A construction device for binding steel reinforcement cage at tunnel entrance
Through the collaborative design of arched guide rails and intelligent rebar laying mechanism, the mechanized and safe construction of the rebar skeleton at the tunnel entrance is realized, solving the problems of low efficiency and poor safety of traditional manual binding, and improving construction efficiency and safety.
Patent Information
- Application Number
- CN202611292986.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-25
- Publication Date
- 2026-11-17
AI Technical Summary
The construction efficiency and safety of the steel reinforcement skeleton outside the tunnel entrance are low, making it difficult to meet the needs of rapid construction and posing safety hazards for high-altitude operations.
By adopting a collaborative design of arched guide rails, circumferential reinforcement laying mechanism, traveling binding mechanism and longitudinal reinforcement laying mechanism, the steel reinforcement cage is upgraded to be mechanized and intelligent. Combined with manual material feeding, a streamlined operation process is formed.
It improved construction efficiency, ensured binding accuracy, reduced labor intensity and safety risks, and met the progress requirements of rapid tunnel construction.
Smart Images

Figure CN123109712A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the technical field of tunnel construction, specifically, it relates to a construction device for binding steel reinforcement skeletons at tunnel entrances. Background Technology
[0002] In tunnel construction, the section extending outward from the tunnel entrance (commonly referred to as the entrance extension, entrance overhang, or entrance cantilever section) is the "face" of the entire tunnel project and a crucial transitional structure connecting the tunnel body with the external roadbed and slopes. Its construction quality directly affects the stability and durability of the tunnel entrance and the smooth progress of subsequent work. Therefore, the construction of this section is particularly important and is one of the core aspects of tunnel construction that cannot be ignored. Unlike the tunnel body, which is located inside the mountain, this outer edge extends entirely outside the mountain, without the natural support and protection of the surrounding rock. It is exposed to the natural environment for a long time and must withstand its own weight, lateral pressure from the mountain, traffic loads (if the tunnel is a traffic tunnel), and the erosion from wind, rain, and temperature differences. Therefore, precise installation of a steel reinforcement cage is essential to provide a solid structural foundation for subsequent formwork support and concrete pouring, ensuring that this section has sufficient strength, rigidity, and crack resistance to avoid safety hazards such as structural deformation, cracking, and collapse.
[0003] From a construction process perspective, the installation of the reinforcing steel cage at the outer edge is a systematic and meticulous operation that must strictly adhere to the principle of supporting first, then binding, and finally shaping to ensure that each step meets design specifications and construction standards. Generally, construction workers will first install the supporting cage. As the load-bearing framework of the entire reinforcing steel cage, the supporting cage's main function is to fix the position of the reinforcing bars, bear the loads of subsequent binding operations and concrete pouring, and prevent deformation or displacement of the reinforcing steel cage. The supporting cage is usually made of high-rigidity steel sections (such as I-beams and channel steel) or large-diameter reinforcing bars, customized according to the structural dimensions and stress characteristics of the outer edge. During installation, lifting equipment is needed to precisely hoist the supporting cage to the designed position, and then it is firmly connected to the mountain foundation or tunnel entrance main structure through pre-embedded steel plates, expansion bolts, and other connectors to ensure the stability of the supporting cage itself and provide a safe and reliable working platform for subsequent binding operations of the circumferential and longitudinal reinforcing bars.
[0004] During the binding process, construction workers must securely bind the circumferential and longitudinal reinforcing bars point by point according to the spacing and row spacing required by the design drawings. Each binding point must be wrapped with binding wire at least three times to ensure a tight and secure binding. However, in actual construction, the binding of both circumferential and longitudinal reinforcing bars currently relies entirely on manual operation. This traditional method has many drawbacks, severely impacting construction efficiency, posing significant safety hazards, and making it difficult to guarantee the stability of construction quality. The bending of the circumferential reinforcing bars requires manual operation according to the design dimensions. The bending angle and radius of each bar need precise manual control, a tedious and time-consuming process. Especially for areas with complex contours and significant curvature variations along the outer edge, processing deviations are prone to occur, requiring repeated adjustments and rework, further reducing efficiency. Moreover, the complete manual binding of the reinforcing bars, requiring workers to wrap binding wire point by point to fix the circumferential and longitudinal reinforcing bars, is not only labor-intensive but also slow. This is particularly true for binding large areas of reinforcing bar skeletons, requiring a significant investment of manpower and time, making it difficult to meet the rapid construction schedule requirements of tunnel projects. In addition, the handling and hoisting of steel bars also require manual labor in conjunction with lifting equipment. The process requires frequent adjustments to the position of the steel bars, which further increases the working time and affects the overall construction efficiency.
[0005] Meanwhile, the work is inherently unsafe, and the personal safety of construction workers is difficult to guarantee. The outer edge of the tunnel entrance extends into the mountainside, leaving the work area without natural protection. Furthermore, some areas involve working at height (typically exceeding 2 meters in height at the outer edge, and reaching 5-10 meters in some tunnel entrances). Workers must perform rebar tying operations on elevated platforms or scaffolding. The working space is narrow and highly susceptible to environmental factors (such as wind, rain, and snow), increasing the risk of falls. Additionally, during manual tying, workers must handle tools such as tying wire and rebar pliers. Prolonged work at height can lead to fatigue and decreased concentration, potentially resulting in substandard tying quality and accidents such as falling tools or rebar slipping, injuring workers below or damaging equipment. Moreover, the weight of the rebar during handling increases the risk of bumps, knocks, and other workplace injuries, further raising the safety risks. Summary of the Invention
[0006] This invention provides a tunnel portal rebar cage binding construction device to achieve automated laying and binding of tunnel portal rebar cages, replacing manual high-altitude operations, improving construction efficiency and binding accuracy, ensuring the safety of construction personnel, reducing labor intensity, reducing labor costs and material waste, adapting to the arc-shaped contour of the portal, ensuring the forming quality of the rebar cage, and laying a solid foundation for subsequent construction.
[0007] To achieve the above objectives, the technical solution adopted by the present invention is as follows: A tunnel portal steel reinforcement skeleton binding construction device includes two arched guide rails spaced apart outside the mountain along the extension direction of the tunnel and located at the tunnel portal. Each of the arched guide rails extends circumferentially along the tunnel. Between the two arched guide rails, a circumferential reinforcement laying mechanism and a traveling binding mechanism are spaced apart along the laying direction of the circumferential reinforcement. Between the circumferential reinforcement laying mechanism and the traveling binding mechanism, a longitudinal reinforcement laying mechanism is installed. Multiple longitudinal steel bars are provided on the longitudinal reinforcement laying mechanism.
[0008] A further technical solution is that the circumferential reinforcement laying mechanism includes two first traveling parts that are assembled one-to-one with two arched guide rails, and a laying part is installed between the two first traveling parts, with multiple circumferential reinforcement bars passing through the laying part at intervals along the extension direction of the tunnel.
[0009] A further technical solution is that the first traveling part includes a first slider slidably mounted on an arched guide rail, a first drive motor is mounted on the first slider, a first traveling wheel is mounted on the output shaft of the first drive motor, the first traveling wheel is connected to the arched guide rail and can move along the guide of the arched guide rail, and the two ends of the laying part are respectively connected to two first sliders.
[0010] A further technical solution is that a first driving member is installed on the first slider, a first adapter is installed on the driving end of the first driving member, the laying part is detachably connected to the first adapter, and the first driving member is used to drive the first adapter to move closer to or further away from the support frame.
[0011] A further technical solution is that the laying part includes a longitudinal reinforcement plate extending along the length direction of the tunnel, and a plurality of reinforcement holes are spaced apart along the length direction on the longitudinal reinforcement plate, and each circumferential reinforcement passes through the corresponding reinforcement hole.
[0012] A further technical solution is that the traveling binding mechanism includes two second traveling parts that are assembled one-to-one with the two arched guide rails, and a binding part is installed between the two second traveling parts.
[0013] A further technical solution is that the second traveling part includes a second slider slidably mounted on the arched guide rail, a second drive motor is mounted on the second slider, a second traveling wheel is mounted on the output shaft of the second drive motor, the second traveling wheel is connected to the arched guide rail and can move along the guide of the arched guide rail, and the two ends of the binding part are respectively connected to the two second sliders.
[0014] A further technical solution is that a second driving member is installed on the second slider, a second adapter is installed on the driving end of the second driving member, the binding part is detachably connected to the second adapter, and the second driving member is used to drive the second adapter to move closer to or away from the support frame.
[0015] A further technical solution is that the binding part includes a longitudinal guide rail extending along the length direction of the tunnel, a plurality of linear slides are mounted on the longitudinal guide rail at intervals along its length direction, an alignment drive member extending toward the reinforcing bar laying mechanism is installed on each of the linear slides, and a binding machine is installed at the drive end of the alignment drive member.
[0016] A further technical solution is that the longitudinal reinforcement laying mechanism includes two rotary material discharge assemblies spaced apart along the tunnel length direction. Each rotary material discharge assembly includes a power motor connected to the peripheral reinforcement laying mechanism and the traveling binding mechanism via a connecting seat. A material placement tray is coaxially mounted on the output shaft of the power motor. An assembly is coaxially fitted outside the material placement tray. The assembly is detachably connected to the connecting seat. A material discharge notch is opened on the side of the assembly near the support frame. Multiple material placement channels are evenly opened around the circumference of the material placement tray. Each material placement channel extends radially along the material placement tray. One end of each longitudinal reinforcement is placed in the corresponding material placement channel.
[0017] The technological advancements achieved by this invention compared to existing technologies, due to the adoption of the aforementioned structure, are as follows: This invention, relying on the coordinated design of arched guide rails, circumferential reinforcement laying mechanism, traveling binding mechanism, and longitudinal reinforcement laying mechanism, realizes the mechanization and intelligent upgrading of the laying and binding operation of the steel reinforcement skeleton outside the tunnel entrance. At the same time, considering the working conditions of the longitudinal reinforcement laying mechanism operating at a low position (when the longitudinal reinforcement laying mechanism is at a low position, because the discharge port of the longitudinal reinforcement laying mechanism is too high or horizontal, it is impossible to unload the material by gravity, and manual assistance is required, and manual operation is convenient at a low position), an operation mode adapted to manual assistance is designed. It fully combines the efficiency of automated operation with the flexibility of manual operation, and solves the pain points of traditional manual binding operation from multiple dimensions such as construction efficiency, operation safety, quality control, working condition adaptation, and cost control, providing a more scientific, efficient and safe operation method for the construction of the steel reinforcement skeleton outside the tunnel entrance.
[0018] This invention constructs an overall working framework using two arched guide rails extending circumferentially along the tunnel, providing precise and stable motion guidance for each actuator. The circumferential reinforcement laying mechanism, the traveling binding mechanism, and the longitudinal reinforcement laying mechanism can move synchronously or stepwise along the tunnel circumference along the arched guide rails, eliminating the need for repeated manual adjustments to the working position. The circumferential reinforcement laying mechanism enables the simultaneous and orderly laying of multiple circumferential reinforcement bars, the longitudinal reinforcement laying mechanism completes the fixed-point placement of multiple longitudinal reinforcement bars, and the traveling binding mechanism automates the binding of the intersections of longitudinal and transverse reinforcement bars. These mechanisms form an assembly line-like work process, replacing manual operations from reinforcement bar handling and positioning to binding, significantly shortening the work time for each process, improving the overall efficiency of reinforcement cage formation, and effectively meeting the schedule requirements of rapid tunnel construction. Simultaneously, the mechanized movement and operation of each mechanism avoids the uneven work speed caused by fatigue and differences in skill level in manual operations, making the construction progress easier to control and reducing the possibility of delays. All core operating mechanisms of this invention are mounted on arched guide rails, allowing for remote control from the ground or simple operation from a safe area. This achieves mechanized replacement of high-altitude operations, eliminating the need for construction workers to enter dangerous high-altitude areas for point-by-point binding, fundamentally eliminating core safety hazards such as falls from heights and injuries from high-altitude tools. Simultaneously, the laying and positioning of reinforcing bars are completed mechanically, avoiding manual handling and adjustment of heavy reinforcing bars at heights, reducing workplace injuries such as bar impacts and crushing injuries. Even when the longitudinal reinforcement laying mechanism is located at a lower position requiring manual assistance for material unloading, this lower position area itself offers convenient manual operation with no high-altitude safety risks, fully ensuring the safety of manual operation and making the overall construction safety protection system more comprehensive.
[0019] In summary, this invention, through scientific mechanical structure design, achieves automation, precision, and safety in the construction of the steel reinforcement skeleton at the tunnel entrance. At the same time, the manual material feeding method designed in conjunction with actual construction conditions allows the device to combine the high efficiency of automation with the flexibility of manual operation. It not only fundamentally solves the core problems of low efficiency, poor safety, and unstable quality in traditional manual construction, but also shows significant advantages in terms of working condition adaptability, cost control, and construction management. Attached Figure Description
[0020] The accompanying drawings are provided to further illustrate the invention and form part of the specification. They are used together with the embodiments of the invention to explain the invention and do not constitute a limitation thereof.
[0021] In the attached diagram: Figure 1 This is a schematic diagram of the structure of an embodiment of the present invention; Figure 2 This is a front view of the structure according to an embodiment of the present invention; Figure 3This is a side view of the structure according to an embodiment of the present invention; Figure 4 This is a schematic diagram of the arched guide rail, the circumferential reinforcement laying mechanism, the traveling binding mechanism, and the corresponding arrangement of multiple circumferential reinforcement bars in an embodiment of the present invention. Figure 5 for Figure 4 Front view of the structure shown; Figure 6 This is a partial structural schematic diagram of the rib laying mechanism according to an embodiment of the present invention; Figure 7 This is a partial structural schematic diagram of the traveling binding mechanism according to an embodiment of the present invention; Figure 8 This is a schematic diagram of a structure in which multiple longitudinal steel bars are provided on the longitudinal reinforcement laying mechanism according to an embodiment of the present invention; Figure 9 This is a schematic diagram of the rotary material discharge assembly in the longitudinal reinforcement laying mechanism according to an embodiment of the present invention; Figure 10 for Figure 9 A schematic diagram of the structure shown from another angle; Figure 11 This is a schematic diagram of the structure of the rotary discharge assembly in an embodiment of the present invention; Figure 12 This is a front view of the material tray in the rotary feeding assembly according to an embodiment of the present invention.
[0022] Components labeled: 100-Support frame, 200-Longitudinal reinforcement, 300-Circumferential reinforcement, 400-Arch-shaped guide rail, 500-Circumferential reinforcement laying mechanism, 501-First drive motor, 502-First traveling wheel, 503-First slider, 504-First drive component, 505-First adapter seat, 506-Longitudinal reinforcement plate, 507-Reinforcement hole, 600-Traveling binding mechanism, 601-Second drive motor 602-Second traveling wheel, 603-Second slider, 604-Second driving component, 605-Second adapter, 606-Longitudinal guide rail, 607-Linear slide, 608-Alignment driving component, 609-Binding machine, 700-Longitudinal reinforcement laying mechanism, 701-Power motor, 702-Connecting seat, 703-Assembly, 704-Discharge notch, 705-Placing tray, 706-Placing channel, 707-Baffle. Detailed Implementation
[0023] The preferred embodiments of the present invention will now be described with reference to the accompanying drawings. It should be understood that the preferred embodiments described herein are for illustrative and explanatory purposes only and are not intended to limit the scope of the invention.
[0024] This invention discloses a construction device for binding steel reinforcement cages at tunnel entrances, such as... Figures 1-12As shown, the structure includes a circumferential reinforcement laying mechanism 500, a traveling binding mechanism 600, a longitudinal reinforcement laying mechanism 700, and two arched guide rails 400. The two arched guide rails 400 are constructed at intervals outside the mountain along the tunnel's extension direction and located at the tunnel entrance, with each arched guide rail 400 extending circumferentially along the tunnel. The circumferential reinforcement laying mechanism 500 and the traveling binding mechanism 600 are assembled at intervals between the two arched guide rails 400 along the laying direction of the circumferential reinforcement 300. The longitudinal reinforcement laying mechanism 700 is assembled between the circumferential reinforcement laying mechanism 500 and the traveling binding mechanism 600, and multiple longitudinal reinforcement bars 200 are provided on the longitudinal reinforcement laying mechanism 700.
[0025] The working principle and advantages of this invention are as follows: This invention, relying on the coordinated design of the arched guide rail 400, the circumferential reinforcement laying mechanism 500, the traveling binding mechanism 600, and the longitudinal reinforcement laying mechanism 700, realizes the mechanization and intelligent upgrading of the laying and binding operations of the steel reinforcement skeleton outside the tunnel entrance. At the same time, considering the working conditions of the longitudinal reinforcement laying mechanism 700 operating at a low position (when the longitudinal reinforcement laying mechanism 700 is at a low position, because the discharge port of the longitudinal reinforcement laying mechanism 700 is too high or horizontal, it is impossible to unload the material by gravity, and manual assistance is required, and manual operation is convenient at a low position), designs an operation mode adapted to manual assistance unloading. It fully combines the efficiency of automated operation with the flexibility of manual operation, and solves the pain points of traditional manual binding operation from multiple dimensions such as construction efficiency, operation safety, quality control, working condition adaptation, and cost control, providing a more scientific, efficient, and safe operation method for the construction of the steel reinforcement skeleton outside the tunnel entrance.
[0026] This invention establishes an overall working framework using two arched guide rails 400 extending circumferentially along the tunnel, providing precise and stable motion guidance for each actuator. The circumferential reinforcement laying mechanism 500, the traveling binding mechanism 600, and the longitudinal reinforcement laying mechanism 700 can move synchronously or stepwise along the tunnel circumference along the arched guide rails 400, eliminating the need for repeated manual adjustments to the working position. The circumferential reinforcement laying mechanism 500 can achieve the synchronous and orderly laying of multiple circumferential reinforcement bars 300, the longitudinal reinforcement laying mechanism 700 can complete the fixed-point material placement of multiple longitudinal reinforcement bars 200, and the traveling binding mechanism 600 can automatically bind the intersections of longitudinal and transverse reinforcement bars. The various mechanisms form an assembly line-like working process, replacing the manual operation of the entire process from reinforcement bar handling and positioning to binding, significantly shortening the working time of a single process, improving the overall efficiency of reinforcement cage formation, and effectively meeting the progress requirements of rapid tunnel construction. Meanwhile, the mechanized movement and operation of each mechanism avoids the uneven work speed caused by fatigue and differences in proficiency in manual operation, making the construction progress easier to control and reducing the possibility of delays. Each core operating mechanism of this invention is mounted on an arched guide rail 400, allowing for remote control from the ground or simple operation in a safe area, achieving mechanized replacement of high-altitude operations. Construction personnel no longer need to enter dangerous high-altitude areas for point-by-point binding, fundamentally eliminating core safety hazards such as falls from heights and injuries from high-altitude tools. Furthermore, the laying and positioning of reinforcing bars are all completed mechanically, avoiding manual handling and adjustment of heavy reinforcing bars at heights, reducing workplace injuries such as bar collisions and impacts. Even when the longitudinal reinforcement laying mechanism 700 is in a lower position requiring manual assistance for material unloading, this lower position itself offers convenient manual operation with no safety risks associated with high-altitude work, ensuring the safety of manual operation and making the overall construction safety protection system more comprehensive.
[0027] In summary, this invention, through scientific mechanical structure design, achieves automation, precision, and safety in the construction of the steel reinforcement skeleton at the tunnel entrance. At the same time, the manual material feeding method designed in conjunction with actual construction conditions allows the device to combine the high efficiency of automation with the flexibility of manual operation. It not only fundamentally solves the core problems of low efficiency, poor safety, and unstable quality in traditional manual construction, but also shows significant advantages in terms of working condition adaptability, cost control, and construction management.
[0028] As a preferred embodiment of the present invention, such as Figures 4-6As shown, the circumferential reinforcement laying mechanism 500 includes a laying section and two first traveling sections. These two first traveling sections are assembled one-to-one with two arched guide rails 400. The laying section is installed between the two first traveling sections, and multiple circumferential reinforcement bars 300 pass through the laying section at intervals along the tunnel's extension direction. Each first traveling section includes a first slider 503 slidably mounted on the arched guide rail 400. A first drive motor 501 is mounted on the first slider 503, and a first traveling wheel 502 is mounted on the output shaft of the first drive motor 501. The first traveling wheel 502 is connected to the arched guide rail 400 and can move along the guide direction of the arched guide rail 400. Both ends of the laying section are connected to the two first sliders 503 respectively. The first traveling wheel 502 can be a gear, and an arched rack extending along its guide direction is constructed on the arched guide rail 400, with the gear and rack meshing with each other. A first driving member 504 is mounted on the first slider 503, and a first adapter 505 is mounted on the driving end of the first driving member 504. The laying part is detachably connected to the first adapter 505, and the first driving member 504 is used to drive the first adapter 505 to move closer to or away from the support frame 100. The laying part includes a longitudinal reinforcement plate 506 extending along the length direction of the tunnel. A plurality of reinforcement holes 507 are spaced apart on the longitudinal reinforcement plate 506 along its length direction, and each circumferential reinforcement 300 passes through the corresponding reinforcement hole 507.
[0029] In this embodiment, the circumferential reinforcement laying mechanism 500, through the matching assembly of two first traveling parts with the arched guide rail 400 and the design of the reinforcement holes 507 in the laying part, allows multiple circumferential reinforcement bars 300 to pass through the reinforcement holes 507 at intervals along the tunnel extension direction to form a regular reinforcement arrangement, replacing the traditional manual operation mode of handling, positioning, and laying circumferential reinforcement bars 300 one by one. At the same time, the first drive motor 501 drives the first traveling wheel 502 to move along the arched guide rail 400, which can drive the laying part and the multiple circumferential reinforcement bars 300 passing through it to move synchronously along the tunnel circumference, realizing the one-time mechanized laying of multiple circumferential reinforcement bars 300, and realizing simultaneous laying and tying in conjunction with the longitudinal reinforcement laying mechanism 700 and the traveling binding mechanism 600, eliminating the need for construction personnel to adjust the position of the reinforcement bars point by point, completely changing the current situation of low efficiency and cumbersome procedures of manual laying, greatly shortening the laying operation time of circumferential reinforcement bars 300, improving the overall progress of reinforcement cage construction, and better meeting the construction period requirements of rapid tunnel construction.
[0030] The first traveling wheel 502 adopts a gear design and meshes with the arched rack on the arched guide rail 400. The gear and rack transmission method has the characteristics of precise transmission ratio and controllable motion trajectory, which allows the first slider 503 to move smoothly and without deviation along the arc guide of the arched guide rail 400. This, in turn, drives the laying part to move strictly along the arc contour of the tunnel circumference, so that the laying trajectory of the circumferential reinforcement 300 is highly consistent with the design contour of the outer edge of the tunnel opening. This solves the problem of large arc deviation of the circumferential reinforcement 300 and non-compliance with design requirements in traditional manual laying. At the same time, the multiple reinforcement holes 507 opened on the longitudinal reinforcement plate 506 of the laying part play a precise limiting and guiding role for the circumferential reinforcement 300. This can strictly ensure that the spacing between multiple circumferential reinforcements 300 along the tunnel extension direction is uniform and consistent, avoiding the problem of uneven reinforcement spacing caused by visual errors and operational deviations in manual operation. This fundamentally improves the positioning accuracy of the circumferential reinforcement 300 laying and lays the foundation for the quality of subsequent reinforcement binding and skeleton forming.
[0031] The first driving component 504 (which can be a pneumatic cylinder, electric cylinder, or hydraulic cylinder) on the first slider 503 can drive the first adapter 505 to move closer to or further away from the support frame 100. The laying part is detachably connected to the first adapter 505. This design allows the spatial position of the laying part to be flexibly adjusted according to construction needs. In the early stage of construction, the laying part can be adjusted to a position away from the support frame 100 by the first driving component 504, which facilitates the inspection and adjustment of the support frame 100 by construction personnel. During the laying operation, the laying part can be precisely adjusted to a design position close to the support frame 100, so that the circumferential steel bars 300 and the support frame 100 form a precise structural fit. At the same time, the distance between the laying part and the support frame 100 can be flexibly adjusted according to the size of the support frame 100 and the thickness of the steel bar protective layer required for different tunnel openings, adapting to the construction design standards of different projects. This solves the problem of difficulty in accurately controlling the relative position of the steel bars and the support frame 100 in traditional manual laying, and improves the adaptability of the mechanism to different construction conditions. The entire process of laying 300mm circumferential reinforcing bars is mechanically driven. Construction workers no longer need to enter the high-altitude area outside the tunnel entrance to manually handle, position, and lay the reinforcing bars, completely eliminating core safety hazards such as falls, injuries from falling reinforcing bars, and injuries from falling tools that occur during manual high-altitude operations. Only a small number of personnel are needed on the ground or in a safe operating area to complete the mechanized laying of 300mm circumferential reinforcing bars. This allows construction workers to stay away from dangerous high-altitude working environments and avoids the physical exertion and work injury risks associated with manually handling heavy 300mm circumferential reinforcing bars at heights, significantly improving the overall safety level of reinforcing bar construction at the tunnel entrance.
[0032] As a preferred embodiment of the present invention, such as Figure 4 , Figure 5 , Figure 7As shown, the traveling binding mechanism 600 includes a binding part and two second traveling parts. These two second traveling parts are assembled one-to-one with two arched guide rails 400, and the binding part is installed between the two second traveling parts. Each second traveling part includes a second slider 603 slidably mounted on the arched guide rail 400. A second drive motor 601 is mounted on the second slider 603, and a second traveling wheel 602 is mounted on the output shaft of the second drive motor 601. The second traveling wheel 602 is connected to the arched guide rail 400 and can move along the guide of the arched guide rail 400. The second traveling wheel 602 and the arched guide rail 400 also use the aforementioned gear and rack transmission method. Both ends of the binding part are respectively connected to the two second sliders 603. A second driving component 604 (which can be a pneumatic cylinder, an electric cylinder, or a hydraulic cylinder) is mounted on the second slider 603. A second adapter 605 is mounted on the driving end of the second driving component 604. The binding part is detachably connected to the second adapter 605, and the second driving component 604 is used to drive the second adapter 605 to move closer to or away from the support frame 100. The binding part includes a longitudinal guide rail 606 extending along the length direction of the tunnel. Multiple linear slides 607 are spaced apart on the longitudinal guide rail 606 along its length direction. An alignment driving component 608 (which can be a pneumatic cylinder, an electric cylinder, or a hydraulic cylinder) is mounted on each linear slide 607. The alignment driving component 608 extends toward the reinforcing bar laying mechanism 500. A binding machine 609 (using a commercially available rebar binding machine) is mounted on the driving end of the alignment driving component 608, and a vision acquisition device (camera, etc.) can be mounted on the binding machine 609.
[0033] Traditional manual rebar tying requires construction workers to manually wrap and fix the rebars point by point using tying wire and rebar pliers. This is not only slow but also requires multiple people to coordinate the rebar positioning and tying, resulting in extremely low efficiency. The traveling tying mechanism 600 drives the tying part to move synchronously along the arched guide rail 400 through two second traveling parts. It can follow the working trajectory of the circumferential rebar laying mechanism 500 to perform follow-up tying of the laid circumferential rebars 300 and longitudinal rebars 200. At the same time, multiple linear slides 607 are installed at intervals on the longitudinal guide rail 606 of the tying part. Each linear slide 607 is equipped with an independent alignment drive 608 and a tying machine 609, which can realize simultaneous synchronous tying at multiple intersection points, replacing the manual single-point operation mode and significantly increasing the tying workload per unit time. In addition, the 609 tying machine adopts a commercially available mature rebar tying machine. The tying action is standardized and automated, requiring no manual intervention. This completely eliminates the problem of uneven operation speed caused by fatigue and differences in proficiency in manual tying, which significantly improves the overall efficiency of rebar tying, effectively shortens the construction period of the rebar skeleton at the tunnel entrance, and meets the progress requirements of rapid construction of tunnel projects.
[0034] The traveling binding mechanism 600, through the coordinated control of multiple driving components, enables the binding machine 609 to adjust its position in space in multiple dimensions, thus ensuring the accuracy and firmness of the rebar binding from the source. First, the second driving component 604 can drive the second adapter 605 and the binding part to move closer to or further away from the support frame 100. It can flexibly adjust the relative position of the binding part and the rebar frame according to the size of the support frame 100 and the thickness requirements of the rebar protective layer, ensuring that the binding machine 609 and the intersection point of the rebar are at the optimal working distance. Second, the linear slide 607 can reciprocate along the longitudinal guide rail 606. It can accurately adjust the longitudinal position of each binding machine 609 according to the spacing of the longitudinal rebars 200, achieving precise longitudinal positioning of the binding points. Third, the alignment driving component 608 extends toward the circumferential rebar laying mechanism 500 and drives the binding machine 609 to move. It can complete the circumferential fine adjustment of the binding machine 609, allowing the binding machine 609 to accurately align with the intersection point of the circumferential and longitudinal rebars 200, avoiding problems such as insecure binding and detachment caused by point offset. The multi-layer position adjustment structure enables the working points of the tying machine 609 to achieve millimeter-level precise alignment. Combined with the standardized automatic tying machine 609, it ensures that the number of wire wraps and the tightness of each tying point are consistent, and the tying quality is far superior to manual operation, completely solving the problem of inconsistent quality in manual tying.
[0035] The traveling binding mechanism 600 and the circumferential reinforcement laying mechanism 500 are both mounted on the same set of arched guide rails 400. Both use the same rack and pinion transmission method, ensuring completely consistent motion guidance. After the circumferential reinforcement laying mechanism 500 completes the precise laying of the circumferential reinforcement 300, the traveling binding mechanism 600 can quickly follow along the same arched guide rail 400 to directly bind the already positioned reinforcement intersections. This eliminates the need for manual readjustment of the reinforcement positions, achieving a streamlined operation of laying the circumferential reinforcement 300, arranging the longitudinal reinforcement 200, and binding the reinforcement intersections. This seamless operation mode eliminates the manual connection time between different processes in traditional construction, making the process flow of the reinforcement cage construction smoother and further improving overall construction efficiency.
[0036] As a preferred embodiment of the present invention, such as Figures 8-12As shown, the longitudinal reinforcement laying mechanism 700 includes two rotary material discharging assemblies, which are spaced apart along the length of the tunnel. Each rotary material discharging assembly includes a power motor 701, a material tray 705, and an assembly 703. The power motor 701 is mounted on a connecting seat 702, which is detachably connected to the peripheral reinforcement laying mechanism 500 and the traveling binding mechanism 600. The material tray 705 is coaxially mounted on the output shaft of the power motor 701, and the assembly 703 is coaxially fitted around the material tray 705. The assembly 703 is detachably connected to the connecting seat 702. A discharge opening 704 is provided on the side of the assembly 703 near the support frame 100. A baffle 707 is pivotally connected to both sides of the discharge opening 704. Each baffle 707 is pivotally connected to the corresponding side of the discharge opening 704 via a pivot shaft. A torsion spring is mounted on the pivot shaft, and the two ends of the torsion spring are connected to the pivot shaft and the assembly 703, respectively. When the longitudinal reinforcing bar 200 is placed between the two baffles 707, the two baffles 707 restrict the longitudinal reinforcing bar 200 to prevent the longitudinal reinforcing bar 200 from changing position on the circumferential reinforcing bar 300. During the restriction process of the baffles 707, the other moving parts of the traveling binding mechanism 600, except for the second drive motor 601, are controlled to move, so that the traveling binding mechanism 600 binds the longitudinal reinforcing bar 200. After binding is completed, the first drive motor 501 and the second drive motor 601 are controlled to move synchronously, so that the longitudinal reinforcing bar laying mechanism 700 moves circumferentially along the arched guide rail 400, and the assembly 703 moves accordingly. At this time, the baffles 707 come into contact with the bound longitudinal reinforcing bar 200, and then gradually rotate a certain angle along its pivot axis so that it passes over the longitudinal reinforcing bar 200. In this embodiment, multiple material placement channels 706 are evenly provided around the circumference of the material placement tray 705. Each material placement channel 706 extends radially along the material placement tray 705, and the ends of multiple longitudinal steel bars 200 on the same side are sequentially assembled into the corresponding material placement channel 706. In this embodiment, because the assembly 703 moves circumferentially along the arched guide rail 400, the angle of its discharge opening 704 will change accordingly. When it is in a low position on both sides of the arched guide rail 400, the discharge opening 704 is in a horizontal or slightly inclined upward state. At this time, manual assistance is required to discharge the longitudinal steel bars 200.
[0037] In this embodiment, the longitudinal reinforcement laying mechanism 700 employs two rotary discharge components spaced apart along the tunnel length. Multiple radial discharge channels 706 evenly spaced around the material tray 705 can pre-load multiple longitudinal reinforcement bars 200. When the power motor 701 drives the material tray 705 to rotate, it causes the longitudinal reinforcement bars 200 to rotate synchronously with the discharge channels 706 until they align with the discharge opening 704 of the assembly 703, achieving automatic discharge and replacing the manual single-bar loading and unloading operation. The spaced design of the dual rotary discharge components provides synchronous support and discharge for both ends of the longitudinal reinforcement bars 200, ensuring the straightness of the longitudinal reinforcement bars 200. Simultaneously, the rotary discharge enables continuous and quantitative output of the longitudinal reinforcement bars 200. Combined with the circumferential movement of the arched guide rail 400, multiple longitudinal reinforcement bars 200 can be laid sequentially along the tunnel's arc contour, significantly shortening the laying time and improving the overall construction efficiency of the reinforcement skeleton. This forms a highly efficient assembly line operation with the circumferential reinforcement laying and reinforcement binding.
[0038] In this embodiment, the material placement tray 705 has uniformly spaced material channels 706 along its circumference, and the material channels 706 extend radially, ensuring that the pre-installed longitudinal steel bars 200 maintain a uniform circumferential spacing. When the power motor 701 drives the material placement tray 705 to rotate at a constant speed, each longitudinal steel bar 200 can be precisely aligned with the discharge notch 704 at a preset angle, achieving automatic discharge at equal intervals. This fundamentally solves the problem of uneven spacing and positional deviation of the longitudinal steel bars 200 caused by visual errors and operational deviations in traditional manual laying. At the same time, two rotating material discharge components are spaced apart along the tunnel length direction, synchronously discharging and positioning both ends of the longitudinal steel bars 200, avoiding the skewness and bending of the steel bars caused by single-end positioning. This ensures that the longitudinal steel bars 200 are laid straight along the tunnel longitudinal direction, forming regular intersection nodes with the circumferential steel bars 300, providing a stable working foundation for the subsequent precise binding of the traveling binding mechanism 600, and improving the forming accuracy of the entire steel bar skeleton. In addition, the radial design of the material placement channel 706 is adapted to the placement requirements of the longitudinal steel bars 200, which can effectively limit the ends of the steel bars and prevent them from slipping or shifting during the rotating material discharge process, thus further ensuring the accuracy of the material discharge positioning.
[0039] The longitudinal reinforcement laying mechanism 700 is equipped with pivotally connected baffles 707 on both sides of the discharge notch 704 of the matching 703, and a torsion spring reset structure. When the longitudinal reinforcement 200 is laid between the two baffles 707, the elastic force of the torsion spring keeps the baffles 707 in a closed state, firmly restricting the longitudinal reinforcement 200 in a preset position, effectively preventing circumferential and longitudinal displacement of the reinforcement on the circumferential reinforcement 300, and ensuring the fixed position of the reinforcement intersection. The binding operation is completed in the limited position, allowing the traveling binding mechanism 600 to accurately align with the intersection point, ensuring the stability of the binding quality. After binding, when the longitudinal reinforcement laying mechanism 700 moves circumferentially with the arched guide rail 400, the baffles 707 contact the bound longitudinal reinforcement 200, rotate around the pivot axis under external force and compress the torsion spring, smoothly passing over the reinforcement. After the movement is completed, the reset force of the torsion spring returns the baffles 707 to the initial limited position, preparing for the discharge limit of the next longitudinal reinforcement 200. This linkage structure enables continuous operation of automatic limiting, binding and fixing, and automatic resetting without manual intervention. It ensures the positioning stability of the longitudinal steel bars 200 without affecting the continuous operation of the equipment, making the connection between material discharge and binding processes smoother.
[0040] When the longitudinal reinforcement laying mechanism 700 moves circumferentially with the arched guide rail 400, the angle of the discharge notch 704 of the matching 703 will change with the curvature of the arched guide rail 400. When the arched guide rail 400 is at a low position on both sides, the discharge notch 704 is horizontal or slightly inclined upwards, which can easily cause problems such as jamming of the longitudinal reinforcement 200 and poor discharge in automated material feeding. In view of this working condition, this embodiment does not forcibly design a complex automated material feeding auxiliary structure, but takes advantage of the convenience of manual operation at a low position and adopts a manual assisted material feeding form, forming a flexible operation mode of high-level automated material feeding and low-level manual assisted material feeding. This approach avoids the problems of increased equipment costs, higher failure rates, and greater debugging difficulties caused by complex auxiliary structures, simplifies the equipment structure, and improves the operational reliability of the equipment in actual construction. It also leverages the convenience of low-position operation to allow construction personnel to quickly complete auxiliary material unloading. The operation is simple and time-saving, and it does not affect the overall efficiency of automated operation. It is perfectly adapted to the full-track construction conditions of the 400 arched guide rail at the tunnel entrance, and solves the problem of insufficient adaptability of a single automated mode to different working conditions at high and low positions.
[0041] Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the claims of the present invention.
Claims
1. A construction device for binding steel reinforcement cages at tunnel entrances, characterized in that: It includes two arched guide rails that are spaced apart outside the mountain and located at the tunnel entrance along the extension direction of the tunnel. Each of the arched guide rails extends circumferentially along the tunnel. Between the two arched guide rails, a circumferential reinforcement laying mechanism and a traveling binding mechanism are installed at intervals along the laying direction of the circumferential reinforcement. Between the circumferential reinforcement laying mechanism and the traveling binding mechanism, a longitudinal reinforcement laying mechanism is installed. Multiple longitudinal reinforcement bars are provided on the longitudinal reinforcement laying mechanism.
2. The tunnel portal steel reinforcement cage binding construction device according to claim 1, characterized in that: The circumferential reinforcement laying mechanism includes two first traveling parts that are assembled one-to-one with two arched guide rails, and a laying part is installed between the two first traveling parts. Multiple circumferential reinforcement bars pass through the laying part at intervals along the extension direction of the tunnel.
3. The tunnel portal steel reinforcement cage binding construction device according to claim 2, characterized in that: The first traveling part includes a first slider slidably mounted on an arched guide rail, a first drive motor mounted on the first slider, a first traveling wheel mounted on the output shaft of the first drive motor, the first traveling wheel being drivenly connected to the arched guide rail and being able to move along the guide of the arched guide rail, and the two ends of the laying part being respectively connected to two first sliders.
4. The tunnel portal steel reinforcement cage binding construction device according to claim 3, characterized in that: A first driving component is installed on the first slider, and a first adapter is installed on the driving end of the first driving component. The laying part is detachably connected to the first adapter, and the first driving component is used to drive the first adapter to move closer to or away from the support frame.
5. The tunnel portal steel reinforcement cage binding construction device according to claim 2, characterized in that: The laying section includes a longitudinal reinforcement plate extending along the length of the tunnel, and a plurality of reinforcement holes are spaced apart along the length of the longitudinal reinforcement plate, through which the circumferential reinforcement bars pass.
6. The tunnel portal steel reinforcement cage binding construction device according to claim 1, characterized in that: The traveling binding mechanism includes two second traveling parts that are fitted one-to-one with two arched guide rails, and a binding part is installed between the two second traveling parts.
7. The tunnel portal steel reinforcement cage binding construction device according to claim 6, characterized in that: The second traveling part includes a second slider that is slidably mounted on an arched guide rail, a second drive motor that is mounted on the second slider, a second traveling wheel that is mounted on the output shaft of the second drive motor, the second traveling wheel that is connected to the arched guide rail and can move along the guide rail, and the two ends of the binding part are respectively connected to the two second sliders.
8. The tunnel portal steel reinforcement cage binding construction device according to claim 7, characterized in that: A second driving component is installed on the second slider, and a second adapter is installed on the driving end of the second driving component. The binding part is detachably connected to the second adapter, and the second driving component is used to drive the second adapter to move closer to or away from the support frame.
9. A tunnel portal steel reinforcement cage binding construction device according to claim 7, characterized in that: The binding part includes a longitudinal guide rail extending along the length direction of the tunnel, and a plurality of linear slides are mounted on the longitudinal guide rail at intervals along its length direction. An alignment drive member extending toward the circumferential reinforcement laying mechanism is installed on each of the linear slides, and a binding machine is installed at the drive end of the alignment drive member.
10. A tunnel portal steel reinforcement cage binding construction device according to claim 1, characterized in that: The longitudinal reinforcement laying mechanism includes two rotary material discharge assemblies spaced apart along the tunnel length. Each rotary material discharge assembly includes a power motor connected to the peripheral reinforcement laying mechanism and the traveling binding mechanism via a connecting seat. A material placement tray is coaxially mounted on the output shaft of the power motor. An assembly is coaxially fitted around the material placement tray. The assembly is detachably connected to the connecting seat. A material discharge notch is provided on the side of the assembly near the support frame. Multiple material placement channels are evenly provided around the material placement tray. Each material placement channel extends radially along the material placement tray. One end of each longitudinal reinforcement is placed in the corresponding material placement channel.