A construction method for a circular silo umbrella-shaped dome structure

By constructing a support structure on the ground and using a lifting device to raise the umbrella-shaped dome frame, the safety hazards and high construction difficulty of high-altitude operations in the construction of circular silos were solved, thus improving both safety and efficiency.

CN123109404APending Publication Date: 2026-11-17CHINA CONSTR SEVENTH ENG DIVISION CORP LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611540509.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-30
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

The construction of the umbrella-shaped dome frame of the circular silo presents significant safety hazards and high construction difficulty, especially the risk of falls due to working at heights and the limited space for material transfer, component positioning and assembly operations.

Method used

A lifting device is used to build a support structure on the ground. By coordinating the lifting device and the support structure, the umbrella-shaped dome frame is gradually raised to the top of the circular silo, reducing high-altitude work and allowing construction workers to complete the main construction tasks on the ground.

Benefits of technology

It significantly reduces safety hazards for construction workers, decreases the risk of falls from heights, reduces construction difficulty, and improves construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109404A_ABST
    Figure CN123109404A_ABST
Patent Text Reader

Abstract

This invention relates to the field of circular silo construction and discloses a construction method for a circular silo umbrella-shaped dome structure. The method involves reserving a construction pit at the center of the circular silo; fixing a lifting device inside the construction pit; installing a support structure at the center of the lifting device; raising the support structure using the lifting device; constructing an umbrella-shaped dome frame inside the circular silo with the support structure as the center; raising the umbrella-shaped dome frame using the lifting device; and fixing the umbrella-shaped dome frame to the upper part of the circular silo. After the umbrella-shaped dome frame is constructed on the ground, it can be raised upwards through the cooperation of the lifting device and the support structure, so that the umbrella-shaped dome frame corresponds to the top of the circular silo. Compared with traditional construction methods, this method significantly reduces high-altitude work, thereby reducing safety hazards for construction workers and decreasing the risk of falls from heights.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of circular silo construction technology, specifically a method for constructing an umbrella-shaped dome structure for a circular silo. Background Technology

[0002] The application of umbrella-shaped dome frames in circular silos is mainly reflected in the support system for silo roof construction. This structure consists of a central cylinder, radial truss beams, and silo wall corbels, resembling the ribs of an open umbrella, which evenly distributes the load to the cylinder wall. Compared to traditional full-span scaffolding, umbrella-shaped support platforms have the advantages of convenient installation and dismantling, and reusability, which can effectively reduce construction costs and safety risks.

[0003] During the construction of the umbrella-shaped dome frame, construction workers need to work at height for extended periods, which presents two challenges: First, there are significant safety hazards, as long-term work at heights carries the risk of falls, and inadequate protection can easily lead to accidents; second, the construction is highly difficult, as material transportation, component positioning and assembly, and node connections all need to be completed at height, with limited operating space.

[0004] Therefore, we propose a construction method for a circular silo umbrella-shaped dome structure to solve the problems mentioned above. Summary of the Invention

[0005] The purpose of this invention is to solve the aforementioned technical problems.

[0006] To achieve the above objectives, the present invention adopts the following technical solution: A construction method for a circular silo umbrella-shaped dome structure includes the following steps: S1: Clean the center of the bottom of the circular silo; After the circular silo is completed, the inner bottom wall of the circular silo is cleaned to ensure that the inner bottom wall of the circular silo is flat. S2: A lifting device is fixedly installed inside the circular silo; A lifting device is fixedly installed inside the circular silo, and the lifting device is located at the center of the circular silo; S3: Install a support structure at the center of the lifting device, and raise the height of the support structure using the lifting device; S301: First, a support frame is placed inside the lifting device, and the support frame is lifted by the lifting structure inside the lifting device; S302: Then, after the lifting device lifts the support frame, the inside of the lifting device has space for storing the next support frame. S303: Next, the next support frame is placed inside the lifting device to reinforce the adjacent support frames above and below; S304: Repeat the operation in the same manner as S301-S303; eventually, several support frames form a support structure that is higher than the circular silo. S4: With the supporting structure as the center, build an umbrella-shaped dome frame inside the circular silo; The construction workers erected an umbrella-shaped dome frame inside the circular silo; and the supporting structure was set coaxially with the supporting structure; so that the construction workers could carry out the construction of the umbrella-shaped dome frame from the bottom of the circular silo. S5: Lift the umbrella-shaped dome frame using a lifting device; Several traction structures inside the lifting device pass through the top of the support structure and are fixed at the center of the erected umbrella-shaped dome frame. When several traction structures provide tension at the same time, they simultaneously provide an upward driving force to the erected umbrella-shaped dome frame, so that the umbrella-shaped dome frame is lifted along the height direction of the circular silo. S6: Secure the umbrella-shaped dome frame to the upper part of the circular silo; After the umbrella-shaped dome frame is lifted to the top of the cylindrical silo, the construction worker stands on the aerial work platform to reinforce the umbrella-shaped dome frame, so that the umbrella-shaped dome frame is fixed to the top of the cylindrical silo for subsequent construction.

[0007] Furthermore: In step S302: After the support frame is raised to a certain height, the raised support frame is pulled by several movable hooks in the lifting device to prevent the raised support frame from falling downwards due to its own gravity.

[0008] Furthermore: In step S303: When fixing two adjacent support frames, several bolts and nuts are used to fix them together to reinforce the adjacent support frames.

[0009] Furthermore: In step S301: Before lifting the support structure, a mounting ring is placed on the top of the lifting device. After the support structure is lifted, the mounting ring is fitted onto the support structure from top to bottom, so that the mounting ring can be adjusted up and down along the height of the support structure.

[0010] Furthermore: In step S301: Before lifting the first support frame, the traction parts of several traction structures bypass the top of the uppermost support structure and are then fixed at the center of the umbrella dome frame so as to lift the subsequent umbrella dome frames.

[0011] Furthermore, the uppermost support frame is provided with several clearance openings at equal intervals, and the traction part of the traction rope is arranged to bypass the clearance openings.

[0012] Furthermore: In step S4: When constructing the umbrella-shaped dome frame, Bailey bridge frames are installed at equal intervals on the top of the mounting ring along the circumferential direction. Reinforcing frames are installed between adjacent Bailey bridge frames, and several reinforcing frames are arranged in a ring structure to reinforce several Bailey bridge frames.

[0013] Furthermore: A right-angled trapezoidal support frame is installed on the top of the Bailey bridge along its length, and reinforcing rods are installed between adjacent support frames to reinforce the support frames.

[0014] The beneficial effects of this invention are: After the umbrella-shaped dome frame of this invention is erected on the ground, it can be lifted upwards by the cooperation of the lifting device and the supporting structure so that the umbrella-shaped dome frame is aligned with the top of the circular silo. Compared with the traditional construction method, this construction method greatly reduces the need for high-altitude operations. On the one hand, it improves the safety of construction workers and reduces the risk of them falling from heights. On the other hand, it allows users to assemble the umbrella-shaped dome frame on the ground, reducing construction difficulty and providing convenience for construction workers. Attached Figure Description

[0015] Figure 1 This is a schematic diagram of the construction state structure of the present invention; Figure 2 This is a three-dimensional structural schematic diagram of the present invention; Figure 3 This is a three-dimensional structural diagram of the lifting device in this invention; Figure 4 This is a partial structural schematic diagram of the lifting device in this invention; Figure 5 This is a cross-sectional structural diagram of the umbrella-shaped dome frame in this invention; Figure 6 This is a partial structural schematic diagram of the umbrella-shaped dome frame in this invention; Figure 7 This is a partially enlarged structural diagram of point A in this invention.

[0016] The names corresponding to each mark in the diagram: 1. Circular silo; 3. Lifting device; 301. Lifting structure; 302. Traction structure; 303. Movable hook; 4. Support structure; 401. Support frame; 4011. Clearance opening; 5. Umbrella dome frame; 501. Bailey bridge; 502. Reinforcing frame; 503. Support frame; 504. Reinforcing rod; 6. Mounting ring. Detailed Implementation

[0017] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention are within the scope of protection of the present invention.

[0018] A construction method for a circular silo umbrella-shaped dome structure includes the following steps: like Figure 1 As shown: Step 1: Clean the center of the bottom of the circular silo 1; After the construction of the walls of the circular silo 1 is completed, the inner bottom wall of the circular silo 1 is cleaned to ensure that the bottom of the circular silo 1 is flat, which will improve stability when the lifting device 3 is installed and prevent the lifting device 3 from becoming loose or tilted.

[0019] like Figure 1 Or as shown in step 2: Step 2: Install the lifting device 3 inside the circular silo 1; The lifting device 3 is fixed at the center inside the circular silo 1. It should be noted that the lifting device 3 is fixed at the center inside the circular silo 1 by a number of expansion bolts or pre-embedded bolts (pre-embedded bolts and expansion bolts are not shown in the figure), thereby reinforcing the lifting device 3; the lifting device 3 is located at the center of the circular silo 1.

[0020] like Figure 1 Or as shown in step 2: Step 3: Install the support structure 4 at the center of the lifting device 3, and raise the height of the support structure 4 by the lifting device 3; like Figure 3 and 4As shown: It should be noted that, for the convenience of describing the construction method, the specific structure of the lifting device 3 is described as follows: The lifting device 3 includes a frame, which is divided into a drive chamber 3a, a traction chamber 3b, and a lifting chamber 3c. The drive chamber 3a is located below the traction chamber 3b, and the lifting chamber 3c is located inside the traction chamber 3b. The side of the lifting chamber 3c is open to facilitate the storage of the support frame 401. The drive structure 301, which is a hydraulic cylinder, is installed inside the drive chamber 3a. The hydraulic cylinder 301 can lift the support frame 401 upwards. The two sides of the traction chamber 3b are respectively... A traction structure 302 is installed, which can lift the umbrella-shaped dome frame 5 upward. The traction structure 302 consists of a drive motor, a reel, a traction rope, and a hook. The hook is fixed to one end of the traction rope, and the traction rope is wound on the reel. The reel is fixed to the drive end of the drive motor. Several movable hooks 303 are equidistantly installed on the top of the lifting chamber 3c in a circumferential direction. The movable hooks 303 can be used to hook the lifted support frame 401 to prevent it from falling downward due to its own weight, thus facilitating the installation of the next support frame 401.

[0021] S301: First, a support frame 401 is placed inside the lifting device 3, and the support frame 401 is lifted by the lifting structure 301 inside the lifting device 3. It should be noted that before the first support frame 401 is lifted, an installation ring 6 is placed on top of the lifting device 3. After the first support frame 401 is lifted, the installation ring 6 is fitted onto the support frame 401, so that the installation ring 6 can be adjusted up and down along the height of the support structure 4. On the one hand, this provides an installation base for the subsequent umbrella dome frame 5; on the other hand, it facilitates the up and down adjustment of the umbrella dome frame 5.

[0022] It should be noted that before lifting the first support frame 401, the traction parts (i.e., traction ropes) of several traction structures 302 are respectively bypassed around the top of the first support structure 401, so as to lift the subsequent umbrella-shaped dome frame 5. This makes the operation convenient and provides convenience for the staff.

[0023] It should be noted that: Several clearance openings 4011 are provided at the top of the uppermost support structure 401. The traction part (i.e., the traction rope) of the traction structure 302 is set to bypass the clearance openings 4011. After the umbrella dome frame 5 is built, it is to prevent the protrusion of the traction rope 302 from interfering with the subsequent construction.

[0024] S302: Then, after the lifting device 3 lifts the support frame 401, the interior of the lifting device 3 (that is, the lifting chamber 3c) has space reserved for storing the next support frame 401. S303: Next, the next support frame 401 is placed inside the lifting device 3 to reinforce the upper and lower adjacent support frames 401; It should be noted that when fixing two adjacent support frames 401, several bolts and nuts are used to reinforce the adjacent support frames 401. This method is convenient and provides convenience for construction workers.

[0025] S304: Repeat the operation in the same way as S301-S303; eventually, several support frames 401 form a support structure 4, and the height of the support structure 4 is higher than the support structure of the circular silo 1; this facilitates the lifting of the umbrella-shaped dome frame 5.

[0026] S4: With the support structure 4 as the center, an umbrella-shaped dome frame 5 is built inside the circular silo 1, so that the umbrella-shaped dome frame 5 can slide up and down relative to the support structure 4. The construction worker erects an umbrella-shaped dome frame 5 inside the circular silo 1 at the bottom; and the umbrella-shaped dome frame 5 is set coaxially with the supporting structure 4; so that the construction worker can carry out construction on the umbrella-shaped dome frame 5 from the bottom of the circular silo 1. Compared with the traditional installation method, there is no need to hoist the umbrella-shaped dome frame 5 to the height, which is convenient to operate and provides convenience for the workers. In addition, it also reduces the construction risk and provides safety for the construction workers.

[0027] In detail: When constructing the umbrella-shaped dome frame 5, Bailey bridge frames 501 are installed at equal intervals on the top of the mounting ring 6 along the circumferential direction. Reinforcing frames 502 are installed between adjacent Bailey bridge frames 501, and several reinforcing frames 502 are arranged in a ring structure to reinforce several Bailey bridge frames 501. More specifically: A right-angled trapezoidal support frame 503 is installed on the top of the Bailey bridge 501 along its length, and a reinforcing rod 504 is installed between adjacent support frames 503 to reinforce the support frames 503, thereby forming an umbrella-shaped dome frame 5.

[0028] In addition, a fixing rod 505 is installed between two adjacent support frames 503, which further strengthens the structure.

[0029] It should be noted that the installation of the umbrella-shaped dome frame 5 is carried out using bolts and nuts; after the construction of the circular silo 1 is completed, the umbrella-shaped dome frame 5 can be disassembled.

[0030] S5: Lift the umbrella-shaped dome frame 5 using the lifting device 3; After several traction parts in the lifting device 3 pass through the top of the support structure 4, one end of the traction part (i.e. the hook) is fixed at the center of the umbrella dome frame 5. When several traction parts provide tightening force at the same time, several traction structures 302 simultaneously provide upward driving force to the umbrella dome frame 5, so that the umbrella dome frame 5 is lifted along the height direction of the circular silo 1.

[0031] It should be noted that the traction part is fixed on the mounting ring 6, and several lifting devices 3 can lift the mounting ring 6, so that the mounting ring 6 can drive the umbrella-shaped dome frame 5 to adjust up and down.

[0032] S6: Fix the umbrella-shaped dome frame 5 to the upper part of the circular silo 1; After the umbrella-shaped dome frame 5 is raised to the top of the circular silo 1, the construction worker stands on the aerial work platform (not shown in the figure) to perform high-altitude work on the umbrella-shaped dome frame 5 so that the umbrella-shaped dome frame 5 is fixed to the top of the support structure 4. At this time, the top of the umbrella-shaped dome frame 5 is flush with the top of the support structure 4.

[0033] Then, the template is fixed on the top of the umbrella dome frame 5 and the support structure 4. At this time, the clearance opening 4011 can allow the traction rope of the traction structure 302 to pass through after the template is fixed, so that the template will not press on the traction rope of the traction structure 302.

[0034] Then, concrete is poured onto the template to complete the concrete pouring construction of the umbrella-shaped dome. After the concrete has solidified, the traction structure 302 is adjusted so that the umbrella dome frame 5 and the template fixed on the umbrella dome frame 5 move downwards simultaneously, thereby separating the template from the concrete structure of the umbrella dome.

[0035] Then the umbrella-shaped dome frame 5 is removed from the supporting structure 4, and then the supporting frame 401 of the supporting structure 4 is removed from the bottom of the supporting structure 4 in sequence. At the same time, when removing the supporting frame 401, the template corresponding to the top of the supporting structure 4 can be separated from the concrete structure of the umbrella-shaped dome, thereby completing the demolition of the structure in sequence.

Claims

1. A construction method for a circular silo umbrella-shaped dome structure, characterized in that: Includes the following steps: S1: Clean the center of the bottom of the circular silo (1); After the construction of the walls of the circular silo (1) is completed, the inner bottom wall of the circular silo (1) is cleaned to ensure that the inner bottom wall of the circular silo (1) is flat. S2: Install the lifting device (3) inside the circular silo (1); A lifting device (3) is fixedly installed inside the circular silo (1), and the lifting device (3) is located at the center of the circular silo (1); S3: Install a support structure (4) at the center of the lifting device (3), and raise the height of the support structure (4) by the lifting device (3); S301: First, a support frame (401) is placed inside the lifting device (3), and the support frame (401) is lifted by the lifting structure (301) inside the lifting device (3); S302: Then, after the lifting device (3) lifts the support frame (401), the inside of the lifting device (3) has space for storing the next support frame (401) so that the next support frame (401) can be stored. S303: Next, the next support frame (401) is placed inside the lifting device (3) to reinforce the upper and lower adjacent support frames (401); S304: Repeat the operation in the same manner as S301-S303; eventually, several support frames (401) form a support structure higher than the circular silo (1); S4: With the supporting structure (4) as the center, build an umbrella-shaped dome frame (5) inside the circular silo (1). The construction worker builds an umbrella-shaped dome frame (5) inside the circular silo (1); and the supporting structure (4) is set coaxially with the supporting structure (4); so that the construction worker can carry out construction on the umbrella-shaped dome frame (5) from the lower part of the circular silo (1); S5: The umbrella dome frame (5) is lifted by the lifting device (3); After several traction structures (302) in the lifting device (3) pass through the top of the support structure (4), they are fixed at the center of the erected umbrella dome frame (5). When several traction structures (302) provide tightening force at the same time, they provide upward driving force to the erected umbrella dome frame (5) at the same time, so that the umbrella dome frame (5) is lifted along the height direction of the circular silo (1). S6: Fix the umbrella-shaped dome frame (5) to the upper part of the circular silo (1); After the umbrella-shaped dome frame (5) is lifted to the top of the circular silo (1), the construction worker stands on the aerial work platform to reinforce the umbrella-shaped dome frame (5) so that the umbrella-shaped dome frame (5) is fixed to the top of the circular silo (1) for subsequent construction.

2. The construction method for a circular silo umbrella-shaped dome structure according to claim 1, characterized in that: In step S302: When the support frame (401) is raised to a certain height, the support frame (401) is pulled by several movable hooks (303) in the lifting device (3) to prevent the raised support frame (401) from falling down due to its own gravity.

3. The construction method for a circular silo umbrella-shaped dome structure according to claim 1, characterized in that: In step S303: When fixing two adjacent support frames (401), several bolts and nuts are used to fix them in order to reinforce the adjacent support frames (401).

4. The construction method for a circular silo umbrella-shaped dome structure according to claim 1, characterized in that: In step S301: Before lifting the support structure (4), a mounting ring (6) is placed on the top of the lifting device (3). After the support structure (4) is lifted, the mounting ring (6) is fitted onto the support structure (4) so ​​that the mounting ring (6) can be adjusted up and down along the height of the support structure (4).

5. The construction method for a circular silo umbrella-shaped dome structure according to claim 1, characterized in that: In step S301: Before lifting the first support frame (401), the traction parts of several traction structures (302) bypass the top of the uppermost support structure (401) and are then fixed at the center of the umbrella dome frame (5) so as to lift the subsequent umbrella dome frames (5).

6. The construction method for a circular silo umbrella-shaped dome structure according to claim 5, characterized in that: The uppermost support frame (401) has several clearance openings (4011) at equal intervals, and the traction part of the traction rope (302) is arranged to bypass the clearance openings (4011).

7. The construction method for a circular silo umbrella-shaped dome structure according to claim 4, characterized in that: In step S4: When constructing the umbrella dome frame (5), Bailey bridge frames (501) are installed at equal intervals on the top of the mounting ring (6) along the circumferential direction. Reinforcing frames (502) are installed between adjacent Bailey bridge frames (501), and several reinforcing frames (502) are arranged in a ring structure to reinforce several Bailey bridge frames (501).

8. The construction method for a circular silo umbrella-shaped dome structure according to claim 6, characterized in that: A support frame (503) with a "right trapezoidal" structure is installed on the top of the Bailey bridge (501) along its length direction, and a reinforcing rod (504) is installed between adjacent support frames (503) to reinforce the support frame (503).