A special drilling equipment for water control in coal mine roadways

The integrated design of the drilling equipment solves the problem of inconvenient movement and storage of water control equipment in coal mine roadways, enabling flexible movement, stable drilling, and efficient dust collection within the roadways, thereby improving the service life and operational efficiency of the equipment.

CN123109538APending Publication Date: 2026-11-17SHANXI PULONGWAN COAL IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611534519.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-30
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing drilling equipment for water control in coal mine roadways is inconvenient to move and store, is easily damaged during movement, has poor equipment stability, and causes serious dust pollution.

Method used

An integrated drilling device was designed, comprising a storage mechanism, a fixing mechanism, a support mechanism, and a dust collection mechanism. By utilizing a telescopic plate, a lifting component, a drive mechanism, and a linkage component, the device can achieve flexible movement, stable drilling, and efficient dust collection.

Benefits of technology

The equipment can move flexibly in narrow tunnels, and the drill rod is not easily damaged after being stored. It has high stability, reduces dust pollution, and improves work efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109538A_ABST
    Figure CN123109538A_ABST
Patent Text Reader

Abstract

This invention relates to the field of tunnel drilling, and in particular to a special drilling equipment for water control in coal mine tunnels. Addressing the problem of inconvenient movement and storage of existing drilling equipment for water control in tunnels, this invention proposes the following solution: It includes a storage mechanism, a drilling mechanism, a fixing mechanism, a drive mechanism, a support mechanism, and a dust collection mechanism. All mechanisms are integrated into a housing, with casters with brakes and handrails at the bottom for flexible, integrated movement. The storage slot can fully house the drilling mechanism, preventing damage to the drill rod from impacts. The drive mechanism drives the fixed drill rod into the ground to secure the housing foundation, while simultaneously driving the mounting frame to descend. The support legs automatically open via a transmission assembly to form multi-directional support, achieving double fixation. The dust collection mechanism absorbs dust generated during drilling. This invention features a high degree of integration, with all mechanisms working in tandem, significantly improving drilling efficiency, optimizing the underground working environment, and is suitable for water control drilling operations in coal mine tunnels.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of tunnel drilling, and more particularly to a special drilling equipment for water control in coal mine tunnels. Background Technology

[0002] In coal mine safety production, water control in roadways is a crucial aspect of ensuring safe underground operations and preventing major accidents such as sudden water inrushes and mine flooding. Currently, the drilling equipment commonly used in coal mine underground roadway water control operations typically consists of a separate drilling rig, pump station, control panel, and associated drill rods and drilling tools. These devices have revealed numerous problems in practical application, particularly regarding mobility and storage.

[0003] First, the overall mobility of the equipment is poor. Existing equipment consists of multiple independent, bulky units. When moving these units in narrow, undulating, and obstacle-filled underground tunnels, they need to be disassembled, transported by truck, and then reassembled and tested at the new work site. This process not only consumes a lot of manpower and time but also leads to low operational efficiency. Second, after the operation is completed, drill pipes, drill tools, and other accessories are usually scattered and piled up or stored on simple carts, which is extremely inconvenient to store, resulting in chaotic management and difficulty in access. Moreover, during the movement, exposed drill pipes are easily damaged by bumps and knocks. Therefore, this solution proposes a special drilling equipment for water control in coal mine tunnels. Summary of the Invention

[0004] The present invention proposes a special drilling equipment for water control in coal mine roadways, which solves the problem of inconvenience in moving and storing existing drilling equipment for water control in roadways.

[0005] To achieve the above objectives, the present invention adopts the following technical solution:

[0006] A special drilling device for water control in coal mine roadways includes:

[0007] The storage mechanism includes a box and multiple casters installed at the bottom of the box. The front of the box has a storage slot and the top of the back of the box has a handrail.

[0008] A drilling mechanism is provided in a storage tank. The drilling mechanism includes a telescopic plate provided in the storage tank, a drilling assembly installed on the telescopic plate, and a lifting assembly installed in the storage tank for driving the telescopic plate to rise and fall.

[0009] A fixing mechanism, which is installed at the bottom of the housing and used to fix the housing to the bottom of the tunnel during the operation of the drilling assembly, the fixing mechanism includes a threaded sleeve threaded to the bottom of the housing and a fixed drill rod fixed to the bottom of the threaded sleeve;

[0010] A drive mechanism, which is mounted on the back of the housing and is used to drive the drill rod to move along its axial direction while rotating;

[0011] The support mechanism includes a mounting frame movably mounted on the outer periphery of the housing, a plurality of support legs mounted on the mounting frame, and a transmission assembly mounted on the mounting frame for driving the support legs to rotate. The mounting frame is transmissionally connected to the drive mechanism to drive the mounting frame to move along the axial direction of the fixed drill rod when the fixed drill rod rotates.

[0012] A dust extraction mechanism is used to extract dust during the operation of the drilling assembly. The dust extraction mechanism includes a dust extraction pipe installed in a storage slot and a vacuum cleaner installed on the outer wall of the housing and connected to the dust extraction pipe. A linkage component is installed in the storage slot to drive the dust extraction pipe to extend out of the storage slot when the mounting frame descends and to retract into the storage slot when the mounting frame moves up.

[0013] The above technical solution not only facilitates the movement of the entire equipment within the tunnel, but also makes it easy to store the drill rod, thus preventing it from being damaged by bumps during movement or transportation. At the same time, the setting of fixing and supporting mechanisms can further ensure the stability of the equipment during drilling.

[0014] As a further improvement to the above solution, the telescopic plate includes a movable plate and a fixed sleeve movably sleeved on the outer periphery of one end of the movable plate. The drilling assembly includes a drilling rod rotatably connected to the bottom surface of the movable plate and a transmission motor installed on the top surface of the movable plate for driving the drilling rod to rotate. A locking element for locking the movable plate is installed on the top surface of the fixed sleeve.

[0015] The above technical solution utilizes the telescopic plate to achieve the storage and extension of drilling components.

[0016] As a further improvement to the above solution, the locking component includes two fixed posts fixed to the top surface of the fixed sleeve, an adjusting plate movably sleeved around the two fixed posts, and two insert rods fixed to the bottom surface of the adjusting plate. A stop block is fixed to the top of the fixed post, and a connecting spring movably sleeved around the fixed post is connected between the stop block and the top surface of the adjusting plate. A through hole is opened on the top surface of the fixed sleeve for the insert rods to pass through, and two rows of holes for inserting insert rods are opened on the top surface of the adjusting plate, with each row of holes including two insertion holes.

[0017] The above technical solution can lock the movable plate, preventing changes in the length of the telescopic plate during drilling or equipment movement.

[0018] As a further improvement to the above solution, the lifting assembly includes a lifting screw rotatably connected inside the storage slot along its length and a transmission motor mounted on the housing for driving the lifting screw to rotate. The fixing sleeve is threaded onto the outer circumference of the lifting screw.

[0019] As a further improvement to the above solution, the mounting frame is provided with a fixing groove for mounting the transmission component. The transmission component includes a rotating shaft rotatably connected in the fixing groove, a transmission gear sleeved on the outer circumference of the rotating shaft, and a rack installed in the fixing groove and meshing with the transmission gear through an elastic element. The top of the support foot is fixed to the outer circumference of the rotating shaft through a connecting block. The top of the rack extends to the top of the mounting frame. A fixing frame for limiting the height of the rack is fixed on the outer circumference of the housing.

[0020] As a further improvement to the above solution, the elastic element is provided in two sets, and the two sets of elastic elements are respectively installed on the outer walls of both sides of the rack. The two sides of the fixing groove are provided with sliding grooves for installing the elastic element. The elastic element includes a sliding rod fixed in the sliding groove, a sliding sleeve movably sleeved on the outer circumference of the sliding rod, and a return spring movably sleeved on the outer circumference of the sliding rod. One end of the sliding sleeve is fixedly connected to the outer wall of the rack, the top of the return spring is fixedly connected to the bottom surface of the sliding sleeve, and the bottom of the return spring is fixedly connected to the bottom of the sliding groove.

[0021] As a further improvement to the above solution, the back of the housing is provided with a mounting groove for installing a drive mechanism. The drive mechanism includes a drive screw rotatably connected inside the mounting groove along its length and a drive motor mounted on the housing for driving the drive screw to rotate. A moving block is threaded onto the outer circumference of the drive screw, and one end of the moving block is fixedly connected to the inner wall of the mounting frame.

[0022] As a further improvement to the above solution, the top of the threaded sleeve extends into the mounting groove, and the inner wall of the threaded sleeve is provided with a limiting groove arranged in its axial direction. The bottom of the drive screw is movably inserted into the threaded sleeve, and a limiting block is fixed to the bottom of the outer periphery of the drive screw. One end of the limiting block extends into the limiting groove and slides with it.

[0023] As a further improvement to the above solution, the bottom inner wall of the storage slot is provided with a guide groove that is set vertically along the front of the box. The linkage mechanism includes a linkage screw that is rotatably connected inside the guide groove along its length, a connecting block that is threaded onto the outer periphery of the linkage screw, a mounting plate that is movably located at the bottom of the guide groove, and a linkage rack that is fixed at the bottom of the moving block along the length of the mounting groove. One end of the linkage screw extends into the mounting groove and is fixed with a linkage gear that meshes with the linkage rack. The top of the connecting block is fixedly connected to the bottom surface of the mounting plate, and the dust suction pipe is fixed to the top surface of the mounting plate.

[0024] Through the above technical solution, the linkage rack can drive the linkage gear and linkage screw to rotate as the moving block rises and falls, thereby driving the mounting plate to move linearly along the guide groove, realizing the synchronous linkage between the dust suction pipe and the mounting frame.

[0025] As a further improvement to the above solution, the suction pipe has a U-shaped structure with its opening facing the outside of the storage groove. The inner width of the suction pipe is greater than the outer diameter of the drilling rod. Multiple suction hoods communicating with the inside of the suction pipe are fixed inside the suction pipe. The suction hoods have a trumpet-shaped structure. The vacuum cleaner includes a suction box installed on the outer wall of the casing and an air extractor installed on the top of the suction box for extracting air from the suction box. The bottom of the suction box is connected to the suction pipe through a connecting pipe. A dust filter is detachably installed inside the suction box. A dust removal port with a sealing cover is opened on one side of the suction box.

[0026] Through the above technical solutions, the U-shaped structure can achieve circumferential dust collection of the drilling rod, and multiple horn-shaped dust collection hoods can expand the dust collection range and improve dust collection efficiency; the dust filter can filter and collect dust, and the dust removal port facilitates the cleaning and replacement of the dust filter, ensuring the long-term stable operation of the dust collection mechanism.

[0027] Compared with the prior art, the beneficial effects of the present invention are as follows:

[0028] 1. This invention, through the integrated design of the storage mechanism, features casters with brakes at the bottom of the housing and a backrest, enabling flexible movement of the equipment in narrow coal mine tunnels without the need for disassembly and transportation, significantly saving manpower and time in equipment relocation; at the same time, the storage slot can fully store the drilling mechanism, preventing damage to drilling rods and other accessories during movement, extending the service life of the accessories, and making management and retrieval of the drilling tools more convenient after integrated storage.

[0029] 2. Through the dual fixing structure of the fixing mechanism and the support mechanism, the drive mechanism can drive the fixed drill rod to rotate and drill into the roadway ground, thereby fixing the foundation of the box and preventing the box from shifting during drilling. At the same time, as the mounting frame descends with the fixed drill rod, the support feet automatically open outward through the transmission component and abut against the roadway ground to form multi-directional support, preventing the box from overturning due to drilling vibration. The dual fixing structure greatly improves the stability of the equipment during drilling and ensures drilling accuracy.

[0030] 3. The support legs of this invention can automatically open and close. When the mounting frame descends, the rack moves upward relative to the support legs under the action of the elastic element, driving the transmission gear to rotate and open the support legs. When the mounting frame rises, the rack moves downward relative to the fixed frame after contacting it, driving the transmission gear to rotate in the opposite direction and close the support legs. No manual operation is required, realizing the linkage between the support legs and the fixed action of the equipment, and improving work efficiency.

[0031] 4. A dust collection mechanism is installed, and the dust collection pipe is linked with the installation frame. When the installation frame descends, the dust collection pipe automatically extends to the outside of the drilling rod. During drilling, the air pump efficiently collects drilling dust through the dust collection pipe and the trumpet-shaped dust collection hood. The dust is filtered by the dust filter in the dust collection box and then retained to avoid dust pollution of the underground environment and harm to the health of the workers. When the installation frame rises, the dust collection pipe automatically retracts into the storage tank to avoid damage during movement. The dust collection box is equipped with a dust cleaning port to facilitate the cleaning and maintenance of the dust filter. Attached Figure Description

[0032] Figure 1 This is a schematic diagram of the structure of the present invention;

[0033] Figure 2 This is a schematic diagram of the structure on the back of the present invention;

[0034] Figure 3 This is a schematic diagram of the linkage component of the present invention.

[0035] Figure 4 A schematic diagram of the drilling mechanism, support mechanism, and fixing mechanism;

[0036] Figure 5 A structural diagram of the mounting frame, support feet, and flipping assembly;

[0037] Figure 6 This is a schematic diagram of the elastic element.

[0038] Figure 7 This is a structural diagram of the transmission gears, shaft, and rack.

[0039] Figure 8 This is a structural diagram of the telescopic plate and locking mechanism;

[0040] Figure 9 A schematic diagram of the drive screw, threaded sleeve, and fixed drill rod;

[0041] Figure 10 This is a schematic diagram of the structure after the supporting legs are extended.

[0042] Explanation of key symbols:

[0043] 1. Housing; 2. Fixed frame; 3. Mounting frame; 4. Support feet; 5. Casters; 6. Adjustment slot; 7. Fixing sleeve; 8. Movable plate; 9. Drill rod; 10. Storage slot; 11. Drive motor; 12. Handrail; 13. Mounting slot; 14. Drive screw; 15. Fixed drill rod; 16. Threaded sleeve; 17. Fixed column; 18. Adjustment plate; 19. Moving block; 20. Lifting screw; 21. Fixing slot; 2 2. Rack; 23. Transmission gear; 24. Slide rod; 25. Sliding sleeve; 26. Slide groove; 27. Rotating shaft; 28. Insertion hole; 29. ​​Insertion rod; 30. Limiting groove; 31. Limiting block; 32. Dust collection box; 33. Air extractor; 34. Guide groove; 35. Dust collection pipe; 36. Dust collection hood; 37. Linkage screw; 38. Mounting plate; 39. Connecting block; 40. Linkage gear; 41. Linkage rack; 42. Sealing cover. Detailed Implementation

[0044] The present invention will now be further described in conjunction with the accompanying drawings and specific embodiments. It should be noted that, without conflict, the various embodiments or technical features described below can be arbitrarily combined to form new embodiments.

[0045] Example 1:

[0046] Please combine Figure 1 - Figure 10 This embodiment of a special drilling equipment for water control in coal mine roadways includes:

[0047] The storage mechanism includes a housing 1 and multiple casters 5 installed at the bottom of the housing 1. The front of the housing 1 has a storage slot 10, and the top of the back of the housing 1 has a handrail 12 fixed thereon. There are four casters 5, which are respectively installed at the bottom of the housing 1 near the four corners. The casters 5 are designed to facilitate the movement of the equipment in the aisle, while the handrail 12 is designed to facilitate the user to drag the housing 1 in the aisle, thereby achieving the purpose of conveniently dragging the equipment in the aisle.

[0048] The drilling mechanism is housed within a receiving slot 10. It includes a telescopic plate within the receiving slot 10, a drilling assembly mounted on the telescopic plate, and a lifting assembly within the receiving slot 10 for driving the telescopic plate to rise and fall. The telescopic plate includes a movable plate 8 and a fixed sleeve 7 movably fitted around one end of the movable plate 8. The drilling assembly includes a drilling rod 9 rotatably connected to the bottom surface of the movable plate 8 and a drive motor mounted on the top surface of the movable plate 8 for driving the drilling rod 9 to rotate. A locking element for locking the movable plate 8 is mounted on the top surface of the fixed sleeve 7. The drilling assembly moves by extending and retracting the telescopic plate, thus extending the telescopic plate during drilling, thereby driving the drilling assembly. Drilling is performed outside the storage trough 10. During the movement or transfer of the equipment, to prevent damage to the drilling components, the telescopic plate can be shortened to store the drilling components inside the storage trough 10. The locking mechanism is designed to lock the length of the telescopic plate after the drilling components extend outside the storage trough 10 or are stored inside the storage trough 10, thereby ensuring the stability of the drilling components during operation or transfer. After the drilling rod 9 moves outside the storage trough 10, the drive motor is started to rotate the drilling rod 9. After it contacts the roadway surface, drilling can be performed on the roadway surface.

[0049] The lifting assembly includes a lifting screw 20 rotatably connected inside the receiving groove 10 along its length and a transmission motor 2 mounted on the housing 1 to drive the lifting screw 20 to rotate. A fixing sleeve 7 is threaded onto the outer circumference of the lifting screw 20, and the outer circumference of the fixing sleeve 7 abuts against the inner ring of the receiving groove 10. After the drilling rod 9 extends outside the receiving groove 10, the transmission motor 2 is started. The rotation of the transmission motor 2 drives the lifting screw 20 to rotate, thereby driving the fixing sleeve 7 to move along its axial direction. When the transmission motor 2 rotates forward, it drives the fixing sleeve 7 to descend, thereby driving the drilling rod 9 to descend. Conversely, when the transmission motor 2 rotates in reverse, it drives the drilling rod 9 to rise, thereby completing the drilling work in the tunnel.

[0050] A fixing mechanism is installed at the bottom of the housing 1 and is used to fix the housing 1 to the bottom of the tunnel when the drilling assembly is running. The fixing mechanism includes a threaded sleeve 16 threaded to the bottom of the housing 1 and a fixed drill rod 15 fixed to the bottom of the threaded sleeve 16. Before the drilling assembly is running, in order to ensure the stability of the entire equipment during the drilling process, the fixed drill rod 15 can be driven to rotate and drill into the tunnel floor, thereby fixing the housing to the tunnel floor and preventing it from moving during the operation of the drilling drill rod 9.

[0051] A drive mechanism, mounted on the back of housing 1, drives the fixed drill rod 15 to rotate and move along its axial direction. A mounting groove 13 is provided on the back of housing 1 for mounting the drive mechanism. The drive mechanism includes a drive screw 14 rotatably connected inside the mounting groove 13 along its length and a drive motor 11 mounted on housing 1 to drive the drive screw 14 to rotate. One end of the output shaft of the drive motor 11 is connected to the top of the drive screw 14. The top of a threaded sleeve 16 extends into the mounting groove 13, and a limiting groove 30 is provided on the inner wall of the threaded sleeve 16 along its axial direction. The bottom of the drive screw 14 is movably inserted into the threaded sleeve 16. A limiting block 31 is fixed to the bottom of the outer periphery of the drive screw 14, and one end of the limiting block 31 extends into the limiting groove 30 and slides therewith. After the motor 11 starts, it drives the drive screw 14 to rotate. Under the restriction of the limit block 31 and the limit groove 30, the drive screw 14 rotates and drives the threaded sleeve 16 to rotate. The threaded sleeve 16 rotates and drives the fixed drill rod 15 to rotate. Since the threaded sleeve 16 is threadedly connected to the housing 1, it will move along its axial direction during rotation. When the drive motor 11 rotates forward and drives the drive screw 14 to rotate forward, the threaded sleeve 16 rotates forward, which in turn drives the fixed drill rod 15 to descend while rotating. When the fixed drill rod 15 contacts the tunnel floor, it can drill into the tunnel floor, thereby completing the fixation of the housing 1. Conversely, when the drive motor 11 rotates in reverse, it can drive the fixed drill rod 15 to rise while rotating, thereby gradually removing the fixed drill rod 15 from the ground, thus achieving the purpose of conveniently fixing the housing.

[0052] In this embodiment, the locking component includes two fixed posts 17 fixed to the top surface of the fixed sleeve 7, an adjusting plate 18 movably sleeved around the two fixed posts 17, and two insert rods 29 fixed to the bottom surface of the adjusting plate 18. A stop block is fixed to the top of each fixed post 17, and a connecting spring movably sleeved around the fixed post 17 connects the stop block to the top surface of the adjusting plate 18. A through hole is provided on the top surface of the fixed sleeve 7 for the insert rods 29 to pass through. Two rows of holes for inserting the insert rods 29 are provided on the top surface of the movable plate 8, each row including two insertion holes 28. An adjusting groove 6 communicating with the storage slot 10 is provided on the top of the housing 3. The adjusting groove 6 facilitates user adjustment of the locking component. Used to lock the movable plate 8, when the insertion rod 29 is inserted into the insertion hole 28, the movable plate 8 can be locked. The setting of the connecting spring allows the adjusting plate 18 to be pressed tightly against the top of the fixed sleeve 7 without external force, so that the insertion rod 29 will not easily loosen when inserted into the insertion hole 28. When it is necessary to move the movable plate 8, the adjusting plate 18 can be lifted up so that the insertion rod 29 is removed from the insertion hole 28 and then the movable plate 8 can be moved. After the insertion rod 29 is aligned with the next insertion hole 28, the adjusting plate 18 is released, and the adjusting plate 18 will automatically fall under the elastic force of the connecting spring, so that the insertion rod 28 is inserted into the insertion hole 29 to complete the locking of the movable plate 8.

[0053] Example 2:

[0054] Combination Figure 2-6 and Figure 9 This embodiment, based on embodiment 1, further improves upon the following: The support mechanism includes a mounting frame 3 movably mounted on the outer periphery of the housing 1, multiple support feet 4 mounted on the mounting frame 3, and a transmission assembly mounted on the mounting frame 3 for driving the support feet 4 to rotate. The mounting frame 3 is connected to the drive mechanism to drive the mounting frame 3 to move along the axial direction of the fixed drill rod 15 when the fixed drill rod 15 rotates. A moving block 19 is threaded onto the outer periphery of the drive screw 14. One end of the moving block 19 is fixedly connected to the inner wall of the mounting frame 3. A fixing groove 21 for mounting the transmission assembly is provided on the mounting frame 3. The transmission assembly includes a rotating shaft 27 rotatably connected in the fixing groove 21, a transmission gear 23 sleeved on the outer periphery of the rotating shaft 27, and a rack 22 mounted in the fixing groove 21 and meshing with the transmission gear 23 via an elastic element. The top of the support feet 4 is fixedly connected to the outer periphery of the rotating shaft 27 via a connecting block. The top of the rack 22 extends above the mounting frame 3. A fixing element for limiting the height of the rack 22 is fixed on the outer periphery of the housing 1. The fixed frame 2 and the support mechanism are set up to further support the housing 1 and prevent it from tipping over during drilling. During operation, when the drive screw 14 rotates forward, it will drive the moving block 19 to descend, which in turn will drive the mounting frame 3 to descend. As the mounting frame 3 descends, the support legs 4 descend synchronously. At the same time, as the mounting frame 3 descends, the distance between the other fixed frames 2 gradually increases. The rack 22 moves upward relative to the mounting frame 3 under the drive of the elastic element, thereby driving the transmission gear 23 to rotate forward, so that the support legs 4 open outward while descending, until the bottom of the support legs 4 abuts against the bottom surface and stops the rotation of the drive screw 14. Conversely, when the drive screw reverses, it will drive the mounting frame 3 to move upward. After the rack 22 abuts against the fixed frame 2, as the mounting frame 3 continues to move upward, the rack 22 will move downward relative to the mounting frame 3, thereby driving the transmission gear 23 to reverse, so that the support legs 4 retract inward while rising, thereby achieving the purpose of driving the support legs to open and close during the lifting and lowering of the mounting frame 3.

[0055] In this embodiment, two sets of elastic elements are provided, and the two sets of elastic elements are respectively installed on the outer walls of both sides of the rack 22. Slide grooves 26 for installing the elastic elements are provided on both sides of the fixing groove 21. The elastic element includes a slide rod 24 fixed in the slide groove 26, a slide sleeve 25 movably sleeved on the outer periphery of the slide rod 24, and a return spring movably sleeved on the outer periphery of the slide rod 24. One end of the slide sleeve 25 is fixedly connected to the outer wall of the rack 22, the top of the return spring is fixedly connected to the bottom surface of the slide sleeve 25, and the bottom of the return spring is fixedly connected to the bottom of the slide groove 26. The elastic element design allows the rack 22 to automatically move upward and return to its original position after the external force is removed. As the mounting frame 3 gradually moves downward, the pressure on the rack 22 from the fixing frame 2 gradually decreases. Therefore, in the initial stage of the downward movement of the mounting frame 3... In the first stage, rack 22 gradually rises relative to mounting frame 3 under the action of return spring, thereby driving transmission gear 23 to rotate forward, which in turn drives shaft 27 to rotate forward, and then drives support leg 4 to automatically open outward until sliding sleeve 25 abuts against the top of sliding groove 26 under the drive of return spring, and support leg 4 stops rotating. Conversely, when mounting frame 3 rises and rack 22 abuts against fixed frame 2, as mounting frame 3 continues to move upward, rack 22 moves downward relative to mounting frame 3, return spring is gradually compressed, and support leg 4 gradually rotates inward to retract until mounting frame 3 returns to its original position, support leg 4 is also fully retracted and in a state of close contact with the outer wall of housing 1, thus achieving the purpose of driving support leg 4 to automatically open and close during the lifting and lowering of mounting frame 3.

[0056] Example 3;

[0057] Combination Figures 1-4 and Figure 10This embodiment, based on embodiment 1, further improves upon the following: it also includes a dust collection mechanism for absorbing dust generated during the operation of the drilling assembly. The dust collection mechanism includes a dust collection pipe 35 installed in the storage slot 10 and a vacuum cleaner installed on the outer wall of the housing 1 and connected to the dust collection pipe 35. A linkage component is installed in the storage slot 10 to drive the dust collection pipe 35 to extend outward when the mounting frame 3 descends and to retract into the storage slot when the mounting frame 3 moves upward. A guide groove 34 is provided on the bottom inner wall of the storage slot 10, which is perpendicular to the front of the housing 1. The linkage mechanism includes a guide groove 34 extending along the length of the guide groove 34. The mounting groove 10 is connected to a directional rotating lead screw 37, a connecting block 39 threaded around the lead screw 37, a mounting plate 38 movably located at the bottom of the guide groove 34, and a linkage rack 41 fixed along the length of the mounting groove 13 to the bottom of the moving block 19. The bottom surface of the receiving groove 10 has a through hole for the linkage rack 41 to pass through when it moves downward. One end of the lead screw 37 extends into the mounting groove 13 and is fixed with a linkage gear 40 that meshes with the linkage rack 41. The top of the connecting block 39 is fixed to the bottom surface of the mounting plate 38. The suction pipe 35 is fixed to the top surface of the mounting plate 38. By utilizing the lifting and lowering movement of the moving block 19, the lifting and lowering movement of the mounting frame is converted into the horizontal extension and retraction movement of the suction pipe through the mechanical transmission structure of the linkage rack-linkage gear-linkage lead screw, realizing the synchronous linkage between the suction mechanism and the fixed and supporting mechanism. No additional power source is required, simplifying the equipment structure.

[0058] The suction pipe 35 has a U-shaped structure, with its opening facing outwards from the storage slot 10. The inner width of the suction pipe 35 is greater than the outer diameter of the drilling rod 2. Multiple suction hoods 36, connected to the inner side of the suction pipe 35, are fixed to its interior. The suction hoods 36 have a flared structure. The vacuum cleaner includes a suction box 32 installed on the outer wall of the housing 1 and an air extractor 33 installed on the top of the suction box 32 to extract air from it. The bottom of the suction box 32 is connected to the suction pipe 35 via a connecting pipe. A dust filter is detachably installed inside the suction box 32. A dust removal port with a sealing cap 42 is opened on one side of the suction box 32. Relying on the suction action of the air extractor 33, an air pressure difference is created within the suction pipe, drawing drilling dust from the work point into the suction pipe. Unlike traditional blower-type dust removal, negative pressure suction eliminates dust diffusion and achieves higher dust removal efficiency. Combined with the U-shaped structure... The surround structure of the suction pipe and the widening effect of multiple horn-shaped suction hoods enable complete encirclement of the drilling drill pipe working area, thus completely solving the problem of drilling dust pollution.

[0059] The implementation principle of this embodiment is as follows: When the drive motor 11 rotates forward, the moving block 19 drives the mounting frame 3 to descend, and at the same time, the linkage rack 41 at its bottom moves downward synchronously; the linkage rack 41 meshes with the linkage gear 40, driving the linkage gear 40 to rotate, and then driving the linkage screw 37 to rotate along the guide groove 34; the rotation of the linkage screw 37 causes the threaded connecting block 39 to move along the guide groove 34 to the outside of the receiving groove 10, driving the mounting plate 38 and the dust suction pipe 35 to extend synchronously until the dust suction pipe 35 surrounds the outer periphery of the drilling rod 9, and the dust suction hood 36 is aligned with the drilling operation point. The extension action is completed synchronously with the drilling of the fixed drill rod and the opening of the support legs.

[0060] When the drill rod 9 rotates for drilling, the air extraction fan 33 is started. The air extraction fan 33 quickly extracts the air from the dust collection box 32, creating a negative pressure environment inside the dust collection box 32, the connecting pipe, and the dust collection pipe 35. Under atmospheric pressure, the dust generated during drilling is sucked into the dust collection pipe 35 through multiple funnel-shaped dust collection hoods 36 and then enters the dust collection box 32 through the connecting pipe. The dust is filtered by the dust filter screen in the dust collection box 32, and the dust is trapped on one side of the dust filter screen. The clean air is discharged by the air extraction fan 33, achieving efficient and thorough collection of drilling dust.

[0061] After drilling is completed, the drive motor 11 reverses, the moving block 19 drives the mounting frame 3 to rise, the linkage rack 41 moves upward synchronously, and the linkage screw 37 rotates in the opposite direction through the linkage gear 40; the connecting block 39 moves along the guide groove 34 into the storage groove 10, driving the dust suction pipe 35 to be retracted into the storage groove 10, so as to avoid the dust suction pipe being damaged by bumps when the equipment is moved; after long-term use, the sealing cover 42 on one side of the dust collection box 32 can be opened, and the dust filter can be taken out from the dust removal port for cleaning or replacement to ensure the dust collection efficiency of the dust collection mechanism.

[0062] The above embodiments are merely preferred embodiments of the present invention and should not be construed as limiting the scope of protection of the present invention. Any non-substantial changes and substitutions made by those skilled in the art based on the present invention shall fall within the scope of protection claimed by the present invention.

Claims

1. A special drilling equipment for preventing and treating water in a coal mine tunnel, characterized in that, include: The storage mechanism includes a box and multiple casters installed at the bottom of the box. The front of the box has a storage slot and the top of the back of the box has a handrail. A drilling mechanism is provided in a storage tank. The drilling mechanism includes a telescopic plate provided in the storage tank, a drilling assembly installed on the telescopic plate, and a lifting assembly installed in the storage tank for driving the telescopic plate to rise and fall. A fixing mechanism, which is installed at the bottom of the housing and used to fix the housing to the bottom of the tunnel during the operation of the drilling assembly, the fixing mechanism includes a threaded sleeve threaded to the bottom of the housing and a fixed drill rod fixed to the bottom of the threaded sleeve; A drive mechanism, which is mounted on the back of the housing and is used to drive the fixed drill rod to move along its axial direction while rotating; The support mechanism includes a mounting frame movably mounted on the outer periphery of the housing, a plurality of support legs mounted on the mounting frame, and a transmission assembly mounted on the mounting frame for driving the support legs to rotate. The mounting frame is transmissionally connected to the drive mechanism to drive the mounting frame to move along the axial direction of the fixed drill rod when the fixed drill rod rotates. A dust extraction mechanism is used to extract dust during the operation of the drilling assembly. The dust extraction mechanism includes a dust extraction pipe installed in a storage slot and a vacuum cleaner installed on the outer wall of the housing and connected to the dust extraction pipe. A linkage component is installed in the storage slot to drive the dust extraction pipe to extend out of the storage slot when the mounting frame descends and to retract into the storage slot when the mounting frame moves up.

2. The coal mine roadway water prevention and control special drilling equipment according to claim 1, characterized in that, The telescopic plate includes a movable plate and a fixed sleeve movably sleeved on the outer periphery of one end of the movable plate. The drilling assembly includes a drilling rod rotatably connected to the bottom surface of the movable plate and a transmission motor installed on the top surface of the movable plate for driving the drilling rod to rotate. A locking element for locking the movable plate is installed on the top surface of the fixed sleeve.

3. The coal mine roadway water prevention and control special drilling equipment according to claim 2, characterized in that, The locking component includes two fixed posts fixed to the top surface of the fixed sleeve, an adjusting plate movably sleeved around the two fixed posts, and two insert rods fixed to the bottom surface of the adjusting plate. A stop block is fixed to the top of the fixed post, and a connecting spring movably sleeved around the fixed post is connected between the stop block and the top surface of the adjusting plate. A through hole is opened on the top surface of the fixed sleeve for the insert rods to pass through. The top surface of the movable plate has two rows of holes for inserting the insert rods, and each row of holes includes two insertion holes.

4. The coal mine roadway water prevention and control special drilling equipment according to claim 1, characterized in that, The lifting assembly includes a lifting screw rotatably connected inside the receiving slot along its length and a transmission motor mounted on the housing for driving the lifting screw to rotate. The fixing sleeve is threaded onto the outer circumference of the lifting screw.

5. The coal mine roadway water prevention and control special drilling equipment according to claim 1, characterized in that, The mounting frame has a fixing groove for mounting the transmission component. The transmission component includes a rotating shaft rotatably connected in the fixing groove, a transmission gear sleeved on the outer circumference of the rotating shaft, and a rack installed in the fixing groove and meshing with the transmission gear through an elastic element. The top of the support foot is fixed to the outer circumference of the rotating shaft through a connecting block. The top of the rack extends to the top of the mounting frame. The outer circumference of the housing is fixed with a fixing frame for limiting the height of the rack.

6. The coal mine roadway water prevention and control special drilling equipment according to claim 5, characterized in that, The elastic element is provided in two sets, and the two sets of elastic elements are respectively installed on the outer walls of both sides of the rack. The two sides of the fixing groove are provided with sliding grooves for installing the elastic element. The elastic element includes a sliding rod fixed in the sliding groove, a sliding sleeve movably sleeved on the outer circumference of the sliding rod, and a return spring movably sleeved on the outer circumference of the sliding rod. One end of the sliding sleeve is fixedly connected to the outer wall of the rack, the top of the return spring is fixedly connected to the bottom surface of the sliding sleeve, and the bottom of the return spring is fixedly connected to the bottom of the sliding groove.

7. The coal mine roadway water prevention and control special drilling equipment according to claim 1, characterized in that, The back of the housing is provided with a mounting groove for installing a drive mechanism. The drive mechanism includes a drive screw rotatably connected inside the mounting groove along its length and a drive motor mounted on the housing to drive the drive screw to rotate. A moving block is threaded onto the outer circumference of the drive screw, and one end of the moving block is fixedly connected to the inner wall of the mounting frame.

8. A special drilling equipment for water control in coal mine roadways according to claim 1, characterized in that, The top of the threaded sleeve extends into the mounting groove, and the inner wall of the threaded sleeve is provided with a limiting groove arranged in its axial direction. The bottom of the drive screw is movably inserted into the threaded sleeve, and a limiting block is fixed to the bottom of the outer periphery of the drive screw. One end of the limiting block extends into the limiting groove and slides with it.

9. A special drilling equipment for water control in coal mine roadways according to claim 7, characterized in that, The bottom inner wall of the storage slot is provided with a guide groove that runs vertically along the front of the box. The linkage mechanism includes a linkage screw that is rotatably connected inside the guide groove along its length, a connecting block that is threaded onto the outer periphery of the linkage screw, a mounting plate that is movably located at the bottom of the guide groove, and a linkage rack that is fixed to the bottom of the moving block along the length of the mounting groove. One end of the linkage screw extends into the mounting groove and is fixed with a linkage gear that meshes with the linkage rack. The top of the connecting block is fixed to the bottom surface of the mounting plate, and the dust suction pipe is fixed to the top surface of the mounting plate.

10. A special drilling equipment for water control in coal mine roadways according to claim 2, characterized in that, The suction pipe has a U-shaped structure with its opening facing the outside of the storage slot. The inner width of the suction pipe is greater than the outer diameter of the drilling rod. Multiple suction hoods communicating with the inside of the suction pipe are fixed inside the suction pipe. The vacuum cleaner includes a suction box installed on the outer wall of the casing and an air extractor installed on the top of the suction box for extracting air from the suction box. The bottom of the suction box is connected to the suction pipe through a connecting pipe.