A method for arranging precast pipe piles

By generating a three-dimensional geological model and optimizing the selection of precast pipe pile combinations, the problem of determining the length and quantity of precast pipe piles was solved, realizing a rapid and optimized pile arrangement scheme, reducing material waste and the number of piles, and improving construction efficiency and the rationality of project investment.

CN123116624APending Publication Date: 2026-11-17CHANGJIANG SURVEY PLANNING DESIGN & RES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611453374.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-18
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing technologies make it difficult to quickly and effectively determine the appropriate pile length and quantity for precast pipe piles, which may lead to problems such as excessively long piles resulting in waste or excessively short piles resulting in too many splices, affecting project investment and construction period.

Method used

By generating a three-dimensional geological model, using three-dimensional design software to calculate the design pile length for each pile location, combining the length of precast pipe piles, enumerating candidate combinations, optimizing and screening the optimal pile combination, reducing the number of pile cuts and splices, and using automated calculation rules to achieve rapid pile matching.

Benefits of technology

This enabled a rapid and optimized pile configuration scheme, reduced material waste, controlled the number of piles, and improved construction efficiency and the rationality of project investment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123116624A_ABST
    Figure CN123116624A_ABST
Patent Text Reader

Abstract

This invention discloses a method for arranging precast pipe piles, comprising: 1) obtaining the design pile length at each foundation pipe pile location; 2) calculating candidate combinations of precast pipe piles at each foundation pipe pile location based on the design pile length; 3) obtaining the optimal pile arrangement combination at each foundation pipe pile location based on the candidate combinations; and 4) obtaining the overall pile arrangement scheme and completing the pile arrangement table based on the optimal pile arrangement combination at each foundation pipe pile location. This invention can reduce (or avoid) pile cutting while controlling the number of pile splices within a reasonable range, and has the advantages of high speed, high result optimization, and reduced manual intervention.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of building engineering structural technology, and specifically relates to a method for assembling precast pipe piles. Background Technology

[0002] Precast pipe piles refer to piles that are prefabricated in a precast component processing plant, transported to the construction site, driven into the ground using a piling machine, and then have a foundation beam (slab) poured on top of the pile. They are frequently used as a foundation construction method in building engineering. Precast pipe piles are classified according to materials, including wooden piles, concrete square piles, prestressed concrete pipe piles, and steel piles. In the domestic construction field, the most commonly used precast pipe piles are mainly precast concrete piles and steel piles. Precast concrete piles can withstand large loads, are strong and durable, and have a fast construction speed, making them one of the most widely used pile types. Commonly used types include solid concrete square piles and prestressed concrete hollow pipe piles. Steel piles mainly include steel pipe piles and H-shaped steel piles. This invention focuses primarily on precast concrete piles.

[0003] During the construction of precast pipe piles, the pile tip generally needs to reach the bearing stratum depth. However, due to the complex geological conditions and uncertainties in the bearing stratum elevation at some large and medium-sized construction sites, there may be situations where piles are too long, resulting in waste from pile cutting, or too short, leading to excessive pile splicing. Therefore, finding a reasonable pile arrangement method that minimizes (or avoids) pile cutting while controlling the number of splices within a reasonable range, achieving precise pile arrangement, and thus resolving the issues of project investment and construction schedule, is essential.

[0004] Currently, the main pile placement methods primarily utilize information technology (such as software platform systems) to obtain the elevation of the bearing layer at each pile location using data from the project's topography, geology, GIS (Geographic Information System), and BIM (Building Information Modeling) 3D models, thereby calculating the design pile length for each pile location. However, current pile placement methods lack a rapid and effective approach to determine the appropriate pile length and quantity for each location, making it difficult to obtain an optimized or even optimal pile placement scheme. This is a significant shortcoming of current main pile placement methods. Summary of the Invention

[0005] The purpose of this invention is to overcome the shortcomings of the prior art and provide a method for assembling precast pipe piles that is fast, has high result optimization, and reduces manual intervention.

[0006] To achieve the above objectives, the present invention employs a rapid pile placement method for precast pipe piles, the method comprising the following steps: 1) Obtain the design pile length at each foundation pipe pile location; 2) Based on the designed pile length of each foundation pipe pile location, calculate the candidate combinations of precast pipe piles for each foundation pipe pile location; 3) Based on the candidate combinations of precast pipe piles at each foundation pipe pile location, obtain the optimal pile combination for each foundation pipe pile location; 4) Summarize the optimal pile combination for each foundation pipe pile location to generate the overall pile combination scheme and pile combination table.

[0007] Further, the specific process of 1) is as follows: a three-dimensional geological model containing the bearing stratum surface is generated using the geological survey data of the project; the three-dimensional geological model is imported into three-dimensional design software (such as CATIA, Revit, MicroStation, etc.); the bearing stratum elevation data of each foundation pipe pile location is obtained (through scripts or plug-in tools); and the set of design pile lengths for all foundation pipe pile locations is obtained. h (s) ={ h 1, h 2, ..., h s},in, S This is the total number of foundation pipe piles. h i For the first i The design pile length for each foundation pipe pile location, and 0 < h i ≤ h MAX , i Take 1, 2, 3, ... S , h MAX This is the maximum design pile length.

[0008] Furthermore, the specific process of 2) is as follows: Based on the designed pile length at each foundation pipe pile location, and in conjunction with the pre-set pile length of the precast pipe pile... , , , The lengths of the three precast pipe piles are respectively (pre-set according to the specifications of commonly used finished pipe piles in the project), and Calculate the candidate combinations of precast pipe piles for each foundation pipe pile location; the specific calculation process is as follows: Get the i Design pile length at each foundation pipe pile location ,according to Calculate each combination of values ​​one by one , ∈ {0, 1, 2, 3}; if satisfying and Then Adding candidate combinations of precast pipe piles In, among them, They represent the first iAmong the candidate combinations of precast pipe piles at the foundation pipe pile locations, the first... j The length of the pile in the combination of values ​​is Y 1. Y 2. Y The number of precast pipe piles with a rating of 3.

[0009] Furthermore, the specific process of 3) is as follows: right For each combination, calculate the pile cutting length for each combination. Take the combination with the shortest pile length. The primary optimization objective is to minimize or avoid material waste during pile cutting, thereby achieving material conservation.

[0010] If the combination with the shortest pile cutting length is not unique, the number of piles to be matched is taken. The smallest group is selected as the optimal pile combination. When the number of pile segments is the same, priority should be given to reducing the number of pile segments to reduce the number of joints, thus balancing construction efficiency and joint quality control.

[0011] Furthermore, the precast pipe pile is a precast concrete pile, including solid concrete square piles or prestressed concrete hollow pipe piles.

[0012] The precast pipe pile arrangement method of the present invention takes the designed pile length and the precast pipe pile length of each pile position as prerequisites, and quickly obtains the pile arrangement combination of each pile position through calculation, so as to realize the overall optimized pile arrangement scheme of precast pipe piles, thereby controlling the number of pile splices within a reasonable range while minimizing (or avoiding) pile cutting.

[0013] Compared with the prior art, the beneficial effects of the present invention are as follows: 1. By enumerating a limited number of precast pile combinations and automatically selecting the optimal pile combination based on the dual-objective optimization rule of minimizing pile cuts and joints, the pile combination scheme has high optimization performance. It can reduce (or avoid) pile cuts while controlling the number of splices within a reasonable range, taking into account both project investment and construction period. 2. With clear calculation rules, the pile arrangement scheme can be quickly calculated and optimized as a whole. The pile arrangement is fast and requires less manual intervention, which can efficiently handle the pile arrangement needs of a large number of pile positions. 3. It can be developed and implemented based on existing computer equipment with 3D data processing capabilities, without the need for large amounts of capital and manpower research and development costs, and is easy to promote and use in architectural engineering design, engineering cost calculation, and architectural engineering construction. Attached Figure Description

[0014] Figure 1 This is a schematic diagram of the overall process of the precast pipe pile arrangement method of the present invention; Figure 2 Calculate the first for the present invention iA flowchart illustrating the candidate combinations of precast piles at each pile location; Figure 3 Calculate the first for the present invention i A flowchart illustrating the optimal pile combination for each precast pile location; Figure 4 This is a schematic diagram of the pile arrangement method for the precast pipe piles of the present invention; Figure 5 This is a schematic diagram of existing pile arrangement methods. Detailed Implementation

[0015] The present invention will now be described in further detail with reference to the accompanying drawings and specific embodiments.

[0016] In the description of this invention, it should be noted that the terms "first," "second," and "third" are used for descriptive purposes only and should not be construed as indicating or implying relative importance.

[0017] Example 1 like Figure 1 The pile arrangement method for the precast pipe piles shown includes the following steps: S1) Obtain the design pile length at each foundation pipe pile location. A 3D geological model containing the bearing stratum surface is generated from the project's geological survey data. This model is then imported into 3D design software (such as CATIA, Revit, Microstation, etc.). Scripts or plug-in tools are used to obtain the bearing stratum elevation data for each foundation pile location, resulting in a set of design pile lengths for all foundation pile locations. h (s) ={ h 1, h 2, ..., h s},in, S This is the total number of foundation pipe piles. h i For the first i The design pile length for each foundation pipe pile location, and 0 < h i ≤ h MAX , i Take 1, 2, 3, ... S , h MAX This is the maximum design pile length.

[0018] S2) Based on the designed pile length at each foundation pipe pile location, and in conjunction with the pre-set precast pipe pile length... , , , The lengths of the three precast pipe piles are respectively: Calculate candidate combinations of precast pipe piles for each foundation pipe pile location; combine Figure 2 The specific calculation process shown is as follows: S201) Obtain the first i Design pile length at each foundation pipe pile location ; S202) According to Calculate each combination of values ​​one by one , ∈ {0, 1, 2, 3}; S203) Judgment and If the condition is met, proceed to S204; otherwise, proceed to S205. S204) will Adding candidate combinations of precast pipe piles In, among them, They represent the first i Among the candidate combinations of precast pipe piles at the foundation pipe pile locations, the first... j The length of the pile in the combination of values ​​is Y 1. Y 2. Y The number of precast pipe piles of type 3; S205) Judgment (If all value combinations have been calculated, proceed to S206; otherwise, proceed to S202). S206) Output the first i All candidate pile combinations at each pile location And move to the next pile (i.e., the first pile). i Calculation of candidate pile positions (+1).

[0019] 3) Based on the candidate combinations of precast pipe piles at each foundation pipe pile location, obtain the optimal pile combination for each foundation pipe pile location; combined with... Figure 3 The specific process shown is as follows: Step S301) Input the first i All candidate pile combinations at each pile location : ; Step S302) Traversal calculation and obtain When the minimum value is obtained ; Step S303) Determine (If the value is unique, proceed to S306; otherwise, proceed to S304). Step S304) Calculate the number of piles by iterating through the piles. Take the number of piles The smallest group; Step S305) Output And move to the next pile (i.e., the first pile). i Calculation of the optimal pile combination for candidate pile positions (+1). Step S306) Output And move to the next pile (i.e., the first pile). i Calculate the optimal pile combination for candidate pile positions (+1).

[0020] 4) Based on the optimal pile combination at each foundation pipe pile location, obtain the overall pile arrangement scheme and complete the pile arrangement table.

[0021] like Figure 4 , Figure 5 As shown, in this example, the designed pile length is 26 meters. Without using the optimization method of this invention, if two 15-meter-long precast pipe piles are directly used, it would require cutting 4 meters of the pile (e.g., Figure 5 As shown), this results in material loss; if the method of this invention is used, then one precast pipe pile with a length of 11 meters and another with a length of 15 meters are used respectively, thus eliminating the need for pile cutting (as shown). Figure 4 (As shown).

[0022] Using the method of this invention, pile allocation was performed on the pile allocation table for 10 pile locations in a certain project. The specific results are shown in Table 1.

[0023] Table 1 Examples of pile configuration Finally, it should be noted that the above description, in conjunction with specific embodiments, provides a further detailed explanation of the invention, and should not be construed as limiting the specific implementation of the invention to these descriptions. For those skilled in the art, any simple substitutions made without departing from the inventive concept should be considered within the scope of protection of this invention.

Claims

1. A method for assembling precast pipe piles, characterized in that: The method includes the following steps: 1) Obtain the design pile length at each foundation pipe pile location; 2) Based on the designed pile length of each foundation pipe pile location, calculate the candidate combinations of precast pipe piles for each foundation pipe pile location; 3) Based on the candidate combinations of precast pipe piles at each foundation pipe pile location, obtain the optimal pile combination for each foundation pipe pile location; 4) Summarize the optimal pile combination for each foundation pipe pile location to generate the overall pile combination scheme and pile combination table.

2. The method for arranging precast pipe piles according to claim 1, characterized in that: The specific process of 1) is as follows: a three-dimensional geological model containing the bearing stratum surface is generated using the geological survey data of the project; the three-dimensional geological model is imported into three-dimensional design software; the bearing stratum elevation data of each foundation pipe pile location is obtained; and the set of design pile lengths for all foundation pipe pile locations is obtained. h (s) ={ h 1, h 2, ..., h s }, in, S This is the total number of foundation pipe piles. h i For the first i The design pile length for each foundation pipe pile location, and 0 < h i ≤ h MAX , i Take 1, 2, 3, ... S , h MAX This is the maximum design pile length.

3. The method for arranging precast pipe piles according to claim 1, characterized in that: The specific process of 2) is as follows: Based on the designed pile length at each foundation pipe pile location, and in conjunction with the pre-set pile length of the precast pipe pile... , , , The lengths of the three precast pipe piles are respectively: Calculate the candidate combinations of precast pipe piles for each foundation pipe pile location; the specific calculation process is as follows: Get the i Design pile length at each foundation pipe pile location ,according to Calculate each combination of values ​​one by one , ∈ {0, 1, 2, 3}; if satisfying and Then Adding candidate combinations of precast pipe piles In, among them, They represent the first i Among the candidate combinations of precast pipe piles at the foundation pipe pile locations, the first... j The length of the pile for each value combination is Y 1. Y 2. Y The number of precast pipe piles with a rating of 3.

4. The method for arranging precast pipe piles according to claim 3, characterized in that: The specific process of 3) is as follows: right For each combination, calculate the pile cutting length for each combination. Take the combination with the shortest pile length. .

5. The method for arranging precast pipe piles according to claim 4, characterized in that: If the combination with the shortest pile cutting length is not unique, the number of piles to be matched is taken. The smallest group is selected as the optimal pile combination. .

6. The method for arranging precast pipe piles according to claim 1, characterized in that: The precast pipe piles are precast concrete piles, including solid concrete square piles or prestressed concrete hollow pipe piles.