A weld-free initial support arch and anchor structure for gas tunnels and its application method
By using a weld-free initial support arch and anchor structure for gas tunnels, and forming an integral structure with bolted connections, the safety hazards and engineering durability issues in the construction of underground tunnels in gas strata have been resolved, achieving safe and reliable tunnel support.
Patent Information
- Application Number
- CN202611519468.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-29
- Publication Date
- 2026-11-17
AI Technical Summary
In existing technologies, welding operations during the construction of underground tunnels in gas-bearing strata are prone to causing gas explosions, resulting in safety hazards and reducing the durability of the project, and failing to effectively protect existing tunnels from deformation.
The gas tunnel adopts a non-welding initial support arch and anchor structure. By connecting components such as steel plates, guide pipes, connecting rings and annular open steel strips, and using bolts for connection and fastening, an integral structure is formed, avoiding welding fixation.
It enables weld-free tunnel support in gas-bearing strata, reducing safety risks, protecting the structural integrity of existing tunnels, and improving the durability of the project.
Smart Images

Figure CN123109727A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of building engineering technology, and in particular to a non-welded initial support arch frame and anchor bolt structure for gas tunnels and its application method. Background Technology
[0002] With the continuous advancement of infrastructure construction in my country, the existing railway and highway tunnels are becoming increasingly saturated. To alleviate regional traffic pressure, shallow-buried cut-and-cover tunneling methods are frequently used in mountain tunnel projects. As road network planning continues to expand, tunnel construction routes inevitably traverse coal-bearing and gas-rich strata. Gas is highly flammable and explosive; welding or hot work at the tunnel face can easily lead to major safety accidents, posing extremely high construction risks. Therefore, the research and application of tunnel support systems that eliminate the need for hot work is of crucial practical significance for cut-and-cover tunnel construction in gas-rich strata.
[0003] Currently, conventional construction techniques primarily involve welding, which connects and fixes pre-conduit guide pipes, longitudinal connecting bars, steel mesh, anchor bolts, and the steel arch frame body. When this technique is applied to tunnels excavated in gas-filled strata, welding sparks can easily ignite and explode the gas inside the tunnel. This can not only cause fatal injuries to on-site workers but also damage the existing support structure, reduce the overall durability of the project, and create long-term safety hazards for the tunnel's entire operation cycle.
[0004] To address this issue, a weld-free initial support arch and anchor structure for gas tunnels, along with its application method, is designed to provide a technical solution to the aforementioned technical problems. Summary of the Invention
[0005] Based on this, it is necessary to provide a non-welded initial support arch and anchor structure for gas tunnels and its usage method to address the above-mentioned technical problems. This is to solve the technical problem in the prior art that when crossing or passing under existing tunnels, it is necessary to fix the joints by welding or other methods, while the reinforced body cannot completely protect the deformation of the existing tunnel.
[0006] To solve the above-mentioned technical problems, the present invention adopts the following technical solution: A non-welded initial support arch and anchor structure for a gas tunnel, comprising: The main arch frame, composed of multiple segments, is used for initial support of the tunnel. Connecting steel plates are welded to the ends of each segment for connecting adjacent segments; The guide tube, welded to the inside of the segment, is used to insert the pre-support small guide tube or anchor bolt; The connecting ring, welded to the side edge of the segment, is used to position the C-shaped longitudinal connecting rib. An annular open steel strip is welded to both sides of the segment corresponding to the anchor bolt, and is used to position the anchor bolt or small guide pipe.
[0007] As a preferred embodiment of the gas tunnel weld-free initial support arch and anchor structure provided by the present invention, each of the connecting steel plates has threaded holes at both ends for mating, which are used to connect two adjacent segments as a whole by the cooperation of bolts and corresponding bolt holes.
[0008] As a preferred embodiment of the gas tunnel weld-free initial support arch and anchor structure provided by the present invention, the inclination angle of the guide pipe is the same as the angle of the advanced small guide pipe or the advanced anchor.
[0009] In a preferred embodiment of the gas tunnel weld-free initial support arch and anchor structure provided by the present invention, the C-shaped longitudinal connecting bar is a common ribbed steel bar.
[0010] As a preferred embodiment of the gas tunnel weld-free initial support arch and anchor structure provided by the present invention, the two ends of the C-shaped longitudinal connecting bar are processed into 90° hooks in the same direction.
[0011] As a preferred embodiment of the gas tunnel weld-free initial support arch and anchor structure provided by the present invention, the outer edge of the segment is welded with a fixing buckle for fixing the steel mesh.
[0012] A method for using a weld-free initial support arch frame and anchor bolt structure in a gas tunnel, the steps of which are as follows: S1: After the gas-containing tunnel is excavated, the main arch frame, which does not require on-site welding, is installed at the working face according to the design requirements. The connecting steel plates between two adjacent segments of each main arch frame are connected by bolts to form a whole. S2: After the adjacent segments are connected, drive the advance anchor bolt or advance small guide pipe towards the working face through the guide pipe; S3: The segment where the anchor bolt is located is driven into the working face on both sides through the annular open steel strip, and bolts are used to tighten it after installation to prevent displacement, forming an integral whole with the main arch frame; S4: After the main arch frame is erected, C-shaped longitudinal connecting bars are inserted into the side edges of the segment, and connecting rings for inserting C-shaped longitudinal connecting bars are welded to connect the initial support arch frame into a whole. S5: After the overall construction is completed in S4, initial shotcrete is applied to form the initial support.
[0013] It is clear without a doubt that the technical problems to be solved by the present invention can be solved by the above-described technical solutions of the present invention.
[0014] Meanwhile, through the above technical solutions, the present invention has at least the following beneficial effects: The present invention provides a non-welded initial support arch frame and anchor structure for gas tunnels and its application method. By connecting steel plates and bolts, multiple segments can be combined to form the main body of the arch frame, thus eliminating the need for welding to fix the contact positions, and can be applied to tunnels containing gas. The guide tube allows for the insertion of advanced anchor bolts or advanced small guide tubes towards the working face, and the annular open steel allows for the insertion of locking anchor bolts into both sides of the working face. This enables bolts to be used to fasten the anchors and prevent displacement, thus forming a unified whole with the main arch frame. The initial support arch frame is connected as a whole by welding connecting rings to the side edges of the segment through C-shaped longitudinal connecting bars. Attached Figure Description
[0015] To more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0016] Figure 1 This is a schematic diagram of the overall structure of the present invention; Figure 2 This is a schematic diagram of the connecting steel plate structure of the present invention; Figure 3 This is a schematic diagram of the guide tube of the present invention; Figure 4 This is a schematic diagram of the structure of the annular open steel strip of the present invention; Figure 5 This is a schematic diagram of the C-type longitudinal connecting rib of the present invention.
[0017] In the diagram: 1. Connecting steel plate; 2. Guide tube; 3. Connecting ring; 4. C-shaped longitudinal connecting rib; 5. Annular open steel strip. Detailed Implementation
[0018] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention.
[0019] To enable those skilled in the art to better understand the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings.
[0020] It should be noted that, unless otherwise specified, the embodiments and features and technical solutions in the present invention can be combined with each other.
[0021] It should be noted that similar labels and letters in the following figures indicate similar items. Therefore, once an item is defined in one figure, it does not need to be further defined and explained in subsequent figures.
[0022] Reference Figures 1-5 A non-welded initial support arch and anchor structure for a gas tunnel, comprising: The main arch frame is composed of multiple segments and is used for the initial support of the tunnel. It is further divided into different segments according to the size of the tunnel cross section and the construction process. Preferably, the main body of the arch frame is a tunnel initial support steel frame assembled from integral H-beams or steel bars; Connecting steel plate 1 is welded to the end of each segment to connect two adjacent segments, thereby fixing the end of each segment by welding before entering the construction site; Preferably, each connecting steel plate 1 has threaded holes at both ends for mating, which are used to connect two adjacent segments as a whole by bolts and corresponding bolt holes. This allows the two adjacent segments to be connected by bolts entering the threaded holes on the corresponding connecting steel plate 1 to achieve assembly, thus eliminating the need for on-site welding.
[0023] Guide pipe 2 is welded to the inside of the segment. Before entering the construction site, guide pipe 2 is fixed to the inside of each segment by welding in advance for inserting advanced support small guide pipes or anchor bolts. Preferably, the inclination angle of the guide tube 2 is the same as the angle of the advanced small guide tube or the advanced anchor rod. When in use, the advanced anchor rod or the advanced small guide tube is driven into the working face through the guide tube 2.
[0024] The connecting ring 3 is welded to the side edge of the segment and is used to position the C-shaped longitudinal connecting rib 4, so that the welding position of the connecting ring 3 can be determined according to the spacing of the C-shaped longitudinal connecting rib 4. Preferably, the C-shaped longitudinal connecting bar 4 is a regular ribbed steel bar with both ends processed into 90° hooks in the same direction, and the straight section in the middle is processed according to the arch frame spacing. When in use, it is horizontally and alternately inserted into the connecting ring 3 welded to the side edge of the initial support arch frame segment.
[0025] The fixing clips are welded to the outer edge of the segment to cooperate with the steel clips to fix the steel mesh, and can be used to make the steel skeleton arch frame not welded as needed.
[0026] Annular open steel strips 5 are welded to both sides of the segment corresponding to the anchor bolt, and the annular open steel strips 5 welded to both sides of the segment are arranged in pairs. The open ends of the annular open steel strips 5 are fastened with bolts to position the anchor bolt or small guide tube. After the anchor bolt or small guide tube is inserted, it is fastened with bolts to prevent displacement. The buckling angle is the same as the anchor bolt angle required by the design.
[0027] In this embodiment, each structure has its own service life. In actual manufacturing and application, the corresponding structure made of different materials can be replaced according to the needs of use.
[0028] Example 2 Based on the above embodiment one, a method for using a weld-free initial support arch frame and anchor bolt structure in a gas tunnel is disclosed, the steps of which are as follows: Step 1: After the gas-containing tunnel is excavated, the main arch frame, which does not require on-site welding, is installed at the tunnel face according to the design requirements. The connecting steel plates 1 between two adjacent segments of each main arch frame are connected together with bolts to form a whole. Step 2: After the adjacent segments are connected, drive the advance anchor bolt or advance small guide pipe into the face direction through the guide pipe 2; Step 3: For the segment where the anchor bolt is located, drive the anchor bolt into both sides of the working face through the annular open steel strip 5, and after the installation is completed, use bolts to tighten it to prevent displacement, so as to form an integral whole with the main body of the arch frame; Step 4: After the main arch frame is erected, C-shaped longitudinal connecting bars 4 are inserted into the side edge of the segment and connecting rings 3 for inserting C-shaped longitudinal connecting bars 4 are welded to connect the initial support arch frame into a whole; at the same time, when using H-shaped steel arch frames, the steel mesh is fixed with tie wire to the outer edge of the segment and fixed clips for fixing the steel mesh are welded in. Step 5: After the overall construction is completed in Step 4, initial shotcrete is applied to form the initial support.
[0029] The preferred embodiments of the present invention disclosed above are merely illustrative of the invention. These preferred embodiments do not exhaustively describe all details, nor do they limit the invention to the specific implementations described. Clearly, many modifications and variations can be made based on the content of this specification. This specification selects and specifically describes these embodiments to better explain the principles and practical applications of the invention, thereby enabling those skilled in the art to better understand and utilize the invention. The invention is limited only by the claims and their full scope and equivalents.
Claims
1. A weld-free initial support arch and anchor structure for a gas tunnel, characterized in that, include: The main arch frame, composed of multiple segments, is used for initial support of the tunnel. Connecting steel plates (1) are welded to the ends of each segment for connecting adjacent segments; Guide tube (2), welded to the inside of the segment, is used to insert the pre-support small guide tube or anchor bolt; The connecting ring (3) is welded to the side edge of the segment and is used to position the C-shaped longitudinal connecting rib (4). An annular open steel strip (5) is welded to both sides of the segment corresponding to the anchor bolt, and is used to position the anchor bolt or small guide pipe.
2. The gas tunnel weld-free initial support arch and anchor structure according to claim 1, characterized in that, Each of the connecting steel plates (1) has threaded holes at both ends for mating, which are used to connect two adjacent segments as a whole by using bolts and corresponding bolt holes.
3. The gas tunnel weld-free initial support arch and anchor structure according to claim 1, characterized in that, The tilt angle of the guide tube (2) is the same as that of the advanced small guide tube or the advanced anchor rod.
4. The gas tunnel weld-free initial support arch and anchor structure according to claim 1, characterized in that, The C-shaped longitudinal connecting bar (4) is a regular ribbed steel bar.
5. The gas tunnel weld-free initial support arch and anchor structure according to claim 4, characterized in that, The two ends of the C-shaped longitudinal connecting bar (4) are processed into 90° hooks in the same direction.
6. The gas tunnel weld-free initial support arch and anchor structure according to claim 4, characterized in that, The outer edge of the segment is welded with fixing clips to secure the reinforcing mesh.
7. A method of using a weldless initial support arch and anchor structure for a gas tunnel, applicable to the weldless initial support arch and anchor structure for a gas tunnel as described in any one of claims 1-6, characterized in that, The steps are as follows: S1: After the gas-containing tunnel is excavated, the main body of the arch frame, which does not require on-site welding, is installed at the working face according to the design requirements, and the connecting steel plates (1) between two adjacent segments of each main body of the arch frame are connected together by bolts to form a whole; S2: After the adjacent segments are connected, drive the advance anchor or advance small guide pipe into the face direction through the guide pipe (2); S3: The segment where the anchor rod is located is driven into the working face on both sides through the annular open steel strip (5), and bolts are used to tighten it after the installation to prevent displacement, so as to form an integral whole with the main body of the arch frame; S4: After the main arch frame is erected, C-shaped longitudinal connecting bars (4) are inserted into the side edge of the segment and a connecting ring (3) for inserting C-shaped longitudinal connecting bars (4) is welded to connect the initial support arch frame as a whole. S5: After the overall construction is completed in S4, initial shotcrete is applied to form the initial support.