Strengthening technology using FRP concrete structures

By forming repair support grooves and perforation grooves on the surface of the concrete structure and attaching FRP anchor components, the problem of easy mortar movement is solved, the static strength and support of the mortar are improved, the repair effect is enhanced, and the maintenance cost is reduced.

CN123109418APending Publication Date: 2026-11-17BLUE STRUCTURE ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510889092.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2025-05-14
Filing Date
2025-06-30
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In traditional concrete structure maintenance, mortar is prone to movement or separation in the filling groove, leading to safety hazards and high maintenance costs.

Method used

Repair support grooves and perforation grooves are formed on the surface of the concrete structure, FRP anchor rod components are installed, and a support bracket is set inside the mortar to improve the static and support force of the mortar.

Benefits of technology

It improves the static strength and support of the mortar, prevents the mortar from separating from the repair support groove, enhances the repair effect, and reduces safety hazards and maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109418A_ABST
    Figure CN123109418A_ABST
Patent Text Reader

Abstract

This invention provides a process for reinforcing FRP (fiberglass reinforced plastic) concrete structures, more specifically, a process for repairing damaged portions of concrete structures. The process includes: a repair support groove forming stage where a repair support groove is formed on the concrete structure while removing the damaged portion; a perforation groove forming stage where the inner surface of the repair support groove is perforated to form a perforation groove; a perforation groove repair anchor component signing stage where a repair anchor component is signed onto the perforation groove formed by the repair support groove; and a mortar filling cut-off stage where the repair support groove is filled with mortar. This FRP anchor concrete structure repair and reinforcement process according to the invention involves removing cracked portions from the concrete structure surface, forming a repair support groove and a perforation groove, and then attaching a repair anchor component onto the perforation groove formed by the repair support groove.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a reinforcement process for concrete structures using FRP (fiberglass reinforced plastic). More specifically, by removing cracked portions of the concrete structure surface, repair support grooves and perforation grooves are formed. Repair anchor components are then installed on the perforation grooves formed by the repair support grooves. Supports for the repair anchor components are added inside the mortar filling the repair support grooves, which improves the static strength and support capacity of the reinforcing mortar. Furthermore, the use of support plates for the repair anchor components inside the repair support grooves enhances reinforcement efficiency. This invention pertains to a concrete structure repair and reinforcement process. Background Technology

[0002] Concrete structures, generally composed of concrete materials or reinforced concrete structures, deteriorate over time after construction due to factors such as snow, rain, temperature changes, external impacts, salt damage, alkali-aggregate reaction, and chemical corrosion, as well as water penetration causing steel corrosion and expansion. This leads to a decline in long-term durability and usability. If these structures continue to corrode and deteriorate, surface cracks will appear, eventually posing a risk of structural collapse. Therefore, continuous management and maintenance are necessary.

[0003] Thus, the surface of the concrete structure will be subjected to peeling, initial defects, or cracks caused by the aforementioned internal and external factors. Peeling, initial defects, or cracks will promote the deterioration process. In order to ensure the continued stability and performance of the reinforced concrete structure, it is necessary to repair the damaged parts of the concrete structure surface to inhibit the further deterioration process and improve durability.

[0004] Therefore, by cutting or excavating the damaged areas on the surface of a concrete structure, mixing the resulting repair grooves, and filling them with mortar repair and reinforcement materials, the durability of the concrete structure can be improved, and its strength and initial appearance can be maintained.

[0005] However, in order to repair damaged parts of traditional concrete structures, the mortar sprayed on or filled into the damaged parts for repair and reinforcement can move or separate from the filling groove after a period of time due to external impact or water penetration. This poses a safety risk due to mortar separation, and frequent mortar separation can lead to repeated reinforcement of the damaged parts, resulting in excessively high repair and maintenance costs.

[0006] The aforementioned invention refers to the background technology in the technical field to which this invention pertains, and not to conventional technology.

[0007] Existing technical documents

[0008] Patent documents

[0009] (Patent Document 1) Republic of Korea Patent No. 10-1743930 Summary of the Invention

[0010] The problem that the invention aims to solve

[0011] This invention is proposed to solve the aforementioned traditional problems. The purpose of this invention is to eliminate the cracks that form on the surface of concrete structures, form repair support grooves and perforation grooves, install repair anchor components at the perforation grooves formed by the repair support grooves, and add a support bracket for the repair anchor components inside the mortar filling the repair support grooves. This can improve the static strength and support force of the mortar, and improve the reinforcement efficiency of the concrete structures that move or shift within the repair support grooves. Its purpose is to provide a repair and reinforcement process.

[0012] means for solving problems

[0013] To achieve the aforementioned goal, this invention provides a cross-sectional repair process for repairing damaged portions of concrete structures.

[0014] The concrete structure repair support groove forming stage involves forming a repair support groove on the concrete structure while removing the damaged portion.

[0015] The repair support groove is formed by perforating the inner surface of the groove to form a perforated groove in the repair support groove perforation groove formation stage;

[0016] The maintenance anchor component is marked in the perforated groove formed by the maintenance support groove during the maintenance anchor component marking stage; and

[0017] A concrete structure repair and reinforcement process using FRP anchors is provided, characterized by a mortar-filled repair support groove with a mortar-filled cut-off stage.

[0018] In one example of the present invention,

[0019] The maintenance anchor bolt component.

[0020] An anchor member connected to the perforated groove formed in the damaged portion of the concrete structure; and

[0021] Its characteristic is that it is first connected to the anchor bar component, and is composed of a bracket support part consisting of fixed support connection components.

[0022] Additionally, in one example of the present invention,

[0023] After the perforated groove of the maintenance support groove is formed.

[0024] Its characteristic is that a perforated groove filling material layer is added to the perforated groove formed on the maintenance support groove.

[0025] Additionally, in one example of the present invention,

[0026] The bracket support is placed inside the maintenance support slot.

[0027] The support connectors of the bracket support are characterized by a radial arrangement.

[0028] Additionally, in one example of the present invention,

[0029] The anchor bar component is characterized by being composed of an elastic synthetic resin material.

[0030] Invention Effects

[0031] According to the FRP anchor bolt concrete structure repair and reinforcement process of the present invention, by removing the part of the concrete structure surface that forms cracks, a repair support groove and a perforation groove are formed, and a repair anchor bolt component is pasted on the perforation groove formed by the repair support groove. The support part of the repair anchor bolt component is added inside the mortar that fills the repair support groove, which can improve the static force and support force of the mortar, prevent the mortar from separating or moving from the repair support groove, and improve the repair effect. Attached Figure Description

[0032] Figure 1 The drawings show the concrete structure repair support groove formation stage of the concrete structure repair and reinforcement process using FRP anchors according to the present invention.

[0033] Figure 2 These are drawings illustrating the formation stage of the perforated groove in the repair support groove of the concrete structure repair and reinforcement process using FRP anchors according to the present invention.

[0034] Figure 3 This is a schematic diagram of the repair anchor body used in the concrete structure repair and reinforcement process according to the present invention.

[0035] Figure 4 This is a diagram showing a portion of the support component of a bracket in an inserted state according to the present invention's FRP concrete structure repair and reinforcement process.

[0036] Figure 5 This is a schematic diagram illustrating the process of signing contracts for repair anchor components in the concrete structure repair and reinforcement process according to the present invention using FRP anchors.

[0037] Figure 6 This is a drawing showing the signed state of the repair anchor components in the concrete structure repair and reinforcement process according to the present invention.

[0038] Figure 7The drawings show the mortar filling cut-off stage of the repair support groove in the concrete structure repair and reinforcement process using FRP anchors according to the present invention.

[0039] Figure 8 Drawings show the filling material used in the repair and reinforcement process of FRP concrete structures according to the present invention.

[0040] Explanation of reference numerals in the attached figures

[0041] 10: Repairing anchor bolt components 20: Anchor bolt parts

[0042] 30: Support bracket 31: Support connector

[0043] 40: Mortar 50: Filler

[0044] 100: Concrete structure; 200: Cracks

[0045] 300: Maintenance support groove; 400: Perforation groove

[0046] S1: Formation stage of concrete structure repair support groove

[0047] S2: Stage of forming perforated groove for maintenance support slot

[0048] S2-1: Perforated Groove Filling Material Filling System

[0049] S3: Signing Stage for Anchor Bolt Repair Components at Tiangongzhijia

[0050] S4: Repair support groove mortar filling cut-off stage Detailed Implementation

[0051] Since the description of this invention is merely for illustrating the structural or functional embodiments, the scope of this invention should not be construed as being limited to the embodiments described herein. That is, the embodiments can have various modifications and forms; therefore, the scope of this invention should be understood to include equivalents that can implement the technical concept.

[0052] Furthermore, the meanings of the terms used in this invention should be understood as follows:

[0053] Terms such as "first" and "second" are used to distinguish one constituent element from another, and these terms should not limit the scope of the rights. For example, the first component can be named the second component, and similarly, the second component can be named the first component.

[0054] When it is said that a component is "connected" to another component, it may mean that the component is directly connected to the other component, but it must be understood that there may be other components in between. On the other hand, when it is said that a component is "directly connected" to another component, it should be understood that there are no other components in between. Furthermore, other expressions for explaining the relationship between components, such as "between ~" and "right between ~", or "neighbors between ~" and "direct neighbors of ~", should also be interpreted in the same way.

[0055] The singular representation must be understood to include multiple representations. Unless there is a clear difference in meaning in the context, terms such as “include” or “own” must be understood to include multiple representations. “Include” or “own” means the presence of a feature, number, step, component, or combination thereof, without precluding the presence or possibility of one or more other features or numbers, steps, actions, components, parts, or combinations thereof.

[0056] For each step, the identifiers (e.g., a, b, c, etc.) are used for ease of description. The identifiers do not indicate the order of each step. Each step may occur in a different order than specified in the context unless the specific order is explicitly stated. That is, each step can occur in the specified order, can actually be executed simultaneously, or can be executed in reverse order.

[0057] Unless all terms used herein have different definitions, they have the same meaning as understood by one of ordinary skill in the art to which this invention pertains. Terms defined in commonly used dictionaries must be interpreted in accordance with the context of the relevant art and should not be interpreted as having an ideal or excessive formal meaning unless explicitly defined in this invention.

[0058] Figure 1 The drawings show the concrete structure repair support groove formation stage of the concrete structure repair and reinforcement process using FRP anchors according to the present invention. Figure 2 These are drawings illustrating the formation stage of the perforated groove in the repair support groove of the concrete structure repair and reinforcement process using FRP anchors according to the present invention. Figure 3 This is a schematic diagram of the repair anchor body used in the concrete structure repair and reinforcement process according to the present invention. Figure 4 This is a drawing showing a portion of the support part of the bracket in the insertion state of the concrete structure repair and reinforcement process using FRP anchors according to the present invention. Figure 5 This is a schematic diagram illustrating the process of signing contracts for repair anchor components in the concrete structure repair and reinforcement process according to the present invention using FRP anchors. Figure 6 This is a drawing showing the signed state of the repair anchor components in the concrete structure repair and reinforcement process according to the present invention. Figure 7The drawings show the mortar filling cut-off stage of the repair support groove in the concrete structure repair and reinforcement process using FRP anchors according to the present invention. Figure 8 Drawings show the filling material used in the repair and reinforcement process of FRP concrete structures according to the present invention.

[0059] As shown in the figure, the concrete structure repair and reinforcement process using the FRP anchor rod of the present invention is a cross-sectional repair process for repairing the damaged part of the concrete structure 100. The cross-sectional repair process of the present invention includes a concrete structure repair support groove forming stage S1, a repair support groove perforation groove forming stage S2, a perforation groove repair anchor rod body signing stage S3, and a repair support groove filling mortar stage S4.

[0060] The concrete structure repair support groove forming stage S1 is the stage in which a repair support groove 300 is formed on the concrete structure 100 while the damaged part is being eliminated.

[0061] In the concrete structure repair support groove forming stage S1, the part of the concrete structure 100 with cracks 200 formed on the surface—the damaged part—is broken or cut using a grinding wheel or excavator to form a groove structure repair support groove 300.

[0062] The perforation groove forming stage S2 of the maintenance support groove is the stage of forming the perforation groove 400 by perforating the inner surface of the maintenance support groove 300.

[0063] In the perforation groove forming stage S2 of the maintenance support groove, the inner surface of the maintenance support groove 300 is perforated with a perforating machine or a drilling machine to form a connecting groove.

[0064] The connecting groove can form a circular groove structure.

[0065] The signing stage S3 for the maintenance anchor bolt component in the sky hole groove is the stage of signing the maintenance anchor bolt component 10 on the sky hole groove 400 formed by the maintenance support groove 300.

[0066] In the signing stage S3 of the anchor bolt component repair in the sky hole groove, a part of the anchor bolt component 10 will be signed in the sky hole groove 400.

[0067] The maintenance anchor body 10 consists of an anchor member 20 connected to a perforated groove 400 formed on the damaged part of the concrete structure 100 and a support member 31 temporarily connected and fixed to the anchor member 20.

[0068] The inverted chock component 20 is made of synthetic resin material or elastic synthetic resin material, and the supporting connecting component 31 is inserted into or attached to one end of the inverted chock component 20.

[0069] The support connector 31 is made of synthetic resin material, or it can be formed of synthetic fiber material.

[0070] The support connector 31 may be formed of FRP (fiber-reforced plastic) material.

[0071] The support connector 31 can be formed of synthetic resin material or metal material to maintain a certain shape, or it can be formed of synthetic fiber material to deform the shape.

[0072] In the aforementioned inverted cladding member 20, by inserting a shaped iron wire along the length direction into the interior, the inverted cladding member 20 can be bent and maintain its bent shape.

[0073] By attaching or embedding a support wire along the length direction to the support connector 31 of the inverted cladding member 20, the support force and fixing force of the support connector 31 can be maintained, allowing the support connector 31 to bend and maintain its bent shape, so that the support connector 31 is placed in a certain shape and angle.

[0074] On the anchor member 20, a suspension receiving groove with a spiral direction formed on the outer surface can prevent the suspension receiving groove from hanging on the inner surface of the perforated groove 400, thereby preventing the suspension receiving groove 20 from falling off or moving, and the introduction of filling material 50 into the suspension receiving groove can improve the bonding efficiency and fixing force.

[0075] By attaching an elastic hanger made of elastic synthetic resin material to the outer surface of the inverted cladding member 20 or making it an integral protrusion, the elastic hanger can be prevented from hanging on the inner surface of the perforated groove 400, thereby preventing the inverted cladding member 20 from moving and separating from the perforated groove 400, and improving the fixing force and support force.

[0076] At this time, the bracket support 30 is arranged inside the maintenance support groove 300, and the support connector 31 of the bracket support 30 is arranged in a radial shape.

[0077] In other words, the support connectors 31 of the bracket support part 30 are arranged radially on the maintenance support groove 300 and on the mortar 40 filled on the maintenance support groove 300. Compared with the vertically arranged structure, this can improve the support force and fixing force of the mortar 40.

[0078] The support connector 31 can prevent deformation or movement by forming more silicon-based coatings on its outer surface, thereby improving support and fixation.

[0079] By attaching a branch clip made of synthetic resin or metal to the outer surface of the support connector 31 for fixation, the branch clip can be inserted into the interior of the mortar 40, thereby improving the support and fixing force of the mortar 40 and preventing it from separating from the maintenance branch 300.

[0080] In addition, the anchor bar component 20 is made of an elastic synthetic resin material.

[0081] In other words, by clamping the upward-facing slip member 20 onto the perforated groove 400, the clamped upward-facing slip member 20 increases the fixing force and supporting force of the upward-facing slip member 20 by elastically pressing the inside of the perforated groove 400, thus preventing it from separating from the perforated groove 400.

[0082] The mortar filling cutoff stage S4 of the maintenance support groove is the stage in which mortar 40 is filled into the maintenance support groove 300.

[0083] In the mortar filling cutoff stage S4 of the maintenance support groove, mortar 40 is filled into the maintenance support groove 300, and the bracket support part 30 placed in the maintenance support groove 300 should be inserted into the mortar 40 filled in the maintenance support groove 300 as shown in the figure.

[0084] By inserting and fixing the support connector 31 of the bracket support 30 into the mortar 40 filled in the maintenance support groove 300, the supporting force and fixing force of the mortar 40 filled in the maintenance support groove 300 can be improved, the strength can be increased, and separation from the maintenance support groove 300 can be prevented.

[0085] After the perforation groove formation stage S2 of the maintenance support groove 300, a perforation groove filling layer S2-1 filled with filling material 50 can be added to the perforation groove 400 formed by the maintenance support groove 300.

[0086] The filling material 50 is composed of adhesive or silicone. The filling material 50 is used to attach and fix the jacking member 20 in the perforated groove 400 to the perforated groove 400, thereby improving the fixing force and support force and preventing it from separating from the perforated groove 400.

[0087] The filler material 50 can also be applied to the outer surface of the inverted cladding member 20 and then clamped in the perforated groove 400.

[0088] The present invention has been described in detail above with reference to the drawings. However, the embodiments mentioned in this process are merely examples and are not intended to be limiting. Any component changes that can be uniformly addressed within the scope of the technical concept or field of the present invention provided in the following patent applications will fall within the scope of the present invention.

Claims

1. A reinforcement process for FRP concrete structures, used to repair damaged parts of concrete structures, characterized in that, The FRP concrete structure reinforcement process includes: The concrete structure repair support groove forming stage involves forming a repair support groove on the concrete structure while removing the damaged portion. The repair support groove is formed by perforating the inner surface of the groove to form a perforated groove in the repair support groove perforation groove formation stage; The maintenance anchor component is marked in the perforated groove formed by the maintenance support groove during the maintenance anchor component marking stage; and The mortar filling stage of the maintenance support groove is completed.

2. The FRP concrete structure reinforcement process according to claim 1, characterized in that, The maintenance anchor bolt component includes: An anchor member connected to the perforated groove formed in the damaged portion of the concrete structure; and First, it is connected to the anchor bolt component, consisting of a bracket support part composed of fixed support connectors.

3. The FRP concrete structure reinforcement process according to claim 1, characterized in that, After the perforation groove formation stage of the maintenance support groove, there is also a perforation groove filling material filling layer on the perforation groove formed on the maintenance support groove to fill the perforation groove with filling material.

4. The FRP concrete structure reinforcement process according to claim 2, characterized in that, The bracket support is placed inside the maintenance support slot. The support connectors of the bracket support are arranged in a radial shape.

5. The FRP concrete structure reinforcement process according to claim 2, characterized in that, The anchor bolt component is composed of an elastic synthetic resin material.