A structure and construction method for cutting the top and releasing pressure along the goaf in a return airway.

By using a composite load-bearing system of isolation walls and support frames in coal mining, the problem of insufficient lateral pressure resistance of roadway structures along the goaf has been solved, improving the stability and safety of the roadway and achieving effective resistance and buffering against falling gangue.

CN123109703APending Publication Date: 2026-11-17GUIZHOU UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611613045.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-19
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing coal mining operations, the rock retaining structures along the goaf have insufficient resistance to lateral pressure and are easily washed away or squeezed into the roadway, endangering operational safety.

Method used

The structure employs a combination of a retaining wall and a support frame. The retaining wall serves as a flexible support, while the support frame acts as a rigid support. They are connected by anchors to form a composite load-bearing system. After the retaining wall bears lateral pressure, it is transferred to the support frame through the anchors. The rigidity of the support frame is then used to connect with the top plate to form an overall stable retaining structure.

Benefits of technology

It enhances the lateral pressure resistance of the rock retaining structure, ensures the stability and safety of the roadway, prevents damage from falling rock impacts, and achieves long-term load-bearing stability and resistance to sudden impacts.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109703A_ABST
    Figure CN123109703A_ABST
Patent Text Reader

Abstract

This application relates to the field of coal mine roadway support technology, and discloses a return airway roof cutting and pressure relief gob-side retaining structure and construction method. The return airway roof cutting and pressure relief gob-side retaining structure is used in goaf areas and roadways with a common roof and floor, and includes a partition wall, a support frame, and a first anchor. The partition wall separates the goaf area and the roadway. The first anchor is mounted on the support frame and extends towards the partition wall, with a portion of the first anchor located within the partition wall. The support frame is connected to the partition wall via the first anchor. This application, by setting up a partition wall and support frame in cooperation, using the first anchor to connect the partition wall and support frame, and fixing the bottom and bottom plate of the support frame, and the top and top plate of the support frame, enables the support frame to effectively transmit and disperse the lateral pressure of the goaf gangue borne by the partition wall, thereby improving the lateral pressure resistance of the retaining structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of coal mine roadway support technology, specifically to a return airway roof cutting and pressure relief roadway retention structure and construction method. Background Technology

[0002] In coal mining, gob-side retaining is one of the core technologies for pillarless mining. In related technologies, gob-side retaining support systems typically involve laying metal mesh on the sidewalls of the roadway and erecting lightweight steel beams as rock retaining structures to isolate collapsing rock from the goaf.

[0003] However, as the mining depth and mining intensity increase, the high lateral pressure generated by the collapse and accumulation of gangue in the goaf continues to act on the retaining structure. The retaining structure formed by ordinary metal mesh or light steel beams is not strong enough to resist lateral pressure and is easily washed away or squeezed into the roadway, thereby endangering the safety of operation. Summary of the Invention

[0004] In view of this, this application provides a return airway top cutting and pressure relief roadway retention structure and construction method to solve or improve the problem that conventional rock retaining structures have insufficient lateral pressure resistance, are easily washed away or squeezed into the roadway, thereby endangering operational safety.

[0005] In a first aspect, this application provides a return airway roof cutting and pressure relief roadway retention structure for goaf areas and roadways with a common roof and common floor, comprising: A separation wall is used to separate the goaf area from the roadway. The separation wall extends along the direction of the roadway, and the top of the separation wall along the height direction of the roadway contacts the roof. A support frame is provided on the side of the isolation wall facing the alley and extends along the direction of the alley. The bottom of the support frame along the height direction is connected to the bottom plate, and the top of the support frame along the height direction is connected to the top plate. A first anchor is disposed on the support frame and extends toward the isolation wall. A portion of the structure of the first anchor is located inside the isolation wall, and the support frame is connected to the isolation wall through the first anchor.

[0006] In one alternative embodiment, at least one second anchor is provided on the top of the support frame, the second anchor extending toward the top plate along the height direction, and a portion of the structure of the second anchor extending into the top plate and connecting with the top plate.

[0007] In one alternative embodiment, the roof has a pre-splitting crack, one end of which is located in the roadway, the other end of which extends along the height direction toward a direction away from the roadway, and the pre-splitting crack extends horizontally toward the goaf. The top of the support frame is also provided with at least one third anchor, one end of which extends into the pre-splitting crack at the top and is adapted to abut against the inner wall of the pre-splitting crack at the top.

[0008] In one alternative embodiment, the support frame has a U-shaped structure, the support frame includes a pair of legs and a connecting section connecting the pair of legs, at least a portion of the connecting section is embedded in the base plate, the first anchor is disposed on the legs, and a reinforcing crossbar is connected between the pair of legs; The outrigger includes at least two telescopic sections, and a connector is provided between two adjacent telescopic sections. The connector is sleeved on the outside of the two adjacent telescopic sections, and under the pressure of the top plate, the telescopic section is adapted to slide relative to the connector along the height direction.

[0009] In one alternative embodiment, a plurality of advanced support anchor cables are provided on the roof slab, and the plurality of advanced support anchor cables are spaced apart along the direction of the roadway; One end of the advanced support anchor cable is located in the roadway, and the other end of the advanced support anchor cable extends along the height direction away from the roadway, and the advanced support anchor cable extends horizontally away from the goaf.

[0010] In one alternative embodiment, the isolation wall is provided with a first reinforcing mesh on the side facing the tunnel in the horizontal direction; And / or, the isolation wall is covered with shotcrete on the side facing the goaf in the horizontal direction.

[0011] In one optional embodiment, a plurality of retaining walls are provided in the goaf area, and the plurality of retaining walls are spaced apart along the direction of the goaf area; The roadway is equipped with a gas extraction pipe, and multiple bypass pipes are installed on the gas extraction pipe. Each bypass pipe passes through the isolation wall and extends into the space between adjacent retaining walls.

[0012] Secondly, this application provides a construction method for a return airway top-cutting and pressure-relief goaf-retention structure, used for constructing the return airway top-cutting and pressure-relief goaf-retention structure described in any of the above claims, wherein the return airway top-cutting and pressure-relief goaf-retention structure includes a second anchor, a third anchor, and an advance support anchor cable. The construction method for the return airway roof cutting and pressure relief along the goaf structure includes the following steps: Construction proceeds towards the top slab, including the installation of the advanced support anchor cables and the formation of pre-cracked top cuts; Construct a barrier wall, and construct a support frame on the side of the barrier wall facing the alleyway; The first anchor is connected between the isolation wall and the support frame; The second anchor is installed on the support frame, with the other end of the second anchor extending into the top plate; The third anchor is installed on the support frame, with the other end of the third anchor extending into the pre-cracked top.

[0013] In one alternative embodiment, the steps of constructing the roof slab, installing the advanced support anchors, and forming the pre-cracked roof cut include: Drilling holes and blasting holes are constructed into the roof slab. The drilling holes and blasting holes are spaced apart along the direction of the roadway, and at least two drilling holes are provided between adjacent blasting holes. The advanced support anchor cables are installed along the direction of the tunnel; The blast hole is blasted with a shaped charge to form the pre-cracked top.

[0014] In an optional embodiment, after the step of installing the third anchor on the support frame and extending the other end of the third anchor into the pre-splitting crack at the top, the method further includes: Multiple retaining walls are constructed into the goaf area, and the multiple retaining walls are spaced apart along the direction of the goaf area; A gas extraction pipe is laid into the roadway, and multiple bypass pipes are installed on the gas extraction pipe, with each bypass pipe passing through the isolation wall and extending between adjacent retaining walls. Beneficial effects

[0015] 1. This application sets up a partition wall and a support frame in cooperation, and uses a first anchor to connect the partition wall and the support frame, as well as the bottom and bottom plate of the support frame are connected and fixed, and the top and top plate of the support frame are connected and fixed, so that the support frame can effectively transmit and disperse the lateral pressure of the gangue in the goaf borne by the partition wall, thereby improving the lateral pressure resistance of the gangue retaining structure.

[0016] 2. The retaining wall is typically used as a flexible support, while the support frame is typically used as a rigid support. Thus, when falling rock from the goaf impacts the retaining wall first, the flexible design of the retaining wall can buffer and absorb the impact energy through deformation, protecting the support frame on the other side. Furthermore, the lateral pressure from the falling rock can be transferred through the retaining wall to the support frame, and then from the support frame to the floor and roof. This forms a four-in-one composite load-bearing system of retaining wall, support frame, floor, and roof, further enhancing the lateral pressure resistance of the rock retaining structure. Attached Figure Description

[0017] To more clearly illustrate the technical solutions in the specific embodiments of this application or the prior art, the drawings used in the description of the specific embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of this application. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.

[0018] Figure 1 This is a schematic diagram of the structure of the return airway roof cutting and pressure relief along the goaf in an embodiment of this application; Figure 2 for Figure 1 A magnified view of a section at point A in the middle; Figure 3 This is a schematic diagram showing the connection relationship between adjacent expansion joints; Figure 4 This is a cross-sectional schematic diagram of the expansion joint and connecting parts; Figure 5 This is a schematic diagram showing the positional relationship between the gas extraction pipe and the bypass pipe in an embodiment of this application; Figure 6 This is a schematic diagram showing the positional relationship between the drill holes and the blasting holes in an embodiment of this application; Figure 7 This is a flowchart illustrating the construction steps of the return airway roof cutting and pressure relief along the goaf structure according to an embodiment of this application. Figure 8 This is a schematic diagram illustrating the construction process of pre-cracking the top of the crack according to an embodiment of this application. Figure 9 This is a schematic diagram illustrating the construction process of the retaining wall and gas extraction pipe in an embodiment of this application.

[0019] Explanation of reference numerals in the attached figures: 100. Roof; 110. Drill hole; 120. Blasting hole; 200. Floor; 300. Goaf; 400. Roadway; 500. Roof cutting pre-splitting crack; 1. Isolation wall; 2. Support frame; 201. Outrigger; 2011. Telescopic section; 202. Connecting section; 203. Reinforcing crossbar; 204. Connecting component; 3. First anchor; 4. Second anchor; 5. Third anchor; 6. Advanced support anchor cable; 7. First reinforcement mesh; 8. Shotcrete cloth; 9. Retaining wall; 10. Gas extraction pipe; 11. Bypass pipe. Detailed Implementation

[0020] To make the objectives, technical solutions, and advantages of the embodiments of this application clearer, the technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0021] The following is combined Figures 1 to 9 This describes an embodiment of the present application.

[0022] According to embodiments of this application, in a first aspect, referring to... Figure 1 , Figure 2 This application provides a return airway roof cutting and pressure relief goaf retention structure for use in a goaf 300 and a roadway 400 with a common roof 100 and a common floor 200. The return airway roof cutting and pressure relief goaf retention structure includes an isolation wall 1, a support frame 2, a first anchor 3, a second anchor 4 and a third anchor 5. Through the cooperation of the above structures, a relatively stable overall rock retaining structure can be formed.

[0023] Specifically, the isolation wall 1 is used to spatially separate the goaf 300 and the roadway 400. The isolation wall 1 extends along the direction of the roadway 400, with its top contacting the roof 100 along the height of the roadway 400, and its bottom resting on the floor 200, forming a relatively complete barrier. Thus, by setting up the isolation wall 1, after the roof 100 corresponding to the goaf 300 collapses, the isolation wall 1 can prevent the collapsed rock from flowing into the roadway 400. Simultaneously, the isolation wall 1 can also isolate the gas within the goaf 300. Furthermore, when the roof 100 corresponding to the isolation wall 1 shows a downward trend, the top of the isolation wall 1 can also support that portion of the roof 100.

[0024] Alternatively, the isolation wall 1 can be formed using flexible masonry materials. For example, it can be constructed by layering and staggering layers of waste gangue from underground mines, filled into woven bags. Of course, other materials with buffering properties and a certain load-bearing capacity can also be used.

[0025] Support frame 2 is installed on the side of the isolation wall 1 facing the roadway 400. Support frame 2 also extends along the direction of roadway 400, with its bottom connected to the floor slab 200 and its top connected to the roof slab 100. Understandably, as a rigid frame installed on one side of the isolation wall 1, support frame 2 provides lateral support to the isolation wall 1, thereby resisting the horizontal lateral pressure transmitted from the collapsed rock in the goaf 300 through the isolation wall 1.

[0026] Optionally, the support frame 2 can be made of metal, such as a U-shaped steel canopy that can extend and retract along the height direction. This allows the support frame 2 to have a high load-bearing capacity and a certain degree of retractability, enabling it to release some energy through structural deformation when subjected to large lateral pressure, thus preventing brittle failure of the support frame 2.

[0027] Understandably, due to the size limitations of the support frame 2, multiple support frames 2 can be sequentially and spaced apart along the direction of the lane 400 to meet the usage requirements of the support frame 2.

[0028] Furthermore, referring to Figure 1 , Figure 2 The first anchor 3 is set on the support frame 2 and extends toward the isolation wall 1. Part of the structure of the first anchor 3 is located inside the isolation wall 1. The support frame 2 is connected to the isolation wall 1 through the first anchor 3 to connect the support frame 2 and the isolation wall 1 into a whole.

[0029] In this embodiment, the lateral pressure from the gangue borne by the isolation wall 1 can be transmitted to the support frame 2 through the first anchor 3, thereby utilizing the support frame 2 to bear the lateral pressure. At the same time, under the action of the first anchor 3, the support frame 2 can constrain the isolation wall 1, thereby effectively preventing the isolation wall 1 from loosening, bulging, or collapsing under the action of lateral pressure.

[0030] Optionally, the first anchor 3 can be an anchor rod, reinforcing bar, or other rod-shaped member with tensile and shear resistance. The portion of the anchor 3 extending into the partition wall 1 can generate friction and interlocking force with the masonry material of the partition wall 1, thereby achieving a reliable connection between the first anchor 3 and the partition wall 1. Furthermore, the first anchor 3 can be fixed to the support frame 2 by welding, bolting, or other methods, so that the support frame 2, the first anchor 3, and the partition wall 1 form an integral structure.

[0031] Optionally, multiple first anchors 3 are provided, spaced apart along the direction of the tunnel 400. Furthermore, when the height of the partition wall 1 and the support frame 2 is relatively high, multiple first anchors 3 are spaced apart along the height direction. In this way, the connection effect between the partition wall 1 and the support frame 2 can be further improved through the action of multiple first anchors 3 at different locations.

[0032] In one specific embodiment, the cross-section of the isolation wall 1 can be trapezoidal, with a bottom width of 800mm, a top width of 600mm, and a height of 2.5m to 3m. The support frame 2 can be a 29# retractable U-shaped steel canopy, spaced 0.8m-1.2m apart along the direction of the tunnel 400. The first anchor 3 is an anchor rod with a length of 1m to 1.5m, and can be arranged in three layers along the height direction of the isolation wall 1, with the three layers of first anchor 3 located at 200mm, 1000mm, and 2000mm above the bottom plate 200, respectively. The spacing between adjacent first anchor 3 along the direction of the tunnel 400 can be 800mm-1000mm.

[0033] With the above-described configuration, when the roof 100 corresponding to the goaf 300 collapses, the collapsed gangue accumulates within the goaf 300, generating a continuously increasing lateral thrust on the retaining wall 1. At this time, the retaining wall 1 first bears the direct pressure from the gangue; its flexible characteristics can buffer some of the impact energy through certain compression deformation and transmit the lateral pressure relatively evenly. Based on this, the first anchor 3 transmits this lateral pressure to the outer support frame 2. The support frame 2, with its high stiffness and strength, resists lateral deformation, thereby maintaining the stability of the entire gangue retaining structure. It is evident that this coordinated internal and external force-bearing mode enables the retaining structure to possess both the ability to resist sudden impacts and the stability to withstand long-term loads.

[0034] In some embodiments, refer to Figure 1 , Figure 2 The top of the support frame 2 is provided with at least one second anchor 4, which extends toward the top plate 100 along the height direction, and a part of the structure of the second anchor 4 extends into the top plate 100 and is connected to the top plate 100.

[0035] In this embodiment, the support frame 2 bears not only the lateral pressure from the goaf 300 but also the vertical pressure from the roof 100. By installing a second anchor 4 at the top of the support frame 2 and anchoring the second anchor 4 into the roof 100, the top of the support frame 2 can be fixed together with the roof 100, thereby effectively preventing the support frame 2 from rotating or sliding inward toward the roadway 400 under the action of horizontal lateral pressure. At the same time, the second anchor 4 can also transfer part of the pressure from the roof 100 to the support frame 2, so that the support frame 2 can play a load-bearing role in both the vertical and horizontal directions, improving the stability of the entire support structure.

[0036] Optionally, in actual construction, after the support frame 2 is erected, an anchoring hole can be drilled between the top of the support frame 2 and the top plate 100 using a drilling device. Then, the second anchoring member 4 is inserted into the anchoring hole and anchoring agent is injected for fixation. Furthermore, the second anchoring member 4 can be an anchor rod, a reinforcing bar, or other rod-shaped components with tensile and shear resistance. The second anchoring member 4 can also be fixed to the support frame 2 by welding, bolting, or other methods.

[0037] In some embodiments, refer to Figure 1 , Figure 2 The roof 100 has pre-splitting cracks 500, which are directional cracks formed by pre-drilling holes in the roof 100 and then performing shaped charge blasting. One end of the pre-splitting crack 500 is located within the roadway 400, and the other end extends vertically away from the roadway 400, while horizontally it extends towards the goaf 300. Thus, by constructing the pre-splitting cracks 500 on the roof 100, the function of these cracks is to sever the mechanical connection between the roof 100 corresponding to the goaf 300 and the roof 100 corresponding to the roadway 400. This allows the roof 100 corresponding to the goaf 300 to fracture directionally along the direction of the pre-splitting cracks 500 during collapse, thereby reducing the impact on the roof 100 corresponding to the roadway 400.

[0038] Furthermore, at least one third anchor 5 is provided on the top of the support frame 2. One end of the third anchor 5 extends into the top pre-splitting crack 500, and the third anchor 5 is adapted to abut against the inner sidewall of the top pre-splitting crack 500.

[0039] In this embodiment, after the third anchor 5 is inserted into the pre-splitting crack 500, its outer wall contacts the rock mass on both sides of the pre-splitting crack 500. When the support frame 2 is subjected to lateral pressure from the goaf 300 and tends to displace towards the inside of the roadway 400, the third anchor 5 can transfer the tensile or shear force to the stable rock mass around the pre-splitting crack 500 through the mechanical interlocking force and friction between itself and the inner wall of the pre-splitting crack 500, thereby effectively restraining the lateral displacement of the support frame 2. In this way, the pre-splitting crack 500 formed during the pre-splitting construction is used as a natural anchor point, without the need for additional anchor holes. This saves construction costs and achieves the fit between the support frame 2 and the pre-splitting line formed by the pre-splitting crack 500.

[0040] Optionally, the third anchor 5 can be a round steel bar or steel pipe welded and fixed to the support frame 2, or a rod-shaped member fixed to the support frame 2 by other means. When the width of the pre-crack 500 is insufficient to allow the third anchor 5 to extend into it, a hole expander can be used to partially enlarge the pre-crack 500, allowing part of the third anchor 5 to extend into the enlarged pre-crack 500. Of course, in addition to the above embodiments, the end of the third anchor 5 extending into the pre-crack 500 can be appropriately processed to enhance the anchoring effect between the third anchor 5 and the inner wall of the pre-crack 500.

[0041] In one specific embodiment, the third anchor 5 is made of round steel with a length of 400mm and a diameter of no more than 30mm. 200mm of the length of the third anchor 5 is exposed outside the support frame 2 and inserted into the pre-splitting crack 500. The third anchor 5 is welded to the side wall of the support frame 2 on the side close to the goaf 300. The specific welding position of the third anchor 5 can be about 2m above the bottom plate 200.

[0042] In some embodiments, refer to Figure 1 , Figure 3 , Figure 4 The support frame 2 has a U-shaped structure and includes a pair of parallel legs 201 and a connecting section 202 connecting the legs 201. Specifically, the pair of legs 201 extend along the height direction of the tunnel 400, and the connecting section 202 is located at the bottom of the legs 201, used to connect the two legs 201 into one unit. At least a portion of the connecting section 202 is embedded in the bottom plate 200, thereby forming a relatively stable embedded connection between the bottom of the support frame 2 and the bottom plate 200, preventing the bottom of the support frame 2 from slipping under lateral pressure.

[0043] The first anchor 3 is installed on the support leg 201, and the support leg 201 and the isolation wall 1 are connected by the first anchor 3. A reinforcing crossbar 203 connects a pair of support legs 201. Multiple reinforcing crossbars 203 can be spaced apart along the direction of the tunnel 400. The two ends of the reinforcing crossbar 203 are connected to the two support legs 201 respectively, thus enabling the reinforcing crossbar 203 and the connecting section 202 to cooperate and improve the overall strength of the support frame 2. The reinforcing crossbar 203 can be made of metal tie rod, and the reinforcing crossbar 203 can be fixedly connected to the two support legs 201 by welding or bolting.

[0044] Furthermore, referring to Figure 3The outrigger 201 includes at least two telescopic sections 2011, and a connector 204 is provided between two adjacent telescopic sections 2011. The connector 204 is sleeved on the outside of the two adjacent telescopic sections 2011, so that the two adjacent telescopic sections 2011 can be connected together in the height direction. Under the compression of the top plate 100, the telescopic section 2011 is adapted to slide relative to the connector 204 in the height direction.

[0045] In this embodiment, by configuring the adjacent telescopic sections 2011 of the outriggers 201 to slide relative to the connecting frame, the support frame 2 can gradually reduce pressure when subjected to the downward pressure of the roof 100 through the relative sliding of the telescopic sections 2011, thus preventing sudden brittle failure or instability of the support frame 2 due to excessive pressure from the roof 100. Simultaneously, when the gangue in the goaf 300 collapses and the isolation wall 1 transmits significant lateral pressure to the support frame 2, the two adjacent telescopic sections 2011 can move away from each other along the height direction, allowing the outriggers 201 to deform horizontally. This deformation releases some energy, preventing brittle failure of the support frame 2.

[0046] Optionally, refer to Figure 3 , Figure 4 The connector 204 can be a clamp, meaning a clamp is installed between adjacent telescopic sections 2011, with the upper and lower edges of the clamp 50mm from the ends of each telescopic section 2011. This clamp not only connects adjacent telescopic sections 2011, but also allows the telescopic section 2011 to slide relative to the clamp under significant lateral pressure, causing the outrigger 201 to deform as a whole. Of course, the connector 204 can also employ other structures besides the aforementioned clamp, to ensure that the relative positions of adjacent telescopic sections 2011 remain unchanged before significant lateral pressure is applied, while changing their relative positions under significant lateral pressure.

[0047] In some embodiments, refer to Figure 1 Multiple pre-support anchor cables 6 are installed on the roof 100, and these anchor cables 6 are spaced apart along the direction of the roadway 400, thus forming one or more rows of pre-support systems. One end of the pre-support anchor cable 6 is located inside the roadway 400, and the other end of the pre-support anchor cable 6 extends vertically away from the roadway 400, while horizontally it extends away from the goaf 300.

[0048] In this embodiment, the function of the advanced support anchor cable 6 is to reinforce and strengthen the roof 100 corresponding to the roadway 400 before blasting and roof cutting. Specifically, the advanced support anchor cable 6 can suspend the shallow rock strata of the roof 100 corresponding to the roadway 400 on the deep stable rock strata through its deep anchoring end, thereby preventing early delamination and excessive subsidence of the roof 100 corresponding to the roadway 400 during roof cutting blasting and working face mining. This plays an auxiliary role in ensuring the effect of blasting and roof cutting, thereby ensuring that the focused blasting can penetrate along the designed roof cutting line direction and achieve a good pressure relief effect.

[0049] Understandably, the pre-support anchor cable 6 and the second anchor 4 at the top of the support frame 2 can cooperate with each other in spatial position, together forming a complete support system for the roof 100. Among them, the pre-support anchor cable 6 mainly undertakes the temporary reinforcement before roof cutting and the control of the roof 100 during the roof cutting process, while the second anchor 4 mainly undertakes the fixation of the top of the support frame 2 and the long-term support of the roof 100 corresponding to the roadway 400 during the use of the roadway 400.

[0050] In one specific implementation, the advance support anchor cable 6 is set at a position 2000mm away from the center of the roadway and offset towards the mining side. The specifications of the advance support anchor cable 6 are a diameter of 21.6mm and a length of 8200mm. The spacing between adjacent advance support anchor cables 6 is 1100mm. The construction angle of the advance support anchor cable 6 is 80°. It can be used in conjunction with a 2.6m long H-beam for series roof support. The preload applied by the advance support anchor cable 6 is not less than 120KN.

[0051] In some embodiments, refer to Figure 1 , Figure 2 The isolation wall 1 has a first reinforcing mesh 7 laid on the side facing the tunnel 400 in the horizontal direction. This first reinforcing mesh 7 can be made of welded steel mesh with a diameter of 6.5mm, with mesh panels measuring 3000mm in length and 1100mm in width. Adjacent mesh panels can overlap by 100mm and be tied together with wire. Furthermore, an additional shotcrete fabric 8 can be installed between the first reinforcing mesh 7 and the isolation wall 1 to provide a base for shotcrete operations.

[0052] In this embodiment, the first reinforcing mesh 7 covers the outer surface of the isolation wall 1 facing the roadway 400, and the first reinforcing mesh 7 is set tightly against the surface of the support leg 201 of the support frame 2 facing the isolation wall 1. Thus, when the isolation wall 1 becomes partially loose or small pieces of gangue are squeezed out, the first reinforcing mesh 7 can intercept and block them, preventing broken gangue from falling into the roadway 400 and affecting passage and safety. Simultaneously, the first reinforcing mesh 7 serves as the adhesion substrate for the subsequent shotcrete sealing layer, enhancing the bond strength between the shotcrete or mortar and the isolation wall 1, and improving the integrity and durability of the shotcrete layer.

[0053] In some embodiments, refer to Figure 1 The isolation wall 1 has a shotcrete fabric 8 laid on the side facing the goaf 300 in the horizontal direction. In this way, the shotcrete fabric 8 can provide a base for the initial temporary sealing and intermediate shotcrete sealing of the isolation wall 1.

[0054] In some embodiments, refer to Figure 5 Multiple retaining walls 9 are installed within the goaf 300, spaced apart along the direction of the goaf 300. The retaining walls 9 can be fully enclosed, dividing the goaf 300 into several independent sealed units along the direction of the goaf. Each retaining wall 9 is constructed from the bottom slab 200 to the top slab 100, laterally covering the entire width of the goaf 300, thus forming a relatively complete sealed partition.

[0055] Furthermore, a gas extraction pipe 10 is installed in the roadway 400. The gas extraction pipe 10 extends along the direction of the roadway 400. Multiple bypass pipes 11 are installed on the gas extraction pipe 10. Each bypass pipe 11 passes through the isolation wall 1 and extends into the space between adjacent retaining walls 9.

[0056] In this embodiment, each sealed unit separated by the retaining wall 9 is equipped with at least one set of independent bypass pipes 11 for gas extraction, thereby enabling independent gas extraction within each sealed unit. This combination of segmented sealing and segmented extraction effectively avoids the disorderly air leakage problem caused by large-area penetration in the goaf 300 under traditional ventilation methods. Furthermore, gas within each sealed unit can be effectively extracted through its dedicated bypass pipe 11, improving both gas extraction concentration and efficiency while preventing gas transfer and accumulation. Simultaneously, when an abnormal situation occurs within a sealed unit, the impact is limited to that unit and less likely to affect the entire goaf 300, which is beneficial for mine safety management.

[0057] Secondly, referring to Figure 6 , Figure 7 , Figure 8 , Figure 9 This application provides a construction method for a return airway top-cutting and pressure-relief goaf-retention structure, used for constructing the return airway top-cutting and pressure-relief goaf-retention structure. The return airway top-cutting and pressure-relief goaf-retention structure includes a second anchor 4, a third anchor 5, and an advance support anchor cable 6. The construction method for the return airway top-cutting and pressure-relief goaf-retention structure includes the following steps: S1. Construction proceeds towards the roof 100, installing advanced support anchor cables 6 and forming pre-splitting cracks 500. Specifically, openings are made in the roof 100 corresponding to roadway 400 to install advanced support anchor cables 6, while simultaneously forming pre-splitting cracks 500 in the roof 100 through blasting or other means. The installation position of the advanced support anchor cables 6 must avoid the location of the pre-splitting openings; the two must coordinate spatially. Furthermore, after the pre-splitting cracks 500 are formed, the mechanical connection between the roof 100 above the goaf 300 and the roof 100 above roadway 400 can be severed, creating pressure relief conditions for subsequent goaf-side roadway construction.

[0058] S2. Construct isolation wall 1, and construct support frame 2 on the side of isolation wall 1 facing roadway 400. Specifically, at the separation point between goaf 300 and roadway 400, construct isolation wall 1 from bottom slab 200 towards top slab 100, with isolation wall 1 extending along the direction of roadway 400. Isolation wall 1 can be constructed using a layered staggered masonry method with bagged gangue. Simultaneously or after the construction of isolation wall 1, construct support frame 2 on the side of isolation wall 1 facing roadway 400. The bottom of support frame 2 is connected and fixed to bottom slab 200, and the top is connected and fixed to top slab 100 to form an outer rigid frame.

[0059] Understandably, the construction sequence of the isolation wall 1 and the support frame 2 can be adjusted according to site conditions. As a preferred method, the bagged gangue wall can be stacked first to form the isolation wall 1, and then the support frame 2 can be erected on the side of the isolation wall 1 facing the roadway 400.

[0060] S3. Connect the first anchor 3 between the isolation wall 1 and the support frame 2. Specifically, the first anchor 3 is set on the support frame 2, extending towards the isolation wall 1, with part of its structure extending into the interior of the isolation wall 1, connecting the isolation wall 1 and the support frame 2 as a whole. The first anchor 3 can be an anchor rod, and the first anchor 3 can be pre-embedded in layers during the installation of the isolation wall 1, with its exposed end welded and fixed to the support leg 201 of the support frame 2.

[0061] S4. Install the second anchor 4 on the support frame 2, with the other end of the second anchor 4 extending into the top plate 100. Specifically, a hole is made in the top plate 100 to anchor one end of the second anchor 4 into the top plate 100, and the portion of the second anchor 4 outside the top plate 100 is welded to the support frame 2. This prevents the support frame 2 from rotating or slipping under lateral pressure, and the downward pressure of the top plate 100 can be transmitted to the support frame 2 through the second anchor 4, and then from the support frame 2 to the bottom plate 200.

[0062] S5. Install the third anchor 5 on the support frame 2, with the other end of the third anchor 5 extending into the pre-splitting crack 500. Specifically, the third anchor 5 is inside the pre-splitting crack 500, forming an abutment fit with the inner wall of the pre-splitting crack 500. It utilizes the clamping friction and mechanical interlocking force of the rock mass on both sides of the pre-splitting crack 500 to provide lateral anchoring force, effectively restraining the lateral displacement of the support frame 2 under the lateral pressure of the gangue.

[0063] In this way, through the above-described setup, the pre-support anchor cable 6 provides protection for the roof 100 during the roof cutting construction, and the pre-splitting crack 500 achieves mechanical decoupling between the roof 100 corresponding to the goaf 300 and the roof 100 corresponding to the roadway 400. The isolation wall 1 and the support frame 2 are integrated through the first anchor 3, the second anchor 4 anchors the top of the support frame 2 to the roof 100, and the third anchor 5 utilizes the pre-splitting crack 500 to achieve lateral anti-overturning anchoring of the support frame 2. These steps cooperate with each other to ensure the overall stability and construction safety of the goaf-side roadway structure.

[0064] In some embodiments, refer to Figure 6 , Figure 8 The construction process towards the top slab 100, including the installation of advanced support anchor cables 6 and the formation of pre-cracked top 500, includes: S101, drilling holes 110 and blasting holes 120 are constructed into the roof 100. The drilling holes 110 and blasting holes 120 are spaced apart along the direction of the roadway 400, and at least two drilling holes 110 are provided between adjacent blasting holes 120.

[0065] In this embodiment, both boreholes 110 and blasting holes 120 are arranged at intervals along the direction of the roadway 400 to form a continuous row of holes. Furthermore, during the arrangement, at least two boreholes 110 are provided between two adjacent blasting holes 120. These boreholes 110 serve as dense guide holes, forming a continuous row of weak surfaces within the roof 100, providing a guiding path for crack propagation during subsequent blasting. Understandably, the depth, diameter, and dip angle parameters of the boreholes 110 and blasting holes 120 can be adaptively designed according to the thickness and properties of the rock strata in the roof 100.

[0066] S102. Construct advance support anchor cables 6 along the direction of roadway 400. Specifically, after the completion of boreholes 110 and blasting holes 120, construct advance support anchor cables 6 along the direction of roadway 400. The construction of advance support anchor cables 6 can be carried out after the completion of boreholes 110 and blasting holes 120, or it can be carried out alternately with the construction of borehole 110. The location of advance support anchor cables 6 should avoid the locations of boreholes 110 and blasting holes 120. Optionally, the advance support anchor cables 6 can be made of high-strength steel strands, anchored in the deep stable rock strata of the roof 100 using resin anchoring agent, and pre-tightened.

[0067] S103. The blasting holes 120 are detonated with shaped charge to form a pre-cutting fracture 500. Specifically, a shaped charge tube is installed in each blasting hole 120, filled with explosive, with the shaped charge direction aligned with the predetermined cutting line. After detonation, the shaped charge effect creates a directional tensile stress field around the blasting holes 120, causing the rock to undergo relatively precise tensile fracture along the line connecting the densely packed boreholes 110. Furthermore, the presence of the densely packed boreholes 110 provides a clear guiding path for the fracture during propagation, preventing disordered fracture expansion. Ultimately, the fractures in all the blasting holes 120 interconnect, forming a continuous pre-cutting fracture 500 in the roof 100.

[0068] Thus, through the above-described configuration, the combined approach of guiding boreholes 110 and shaped charge blasting combines the low-damage characteristics of dense boreholes 110 with the controllable fracture direction and reliable penetration of shaped charge blasting. The dense boreholes 110 create a continuous weak surface with stress concentration inside the top plate 100. Based on this, the shaped charge blasting generates directional tensile stress. The synergistic effect of both significantly improves the crack penetration rate, thereby enhancing the depressurization effect of top cutting.

[0069] In some embodiments, refer to Figure 9 After the step of installing the third anchor 5 on the support frame 2 and extending the other end of the third anchor 5 into the pre-crack 500, the method further includes: S6. Construct multiple retaining walls 9 into the goaf 300, with the multiple retaining walls 9 spaced apart along the direction of the goaf 300. Specifically, each retaining wall 9 is constructed from the bottom plate 200 to the top plate 100, laterally covering the width of the entire goaf 300, forming a full-section closed partition.

[0070] The retaining wall 9 can be constructed using woven bags of gangue, brickwork, or poured concrete. The retaining wall 9 typically has a trapezoidal cross-section to ensure its stability. After the retaining wall 9 is constructed, the goaf 300 can be divided into multiple independent sealed units, each separated by the retaining wall 9 to prevent large-scale air leakage within the goaf 300.

[0071] S7. Lay a gas extraction pipe 10 into the roadway 400, and install multiple bypass pipes 11 on the gas extraction pipe 10, so that each bypass pipe 11 passes through the isolation wall 1 and extends into the space between adjacent retaining walls 9.

[0072] Specifically, the gas drainage pipe 10 typically uses a large-diameter pipe to meet the flow requirements for gas drainage. Multiple bypass pipes 11 are installed on the gas drainage pipe 10, with the number and spacing of the bypass pipes 11 matching the spacing of the retaining walls 9. One end of each bypass pipe 11 is connected to the gas drainage pipe 10, and the other end extends through the isolation wall 1 into the sealed unit of the goaf 300 between two adjacent retaining walls 9. Furthermore, the bypass pipe 11 needs to be sealed at the point where it extends into the isolation wall 1 to prevent air leakage.

[0073] In this way, through the above-described configuration, each independent sealed unit separated by the retaining wall 9 is equipped with at least one set of independent gas drainage bypass pipes 11, realizing a gas drainage layout of one sealed section and one drainage section. This layout can effectively avoid the risk of spontaneous combustion of residual coal caused by large-scale air leakage in the goaf 300, while the independent drainage of each sealed unit can ensure a high drainage concentration and drainage efficiency, effectively solving the problem of excessive gas levels in the upper corner of the working face.

[0074] Although embodiments of this application have been described in conjunction with the accompanying drawings, those skilled in the art can make various modifications and variations without departing from the spirit and scope of this application, and all such modifications and variations fall within the scope defined by the appended claims.

Claims

1. A return airway roof-cutting pressure-relief gob-side entry retaining structure, characterized in that, For goaf (300) and roadway (400) having a common roof (100) and a common floor (200), including: A partition wall (1) is used to separate the goaf (300) and the roadway (400). The partition wall (1) extends along the direction of the roadway (400), and the top of the partition wall (1) along the height direction of the roadway (400) contacts the roof plate (100). A support frame (2) is provided on the side of the isolation wall (1) facing the roadway (400) and extends along the direction of the roadway (400). The bottom of the support frame (2) along the height direction is connected to the bottom plate (200), and the top of the support frame (2) along the height direction is connected to the top plate (100). The first anchor (3) is disposed on the support frame (2) and extends toward the isolation wall (1). Part of the structure of the first anchor (3) is located inside the isolation wall (1). The support frame (2) is connected to the isolation wall (1) through the first anchor (3).

2. The air returning gateway top-caving pressure releasing gob-side entry retaining structure according to claim 1, characterized in that, The top of the support frame (2) is provided with at least one second anchor (4), the second anchor (4) extends toward the top plate (100) along the height direction, and a part of the structure of the second anchor (4) extends into the top plate (100) and connects with the top plate (100).

3. The air returning gateway top-caving pressure releasing gob-side entry retaining structure according to claim 1, characterized in that, The roof (100) has a pre-splitting crack (500), one end of which is located in the roadway (400), the other end of which extends along the height direction away from the roadway (400), and the pre-splitting crack (500) extends horizontally toward the goaf (300). The top of the support frame (2) is also provided with at least one third anchor (5), one end of the third anchor (5) extends into the top pre-crack (500), and the third anchor (5) is adapted to abut against the inner sidewall of the top pre-crack (500).

4. The return airway top-cutoff pressure-relief gob-side entry retaining structure according to any one of claims 1-3, characterized in that, The support frame (2) has a U-shaped structure. The support frame (2) includes a pair of legs (201) and a connecting section (202) connecting the pair of legs (201). At least part of the connecting section (202) is embedded in the base plate (200). The first anchor (3) is provided on the legs (201), and a reinforcing crossbar (203) is connected between the pair of legs (201). The outrigger (201) includes at least two telescopic sections (2011), and a connector (204) is provided between two adjacent telescopic sections (2011). The connector (204) is sleeved on the outside of the two adjacent telescopic sections (2011), and under the compression of the top plate (100), the telescopic section (2011) is adapted to slide relative to the connector (204) along the height direction.

5. The return airway roof cutting and pressure relief structure with gob-side retention as described in any one of claims 1-3, characterized in that, Multiple advanced support anchor cables (6) are provided on the roof plate (100), and the multiple advanced support anchor cables (6) are spaced apart along the direction of the roadway (400); One end of the advanced support anchor cable (6) is located in the roadway (400), and the other end of the advanced support anchor cable (6) extends along the height direction toward a direction away from the roadway (400), and the advanced support anchor cable (6) extends horizontally toward a direction away from the goaf (300).

6. The return airway roof cutting and pressure relief structure with gob-side retention as described in any one of claims 1-3, characterized in that, The isolation wall (1) has a first reinforcing mesh (7) laid on the side facing the tunnel (400) in the horizontal direction; And / or, the isolation wall (1) is covered with shotcrete cloth (8) on the side facing the goaf (300) in the horizontal direction.

7. The return airway roof cutting and pressure relief structure with gob-side retention as described in any one of claims 1-3, characterized in that, Multiple retaining walls (9) are provided in the goaf (300), and the multiple retaining walls (9) are spaced apart along the direction of the goaf (300); A gas extraction pipe (10) is installed in the roadway (400), and multiple bypass pipes (11) are installed on the gas extraction pipe (10). Each bypass pipe (11) passes through the isolation wall (1) and extends into the space between adjacent retaining walls (9).

8. A construction method for a return airway roof cutting and pressure relief structure with gob-side retention, characterized in that, The return airway top cutting and pressure relief structure with gob-side retention is used for construction of any one of claims 1-7, wherein the return airway top cutting and pressure relief structure with gob-side retention includes a second anchor (4), a third anchor (5), and an advance support anchor cable (6). The construction method for the return airway roof cutting and pressure relief along the goaf structure includes the following steps: Construction is carried out on the top slab (100), the advanced support anchor cable (6) is installed and the top pre-crack is formed (500). Construction of the isolation wall (1), and construction of the support frame (2) on the side of the isolation wall (1) facing the roadway (400); Connect the first anchor (3) between the isolation wall (1) and the support frame (2); The second anchor (4) is installed on the support frame (2), and the other end of the second anchor (4) extends into the top plate (100); The third anchor (5) is installed on the support frame (2), and the other end of the third anchor (5) extends into the top pre-crack (500).

9. The construction method of the return airway roof cutting and pressure relief along the goaf structure according to claim 8, characterized in that, The steps of constructing the top slab (100), installing the advanced support anchor cable (6), and forming the pre-cracked top (500) include: Drill holes (110) and blasting holes (120) are drilled into the top plate (100). The drill holes (110) and the blasting holes (120) are arranged at intervals along the direction of the roadway (400), and at least two drill holes (110) are arranged between adjacent blasting holes (120). The advanced support anchor cable (6) is constructed along the direction of the roadway (400); The blast hole (120) is blasted with a shaped charge to form the top-cutting pre-splitting crack (500).

10. The construction method of the return airway roof cutting and pressure relief roadway retention structure according to claim 8, characterized in that, After the step of installing the third anchor (5) on the support frame (2) and extending the other end of the third anchor (5) into the pre-cracked top (500), the method further includes: Multiple retaining walls (9) are constructed into the goaf (300), and the multiple retaining walls (9) are spaced apart along the direction of the goaf (300); A gas extraction pipe (10) is laid in the roadway (400), and multiple bypass pipes (11) are installed on the gas extraction pipe (10), and each bypass pipe (11) passes through the isolation wall (1) and extends into the space between adjacent retaining walls (9).