist due to the inconsistency of jacking height or lifting height between multiple lifting systems caused by the running error between the screw system. Attached Figure Description

[0024] Figure 1 This is a front view schematic diagram of the sliding template structure of the present invention; Figure 2 This is a schematic diagram of the sliding template edge rib configuration of the present invention; Figure 3 This is a cross-sectional view of the sliding template AA of the present invention; Figure 4 This is a top view of the sliding template structure of the present invention; Figure 5 This is a schematic diagram of the staggered opening of the sliding template of the present invention; Figure 6 This is a schematic diagram of the first stiffening plate structure of the sliding template of the present invention; Figure 7 This is a schematic diagram of the sliding template end plate structure of the present invention; Figure 8 This is a schematic diagram of the template system layout of the present invention; Figure 9 This is a cross-sectional view of the template system BB of the present invention; Figure 10 This is a schematic diagram of the system layout for the present invention; Figure 11 This is a schematic diagram of the external operating frame structure of the present invention; Figure 12 This is a cross-sectional view of the external operating frame EE of the present invention; Figure 13 This is a schematic diagram of the lifting frame structure of the present invention; Figure 14 This is a CC cross-sectional view of the lifting frame of the present invention; Figure 15This is a cross-sectional view of the lifting frame DD of the present invention; Figure 16 This is a schematic diagram of the lead screw system structure of the present invention; Figure 17 This is a schematic diagram of the waler passing through the sliding template of the present invention; Figure 18 This is a block diagram of the electrical control connection of the present invention.

[0025] In the diagram: 1. Slide rail steel formwork; 101. Panel; 102. Side rib; 103. First stiffening plate; 104. Guide rail groove; 105. Bolt hole; 106. Connection hole; 107. Second stiffening plate; 108. Pin hole; 109. Reinforcing component; 110. End plate; 111. Slot; 112. Wedge block; 2. Fixed steel formwork; 3. Trapezoidal adjustable wooden formwork; 4. Waler; 5. First tie bolt; 6. Sleeve; 7. End plate; 8. Concrete cylinder wall; 9. External operating frame; 901. Second main upright; 902. Vertical channel steel; 903. Diagonal brace; 904. Second horizontal bar; 905. Connection node; 906. 907. Support wheel frame; 908. Support roller; 909. Ladder; 9000. Nut seat; 910. Plug-in seat; 10. Lifting frame; 1001. First roller; 1002. Reinforcing ring; 1003. First crossbar; 1004. First main upright; 1005. First connecting channel steel; 1006. Third stiffening plate; 1007. Second roller; 1008. Second connecting channel steel; 1009. Baffle; 1010. Power mounting plate; 11. Inner operating frame; 12. Radial beam; 13. Reducer; 14. Coupling; 15. Bolt tube; 16. Output shaft; 17. Screw; 18. Square nut; 19. Pressure plate. Detailed Implementation

[0026] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0027] Example 1 like Figure 1 , Figure 2As shown, this invention first discloses a sliding template. The technical solution adopted includes a sliding steel template 1, which includes a panel 101. The panel 101 is made of 6mm thick steel plate. Three through bolt holes 105 are formed along the central axis of the panel 101 in a direction perpendicular to the panel 101. Side ribs 102, made of angle steel, are welded to both sides of the front of the panel 101. Multiple connecting holes 106 are equidistantly formed on the surface of the side ribs 102 that are perpendicular to the panel 101. The horizontal plane containing the axis of each bolt hole 105 is 100mm away from the horizontal plane containing the axis of the nearest connecting hole 106 above or below it. Figure 5 As shown; in order to improve the grout leakage prevention performance of two adjacent sliding steel formwork 1, the upper panel 101 of the sliding steel formwork 1 is higher than the side rib 102, and the lower side rib 102 is lower than the panel 101. When the two slides are joined, the lower end of the side rib 102 of the upper sliding steel formwork 1 can press down on the upper end of the panel 101 of the lower sliding steel formwork 1, thereby preventing the end from warping up, causing the joint to expand and resulting in grout leakage.

[0028] like Figure 3 , Figure 4 As shown, a channel steel is welded to the front of panel 101 as a reinforcing member 109. A longitudinally arranged second stiffening plate 107 is also welded to the front of panel 101. The second stiffening plate 107 is arranged above and below the channel steel. Two longitudinal track channel steels are welded to the reinforcing member 109. The upper and lower end faces of the track channel steels are flush with the upper and lower end faces of the side ribs 102. The grooves of the track channel steels are guide rail grooves 104. The two track channel steels are arranged in opposite directions, that is, the two guide rail grooves 104 face the left and right sides. A horizontal first stiffening plate 103 is welded between the two track channel steels and to the side away from panel 101. The structure of the first stiffening plate 103 is as follows. Figure 6 As shown. There is a gap between the second stiffening plate 107 and the track channel steel for the waler 4 to pass through; the two guide rail grooves 104 are provided with through pin holes 108; a pin body is slidably contacted in the pin hole 108.

[0029] To improve the accuracy of the connection between the upper and lower sliding track steel formwork 1, end plates 110 are welded to the upper and lower end faces of the side ribs 102 and the track channel steel. The structure of the end plates 110 is as follows: Figure 7 As shown, the part corresponding to the end plate 110 and the reinforcement 109 is position one, and the part corresponding to the track channel steel is position two. There is a slot 111 at the junction of position one and position two. A wedge 112 is welded into the slot 111 of the top end plate 110. When the upper and lower slide rail steel templates 1 are connected, the wedge 112 of the lower slide rail steel template 1 is inserted into the slot 111 of the bottom end plate 110 of the upper slide rail steel template 1 to achieve precise connection.

[0030] The number of radial beams 12 below the platform system of the sliding steel formwork 1 and the electric lifting device are equal and correspond one-to-one (in this embodiment, there are twenty sets of radial beams 12 and twenty sets of sliding steel formwork 1), such as Figure 8 , Figure 9 As shown, a formwork system is installed on both the inner and outer sides of the concrete cylinder wall 8. The formwork system includes two layers of fixed steel formwork 2, which are respectively set on the outer and inner sides of the concrete cylinder wall 8. The outer fixed steel formwork 2 fills the gaps between two adjacent sets of sliding steel formwork 1. The sliding steel formwork 1 and the fixed steel formwork 2, as well as the fixed steel formwork 2 and the fixed steel formwork 2, are connected by connecting bolts. The connecting bolts pass through the connecting holes 106. If there is a gap smaller than the width of the fixed steel formwork 2, a trapezoidal adjusting wooden mold 3 is used to fill it to achieve a closed connection. The number of fixed steel formwork 2 on the inner side of the concrete cylinder wall 8 is equal to that of the sliding steel formwork 1 and the outer fixed steel formwork 2, and they correspond one-to-one (if there is a gap smaller than the width of the fixed steel formwork 2, a trapezoidal adjusting wooden mold 3 is used to fill it to achieve a closed connection). A sleeve 6 connects the inner fixed steel formwork 2 and the sliding steel formwork 1, and the outer fixed steel formwork 2. A first tie bolt 5 passes through the bolt hole 105 of the sliding steel formwork 1 and connects to the inner fixed steel formwork 2. A second tie bolt connects the outer fixed steel formwork 2 to the inner fixed steel formwork 2. Both ends of the first and second tie bolts have double-layered locking nuts. The inner nut is tightly fitted to the washer to bear the tensile force, while the outer nut acts as an anti-loosening back nut to control the cylinder wall thickness. Both the first and second tie bolts pass through the sleeve 6. Three walers 4 are installed at each formwork back rib position of the sliding steel formwork 1 and the inner and outer formwork systems. Each waler 4 consists of two reinforcing bars, positioned above and below the tie bolts. One end of the tie bolt is threadedly connected to an end plate 7 with a threaded hole. The end plate 7 blocks the inner waler 4 to prevent it from falling off.

[0031] like Figure 10 As shown, this embodiment also discloses a lifting system, which includes an outer operating frame 9 and an inner operating frame 11. Both the outer operating frame 9 and the inner operating frame 11 are connected to the lower end of the radial beam 12 and are located on the outer and inner sides of the template system, respectively. The inner operating frame 11 is the same as in the prior art and will not be described again here. The structure of the outer operating frame 9 is as follows... Figure 11 , Figure 12As shown, the second main frame of the external operating frame 9 includes a second main upright 901 and a vertical channel steel 902, both of which are vertical frame structures and are connected by a second horizontal bar 904. Diagonal bracing 903 is provided to improve the stability of the second main frame. A connection node 905 is provided at the top of the second main frame; the connection node 905 is a bolted connection seat for bolting to the radial beam 12. A ladder 908 is connected to the vertical channel steel 902. A nut seat 909 is bolted to the side of the second main upright 901 facing inwards from the second main frame, and a channel steel rail is provided on the second main upright 901. A plug-in seat 910 is bolted to the side away from the inwards from the second main frame. Both the nut seat 909 and the plug-in seat 910 are made of channel steel and are welded with stiffening plates. A support wheel frame 906 is bolted to the lower part of the side of the second main upright 901 away from the interior of the second main frame. A support roller 907 is axled to the end of the support wheel frame 906. The support roller 907 slides in contact with the concrete cylinder wall 8, providing rolling support along the concrete cylinder wall 8. This improves the stability of the outer operating frame 9 while reducing friction at the contact point. A lifting frame 10 is slidably connected within the channel steel track of the outer operating frame 9.

[0032] like Figures 13 to 15 As shown, the main body of the lifting frame 10 is the first main upright 1004. There are two first main uprights 1004, which are connected by the first crossbar 1003 to form a frame. Figure 11 The direction shown is positive. A set of first rollers 1001 are connected to the upper and lower axes of the two vertical planes of the first main upright 1004, both in the positive and rearward directions. The first rollers 1001 roll within the channel steel rails, improving the stability of the lifting frame 10's movement. A steel reinforcing ring 1002 is connected to the first main upright 1004 to enhance its strength. First connecting channel steel 1005 and second connecting channel steel 1008 are threaded to the left and right sides of the first main upright 1004, respectively. A third stiffening plate 1006 is welded between the first connecting channel steel 1005 and the second connecting channel steel 1008 and the first main upright 1004. Figure 13 As shown, a power mounting plate 1010 is bolted to the first connecting channel steel 1005. A bearing seat is embedded in the end of the second connecting channel steel 1008 away from the first main upright 1004. A second roller 1007 is connected to the bearing seat. There are two second connecting channel steels 1008. The two sets of second rollers 1007 are arranged opposite each other and roll in the guide rail groove 104 of the slide rail template 1. A baffle 1009 is welded to the end face of the second connecting channel steel 1008 to prevent the bearing seat from loosening and falling off, thus avoiding safety hazards.

[0033] The power mounting plate 1010 has bolt holes, such as... Figure 16As shown, there is a bolt tube 15 above the power mounting plate 1010. The bolts connecting the power mounting plate 1010 and the reducer 13 pass through the bolt tube 15. The reducer 13 is installed vertically downwards. The power mounting plate 1010 has a shaft hole. The output shaft 16 of the reducer 13 passes through the shaft hole, and a bearing is installed between the output shaft 16 and the shaft hole. The lower end of the output shaft 16 is keyed to a coupling 14. The lower end of the coupling 14 is keyed to a screw 17. A square nut 18 is engaged on the screw 17. The nut seat 909 is a channel steel with two slots arranged in opposite directions. The square nut 18 is located between the two channel steels. Figure 16 The nut seat 909 shown is in side view. Figure 12 The nut seat 909 shown is viewed from above, and the top and bottom surfaces of the square nut 18 are flush with the top and bottom surfaces of the channel steel of the nut seat 909. The vertical surface of the square nut 18 is in sliding contact with the vertical surface of the channel steel of the nut seat 909. There is a pressure plate 19 at the top and bottom of the nut seat 909. The pressure plate 19 has a through hole, through which the screw 17 passes. The two pressure plates 19 are locked with locking bolts, thereby limiting the square nut 18 from the top and bottom.

[0034] like Figure 18 As shown, twenty sets of reducers 13 are electrically connected to a main control box. The main control box contains a microprocessor and has an external control switch. The microprocessor is electrically connected to the control switch and all reducers 13. To ensure the accuracy of lifting or jacking, laser rangefinders are installed at the bottom of the lifting frame 10 and the bottom of the radial beam 12, and displays are also provided. Each set of reducers 13 has an independent sub-control box. The sub-control box contains a microprocessor and has an external control switch. The microprocessor is electrically connected to the control switch and the corresponding reducer 13. The microprocessor in the main control box and the microprocessor in the sub-control box are electrically connected to the laser rangefinder and the display.

[0035] This embodiment further discloses a construction method for an electric formwork lifting system based on the above-mentioned sliding template and lifting system, and the technical solution adopted is as follows: Step 1: Based on the designed wall thickness of the concrete cylinder 8, assemble the platform system, lifting system, and first-layer formwork system. During the assembly of the first-layer formwork system, a sliding steel formwork 1 is installed directly below the radial beam 12. Adjacent sliding steel formwork 1s are filled with standardized steel formwork 2s. If gaps smaller than the width of the standardized steel formwork 2 appear, trapezoidal adjustable wooden molds 3 are used to fill them and seal the formwork system. Connecting bolts are used between sliding steel formwork 1 and standardized steel formwork 2, between standardized steel formwork 2 and standardized steel formwork 2, between sliding steel formwork 1 and trapezoidal adjustable wooden molds 3, and between standardized steel formwork 2 and trapezoidal adjustable wooden molds 3. Connecting bolts pass through connecting holes 106; a fixed steel template 2 is set inside the concrete cylinder wall 8, and the number of fixed steel templates 2 is equal to and corresponds one-to-one with the outer sliding rail steel template 1 and fixed steel template 2 (if there is a gap smaller than the width of the fixed steel template 2, a trapezoidal adjusting wooden mold 3 is used to fill it to achieve the closure of the template system). Fixed steel templates 2 are connected to each other and to the trapezoidal adjusting wooden mold 3 by connecting bolts. A sleeve 6 is set between the inner and outer templates of the template system, and the first tie bolt 5 and the second tie bolt are passed through the template and the sleeve 6 and locked. When installing the waler 4, the waler 4 is passed through the gap between the second stiffening plate 107 and the track channel steel in the sliding rail steel template 1, such as Figure 17 As shown, tighten the sliding track steel template 1, the fixed steel template 2 and the trapezoidal adjustable wooden template 3 (those skilled in the art can adjust the size of the second stiffening plate 107 as needed so that the waler 4 can fit tightly with the second stiffening plate 107, the fixed steel template 2 and the trapezoidal adjustable wooden template 3), and after installing the waler 4 and the end plate 7, the assembly of the first layer template system is completed; Step 2: Pour concrete into the formwork system. During the concrete setting process, assemble the second and third layer formwork systems, pouring one layer of concrete for each layer assembled. When assembling the second layer of sliding steel formwork 1, ensure that the straightness error between the guide rail groove 104 of the second layer of sliding steel formwork 1 and the guide rail groove 104 of the first layer of sliding steel formwork 1 along the cylinder wall direction does not exceed 5mm; the fitting clearance between the second roller 1007 of the lifting frame 10 and the guide rail groove 104 of the second layer of sliding steel formwork 1 is 1-3mm; the height difference between all sliding steel formwork 1s in the second layer does not exceed 25mm; when assembling the third layer of sliding steel formwork 1, ensure that the straightness error between the guide rail groove 104 of the third layer of sliding steel formwork 1 and the guide rail groove 104 of the first and second layers of sliding steel formwork 1 along the cylinder wall direction is... The straightness error of the guide rail groove 104 of the second roller 1007 of the lifting frame 10 and the guide rail groove 104 of the third layer of slide steel formwork 1 is 1-3mm; the height difference of all slide steel formwork 1 in the third layer does not exceed 25mm; and so on, with three layers of formwork as a unit for flipping and lifting, when assembling the subsequent slide steel formwork 1, the straightness error of the guide rail groove 104 of the lift frame 10 and the guide rail groove 104 of the two layers of slide steel formwork 1 below along the cylinder wall direction is kept to be no more than 5mm, and the straightness error of the guide rail groove 104 of the second roller 1007 of the lifting frame 10 and the guide rail groove 104 of the newly assembled slide steel formwork 1 is always 1-3mm; in the slope section of the concrete cylinder wall, the straightness error of the guide rail groove 104 along the cylinder wall direction is not limited to 5mm; the height difference of all slide steel formwork 1 in the same layer does not exceed 25mm; Step 3: After completing the three-layer assembly, press the control switch of the main control box to run the reducer 13. Under the action of the screw system, the lifting frame 10 moves up along the channel steel track and guide rail groove 104 to the third layer slide rail steel template 1. Stop the operation of the reducer 13. Insert the pin into the nearest pin hole 108 below the second connecting channel steel 1008 of the lifting frame 10. The end of the pin extends out of the outside of the pin hole 108. Press the control switch of the main control box to run the reducer 13 in reverse so that the second connecting channel steel 1008 is stably seated on the pin. Stop the operation of the reducer 13 (all twenty sets of lifting frames 10 are monitored on-site by personnel. Stop when the second connecting channel steel 1008 is seated on the pin). Check the twenty sets of lifting frames 10. If there is a lifting frame 10 that has not yet been placed, operate the control switch of the corresponding sub-control box to make independent fine adjustments. After all the lifting frames 10 are in place, proceed to step 4. Step 4: Control the control switch of the main control box to simultaneously reverse the twenty sets of reducers 13. The lifting frame 10 applies pressure to the pins, lifting the outer operating frame 9 and the radial beam 12, thereby lifting the entire platform system to a height exceeding the design height by 0.2m (check the detection results of the laser rangefinder on the display). Insert the pin into the nearest pin hole 108 below the plug-in seat 910 of the outer operating frame 9. Following the same operation method as during lifting, lower the entire platform system and make fine adjustments until all plug-in seats 910 are seated on the pins. Check the height of the platform system again using the laser rangefinder. If the error value between the platform system height and the design height is within 25mm, it is considered qualified. Otherwise, control the reducer 13 to run again and make fine adjustments to the height of the outer operating frame 9 until the error requirement is met. Step 5: After ensuring that the first layer of concrete cylinder wall 8 has completely solidified, remove the first layer of formwork system and hoist it to the fourth layer for assembly (i.e., flip-up lifting). Then pour concrete. After that, each cycle will first rotate the reducer forward to lift the lifting frame to the height of the next layer, insert the pin, and then rotate the reducer in reverse to lift the outer operating frame, so that the entire platform system rises to the height of one formwork layer. Then assemble the formwork system and connect the slide rail steel formwork 1, and pour concrete. Repeat this process until the pouring of the entire concrete cylinder wall 8 is completed. Step 6: After the concrete has hardened, remove all formwork systems, lifting systems and platform systems. Each time the object is lifted or raised, the pin corresponding to the object to be lifted must be pulled out. After being pulled out, the object will still fall due to the action of the screw system.

[0036] The circuits and mechanical connections involved in this invention are conventional methods used by those skilled in the art, and technical inspiration can be obtained through a limited number of experiments; they are common knowledge.

[0037] Components not described in detail in this article are existing technologies.

[0038] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A construction method for an electric lifting system, comprising installing a sliding steel formwork (1) and a fixed steel formwork (2) on the outer and inner sides of a concrete cylinder wall (8), and a lifting system supporting a radial beam (12), characterized in that: The outer side of the concrete cylinder wall (8), the radial beam (12) is connected to the top of the operating frame of the lifting system. The operating frame of the lifting system and the lifting frame (10) establish a limiting relationship with the sliding template through the limiting mechanism and lift in an alternating manner. The lifting frame (10) is lifted along the track of the sliding template. The sliding template includes a slide rail steel template (1). The slide rail steel template (1) includes a panel (101). The panel (101) is connected to a reinforcing member (109). The reinforcing member (109) is connected to two symmetrically arranged guide rails. The guide rails have guide rail grooves (104). The lifting frame (10) is lifted along the guide rail grooves (104).

2. The construction method according to claim 1, characterized in that: The guide rail groove (104) has a through pin hole (108). The pin holes (108) of the two guide rails are in corresponding positions. A pin is inserted into the pin hole (108), and the operating frame and the lifting frame (10) are alternately seated on the pin to achieve staggered lifting.

3. The construction method according to claim 1, characterized in that: The slide rail steel template (1) is also provided with bolt holes (105), through which tie bolts can be passed to connect with the fixed steel template (2) inside the concrete cylinder wall (8); the two sides of the panel (101) are connected with side ribs (102), the side ribs (102) have plates perpendicular to the panel (101), and connection holes (106) are provided on the plate surface; the upper panel (101) of the slide rail steel template (1) is higher than the side ribs (102), and the lower side ribs (102) are lower than the panel (101); the axis of the bolt holes (105) and the axis of the connection holes (106) are located on different horizontal planes; the slide rail steel template (1) is connected to the fixed steel template (2) on the side by passing the connection bolts through the connection holes (106).

4. The construction method according to claim 2 or 3, characterized in that: The lifting system's operating frame includes an outer operating frame (9). A screw system is installed between the outer operating frame (9) and the lifting frame (10). When the lifting frame (10) is lifted, a pin is inserted into the slot (108) of the guide rail groove (104) opposite to the lower part of the outer operating frame (9). When the outer operating frame (9) is lifted, a pin is inserted into the slot (108) of the guide rail groove (104) opposite to the lower part of the lifting frame (10).

5. The construction method according to claim 4, characterized in that: Support rollers (907) are set on the outer operating frame (9) and a track is set on it. The support rollers (907) are supported on the outside of the concrete cylinder wall (8). The lifting frame (10) is equipped with a first roller (1001) and a second roller (1007). The first roller (1001) is connected to the track of the outer operating frame (9) and the track of the outer operating frame (9) constrains the movement trajectory of the first roller (1001). The second roller (1007) is located in the guide groove (104) of the slide steel template (1) and the guide groove (104) constrains the movement trajectory of the second roller (1007).

6. The construction method according to claim 5, characterized in that: There are multiple lifting systems and sliding steel formwork (1), and they correspond to the positions of the radial beam (12). The multiple lifting systems are electrically connected to the main control device, and each lifting system is also electrically connected to an independent sub-control device.

7. The construction method according to claim 6, characterized in that: Includes the following steps: Step 1: Assemble the outer operating frame (9), inner operating frame (11) and lifting frame (10) of the lifting system, and assemble the lower-level template system, connecting the slide rail steel template (1) to the lower-level template system; Step 2: Insert a pin into the pin hole (108) below the contact position between the outer operating frame (9) and the slide rail steel template (1) so that the outer operating frame (9) sits on the pin. Step 3: Operate the main control device to make the screw system run in the forward direction, so that the lifting frame (10) climbs upward. After all the lifting frames (10) have passed the design position, stop the screw system and insert the pin into the pin hole (108) corresponding to the design position. Operate the main control device to control the screw system to run in the reverse direction, so that the lifting frame (10) falls on the pin. Then check all the lifting frames (10). If there is a lifting frame (10) that has not fallen on the pin, operate the corresponding independent sub-control device to control the single lifting frame (10) to run independently until all the lifting frames (10) fall on the pin. Before or after the lifting starts, pull out the pin at the position where the lifting frame (10) was before the lifting. Step 4: Operate the main control device to reverse the screw system, lift the outer operating frame (9) upward, and then push the entire platform system upward; after all the outer operating frames (9) have passed the design position, stop the screw system, insert the pin into the pin hole (108) corresponding to the design position, operate the main control device to control the screw system to run in the forward direction, so that the outer operating frames (9) fall on the pin, and then check all the outer operating frames (9). If any do not fall on the pin, operate the corresponding independent sub-control device to control the individual outer operating frame (9) to run independently until all the outer operating frames (9) fall on the pin. Step 5, install the formwork system and slide rail steel formwork for the new layer (1); Step 6, repeat steps 3 to 5 to achieve alternating lifting or jacking of the lifting frame (10) and the external operating frame (9). Each time the lifting frame (10) is lifted and the external operating frame (9) is jacked, the lifting system raises the platform system by the height of one template layer, and then the template system of the corresponding layer is installed until the chimney construction is completed. Step 7: Dismantle the lifting system. First, dismantle the lifting frame (10), then dismantle the outer operating frame (9) and the inner operating frame (11).

8. The construction method according to claim 7, characterized in that, In step 1, a sliding steel template (1) is set below the radial beam (12), and the adjacent sliding steel templates (1) are filled with the fixed steel templates (2) of the template system. The sliding steel templates (1) and the fixed steel templates (2) are connected by connecting bolts. The inner fixed steel templates (2) are connected by connecting bolts. A sleeve (6) is set between the inner template of the template system and the outer template of the template system and the sliding steel template (1) of the lifting system. The first tie bolt (5) and the second tie bolt pass through the template and the sleeve (6) and are locked. The walers (4) are used to tighten the sliding steel templates (1) and the fixed steel templates (2) to complete the assembly of the template system and the connection between the sliding steel templates (1) and the template system.

9. The construction method according to claim 7, characterized in that, In step 5, when installing a new layer of slide rail steel formwork (1), in the non-slope section of the concrete cylinder wall (8), the straightness error of the guide rail groove (104) of the newly installed slide rail steel formwork (1) and the guide rail groove (104) of all the slide rail steel formwork (1) below it along the cylinder wall direction shall not exceed 5mm; the matching gap between the second roller (1007) of the lifting frame (10) and the guide rail groove (104) of the newly installed slide rail steel formwork (1) shall not exceed 3mm; and the height difference of all slide rail steel formwork (1) in the same layer shall not exceed 25mm.